SU1024592A1 - Method of resupporting mine workings - Google Patents

Method of resupporting mine workings Download PDF

Info

Publication number
SU1024592A1
SU1024592A1 SU813247963A SU3247963A SU1024592A1 SU 1024592 A1 SU1024592 A1 SU 1024592A1 SU 813247963 A SU813247963 A SU 813247963A SU 3247963 A SU3247963 A SU 3247963A SU 1024592 A1 SU1024592 A1 SU 1024592A1
Authority
SU
USSR - Soviet Union
Prior art keywords
rocks
squeezing
injection
stratified
section
Prior art date
Application number
SU813247963A
Other languages
Russian (ru)
Inventor
Николай Петрович Бажин
Владимир Николаевич Рева
Леонид Когосович Нейман
Олег Иванович Мельников
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU813247963A priority Critical patent/SU1024592A1/en
Application granted granted Critical
Publication of SU1024592A1 publication Critical patent/SU1024592A1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

Изобретение относитс  к способам пе рекреплени  подъемных горшых выработок закрепленных рамной крепью. Известен способ прикреплени  горных выработок, включающий демонтаж крепи, расширение сечени  выработки и установку новых рам крепи l . Недостатком такого способа  вл етс  повышенна  опасность производства работ , а также их значительна  трудоемкость . Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ перекреплени горных выработок, включающий отжатие н отдельных последовательных участках вы работки расслоившихс  вокруг нее пород путем распора домкратных устройств, перестановку рамной крепи и сн тие распора 2 . Недостатком известного способа  вл етс  отсутствие улучшени  условий поддержани  выработки после ее перек- реплени , поскольку окружающие породы остаютс  разупрочненными, Целью изобретени   вл етс  повьш1ени устойчивости выработки. Поставленна  цель достигаетс  тем, что согласно способу перекреплени  горных выработок, включающему отжатие на отдельных последовательных участках выработки расслоившихс  вокруг нее пород путем, распора домкратных устройств перестановку рамной крепи и сн тие распора , отжатие пород на каждом участке производ т дважды, причем после первого отжати  распор снимают не полностью и при неполном распоре производ т нагнетание в расслоившиес  породы в жущего раствора, создание после окончани  нагнетанин второго отжати  и поддержание последнего до тех пор, пока в жущий раствор не наберет заданную прочность. При этом нагнетание раствора производ т при обеспечении распора домкрагны устройств на участках, смежных с участком нагнетани . На чертеже изображенй схема последо вательности работ по перекреплению на отдельных участках выработки, продольный разрез. Способ осуиюствл етс  следующим образом . Работы по перекреплению выработки в одновременно на трех участках 1,2 и 3, крайние из которых  вл ютс  смежными соответственно с перекрепленной 4 и деформированной 5 част ми выработки. На участке 3 производ т первое отжа- тие расслоившихс  пород в массив путем распора домкратных устройств 6, устано&ленных в межрамных промежутках, до величины ЗООО Кн. При этом сечение деформированной части выработки 5 увеличиваетс  от контура 7 до контура 8. Это увеличение может составить до 50% по- вери первоначального сечени  выработки, отмеченного контуром 9. Расслоившиес  порюды отжимают в кровле, а также при необходимости и в боках выработки, при этом происходит уплотнение пород в пределах образовавшейс  вокруг выработки зоны неупругих деформаций, расположенной между контуром деформированной выработки 5 и границей этой зоны 10. После отжати  пород производ т демонтаж рам крепи 11, На участке 2 в это врем  производ т сн тие распора домкратов 6 после перового отжати  пород. Распор снимают не полностью, чтобы не вызвать обрушени  пород. Затем на участке 2 бур т скважины и вставл ют в них трубки 12 с кондукторами , через которые произвоа т нагнетание в расслоившиес  породы в жущего раствора с помощью растворо- насоса 13, причем нагнетание начинают после отжати  пород на участке 3, Предварительное сн тие распора на участке 2 обеспечивает возможность нагнетани  оптимального объема в жущего раствора в трещины расслоившихс  пород. После окончани  нагнетани  производ т второе отжатие пород с максимальным усилием распора домкратов 6. На участке 1, где ранее было выполнено нагнетание и второе отжатие пород, в это врем  поддерживают распор и производ т перестановку рам крепи 11, Когда на участке 1 в жущий раствор в трещинах породы наберет заданную прочность , распор полностью снимают и домкраты 6 перенос т на следующий участок деформированной части выработки 5. Далее цикл работы повтор етс . Нагнетание в жущего раствора в сочетании с уплотнением пород приводит к восстановлению и.х прочности. При цапь- нейщей службе выработки после перекреплени  в случае вли ни  очистных работ напр жени  в окружающих породах повышаютс . Однако упрочненный массив, благодар  его восстановленной прочности, будет деформироватьс  в меньщей степени, вследствие чего выработка буцет устойчивее .The invention relates to methods for re-fastening lifting pot workings fixed with frame support. There is a known method of attaching mine workings, including dismounting supports, extending the cross section of generation and installing new support frames l. The disadvantage of this method is the increased danger of the work, as well as their considerable labor intensity. The closest to the invention in its technical essence and the achieved result is a method of perekreplenii mine workings, including squeezing n separate successive areas of excavation of stratified rocks around it by expanding the detachable devices, rearranging the frame support and removing the thrust 2. The disadvantage of the known method is the lack of improvement of the conditions for maintaining production after its overlap, since the surrounding rocks remain weakened. The aim of the invention is to increase the sustainability of the development. This goal is achieved by the fact that according to the method of perekreplenii mining, which includes squeezing in separate successive areas of mining stratified around it rocks by, spreading jacking devices, rearranging the frame lining and removing thrust, squeezing the rocks at each site twice, and after the first wring out it is not completely removed and in case of incomplete expansion the injection is carried out in the stratified rocks in the remaining solution, the second pressure is created after the end of the pumping and the last One day until the desired strength is gained by the mortar. At the same time, the injection of the solution is carried out while ensuring that the devices are deployed at the sites adjacent to the injection section. The drawing shows a diagram of a sequence of work on perekrepleniya on individual sections of the development, a longitudinal section. The method is carried out as follows. Work on perekreplenie production in simultaneously on three sites 1,2 and 3, the outermost of which are adjacent, respectively, with perekreplennuyu 4 and deformed 5 parts of the mine. In section 3, the first stratification of the stratified rocks into the massif is carried out by distributing the jacking devices 6, installed in the frame intervals, up to the value of ZOOO Kn. In this case, the cross section of the deformed part of the excavation 5 increases from contour 7 to contour 8. This increase can be up to 50% by believing the initial production cross section marked by contour 9. The exfoliated pores are squeezed out in the roof, and also, if necessary, in the sides of the excavation. rocks are compacted within the zone of inelastic deformations formed around the mine, located between the contour of the deformed mine 5 and the boundary of this zone 10. After the rocks are pressed, the frames of the lining 11 are dismantled. t it is produced deprotection thrust jacks 6 after urging the rock pore. Thrust is not completely removed, so as not to cause the collapse of rocks. Then, wells are drilled in section 2 and tubes 12 with conductors are inserted into them, through which injection into the stratified rocks is made in the remaining solution using a solution-pump 13, and the injection is started after pressing the rocks in section 3. Section 2 provides the opportunity to inject an optimal volume into the slurry into the cracks of the stratified rocks. After the completion of the injection, the rocks are second pressed with the maximum force of the jacks 6. The section 1, where the injection and the second rocks were pressed, was supported at this time, and the frames of the support were rearranged, 11 the rock cracks will pick up a predetermined strength, the thrust will be completely removed and the jacks 6 will be transferred to the next section of the deformed part of the mine 5. Next, the work cycle is repeated. Pumping in the slurry solution in combination with compaction of the rocks leads to the restoration of i.x strength. In the case of a core production service, after reclamation, in the event of the effect of cleaning work, the stresses in the surrounding rocks increase. However, the hardened array, due to its restored strength, will be deformed to a lesser degree, as a result of which the output of the buzet is more stable.

Claims (2)

(541 1. СПОСОБ ПЕРЕКРЕПЛЕНИЯ ГОРНЫХ ВЫРАБОТОК, включающий отжа тие на отдельных последовательных участках выработки расслоившихся вокруг нее пород путем распора домкратных устройств, перестановку рамной крепи и снятие распора, отличающийся тем, что, с целью повышения устойчивости выработки, отжатие пород на каждом участке производят дважды, причем после первого отжатия распор снимают не полностью и при неполном распоре производят нагнетав ние в расслоившиеся породы вяжущего раствора, создание после окончания нагнетания второго отжатия и поддержание последнего до тех пор, пока вяжущий раствор не наберет заданную прочность.(541 1. METHOD OF REINFORCING MINING OPERATIONS, including squeezing rock in separate successive sections of the formation of stratified rocks around it by jacking devices, moving the frame support and removing the spreader, characterized in that, in order to increase the stability of production, the rocks are pressed in each section twice, moreover, after the first squeezing, the spacers are not completely removed and, if incomplete, the injection is carried out into the stratified rocks of the cementitious mortar, the second squeezing is created after the completion of the squeezing maintaining the last as long as the binder solution attains a predetermined strength. 2. Способ по π. 1, о т л и чающийся тем, что нагнетание раствора прюизвоцят при обеспечении распора домкратных устройств на участках, смежных с участком нагнетания.2. The method according to π. 1, which includes the fact that the injection of the solution is achieved while ensuring jacking devices in the areas adjacent to the injection area.
SU813247963A 1981-02-16 1981-02-16 Method of resupporting mine workings SU1024592A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813247963A SU1024592A1 (en) 1981-02-16 1981-02-16 Method of resupporting mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813247963A SU1024592A1 (en) 1981-02-16 1981-02-16 Method of resupporting mine workings

Publications (1)

Publication Number Publication Date
SU1024592A1 true SU1024592A1 (en) 1983-06-23

Family

ID=20943041

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813247963A SU1024592A1 (en) 1981-02-16 1981-02-16 Method of resupporting mine workings

Country Status (1)

Country Link
SU (1) SU1024592A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Отраслева инструкци по применению металлических сборных железобетонных и анкерных крепей в подготовитедшых выработках угольных и сланцевых шахт. Mi, ИГД им. А. А. Скочинского, 1973, с. 30-31. 2, Авторское свидетельство СССР № 883469, кл. Е 21 D 13/02, 1980 (ntxyroTmi). *

Similar Documents

Publication Publication Date Title
CN102425454B (en) Construction method of walling and filling combined gob-side entry retaining wall body
CN103615273A (en) Square steel confined concrete arch center wall back filling bolting-grouting support system and construction method
KR20130085353A (en) Construction method for retaining wall and construction apparatus for thereof and retaining wall structure
KR20070075506A (en) Construction method of underground structure using concrete filled pipe roof and concrete wall
CN113107489A (en) High-ground-pressure three-soft coal seam along-empty crossheading advanced grouting reinforcement method
CN111577334A (en) Operating tunnel inverted arch repairing method
CN114922653A (en) Expansion and collapse mixed stratum tunnel supporting structure and construction method thereof
CN104120739A (en) Multi-pilot tunnel excavation one-off arching construction method
CN110107319A (en) A method of utilizing embedding arch shotcrete composite structure Strengthening Tunnel lining cutting
CN109578032A (en) A kind of high stress breaking surrounding rock chamber reinforcement means
CN203499695U (en) Reinforcing structure for shallow-buried tunnel in bustling urban area
SU1024592A1 (en) Method of resupporting mine workings
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN110259459B (en) Tunnel excavation construction organization method based on three-step method
WO1999019603A1 (en) Arched support structure
CN211038697U (en) Underground excavation small-section tunnel construction supporting device
CN214787376U (en) Cast-in-place and prefabricated tunnel shaft inner wall structure that combines together
CN106703878B (en) A kind of block method of the prefabricated block self locking solid wall of new concrete
CN108824450A (en) A kind of assembled deep foundation pit supporting structure and its construction method
CN213268513U (en) Outer wall structure
CN210622819U (en) Pipe shed and steel support combined supporting device
CN112682048A (en) Replacement and reinforcement construction method for newly-built tunnel to span existing tunnel at small clear distance
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
CN212614717U (en) Construction structure of rich water weak surrounding rock large-section tunnel
RU2082884C1 (en) Method of construction of deep-seated subway station