SU1031884A1 - Bridge-type crane - Google Patents

Bridge-type crane Download PDF

Info

Publication number
SU1031884A1
SU1031884A1 SU813371559A SU3371559A SU1031884A1 SU 1031884 A1 SU1031884 A1 SU 1031884A1 SU 813371559 A SU813371559 A SU 813371559A SU 3371559 A SU3371559 A SU 3371559A SU 1031884 A1 SU1031884 A1 SU 1031884A1
Authority
SU
USSR - Soviet Union
Prior art keywords
span
unloading
crane
tension
tension nut
Prior art date
Application number
SU813371559A
Other languages
Russian (ru)
Inventor
Игорь Александрович Елисеев
Николай Владимирович Карталов
Николай Иванович Харитонов
Николай Николаевич Харитонов
Original Assignee
Тульский Ордена Трудового Красного Знамени Политехнический Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Тульский Ордена Трудового Красного Знамени Политехнический Институт filed Critical Тульский Ордена Трудового Красного Знамени Политехнический Институт
Priority to SU813371559A priority Critical patent/SU1031884A1/en
Application granted granted Critical
Publication of SU1031884A1 publication Critical patent/SU1031884A1/en

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

КРАН МОСТОВОГО ТИПА, содержащий пролетное строение с установленной на нем грузовой тележкой и устройство дл  разгрузки пролетного строени  от поперечного изгиба, включающее контакты, установленные по кра м нижнего по са пролетного строени , и соедин ющую их т гу, один конец которой выполнен резьбовым и снабжен нат жной гайкой, отличающийс  тем, что, с целью снижени  металлоемкости крана, устройство дл  разгрузки пролетного строени  от поперечного изгиба снабжено закрепленным на пролетном строении приводом перемещени  нат жной гайки, включающим шаговый двигатель, редуктор и установленную на выходном валу редуктора муфту, взаимодействующую с упом нутой нат жной гайкой, причем на нижнем по се пролетного строени  закреплен датчик деформаций, электрически соединенный через блок управлени  с щаговым двигателем .A BRIDGE TYPE CRANE, containing a span with a loading trolley mounted on it and a device for unloading the span from transverse bending, including contacts mounted along the edges of the bottom span of the span, and connecting them with a spindle, one end of which is threaded and provided tension nut, characterized in that, in order to reduce the metal capacity of the crane, the device for unloading the span from the transverse bend is provided with a tension-moving drive mounted on the span structure nuts, including a stepper motor, a reducer and a coupling mounted on the output shaft of the reducer, which cooperates with the tension nut, and a strain gauge fixed electrically connected to the pinch motor on the lower half of the span structure.

Description

Изобретение относитс  к подъемно-транспортному машиностроению, а именно к конструкци м кранов мостового типа с устройством дл  разгрузки пролетного строени  от поперечного изгиба.The invention relates to a lifting and transport machinery, namely, to structures of bridge-type cranes with a device for unloading the span from transverse bending.

Известен кран мостового типа, содержащий пролетное строение с установленной на нем грузовой тележкой и устройство дл  разгрузки пролетного строени  от поперечного изгиба, включающее кронштейны, установленные по кра м нижнего по са пролетного строени , и содин ющую их т гу, один конец которой выполнен резьбовым и снбажен нат жной гайкой 1.A bridge-type crane is known, comprising a span structure with a loading trolley mounted on it and a device for unloading the span structure from a transverse bend, including brackets mounted along the edges of the lower span structure, and connecting them with a thread, tension nut 1.

Недостатком известного крана  вл етс  повышенна  металлоемкость вследствие независимости разгружающего момента от величины и положени  временной нагрузки на кран.A disadvantage of the known crane is the increased metal consumption due to the independence of the unloading moment from the size and position of the temporary load on the crane.

Цель изобретени  - снижение металлоемкости крана.The purpose of the invention is to reduce the metal capacity of the crane.

Поставленна  цель достигаетс  тем, что в кране мостового типа, содержащем пролетное строение с установленной на нем грузовой тележкой и устройство дл  разгрузки пролетного строени  от поперечного изгиба, включающее кронштейны, установленные по кра м нижнего по са пролетного строени , и соедин ющую их т гу , один конец которой выполнен резьбовым и снабжен нат жной гайкой, устройство дл  разгрузки пролетного строени  от поперечного изгиба снабжено закрепленным на пролетном строении приводом перемещени  нат жной гайки, включающим шаговый двигатель, редуктор и установленную на выходном валу редуктора муфту, взаимодействующую с упом нутой нат жной гайкой, причем на нижнем по се пролетного строени  закреплен датчик деформаций , электрически соединенный через блок управлени  с шаговым двигателем.The goal is achieved by the fact that in a bridge-type crane containing a superstructure with a cargo trolley mounted on it and a device for unloading the superstructure from transverse bending, including brackets installed along the edges of the lower superstructure, and connecting them to one end of which is threaded and provided with a tension nut, a device for unloading the span from transverse bending is fitted with a tension-moving drive mounted on the span, including a shaft A motor, a gearbox and a coupling mounted on the output shaft of the gearbox, which cooperates with the tension nut, and a strain gauge mounted electrically connected to the stepper motor on the lower half of the span structure.

На фиг. 1 изображен кран мостового типа , общий вид; на фиг. 2 - узел I на фиг. 1.FIG. 1 shows a bridge crane, general view; in fig. 2 — node I in FIG. one.

Кран мостового типа содержит пролетное строение 1 с устанновленной на нем грузовой тележкой 2 и устройство дл  разгрузки пролетного строени  от поперечного изгиба. Последнее включает в себ  кронштейны 3 и 4, установленные по кра м нижнего по са пролетного строени , и соедин ющую их т гу 5, один конец которой закреплен посредством стопорной гайки 6 в кронштейне 3, а другой выполнен резьбовым и снабжен нат жной гайкой 7.The bridge-type crane contains a span structure 1 with a loading trolley 2 installed on it and a device for unloading the span structure from a transverse bend. The latter includes brackets 3 and 4, mounted along the edges of the lower span structure, and connecting them to a string 5, one end of which is fixed by means of a lock nut 6 in the bracket 3, and the other is threaded and provided with a tension nut 7.

Устройство дл  разгрузки пролетного строени  снабжено закрепленным на пролетном строении приводом перемещени  нат жной гайки, включающим шаговый двигатель 8, редуктор 9 и установленную на выходном валу редуктора муфту 10, взаимодействующую с нат жной гайкой. На нижнем по се пролетного строени  закреплен датчик 11 деформаций, электрически сое диненный через блок 12 управлени  с шаговым двигателем. Т г 5 может быть несколько с расположением их по ширине нижнего по са пролетного строени . Между гай кой 7 и кронштейном 4 может быть установ лен упорный подшипник 13 дл  облегчени The device for unloading the superstructure is equipped with a drive for moving a tension nut fixed on the superstructure, including a stepper motor 8, a gearbox 9 and a coupling 10 mounted on the output shaft of the gearbox and interacting with the tension nut. A strain sensor 11, electrically connected through a control unit 12 with a stepper motor, is fixed on the lower superstructure. T g 5 may be somewhat with their location across the width of the lower span structure. Between nut 7 and bracket 4 a thrust bearing 13 can be mounted to facilitate

5 конструкции.5 designs.

Кран работает следующим образом. Без нагрузки производитс  предваритель ное напр жение пролетного строени  1 и настройка блока 12 управлени . Предварительное напр жение пролетного строени Crane works as follows. Without load, the prestressing of the span 1 and the adjustment of the control unit 12 are made. Span prestressing

0 осуществл етс  нат жением т ги 5 при помощи стопорной гайки 6 и гайки 7, котора  навинчиваетс  на резьбовой конец т ги. Нат жение осуществл етс  до тех пор, пока не возникнут сжимающие напр жени  в0 is carried out by pulling the gi 5 with the help of the locking nut 6 and the nut 7, which is screwed onto the threaded end of the gi. Tension takes place until a compressive stress occurs in

5 нижнем по се пролетного строени . Стопорна  гайка 6 фиксируетс  в этом положении, а нат жна  гайка 7 при помощи соединительной муфты 10 соедин етс  с устройством дл  регулировани  усили  в т ге, причем в этом положении включени  щагового дви0 гател  8 не происходит.5 lower over the span. The locking nut 6 is fixed in this position, and the tension nut 7 is connected with a device for adjusting the force in the pull rod with the help of the coupling 10, and in this position the firing motor 8 is not engaged.

При нагружении крана нагрузкой с датчика 11 деформаций подаетс  сигнал в блок 12 управлени , соединенный с обмотками управлени  шагового двигател , последний включаетс  и передает крут щий моментWhen loading the crane with a load from the deformation sensor 11, a signal is sent to the control unit 12 connected to the control windings of the stepper motor, the latter is turned on and transmits the torque

через редуктор и соединительную муфту нат жной гайке, котора , навинчива сь на резьбовые концы т ги, усиливает ее нат жение , вследствие чего увеличиваетс  разгружающий момент.through a reducer and a coupling nut, a tension nut, which, screwing onto the threaded ends of the rod, increases its tension, as a result of which the unloading moment increases.

Таким образом, увеличение или уменьшение нагрузки, действующей на пролетное строение, а также изменение ее положени  приводит к навинчиванию или отвинчиванию нат жных гаек, т. е. к увеличению или уменьшению разгружающего момента.Thus, an increase or decrease in the load acting on the span, as well as a change in its position, leads to screwing in or unscrewing the tension nuts, i.e., to increasing or decreasing the unloading moment.

5 Использование изобретени  позволит снизить металлоемкость пролетного строени  крана, обеспечить более эффективную его разгрузку от действи  переменной по величине и положению вертикальной нагрузки на кран.5 The use of the invention will make it possible to reduce the metal consumption of the crane span, to ensure its more efficient unloading from the action of a variable in magnitude and position of the vertical load on the crane.

8eight

cpus.Zcpus.Z

Claims (1)

КРАН МОСТОВОГО ТИПА, содержащий пролетное строение с установленной на нем грузовой тележкой и устройство для разгрузки пролетного строения от поперечного изгиба, включающее контакты, установленные по краям нижнего пояса про летного строения, и соединяющую их тягу, один конец которой выполнен резьбовым и снабжен натяжной гайкой, отличающийся тем, что, с целью снижения металлоемкости крана, устройство для разгрузки пролетного строения от поперечного изгиба снабжено закрепленным на пролетном строении приводом перемещения натяжной гайки, включающим шаговый двигатель, редуктор и установленную на выходном валу редуктора муфту, взаимодействующую с упомянутой натяжной гайкой, причем на нижнем поясе пролетного строения закреплен датчик деформаций, электрически соединенный через блок управления с шаговым двигателем.A BRIDGE-type CRANE containing a span with a load trolley mounted on it and a device for unloading the span from a transverse bend, including contacts mounted along the edges of the lower belt of the span and connecting their rod, one end of which is threaded and equipped with a tension nut, characterized in that, in order to reduce the metal consumption of the crane, the device for unloading the span from the transverse bend is equipped with a drive to move the tension nut fixed on the span, including a stepper motor, gearbox and a clutch mounted on the output shaft of the gearbox interacting with the said tension nut, and a deformation sensor is fixed to the lower span of the span, electrically connected through the control unit to the stepper motor.
SU813371559A 1981-12-23 1981-12-23 Bridge-type crane SU1031884A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813371559A SU1031884A1 (en) 1981-12-23 1981-12-23 Bridge-type crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813371559A SU1031884A1 (en) 1981-12-23 1981-12-23 Bridge-type crane

Publications (1)

Publication Number Publication Date
SU1031884A1 true SU1031884A1 (en) 1983-07-30

Family

ID=20988650

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813371559A SU1031884A1 (en) 1981-12-23 1981-12-23 Bridge-type crane

Country Status (1)

Country Link
SU (1) SU1031884A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. За вка JP № 47-42973, кл. 83 F 3, 1973 (прототип). *

Similar Documents

Publication Publication Date Title
SU1031884A1 (en) Bridge-type crane
SE456154B (en) PRESSURE MODULATOR FOR BLOCK-PROTECTED BRAKE SYSTEM IN FORDON SPEC WITH AN ELECTROMAGNETIC MANOVERABLE FRICTION COUPLING
NZ224384A (en) Power operated windlass; motor rotation in one direction frees windlass
US4782961A (en) Crane
SU1031883A1 (en) Bridge-type crane
SU914479A1 (en) Rope tension limiting device
SU1092132A1 (en) Crane
SU1505885A1 (en) Winch
SU1602848A2 (en) Apparatus for controlling winches of grab-bucket crane
SU1183443A1 (en) Device for checking rope tension
SU1723007A1 (en) Load-hoisting device
SU867855A1 (en) Limit switch of load-handling device
SU616222A1 (en) Apparatus for stabilizing bridge-type crane motion
RU1768493C (en) Crane load-carrying capability limiter
SU1504416A1 (en) Clamp for rope
SU488652A1 (en) Device for pulling ingot on semi-continuous casting plants
RU1770255C (en) Crane grip overlift safeguard
SU1576417A1 (en) Arrangement for cleaning shipъs side in dock
RU2034766C1 (en) Lift speed limiter
SU1084237A2 (en) Hand-operated winch
JPS6222825Y2 (en)
SU440330A1 (en) Bridge Cranes Limiter
SU1013394A1 (en) Crane travelling gear
SU423624A1 (en) JOINT OF TASKING ORGAN OF REMOTE COPYING MANIPULATOR
SU1100211A2 (en) Speed limiter for load-handling apparatus