SU1010297A1 - Method of filling worked area at layerwise lowering-type working - Google Patents

Method of filling worked area at layerwise lowering-type working Download PDF

Info

Publication number
SU1010297A1
SU1010297A1 SU813341511A SU3341511A SU1010297A1 SU 1010297 A1 SU1010297 A1 SU 1010297A1 SU 813341511 A SU813341511 A SU 813341511A SU 3341511 A SU3341511 A SU 3341511A SU 1010297 A1 SU1010297 A1 SU 1010297A1
Authority
SU
USSR - Soviet Union
Prior art keywords
layer
laid
filling
layers
pipelines
Prior art date
Application number
SU813341511A
Other languages
Russian (ru)
Inventor
Илья Иванович Носкин
Галина Мефодьевна Батурина
Владимир Иванович Губин
Виталий Степанович Ботов
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Горно-Металлургический Институт Цветных Металлов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Горно-Металлургический Институт Цветных Металлов filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Горно-Металлургический Институт Цветных Металлов
Priority to SU813341511A priority Critical patent/SU1010297A1/en
Application granted granted Critical
Publication of SU1010297A1 publication Critical patent/SU1010297A1/en

Links

Abstract

1. СПОСОБ ЗАКЛАДКИ ВЫРАБОТАННОГО ПРОСТРАНСТВА ПРИ СЛОЕВОЙ ОТРАБОТКЕ В НИСХОДЯЩЕМ ПОРЯДКЕ, включающий подачу закладочной твердеющей, смеси в отрабатываемые последовательно слои по закладочному трубопроводу, уложенному ранее на почве вышера1сположенного отработанного сло , о т Яичающийс  тем, что, с целью повышени  эффективности закладочных работ путем снижени  трудозатрат на монтаж закладочного трубопровода и исключени  потерь закладочных труб, предварительно закладыг вают второй слой, затем первый, при заложении которого образуют выработки , и в них укладывают трубопроводы, закладку каждого нижележащего слой, начина  с третьего, осуществл ют через скважины, пробуренные из вырабоtn ток первого сло  в затвердевшем массиве . К) СО ч1. A method for stowing IN MINING layers in descending order, comprising: supplying a backfill settable mixtures practiced sequentially in layers on stowing line laid on the ground before the exhaust vyshera1spolozhennogo layer of t Yaichayuschiys in that in order to increase the efficiency of filling operations by reducing labor costs for installation of the filling pipeline and elimination of losses of filling pipes, preliminarily lays the second layer, then the first, with the laying of which form a generation, and they are placed in pipelines, each tab underlying layer, starting from the third, is carried out through a well drilled from vyrabotn current of the first layer in the cured array. K) SO h

Description

2. Способ по П.1, отличающийс  тем, что скважины, начина  с третьего сло , образуют путем .вдавливани  в свежеуложенную закладочную смесь цилиндрического элемента на всю мощность заложенного сло  с последующим его извлечением .2. The method according to Claim 1, characterized in that the wells, starting from the third layer, are formed by pressing a cylindrical element into the fresh layer of the backfill mixture into the newly laid filling layer and then removing it.

Изобретение относитс  к горному делу и Может быть использовано при слоевой отработке в нисход щем пор дке месторождений полезных ископа емых с закладкой выработанного пространства . Известен способ закладки вырабо танного пространства при.слоевой сэтработке в нисход щем пор дке, заключающийс  в монтаже закладочного трубопровода по вентил ционно-закладочным выработкам до закладываемо го сло  и подаче по нему в закладываемый слой твердеющей смеси } Недостатком способа  вл етс высока  трудоемкость работ, св занна  с монтажом и демонтажом труб, большим их расходом и невозможностью обеспечени  полноты закладки даже пр расположении заходок под углом 1-5° Наиболее близким к изобретению по- технической сущности и достигаемому результату  вл етс  способ закладки выработанного пространства при слоевой отработке в нисход щем пор дке, включающий подачу закладочной твердеющей смеси в отрабатываемы последовательно слои по закладочному трубопроводу, уложенному ранее на почве вышерасположенного отработанно го-сло , и состо щему .из цельных труб с промежутками на почве отработанного сло , промежутки между трубами засыпают сыпучим материалом, между промежутками возвод т дополнительные , раздел ющие отработанный слой на отсеки, перемычки, затем из промежутков уложенного ранее по почве вышерасположенного сло  трубопровода удал ют сыпучий материал, вставл ют в них переключатели потока смеси и производ т подачу твердею щей смеси последовательно в каждый отсек отработанного сло , начина  от самого дальнего по отношению к начал трубопровода, посредством переключателей потока смеси 2 . Недостатком известного способа  вл етс  низка  эффективность закладочных работ, обусловленна  большими трудозатратами по монтажу и демонтажу трубопроводов в каждом слое и каждой заходке, потерей в закла .Г, дочном массиве большого количества дефицитных труб, возведением дополнительных раздел ющих перемычек и ненадежное обеспечение полноты закЛадки . Цельизобретени  - повышение эффективности закладочных работ путем снижени  трудозатрат на монтаж закладочного трубопровода и исключени . потерь закладочных труб. , Поставленна  цель достигаетс  тем, что согласно способу, включающему подачу закладочной твердеющей смеси в отрабатываемые последовательно слои по закладочному трубопроводу , уложенному ранее на почве вышерасположенного отработанного сло , предварительно закладывают второй слой, затем первый, при залежении которого образуют выработки, и в них укладывают трубопроводы, закладку каждого нижележащего сло , начина  с третьего, осуществл ют через сква- . жины, пробуренные из выработок первого сло  в затвердевшем массиве. Кроме того, скважины, начина  с третьего сло , образуют путем вдавливани  в свежеуложенную закладочную смесь цилиндрического элемента на всю мощность заложенного сло  с после/дующим его извлечением. Сущность способа по сн емс  чертежами (фиг.13). На фиг , 1 изображена часть рудного тела, отрабатываемого сло ми в нисход щем пор дке, вертикальный разрез; на фиг.2 - разрез А-А на фиг.1; на фиг.З - разрез Б-Б на фиг.1. Отработку слоев 1- производ т в нисход щем пор дке с последующей их закладкой. Трубопровод 5 прокла31 дывают по закладочным выработкам 6,. образуемым в слое 1. гтосле предварительнои отработки и закладки сло  2. Выработки 6 образуют через интервалы , равные половине ширины заходок путем, проходки их по затвердевшей закладке известными способами или пу тем предварительной установки в выработанном пространстве первого сло  опалубки или надувных оболочек и последующей закладки остального выработанного пространства. Закладку очередного сло  3 про- извод т .следущим образом. Из выработок б оформл ют, в слое 2 скважины 7 и 8 через интервалы, обеспечивающие полное заполнение выработанного пространства и равномерное распределение твердеющей смеси по отработанному слою. Затем трубопровод $ посредством переключателей потока смеси 11 и полей 10 подсоедин ют к патрубкам 9, .закрепленным в скважинах 7. Одновременно с этим возвод т изолирующие перемычки 12 по границам каждой заходкй с подходными выра ботками 13. Затем .подают твердеющую 7 ( ттФшШш ш ,-г V .; ;- ..;. J 0}.0::. p:-:vt.4- /-:-:; ..4.,V. ;-;.ч.: 1«Л f , V :,;;/г -;&:- . :V; ;-i ;::/ :/i : ... .. .;.:й..,..,.,#... /Ь .. :::7..,. . Avr-p Ng; l. o:.g. ./ 74 смесь до,полного заполнени  заходок в слой. КонтроЯь за полнотой закладки заходок 1 и 15, например, в слое V осуществл ют через контрольные скважины 8.. После Закладки заходок 16 и 15 и твердени  в них смеси до необходимой прочности производ т отраббтку заходкй 16 сло  k. После ее отг работки оформл ют скважины 7 и 8 в ранее заложенных заходках Сло  3, возвод т изолирущие перемычки 12 и производ т ее заполнение твердеющей смесью. Аналогично производ т ; закладку, последующих слоев до полной отр аботки этажа. Использование предлагаемого способа закладки выработанного пространства при слоевой отработке в нйсход щем пор дке позволит более эффективно , вести закладочные работы с меньшими трудовыми затратами, устранить возведение дополнительных изолирущих перемычек, исключить lidcTO нную работу по монтажу йакладЬчных трубопроводов, а такжеоставление -их в-закладываемом массиве. f/I / . , .. iV ivi. Г-.1--- IV ч t « y--v.-V i;fVl -i:V .; ч . : Л ...;, ..v.. -.-: ч-7 ;-.; тМ . :f-ol . , ffy..ff: | „ -::;/: ; . rf.v «.. . в |..Г.Д r-V.iii - .. The invention relates to mining and can be used for layered mining in a descending order of mineral deposits with the laying of the goaf. There is a known method of laying the developed space in a layer-by-layer setting in descending order, which consists in mounting the filling pipeline through ventilation and filling developments to the laying layer and feeding it into the laying layer of the hardening mixture} The disadvantage of this method is the high labor intensity associated with the installation and dismantling of pipes, their large consumption and the impossibility of ensuring the completeness of the bookmark, even when arranged at 1–5 ° angles. The closest to the invention of the technical essence and The desired result is a method of laying the worked-out space in layer-by-layer mining in the downward order, which includes feeding the filling hardening mixture into the layers to be worked out successively along the filling pipeline laid earlier on the soil of the upper used layer and consisting of solid pipes with intervals of in the soil of the waste layer, the gaps between the pipes are filled with loose material, between the gaps, additional layers are separated separating the waste layer into compartments, lintels, then from The interstitial layers of the upstream layer of the pipeline, previously laid on the soil, remove the bulk material, insert the flow switches of the mixture into them, and supply the hardening mixture successively to each compartment of the waste layer, starting from the furthest from the beginning of the pipeline, using the flow switches of the mixture 2. The disadvantage of this method is the low efficiency of backfilling, due to the large labor costs for installation and dismantling of pipelines in each layer and each entry, loss in the inlet, a large array of deficient pipes, erection of additional separating jumpers and unreliable ensuring the completeness of the header. The purpose of the invention is to increase the efficiency of backfilling by reducing the labor costs for the installation of the backfill pipeline and exclusion. backfill losses. This goal is achieved by the fact that according to the method, which includes supplying a filling hardening mixture to the layers worked out successively through a filling pipeline laid earlier on the soil of the upper waste layer, a second layer is pre-laid, then the first layer, which is formed when the deposit is laid, and pipelines are laid in them The laying of each underlying layer, beginning with the third, is carried out through the well. gin drilled from the workings of the first layer in the solidified array. In addition, the wells, starting from the third layer, are formed by pressing a cylindrical element into the freshly laid filling mixture of the full thickness of the bedded layer with its subsequent extraction. The essence of the method is illustrated in the drawings (Fig. 13). Fig. 1 shows a portion of the ore body being worked by layers in a descending order, with a vertical section; figure 2 - section aa in figure 1; on fig.Z - section bb in figure 1. The development of layers 1- is carried out in descending order with their subsequent laying. Pipeline 5 prokla31 blow through filling workings 6 ,. formed in layer 1. pre-refinement and laying of layer 2. Production 6 is formed at intervals equal to half the width of the inlets by passing them through the hardened tab by known methods or by pre-installation in the developed space of the first layer of formwork or inflatable shells and subsequent laying the rest developed space. The laying of the next layer 3 is carried out in the following way. From excavations b, bore holes 7 and 8 are formed in layer 2 at intervals that ensure the complete filling of the developed space and uniform distribution of the hardening mixture over the spent layer. Then the pipeline $ is connected by means of flow switches 11 and fields 10 to the pipes 9 fixed in the wells 7. At the same time, insulating bridges 12 are erected along the boundaries of each entry with suitable workings 13. Then hardening 7 is fed ( -г V.;; - ..;. J 0} .0 ::. p: -: vt.4- / -: - :; ..4., V.; -;. including: 1 "Л f, V:, ;; / g -; & &.: -.: V;; i: :: /: / i: ... ...;.: y ..., ..,., #. .. / b .. ::: 7 .., .... Avr-p Ng; l. O: .g ./74 mix until complete filling of the steps into the layer. Control over the completeness of bookmarks 1 and 15, for example in layer V is carried out through test wells 8. After the Bookmark Passage 16 and 15 and hardening of the mixture in them to the required strength are performed by processing the overhang of layer 16. After it has been prepared, wells 7 and 8 are made in the previously laid Layers 3, the insulating jumpers 12 are erected and filled with a hardening mixture. The subsequent laying up to the full floor level is carried out in a similar way. Using the proposed method of laying out the worked-out space during the layer-by-layer mining in the lower order will allow to more efficiently carry out the backfilling work with less labor costs. eliminate the construction of additional insulated jumpers, eliminate the lidcto work on the installation of core pipelines, as well as the construction of their in-laid array. f / i /. .. iV ivi. Г-.1 --- IV ч t «y - v. -V i; fVl -i: V.; h : L ...;, ..v .. -.-: h-7; -; tm. : f-ol. , ffy..ff: | „- ::; /:; . rf.v “... in | ..GD r-V.iii - ..

//

фуг. Jfug. J

Claims (2)

1· СПОСОБ ЗАКЛАДКИ ВЫРАБОТАННОГО ПРОСТРАНСТВА ПРИ СЛОЕВОЙ ОТ-1 · METHOD FOR LAYING THE EQUIPPED SPACE AT LAYERED- РАБОТКЕ В НИСХОДЯЩЕМ ПОРЯДКЕ, включающий подачу закладочной твердеющей, смеси в отрабатываемые последовательно слои по закладочному трубопроводу, уложенному ранее на почве вышерасположенного отработанного слоя, отличающийся тем, что, с целью повышения эффективности закладочных работ путем снижения трудозатрат на монтаж закладочного трубопровода и исключения потерь закладочных труб, предварительно заклады·: вают второй слой, затем первый, при заложении которого образуют выработки, и в них укладывают трубопроводы, закладку каждого нижележащего слоя, начиная с третьего, осуществляют че- 9 рез скважины, пробуренные из выработок первого слоя в затвердевшем мае- IV сиве. ΙΓ £620101WORKING IN A DOWNWAY ORDER, including feeding the filling hardening mixture into sequentially worked layers through the filling pipe laid earlier on the soil of the above spent layer, characterized in that, in order to increase the efficiency of filling operations by reducing the labor costs for installing the filling pipe and eliminating losses of filling pipes , preliminary mortgages ·: they form the second layer, then the first, when laid, they form workings, and pipelines are laid in them, each elezhaschego layer, from the third, carried che Res 9 wells drilled openings of the first layer in the hardened siewe May-IV. ΙΓ £ 620101 2. Способ по п.1, отличающийся тем, что скважины, начиная с третьего слоя, образуют путем вдавливания в свежеуложенную закладочную смесь цилиндрического элемента на всю мощность заложенного слоя с последующим его извлечением.2. The method according to claim 1, characterized in that the wells, starting from the third layer, are formed by pressing into a freshly laid backfill mixture of a cylindrical element for the entire power of the embedded layer with its subsequent extraction. Недостатком известного способа является низкая эффективность закладочных работ, обусловленная большими трудозатратами по монтажу и демонтажу трубопроводов в каждом слое 5 :и~кажд0юзаходке, потерей в закладочном массиве большого количества дефицитных труб, возведением дополнительных разделяющих перемычек и ненадежное обеспечение полноты закладки.The disadvantage of this method is the low efficiency of the laying work, due to the large labor costs for installation and dismantling of pipelines in each layer 5 : and ~ each loss, loss in the filling array of a large number of deficient pipes, the construction of additional separating jumpers and unreliable ensuring the completeness of the bookmark. Цель изобретения - повышение эффективности закладочных работ путем снижения трудозатрат на монтаж за(5 кладочного трубопровода и исключения.The purpose of the invention is to increase the efficiency of laying work by reducing labor costs for installation for (5 masonry pipeline and exceptions. потерь закладочных труб.loss of filling pipes. . Поставленная цель достигается тем, что согласно способу, включающему подачу закладочной твердеющей смеси в отрабатываемые последовательно слои по закладочному трубопроводу, уложенному ранее на почве вышерасположенного отработанного слоя, предварительно закладывают второй 25 слой, затем первый, при залежении которого образуют выработки, и в них укладывают трубопроводы, закладку каждого нижележащего слоя, начиная с третьего, осуществляют через сква- .. This goal is achieved by the fact that according to the method, which includes feeding the curing hardening mixture into successive layers through the filling pipe laid earlier on the soil of the above spent layer, the second 25 layer is preliminarily laid, then the first one, when the deposits are formed, form workings, and pipelines are laid in them , the tab of each underlying layer, starting with the third, is carried out through the squa-. ’ жины, пробуренные из выработок пер3® вого слоя в затвердевшем массиве.'s drilled from the workings of the first 3 ® layer in the hardened mass. Кроме того, скважины, начиная с третьего слоя, образуют путем вдавливания в свежеуложенную закладочную смесь цилиндрического элемента на всю 35 мощность заложенного слоя с последующим его извлечением.In addition, the wells, starting from the third layer, are formed by pressing into the freshly laid backfill mixture of the cylindrical element for the entire 35th power of the laid layer with its subsequent extraction. Сущность способа поясняемся чертежами (фиг.1- 3).'The essence of the method is illustrated by drawings (Fig.1-3). ' На фиг,1 изображена часть рудного Λ тела, отрабатываемого слоями в нисходящем порядке, вертикальный разрез; на фиг.2 - разрез А-А на фиг.1; на фиг.З - разрез Б-Б на фиг.1.On Fig, 1 shows a part of the ore Λ of the body mined by the layers in a descending order, a vertical section; figure 2 is a section aa in figure 1; in Fig.Z - section bB in Fig.1. Отработку слоев 1-4 производятDevelopment layers 1-4 produce 45 в нисходящем порядке с последующей их закладкой. Трубопровод 5 прокла45 in descending order with their subsequent bookmark. 5 pipelines
SU813341511A 1981-09-22 1981-09-22 Method of filling worked area at layerwise lowering-type working SU1010297A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813341511A SU1010297A1 (en) 1981-09-22 1981-09-22 Method of filling worked area at layerwise lowering-type working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813341511A SU1010297A1 (en) 1981-09-22 1981-09-22 Method of filling worked area at layerwise lowering-type working

Publications (1)

Publication Number Publication Date
SU1010297A1 true SU1010297A1 (en) 1983-04-07

Family

ID=20978031

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813341511A SU1010297A1 (en) 1981-09-22 1981-09-22 Method of filling worked area at layerwise lowering-type working

Country Status (1)

Country Link
SU (1) SU1010297A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Г.Чесноков Н.И., Петросов А.А., Шевченко Б.Ф. .Системы разработки месторождений урана с-твердеющей закладкой. М., Атомиздат, 1975, c.2i 4-2if5.. 2. Авторское свидетельство СССР № 718610, кл. Е 21 F 15/00, 1978 (прототип). (ЗА) *

Similar Documents

Publication Publication Date Title
CN105484765B (en) A kind of the assembled secondary liner structure and its construction method of bored tunnel
CN110043269B (en) Excavation construction process for tunnel body of highway tunnel
CN108798672A (en) A kind of mining methods of the big area's ore high-efficiency mining that collapses
CN110219650B (en) Deep hole subsequent filling mining method in environment reconstruction stage
SU1010297A1 (en) Method of filling worked area at layerwise lowering-type working
CN103397881B (en) A kind of engineering method expanding mineral building stopping area
CN109209484B (en) Auxiliary working face withdrawing method for withdrawing channel combined with paste prefabricated block
RU2286457C1 (en) Pillar removal method
SU1668667A1 (en) Method for combination mining of gently sloping seams
RU2186981C1 (en) Method of layer mining of kimberlite pipe by raising and filling
CN111779484A (en) Under-construction filling mining process under geological conditions of three-soft coal seam
CN110541711A (en) method for strengthening underground chamber brush
RU2093678C1 (en) Method for mining thick steep ore bodies
RU2723317C1 (en) Method of erection of artificial safety ice-broken pillars at development of deposits in cryolite zone
SU1740666A1 (en) Ore deposit working method
SU1298381A1 (en) Method of hydromechanical mining of steep coal seams
SU1203241A1 (en) Method of mining mineral deposits with filling-up of excavated space
SU1067214A1 (en) Method of working gently sloping deposits
SU985304A1 (en) Method of erecting a roof support in mine working
SU756043A1 (en) Method of filling-up underground working
SU1213222A1 (en) Method of filling-up excavated space with castable self-setting mixes
RU2203420C2 (en) Process of layer-by-layer development of kimberlite pipe in ascending order with backfill and powered complex for method embodiment
RU2087713C1 (en) Method of control of rock pressure (deformations) in rock mass on solid mineral deposits
RU2084631C1 (en) Method of hydraulic mining of steep thick seams with solid hardening gobbing
SU1126696A1 (en) Method for underground working of mineral deposits