SU1010236A1 - Apparatus for brick-laying into building walls - Google Patents

Apparatus for brick-laying into building walls Download PDF

Info

Publication number
SU1010236A1
SU1010236A1 SU813321639A SU3321639A SU1010236A1 SU 1010236 A1 SU1010236 A1 SU 1010236A1 SU 813321639 A SU813321639 A SU 813321639A SU 3321639 A SU3321639 A SU 3321639A SU 1010236 A1 SU1010236 A1 SU 1010236A1
Authority
SU
USSR - Soviet Union
Prior art keywords
supplying
building
conveyor
mortar
walls
Prior art date
Application number
SU813321639A
Other languages
Russian (ru)
Inventor
Михаил Иванович Ерошевский
Original Assignee
Московский Ордена Трудового Красного Знамени Инженерно-Строительный Институт Им.В.В.Куйбышева
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Ордена Трудового Красного Знамени Инженерно-Строительный Институт Им.В.В.Куйбышева filed Critical Московский Ордена Трудового Красного Знамени Инженерно-Строительный Институт Им.В.В.Куйбышева
Priority to SU813321639A priority Critical patent/SU1010236A1/en
Application granted granted Critical
Publication of SU1010236A1 publication Critical patent/SU1010236A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

УСТРОЙСТВО ДЛЯ КИРПИЧНОЙ КЛАДКИ СТЕН ЗДАНИЙ, содержащее несу-. щие элементы, на которых смонтированы транспортер дл  подачи кирпича и подвижные бункеры с плоскими соплами дл  подачи и расстилани  раствора , рабочие площадки и средство дл  подачи раствора, отличающеес  .тем, что, с цел()Ю снижени  .стоимости строителбства и повышени  производительности, несув е эЛементы установлены у осей наружных и внутренних стен здани  и выполнены в виде самоподъемных телескопических стоек с установленными на них сверху по шири«е здани  ригел ми, на которых подвешены рабочие, площадки, при этом ригел  оснащены направл ю щими рамками, дл  контрол  горизонтальности кладки, а транспортер дл  подачи кирпича выполнен замкнутым и соединен с раздаточными площадке ми посредством наклонных лотков, а средство 1ДЛЯ подачи раствора соеди (Л нено с бункерами с помощью замкнутого растворопровода, подвижного в с горизонтальной плоскостиDEVICE FOR A BRICK PLEASANT OF THE WALLS OF BUILDINGS, containing un-. elements, on which a conveyor for supplying bricks and movable bunkers with flat nozzles for feeding and spreading mortar, working platforms and means for supplying mortar, are characterized, which, in order to () reduce the cost of construction and increase productivity The elements are installed at the axes of the outer and inner walls of the building and are made in the form of self-lifting telescopic racks with deadbolts mounted on them from above the width of the building, on which workers are hung, platforms, while the crossbar is equipped with s guide th conductive framework for controlling horizontality of masonry, and a conveyor for supplying the bricks formed closed and is connected to the dispensing platform E by the inclined chutes, and means 1 for supplying Cpd solution (A Neno with hoppers via mud channel closed, movable in a horizontal plane

Description

оabout

5five

оэoh

О5 Изобретение относитс  к строите ству и может быть использовано дл  кирпичной Гладки стен зданий. Известно устройство дл  кирпичн кладки стен зданий, выполненное в виде объемлющего возводимое здание .самоходного портала, имеющего подъ емно-опускную ферму с перемещающей с  по ней подвесной кабиной, обору дованной механизмами дл  подёчи и расстилани  раствора, а также верт кального подъема и подачи кирпича каменщикам С1.Л. Недостатками данного устройства .  вл ютс  низка  производительность кирпичной кладки, так как последн   ведетс  в пределах небольшой длины кабины, при этом кладка ведетс  отдельными небольшими участками , увеличены трудозатраты на 1 м кладки из-за большого объема ручных операций по передаче кирпича с транспортных средств до каменщика, значительна  металлоемкость и rpOMoajqiKocTb устройства . Наиболее близким к изобретению по технической сущности и достигае мому эффекту  вл етс  устройство д кирпичной кладки стен зданий, содержащее несущие элементы, на кото рых смонтированы транспортер дл  подачи кирпича и подвижные бункеры с плоскими соплами дл  подачи и расстилани  раствора, рабочие пло щадки и средство дл  подачи раствора С 2. Однако известное устройство обла дает недостаточной производительностью , а сложность его изготовлени  повышает стоимость строительства . Целью изобретени   вл етс  сниже ние стоимости строительства и повышение производительности. Эта цель достигаетс  тем, что в устройстве дл  кирпичной кладки стен зданий, содержащем несущие элементы,- на которых смонтированы транспортер дл  подачи кирпича и подвижные бункеры с плоскими соплами дл  подачи и расстилани  раствора, рабочие площадки и средст во дл  подачи раствора, несущие элементы установлены у осей наружных и внутренних стен зданий и выполнены в виде самоподъемных телескопических стоек с установленными на них по ширине здани  ригел ми. на которых подвешены рабочие площадки , при этом ригел  оснащены направл ющими рамками дл  контрол  горизонтальности кладки, а транспортер дл  подачи кирпича выполнен замкнутым и соединен с раздаточными площадками посредством наклонных лотков , а средство дл  подачи раствора соединено с бункерами с помощью замк-: нутого растворопровода, подвижного в горизонтальной плоскости. На фиг. 1 представлен общий вид устройства, план; на фиг. 2 - то же, поперечный разрез; на фиг. 3 - то же, продольный разрез. Устройство включает самоподъемные телескопические стойки 1, ригели 2, рабочие площадки 3 дл  каменщиков , замкнутый транспортер k, направл ющую рамку 5, бункер 6 дл  раствора, резиновый шланг 7 замкнутый растворопровод 8, монтажную стойку 9, регулировочные винты 10 дл  вертикального подъема оборудовани , регулировочные винты 11 дл  горизонтального перемещени  оборудовани  , механизм 12 дл  перемещени  замкнутого растворопровода 8 и раздаточные площадки 13 дл  кирпича. Дл  подачи кирпича на раздаточную площадку 13 используетс  башенный кран Н. Управление передвижением бункера 6.дл  раствора осуществлено с помощью автоматических переключателей 16. Бункер 6 дл  раствора снабжен плоским соплом 16. Раздаточные площадки 13 соединены с замкнутым транспортером посредством наклонных лотков 17. Дл  перемещени  замкнутого растворопровода 8 используетс  приводной механизм 18. Раствор в растворопровод 8 подаетс  с помощью растворонасосной установки 19. Устройство работает следующим образом . С помощью башенного крана k кирпич подаетс  в контейнерах на раздаточные площадки 13, откуда по наконным лоткам 17 поступает на замкнутый транспортер k. Каменщик наход сь на рабочей площадке 3, берет кирпич с транспортера k и укладывает его на готовуюрастворную постель. Из растворонасосной установки 19 раствор поступает в замкнутый растворопровод 8, а из него по резиновому шлангу 7 подаетс  в раздаточный бункер 6, который автоматическиПередвигаетс  по монорельсу вдоль фронта работ каменщиков и с помощью плоского сопла Г/ расстилает, раствор между уголками направл ющей рамки 5. В момент прохожде и  раздаточного бункера над оконным проемом автоматические переключатели 15 обеспечивают прекращение, подачи раствора из сопла 16. После того,как каждый каменщик на длине своей дел нки выложит р р кирпи чей, по заданной программе автоматиче ски включаютс  в работу электроприводы всех телескопических стоек 1 , которые:поднимают на высоту одного р да кладки ригели 2, а вместе с ними рабочую площадку каменщика 3, замкнутый транспортер , раздаточный бун кер 6 дл  раствора с замкнутым растворопроводом 8, раздаточными площадками 13 дл  кирпича. По окончании кла ки очередного.р да система подъемных стоек 1 автоматически ввлючаетс  в работу и поднимает все устройст (ВО дл  кладки последующего р да. Когда закончена кладка в пределах этажа , на возведенные стены опираютс  . монтажные стойки 9, а телескопические стойки 1 поднимаютс  в исходное верхнее положение, освобожда  тем самым пространство внизу дл  монтажа междуэтажного перекрыти . Если, к приме ру, монтаж междуэтажного перекрыти  начинаетс  между ос ми А-Б, то замкнутый растворопровод 8, ширина которого равна менее половины ширины водимого здани , передвигаетс  меха10 6 низмом 18 на вторую половину дома, т.е. между,ос ми . Настил рабочих площадок 3 раздвигаетс  в смежные пролеты, и после этого начинаетс  монтаж внутренних перегородок, относительно котбрых телескопические стойки 1 с ригел ми 2 смещены йа (О см. Панели перекрыти  могут устанавливав тьс  как на стены, так и на внутрен Hie несущие панели перегородки. По окончании монтажа перегородок, сантехкабин и панелей перекрытий в работу снова включаютс , телескопические стойки 1, которые с;воим основанием опираютс  на смонтированное перекрытие , и далее начинаютс  работы по:: кладке следующего этажа. Вс  указанна  система , будучи смонтированной один раз, в последухмцем шагает с: г т этажа на этаж без разборки до полного окончани  кладки по зданию. Дл  возведени  стен различной тол- щины с помощью регулировочных винтоа 11 производитс  горизонтальноеперемещение замкнутого транспортера t, направл ющей рамки и растворного бункера 6. Устройство позвол ет в 6 раз повысить произво/ тельность, при этом количество рабочих сокращаетс  в 3 раза. Устройство позвол ет снизить стоимость строительства за1 смет уменьшени  подсобных рабочих, более полного использовани  грузопод-ьемности башенного крана, а также за счет сравнительно недорогого оборудовани , используемого в устройстве.O5 The invention relates to the construction and can be used for brick smoothing of the walls of buildings. A device for brick masonry of building walls, designed as a self-propelled portal enclosing a building being erected, has a lifting and lowering truss with a suspended cabin moving along it, equipped with mechanisms for lifting and spreading mortar, as well as vertical brick lifting and feeding to bricklayers S1.L. The disadvantages of this device. the productivity of the brickwork is low, since the latter is maintained within a small cabin length, while laying is carried out in separate small areas, labor costs are increased by 1 m of laying due to the large amount of manual operations for transferring bricks from vehicles to the bricklayer, considerable metal intensity and rpOMoajqiKocTb device. The closest to the invention to the technical essence and the achieved effect is a device for masonry of building walls, containing load-bearing elements, on which a conveyor for feeding bricks and movable bins with flat nozzles for feeding and spreading mortar, working platforms and tools for mounting are mounted. supplying the C 2 solution. However, the known device has insufficient capacity, and the complexity of its manufacture increases the cost of construction. The aim of the invention is to reduce construction costs and increase productivity. This goal is achieved by the fact that in a bricklaying device for building walls containing load-bearing elements, on which a conveyor for feeding bricks and moving bunkers with flat nozzles for feeding and spreading mortar, working platforms and means for feeding solution, support elements are installed at the axes of the external and internal walls of buildings and made in the form of self-lifting telescopic racks with deadbolts mounted on them across the width of the building. on which the working platforms are suspended, while the crossbar is equipped with guide frames for controlling the horizontal position of the masonry, and the brick supply conveyor is closed and connected to the dispensing platforms by inclined trays, and the means for supplying the solution is connected to the bunkers using a closed solution pipeline, rolling in a horizontal plane. FIG. 1 shows a general view of the device, a plan; in fig. 2 - the same, cross section; in fig. 3 - the same, longitudinal section. The device includes self-lifting telescopic pillars 1, girders 2, work sites 3 for bricklayers, closed conveyor k, guide frame 5, solution hopper 6, rubber hose 7 closed solution line 8, mounting rack 9, adjusting screws 10 for vertical lifting of equipment, adjusting screws 11 for horizontal movement of equipment, mechanism 12 for moving a closed mortar 8 and transfer areas 13 for bricks. For supplying bricks to the dispensing area 13, a tower crane N. is used. The movement of the bunker 6. The solution is controlled by automatic switches 16. The solution bunker 6 is equipped with a flat nozzle 16. The dispensing platforms 13 are connected to a closed conveyor by inclined trays 17. To move the closed the solution line 8 uses a drive mechanism 18. The solution in the solution line 8 is supplied using a solution pump unit 19. The device operates as follows. By means of the tower crane k, the brick is supplied in containers to the dispensing platforms 13, from where it enters the closed conveyor k via the tip trays 17. The bricklayer is on the working platform 3, takes a brick from the conveyor belt k and puts it on the ready-made bed. From the mortar pump installation 19, the solution enters the closed mortar 8, and from there, via a rubber hose 7, is fed into a dispensing bin 6, which is automatically moved along a monorail along the work front of bricklayers and spreads the solution between the corners of the guide frame 5 using a flat nozzle the moment of passage and the dispensing hopper above the window opening, the automatic switches 15 provide for stopping the supply of the solution from the nozzle 16. After each mason, on the length of his or her business, lays out p the piles of bricks, this program automatically switches on the electric drives of all telescopic racks 1, which: raise the girders 2 to a height of one row of masonry, and with them the mason's working platform 3, a closed conveyor, a dispensing bun 6 for a solution with a closed solution pipeline 8, and dispensing platforms 13 for a brick. At the end of the next grade, the system of the lifting racks 1 automatically enters into operation and lifts all the devices (VO for the next row). When the masonry is completed within the floor, the erection walls 9 rest on the erected walls and the telescopic racks 1 rise to the initial upper position, thus freeing the space for mounting the interfloor overlap. If, for example, the interfloor overlap begins between axes AB, then a closed solution pipeline 8, whose width is less than half the width of the building being erected is moved by mechanism 10 6 by low 18 to the second half of the house, i.e. between the axes. The flooring of work sites 3 is moved apart into adjacent spans, and then the installation of internal partitions, relative to telescopic pillars 1 with beams 2, is displaced ya (Oh, see. Floor panels can be installed on both walls and internal Hie supporting partition walls. When the partitions, sanitary equipment and floor panels are installed, the telescopic pillars 1, which with TC mounted on the ceiling, and further originate works :: laying of the next floor. The entire system, once assembled, is subsequently followed by the following steps from: rt of floor to floor without disassembly until the masonry is completely completed in the building. For the construction of walls of various thickness, using adjusting screws 11, horizontal movement of the closed conveyor t, guide frame and mortar bin 6 is performed. The device allows to increase productivity by 6 times, while the number of workers is reduced by 3 times. The device makes it possible to reduce the cost of building up the cost of reducing utility workers, more fully utilizing the load capacity of the tower crane, and also due to the relatively inexpensive equipment used in the device.

QQQQ

iiVYiiiiVYii

.::: . AI ijSi |Д ГЧ « I ft 8 i HjMl I n о - M-r l I li.. :::. AI ijSi | D MS “I ft 8 i HjMl I n o - M-r l I li.

жWell

Ik Ik

x x

JVy/ у ylJsS б AJVy / ylJsS b A

Фиг.2 TTTsff liAl Mj JAf. 2 TTTsff liAl Mj JAf.

Claims (1)

УСТРОЙСТВО ДЛЯ КИРПИЧНОЙ КЛАДКИ СТЕН ЗДАНИЙ, содержащее несу-.· щие элементы, на которых смонтированы транспортер для подачи кирпича и подвижные бункеры с плоскими соплами для подачи и расстилания раствора, рабочие площадки и средство для подачи раствора, отличающееся .тем, что, с целью снижения .стоимости строительства и повышения производительности, несущие элементы установлены у осей наружных и внутренних стен здания и выполнены в виде самоподъемных телескопических стоек с установленными на них сверху по ширине здания ригелями, на которых подвешены рабочие.площадки, при этом ригеля оснащены направляющими рамками, для контроля гориэонтальности кладки, а транспортер для подачи кирпича выполнен замкнутым ;й соединен с раздаточными площадкеми посредством наклонных лотков, a S средство |для подачи раствора соединено с бункерами с помощью замкнутого растворопровода, подвижного в горизонтальной плоскости*DEVICE FOR BRICK LAYING OF BUILDING WALLS, containing load-bearing elements, on which a conveyor for supplying bricks and mobile hoppers with flat nozzles for feeding and spreading mortar are mounted, working platforms and means for supplying mortar, characterized in that, for the purpose To reduce construction costs and increase productivity, load-bearing elements are installed at the axes of the external and internal walls of the building and are made in the form of self-lifting telescopic racks with crossbars installed on them from above the width of the building, on which The working platforms are suspended, while the crossbars are equipped with guide frames to control the horizontal alignment of the masonry, and the conveyor for supplying bricks is closed; rolling in the horizontal plane * 962010Г OS962010G OS 1 10102361 1010236
SU813321639A 1981-07-23 1981-07-23 Apparatus for brick-laying into building walls SU1010236A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813321639A SU1010236A1 (en) 1981-07-23 1981-07-23 Apparatus for brick-laying into building walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813321639A SU1010236A1 (en) 1981-07-23 1981-07-23 Apparatus for brick-laying into building walls

Publications (1)

Publication Number Publication Date
SU1010236A1 true SU1010236A1 (en) 1983-04-07

Family

ID=20970671

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813321639A SU1010236A1 (en) 1981-07-23 1981-07-23 Apparatus for brick-laying into building walls

Country Status (1)

Country Link
SU (1) SU1010236A1 (en)

Similar Documents

Publication Publication Date Title
CN204588379U (en) For the Dokdo type elevator of outdoor
EP0674069B1 (en) Arrangement and method for realising building constructions using masonry blocks and/or shutterings
CN110173102A (en) The more work surface synchronous construction foot hand systems of super high-rise building and construction method
US3474580A (en) Prefabricated buildings and their assembly
SU1010236A1 (en) Apparatus for brick-laying into building walls
CN101870872A (en) Method for building vault lining of flue
CN104499659B (en) Portable bed board Apparatus and method for
CN210713745U (en) Synchronous construction scaffold system for multiple working faces of super high-rise building
EP0048870B1 (en) Apparatus for the construction of prefabricated wall units
SU1490240A1 (en) Arrangement for laying brick walls
CN111663758A (en) Suspended scaffold and construction method
SU55318A1 (en) Combined Construction Conveyor
SU1767130A1 (en) Traveling formwork
RU2250321C2 (en) Displaceable scaffolds for performing building and construction works
SU1428832A1 (en) Arrangement for erecting buildings
SU616389A1 (en) Falsework for constructing monolithic buildings
RU2276244C2 (en) Movable form with mechanized set for floor structure erection
CN214220554U (en) High-rise intelligent integrated platform that promotes of building engineering
CN211198305U (en) Construction elevator panel turnover door
SU1650885A1 (en) Mounting device for supplying panels into a wall being erected
SU1377354A1 (en) Modular forms
DE929089C (en) Procedure for the erection of buildings
SU1155560A1 (en) Device for devivering load to building window opening
RU2398943C2 (en) Method for accelerated assembly of attics from unified sandwich-panels
SU796363A1 (en) Sliding form