SU1030299A1 - Method for launching sea platform - Google Patents

Method for launching sea platform Download PDF

Info

Publication number
SU1030299A1
SU1030299A1 SU813340923A SU3340923A SU1030299A1 SU 1030299 A1 SU1030299 A1 SU 1030299A1 SU 813340923 A SU813340923 A SU 813340923A SU 3340923 A SU3340923 A SU 3340923A SU 1030299 A1 SU1030299 A1 SU 1030299A1
Authority
SU
USSR - Soviet Union
Prior art keywords
platform
transfer device
under
water
slipway
Prior art date
Application number
SU813340923A
Other languages
Russian (ru)
Inventor
Юрий Федорович Сенькин
Original Assignee
Senkin Yurij F
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Senkin Yurij F filed Critical Senkin Yurij F
Priority to SU813340923K priority Critical patent/SU1139669A1/en
Priority to SU813340923A priority patent/SU1030299A1/en
Application granted granted Critical
Publication of SU1030299A1 publication Critical patent/SU1030299A1/en

Links

Landscapes

  • Intermediate Stations On Conveyors (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

СПОСОБ СПУСКА ПЛАВУЧЕЙ МОРС-; КОЙ ПЛАТФОРМЫ, имеющий опорные ко ., с использованием стапельных тележек, на которых ее перемещают с горизонтального стапельного места на передаточное устройство, а затем на воду, отличающийс  тем, что, с целью повышени  эффективности его технологических операций, после перемещени  платформы на передаточное устройство опускают на грунт колонны, поднимают ее над стапельными тележками и вывод т последние изпод нее, а затем дебалластируют передаточное .устройство и вывод т его из-под платформы, которую затем на колоннах опускают на воду. (О G СА:) О Ю СО соMETHOD OF SLIPPING FLOATING SEAS; WHICH PLATFORMS, having supporting chambers, with the use of slipway carts, on which it is moved from a horizontal building berth to a transfer device, and then onto water, characterized in that, in order to increase the efficiency of its technological operations, after moving the platform to the transfer device on the ground of the column, lift it above the slipways and remove the latter from under it, and then devalast the transfer device and remove it from under the platform, which is then lowered onto the columns ode. (O G SA :) O Yu SO

Description

Изобретение относитс  к спуску . судов, в--частности самоподъемных плавучих морских платформ дл  разведки и добычи нефти в море.This invention relates to a descent. vessels, in particular self-climbing floating offshore platforms for exploration and production of oil at sea.

Известен способ спуска судна со стапел  на воду, при котором его передают с горизонтального стапельного места на стапель-палубу передаточного плавучего дока который затем, прин в балласт, опускает ; судно на воду 1.There is a method of launching a ship from the stocks to the water, in which it is transferred from the horizontal berth to the slipway-deck of the transfer floating dock, which then, having been received into the ballast, lowers it; ship on water 1.

Известен способ спуска -плавучей морской.платформы, имеющей опорные колонны, с использованием стапельтных тележек, на которых ее перемещают с горизонтального стапельного, места на передаточное устройство, а затем на воду 2..The known method of descent is a floating marine platform, which has supporting columns, with the use of slipway carts, on which it is moved from a horizontal slipway, to a transfer device, and then to water 2.

Недостатками указанных способов  вл ютс  высока  стоимость постройки передаточного устройства, а также потребность значительного времени и больших затрат на выполнение операции спуска.The disadvantages of these methods are the high cost of construction of the transfer device, as well as the need for considerable time and high costs for the operation of the descent.

Цель изобретени  - повышение эффективности его технологических операций.The purpose of the invention is to increase the efficiency of its technological operations.

Указанна  цель достигаетс  тем, что согласно способу спуска плавучей морской платформы, имеющей опорные колонны, с использованием стапельных тележек, на которых ее перемещают с горизонтального стапельного места на передаточное устройство, а затем на воду, после перемещени  платформы на передаточное устройство опускают на грунт колонны, поднимак т ее над стапельными тележками и вывод т последние из-под нее, а затем дебалластируют передаточное устройство и вывод т его из-под платформы, которую затем на колоннах опускают на воду. На фиг. 1 показана операци  пе редачи плавучей морской платформыThis goal is achieved in that, according to the method of launching a floating offshore platform having support columns, using slipway carts on which it is moved from a horizontal storage berth to a transfer device and then onto the water, after moving the platform to a transferring device, it is lowered onto the soil of the column, raises it above the slipway carts and removes the latter from under it, and then devalases the transfer device and removes it from under the platform, which is then lowered onto the water on the columns. FIG. 1 shows the operation of a floating offshore platform.

со стапельного места на оередаточ .Ное устройство; на фиг. 2 - операци  по выводу передаточного устройства из-под плавучей платформы.from the berth to the transfer. in fig. 2 — Operation for withdrawing a transfer device from under a floating platform.

Способ спуска платформы на воду 5 выполн етс  следующим образом.The method of launching the platform into water 5 is carried out as follows.

Передаточное устройство 1 пробуксировывают и пришвартовывают к стапельному месту, при этом ориентируютThe transfer device 1 is stalled and moored to the berth, while orienting

дего относительно опоры 2, установленной на стапельном месте, и подвод ной опоры 3, установленной на грунте. (На фиг. 2 показана ватерлини  W -Ь при нахождении передаточного устройс ства на плаву). Затем, прин в балласт , притапливают его (фиг. 2, ватерлини  Wj-Ln) и состыковывают рельсовые пути 4 стапельного места и передаточного устройства 1. После этого перемещают плавучую морскуюThe module is relative to the support 2 installed on the dock site and the underwater support 3 installed on the ground. (In Fig. 2, the waterline W –b is shown when the transfer device is afloat). Then, pring into the ballast, they heat it up (Fig. 2, waterline Wj-Ln) and join the rail tracks 4 of the berths and the transfer device 1. After that, the floating sea is moved

0 платформу 5 на стапельных тележках 6 на: передаточное устройство 1 и, опустив опорные колонны 7 на грунт, поднимают платформу над стапельными тележками и вывод т их с передаточного устройства. Затем, продув балласт , поднимают передаточное устройство 1 над опорами 2 и 3 и вывод т его из-под плавучей платформы 5. После этого опускают платформу на0 platform 5 on the slip carts 6 to: transfer device 1 and, lowering the supporting columns 7 on the ground, lift the platform above the slipways and remove them from the transfer device. Then, having blown the ballast, raise the transfer device 1 above the supports 2 and 3 and take it out from under the floating platform 5. After that, the platform is lowered onto

0 воду и поднимают с грунта колонны 7.0 water and raise from the ground columns 7.

Подъем плавучей морской платформы на стапельное место, например дл  ремонта, осуществл етс  в обратнойThe lifting of the floating offshore platform to the berth, for example for repairs, is carried out in reverse

5 последовательности.5 sequences.

Технико-экономическа  эффективность предложенного способа заключаетс  в быстроте, надежности и простоте операции спуска плавучей морс . кой платформы на воду. Предложенный способ может значительно повысить производительность труда.The technical and economic efficiency of the proposed method lies in the speed, reliability and simplicity of the operation of the descent of the floating mors. What a platform on the water. The proposed method can significantly increase productivity.

J СJ C

ТЯЗОПОО OOQOOPEYE POOL OOQOOP

Claims (1)

СПОСОБ СПУСКА ПЛАВУЧЕЙ МОРСКОЙ ПЛАТФОРМЫ, имеющей опорные ко лонны, с использованием стапельных тележек, на которых ее перемещают с горизонтального стапельного Места на передаточное устройство, а затем на воду, отличающийся тем, что, с целью повышения эффективности его технологических операций, после перемещения платформы на передаточное устройство опускают на грунт колонны, поднимают ее над стапельными тележками и выводят последние изпод нее, а затем дебалластируют передаточное устройство и выводят его из-под платформы, которую затем на колоннах опускают на воду.METHOD FOR RUNNING A FLOATING MARINE PLATFORM having supporting columns using slipway trolleys on which it is moved from a horizontal slipway to a transfer device, and then to water, characterized in that, in order to increase the efficiency of its technological operations, after moving the platform to the transmission device is lowered onto the soil of the column, it is lifted above the slipway trolleys and the latter are brought out from under it, and then the ballast device is de-ballasted and brought out from under the platform, which then on the columns lowered into the water. Р mSU„·,1030299P m SU „, 1030299
SU813340923A 1981-09-10 1981-09-10 Method for launching sea platform SU1030299A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SU813340923K SU1139669A1 (en) 1981-09-10 1981-09-10 Method of launching self-lifting floating drilling platform
SU813340923A SU1030299A1 (en) 1981-09-10 1981-09-10 Method for launching sea platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813340923A SU1030299A1 (en) 1981-09-10 1981-09-10 Method for launching sea platform

Publications (1)

Publication Number Publication Date
SU1030299A1 true SU1030299A1 (en) 1983-07-23

Family

ID=20977822

Family Applications (2)

Application Number Title Priority Date Filing Date
SU813340923K SU1139669A1 (en) 1981-09-10 1981-09-10 Method of launching self-lifting floating drilling platform
SU813340923A SU1030299A1 (en) 1981-09-10 1981-09-10 Method for launching sea platform

Family Applications Before (1)

Application Number Title Priority Date Filing Date
SU813340923K SU1139669A1 (en) 1981-09-10 1981-09-10 Method of launching self-lifting floating drilling platform

Country Status (1)

Country Link
SU (2) SU1139669A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3067047A1 (en) * 2017-06-06 2018-12-07 Ideol METHOD FOR LAUNCHING

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Пегов И.П. Первый отечественнйй спусковой ремонтный док грузоподъемностью 12500 т. - Судостроение, 1973, № 6, с. З-б. 2. Авторское свидетельство СССР по за вке 3223429/27-11, кл. В 63 В 35/44, 1-6.12.80 (прототип) . *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3067047A1 (en) * 2017-06-06 2018-12-07 Ideol METHOD FOR LAUNCHING
WO2018224770A1 (en) 2017-06-06 2018-12-13 Ideol Launching method
CN110719981A (en) * 2017-06-06 2020-01-21 伊代奥尔公司 Launching method
JP2020522429A (en) * 2017-06-06 2020-07-30 イデオルIdeol Launch method
US10967942B2 (en) 2017-06-06 2021-04-06 Ideol Launching method
CN110719981B (en) * 2017-06-06 2022-04-19 伊代奥尔公司 Launching method

Also Published As

Publication number Publication date
SU1139669A1 (en) 1985-02-15

Similar Documents

Publication Publication Date Title
US3433024A (en) Versatile marine structure
US20050158125A1 (en) Structure for the transport, installation and dismantlement of a bridge of a fixed oil platform and method for implementing said structure
US2551375A (en) Submergible drilling barge and method of operation
RU2145289C1 (en) Method and system of mooring tank ship
US4075860A (en) Mobile ship loading and unloading facility
CN110719981B (en) Launching method
US4135842A (en) Method for transporting and erecting offshore towers
US3163147A (en) Floating drilling platform
US3797438A (en) Method for the construction of floating units of great dimensions
SU1030299A1 (en) Method for launching sea platform
GB2105392A (en) Docking facilities associated with off-shore installations
RU2309221C2 (en) Marine ice-resistant adjustable platform mounting system and method for platform transportation and mounting by means of mounting system
CN107399412A (en) MOPU method of construction
RU2441799C2 (en) Method for construction of floating structures
RU2310578C1 (en) Floating transfer dock
RU2603340C1 (en) Offshore ice-resistant process platform
JPS59145688A (en) Launching/grounding system for vessel and ocean structure
SU1219448A1 (en) Transfer floating dock
US3025678A (en) Marine method
SU1068333A1 (en) Method of constructing and launching a semisubmersible floating offshore drilling rig
SU1373627A1 (en) Slipway of floating type for vessel
SU1562233A1 (en) Arrangement for lifting and launching floating craft on water
SU992303A1 (en) Method and apparatus for constructing and launching a self-raising floating platform
SU1014786A1 (en) Method of mounting support column of self-raising offshore drilling rig
SU491534A1 (en) Shipbuilding and ship repair complex