SU1062407A1 - Method of erecting a partition in full-up work - Google Patents

Method of erecting a partition in full-up work Download PDF

Info

Publication number
SU1062407A1
SU1062407A1 SU813283022A SU3283022A SU1062407A1 SU 1062407 A1 SU1062407 A1 SU 1062407A1 SU 813283022 A SU813283022 A SU 813283022A SU 3283022 A SU3283022 A SU 3283022A SU 1062407 A1 SU1062407 A1 SU 1062407A1
Authority
SU
USSR - Soviet Union
Prior art keywords
vacuum
fence
layer
development
filling
Prior art date
Application number
SU813283022A
Other languages
Russian (ru)
Inventor
Шаим Успанович Кунакбаев
Original Assignee
Kunakbaev Shaim U
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunakbaev Shaim U filed Critical Kunakbaev Shaim U
Priority to SU813283022A priority Critical patent/SU1062407A1/en
Application granted granted Critical
Publication of SU1062407A1 publication Critical patent/SU1062407A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

СПОСОБ ВОЗВЕДЕНИЯ ПЕРЕМЫЧКИ ПРИ ЗАКЛАДОЧНЫХ РАБОТАХ, включающий установку ограждени  в выработке , подачу твердеющей закладочной смеf , ( 1J си к ограждению при заполнении ею выработанного пространства и послойное упрочнение образующегос  возле ограждени  закладочного массива на площади, равной площади основани  перемычки, по мере подъема уровн  закладочного массива в выработке , отличающийс  тем, что, с целью упрощени  технологии возведени  и сокращени  затрат, при установке ограждени  на месте возведени  перемычки- размещают с интервалами вакуум-трубки, а также вакуум-щит, подключенные к вакуум-насосу, и по мере подъема уровн  закладочного массива в выработке вакуум-трубки и вакуум-щит перемещают от почвы до кровли с одновременным их вибрированием. сл 05 ю 4 J fMETHOD OF CONSTRUCTING THE LINKAGE DURING PLATING WORKS, including installation of a fence in the development, supply of hardening filling mortar, (1J si to the fence when it fills the worked-out space and layer-by-layer hardening of the formation around the fence of the backfill array in an area equal to the area of the jumper base to the extent of the lift. in the development, characterized in that, in order to simplify the construction technology and reduce costs, when installing a fence at the construction site, jumpers are placed with and interval the vacuum tube and the vacuum shield connected to a vacuum pump, and at least a layer of filling mass recovery in the development of vacuum tube and the vacuum panel is moved from the ground to the roof with them while vibrating. slab 05 w 4 J f

Description

Изобретейие относитс  к горной промышленности и может быть использовано при разработке месторождений полезных ископаемых с закладкой выработанного пространства . Известен способ возведени  бетонной перемычки при закладочных работах, включающий установку в горной выработке опалубки и подачу за нее твердеющей смеси 1. Недостатком указанного способа  вл ютс  большие трудовые и материальные затраты на ее возведение. Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ возведени  перемычки при закладочных работах, включающий установку ограждени  в выработке, подачу твердеющей закладочной смеси к ограждению при заполнении ею выработанного пространства и послойное упрочнение образующегос  возле ограждени  закладочного масси1 а на площади, равной площади основани  перемычки по мере подъема уровн  закладочного массива в выработке, при этом упрочнение закладочного массива производ т 1утем нагнетани  в твердеющую смесь быстротвердеющего раствора 2. Недостатками известного способа  вл ютс  сложность технологии и повышенные трудовые и материальные затраты, что св зано с необходимостью доставки в жущего в шахту, применением специального оборудовани  н дополнительным расходом в жущего материала. Целью изобретени   вл етс  упрощение техноло1ии возведени  и сокращение затрат . LUvib досгигаетс  тем, что согласно способу возведени  перемычки при закладочных работах, включающему установку ограждени  в выработке, подачу твердеющей закладочной смеси к ограждению при заполнении ею выработанного пространства и послойное упрочнение образующегос  возле ограждени  закладочного массива на площади, равной Г1о опи1ди основани  перемычки, по мере подъема уровн  закладочного массива в выработке , при установке ограждени  на месте возведени  перемычки размещают с интервалами вакуум-трубки и вакуум-щит, под к„-1юченные к вакуум-насосу, а по мере подъема уровн  закладочного массива в выработке вакуу.м-трубки и вакуум-щит перемещают от почвы до кровли с одновременным их вибрированием . На чертеже изображена схема возведе;;1;  бетонной перемычки (вертикальный, поперечный разрез перемычки). Пример. Перед закладкой заполн емой выработки 1 между почвой и кровлей изолируемой выработки 2 устанавливают ограждение . Например раздвижные направл ющие 3 вакуум-щита 4. Дл  чего, например, в углублени  кровли и почвы выработки 2 уста и ;;. и п,;; ют концы направл ющих 3 и рас7 крепл ют их с помощью винтового домкрата , вмонтированного в раздвижное устройство . Затем на направл ющие 3 устанавливают вакуум-щит 4 (вакуум-щит - опалубку ). На которой закреплены вакуум-трубки 5 и вакуум-полость 6 с возможностью перемещени  вверх - вниз при помощи подвижных втулок 7 и подъемного устройства, состо щего из блочков 8, троса 9 и лебедки 10. В данном в куум-п1.ите вакуум-полость 6 соединена с вакуум-трубками 5 и служит коллектором дл  сбора и удалени  отсасываемой воды через армированный проволокой щланг 11, который подключаетс  к вакуум-насосу . На вакуум-щит - опалубку неподвижно закрепл етс  пневмовибратор 12. Место сопр жени  вакуум-щита с боковыми стенками выработки герметизируетс  от просачивани  жидкой закладки резиновыми фартуками на концах вакуум-щита. Вакуум-трубки к вакуум-щиту можно прикрепл ть с помощью резьбового соединени  дл  обеспечени  возможности сборки -- разборки при повторном использовании. Закладочную смесь 13, поступающую на почву заполн емой выработки 1, обезвоживают сло ми. Высота сло  определ етс  расчетным путем и зависит от скорости подъема уровн  смеси, производительности обезвоживани  смеси и высоты вакуум-щита 4. Врем  эффективного обезвоживани  одного сло  может составл ть 5-10 мин. Высоту сло  и рассто ние между вакуум-трубками рекомендуетс  принимать 15-20 см. Скорость подъема уровн  смеси в выработке на практике не превышает 30-50 см в час. Поэтому обезвоживание можно осуществл ть при сравнительно небольщой производительности вакуум-насоса. Вакуумирование ведетс  совместно с вибрированием вакуумщита и вакуум-трубок, что способствует увеличению пропускной способности фильтра и лучщему уплотнению обезвоженной смеси. После окончани  обезвоживани  сло , вакуум-насос отключают и передвигают вакуум-щит на рассто ние высоты сло  вверх, и снова включают вакуум-насос. Пневмовибратор работает посто нно. Вибраци  вакуум-трубок способствует также облегчению передвижени  их вверх, после окончани  цикла обезвоживани , а также заполнению полости в смеси. Подъем вакуум-щита производитс  при помощи лебедки 10, наматывающей трос 9, через блочки 8. Так как между вакуум-трубками образуютс  слои, степень обезвоживани  которых меньше, чем слоев у трубок, то образуютс  вертикальные слои переменной прочности, параллельные оси выработки, что уменьшает проницаемость массива перемычки взрывным волнам, которые передаютс  с боковых стенок выработки.The invention relates to the mining industry and can be used in the development of mineral deposits with the laying of the goaf. A known method of erecting a concrete lintel during backfilling works, including the installation of formwork in the mine workings and the supply of hardening mixture for it. The disadvantage of this method is the large labor and material costs of its construction. The closest to the invention to the technical essence and the achieved result is a method of erecting a jumper during filling operations, including installing a barrier in the making, supplying a hardening filling mixture to the fence when it fills the developed space and layer-by-layer hardening of the forming mass in the area equal to the area the base of the jumper as the level of the backfill array rises in the mine, while the backfill array is hardened by the first injection in a hardening mixture of a quick-hardening solution 2. The disadvantages of this method are the complexity of the technology and the increased labor and material costs, which is associated with the need to deliver it to the mine through the use of special equipment and additional consumption of the melting material. The aim of the invention is to simplify construction technology and reduce costs. LUvib is achieved by the fact that, according to the method of erecting a jumper during filling operations, including installing a barrier in working out, supplying hardening filling mixture to the fence when it fills the developed space and layer-by-layer hardening of the formation near the fence of the backfill array on an area equal to the space of the jumper and the lintel, the layer will have a jumper layer, and the layer will be covered by the jumper in the jumper area of the jumper in the jumper area. the level of the backfill array in the mine, when installing a fence at the construction site, the jumpers are placed at intervals of the vacuum tube and the vacuum shield, under the "-1" to akuum-pump and at least a layer of filling mass in the formulation vakuu.m lifting tube and the vacuum panel is moved from the ground to the roof with them while vibrating. The drawing shows a diagram of the erection ;; 1; concrete lintel (vertical, cross-section lintel). Example. Before laying the filling of the excavation 1 between the soil and the roof of the insulated excavation 2, a fence is established. For example, sliding guides 3 of a vacuum shield 4. For example, in the recesses of the roof and soil, 2 mouths and 2 are made ;;. and n, ;; the ends of the guides 3 are fastened and fastened by means of a screw jack mounted in the sliding device. Then a vacuum shield 4 is installed on the guides 3 (vacuum shield - formwork). On which the vacuum tubes 5 and the vacuum cavity 6 are fixed with the possibility of moving up and down using movable bushings 7 and a lifting device consisting of blocks 8, cable 9 and a winch 10. In this one in Qum P., create a vacuum cavity 6 is connected to vacuum tubes 5 and serves as a collector for collecting and removing sucked water through wire-reinforced hose 11, which is connected to a vacuum pump. A pneumatic vibrator 12 is fixed onto the vacuum shield - formwork. The interface between the vacuum shield and the side walls of the excavation is sealed against the leakage of the liquid rubber sheet with rubber aprons at the ends of the vacuum shield. Vacuum tubes can be attached to a vacuum shield using a threaded joint to allow for assembly / disassembly when reused. The backfill mixture 13 entering the soil of the filling development 1 is dehydrated by layers. The height of the bed is determined by calculation and depends on the rate of rise of the level of the mixture, the dewatering capacity of the mixture and the height of the vacuum shield 4. The time for effective dewatering of one layer may be 5-10 minutes. The height of the layer and the distance between the vacuum tubes are recommended to be 15–20 cm. In practice, the rate of raising the level of the mixture in production does not exceed 30–50 cm per hour. Therefore, the dewatering can be carried out with a relatively low productivity of the vacuum pump. Vacuuming is carried out in conjunction with the vibrating of the vacuum shield and vacuum tubes, which contributes to an increase in the filter capacity and a better compaction of the dehydrated mixture. After the dehydration of the bed is finished, the vacuum pump is turned off and the vacuum shield is moved up to the height of the bed upwards, and the vacuum pump is turned on again. Pneumatic vibrator operates continuously. The vibration of the vacuum tubes also facilitates their movement upwards, after the end of the dewatering cycle, as well as filling the cavity in the mixture. The vacuum shield is raised using a winch 10, winding the cable 9 through blocks 8. As layers are formed between the vacuum tubes, the degree of dehydration of which is less than the layers of the tubes, vertical layers of varying strength are formed parallel to the working axis, which reduces the permeability of the jumper array to blast waves that are transmitted from the side walls of the excavation.

При удалении из закладочной смеси 20- 30% воды, она приобретает свойства твердого тела, т.е. сохран ет приданную ей при обезвоживании форму, что позвол ет перемычке из обезвоженной смеси, при ширине основани  2-3 м и более, сдерживать гидростатическое и динамическое давление необезвоженной закладочной смеси.When 20–30% of water is removed from the filling mixture, it acquires the properties of a solid, i.e. It retains the shape given to it during dehydration, which allows a jumper from the dehydrated mixture, with a base width of 2-3 m or more, to hold in place the hydrostatic and dynamic pressure of the dehydrated filling mixture.

После заполнени  выработки до кровли и одновременно окончани  возведени  перемычки , демонтируют направл ющие 3, отдел ют их от вакуум-щита 4. Включив вибратор 12, вынимают из перемычки вакуумтрубки 5 и промывают фильтры водой. После этого оборудование используетс  повторно . Дл  обеспечени  возможности возведени  перемычек в различных выработках, вакуум-щит делаетс  секционным.After filling the excavation to the roof and at the same time ending the construction of the jumper, the guides 3 are removed, separated from the vacuum shield 4. After turning on the vibrator 12, the vacuum tube 5 is removed from the jumper and washed with water. After that, the equipment is reused. To enable the erection of jumpers in various workings, the vacuum shield is made sectional.

Предлагаемый способ возведени  бетонной перемычки обеспечивает высокую производительность , что достигаетс  приготовлением материала дл  возведени  перемычки на механизированных закладочных комплексах непрерывного действи  (расположенных на поверхности рудника) одновременно с процессом закладки. Дл  транспорта смеси к месту возве ени  перемычки используетс  трубопроводный транспорт, при этом разгружаетс  клетевой ствол и рельсовые пути в щахте.The proposed method of erecting a concrete lintel provides high performance, which is achieved by preparing a material for erecting a lintel on mechanized stowing complexes of continuous action (located on the surface of the mine) simultaneously with the laying process. A pipeline transport is used to transport the mixture to the point where the jumper is built, and the cage shaft and rail tracks are unloaded in the Schachte.

Так как производительность подачи смеси больша  и длина вакуум-трубок может достигать 3-5 м, то толщину бетонной перемычки можно принимать такую, что прочность и устойчивость перемычки будут иметь практически любой коэффициент надежности.Since the mixture delivery capacity is large and the length of the vacuum tubes can reach 3-5 m, the thickness of the concrete lintel can be taken such that the strength and stability of the lintel will have almost any reliability coefficient.

Claims (1)

СПОСОБ ВОЗВЕДЕНИЯ ПЕРЕМЫЧКИ ПРИ ЗАКЛАДОЧНЫХ РАБОТАХ, включающий установку ограждения в выработке, подачу твердеющей закладочной сме- си к ограждению при заполнении ею выработанного пространства и послойное упрочнение образующегося возле ограждения закладочного массива на площади, равной площади основания перемычки, по мере подъема уровня закладочного массива в выработке, отличающийся тем, что, с целью упрощения технологии возведения и сокращения затрат, при установке ограждения на месте возведения перемычки- размещают с интервалами вакуум-трубки, а также вакуум-щит, подключенные к вакуум-насосу, и по мере подъема уровня закладочного массива в выработке вакуум-трубки и вакуум-щит перемещают от почвы до кровли с одновременным их вибрированием.METHOD FOR ESTABLISHING A JUMPER FOR LAYING WORKS, including installing a fence in the excavation, supplying a hardening filling mixture to the fence when it fills the worked out space and layer-by-layer hardening of the filling array formed near the fence in an area equal to the area of the foundation of the bridge in the development of the filling array in the working out , characterized in that, in order to simplify the construction technology and reduce costs, when installing fencing at the construction site, jumpers are placed at intervals the vacuum tube, as well as the vacuum shield connected to the vacuum pump, and as the level of the filling array rises in the development of the vacuum tube and the vacuum shield are moved from the soil to the roof while vibrating.
SU813283022A 1981-03-27 1981-03-27 Method of erecting a partition in full-up work SU1062407A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813283022A SU1062407A1 (en) 1981-03-27 1981-03-27 Method of erecting a partition in full-up work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813283022A SU1062407A1 (en) 1981-03-27 1981-03-27 Method of erecting a partition in full-up work

Publications (1)

Publication Number Publication Date
SU1062407A1 true SU1062407A1 (en) 1983-12-23

Family

ID=20956030

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813283022A SU1062407A1 (en) 1981-03-27 1981-03-27 Method of erecting a partition in full-up work

Country Status (1)

Country Link
SU (1) SU1062407A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Байконуров О. А. и др. Технологи добычи руд с твердеющей закладкой. М., «Недра, 1979, с. 103-105. 2. Авторское свидетельство СССР по за вке № 2935130/22-03, кл. Е 21 F 15/00, 1980. *

Similar Documents

Publication Publication Date Title
CN108035335A (en) A kind of construction freezing method well shaft type underground parking garage method
CN111350202A (en) Novel assembly type anchoring structure capable of being used as dewatering well and support and construction method
CN106437737B (en) Pipe jacking type coal mine small-section roadway tunneling method
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN111173038B (en) Construction process of vertical shaft
WO2018133740A1 (en) Underground building and construction method for same
CN107700474A (en) A kind of existing construction foundation reinforcement means and campshed formula diaphram wall
CN113089652A (en) Occlusive pile construction method and reinforced structure
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN110847929B (en) Tunnel portal section pre-reinforcing and excavating construction method based on partition blasting
CN112392049A (en) Excavation construction method for deep foundation pit in weak stratum
CN116335757A (en) Filling retaining wall with negative poisson ratio structure and construction method thereof
CN110552371A (en) Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method
CN113529765A (en) Rapid precipitation construction method of anti-floating anchor rod
CN103469828A (en) Construction method of hydrophobic structure of post-cast strip of bottom plate of basement
SU1062407A1 (en) Method of erecting a partition in full-up work
CN210216452U (en) Old excavation supporting system reinforced structure
CN111779004A (en) Construction process for fast supporting high slope of broken rock by strong unloading
CN109024669B (en) Steel jacket box split construction pipe trench method
CN110863856A (en) Road-entering type cemented filling plugging wall and construction method thereof
KR102171437B1 (en) Construction method of panel for pedestrian block
CN210315908U (en) Immersed tube type inspection well
CN2311520Y (en) Bulkhead apparatus for continuous digging bored concrete pile hole
CN113202509B (en) Construction process for complex tunnel foundation treatment
CN112267893B (en) Construction method of large-section tunnel