CN101870872A - Method for building vault lining of flue - Google Patents

Method for building vault lining of flue Download PDF

Info

Publication number
CN101870872A
CN101870872A CN201010233066A CN201010233066A CN101870872A CN 101870872 A CN101870872 A CN 101870872A CN 201010233066 A CN201010233066 A CN 201010233066A CN 201010233066 A CN201010233066 A CN 201010233066A CN 101870872 A CN101870872 A CN 101870872A
Authority
CN
China
Prior art keywords
mold
support
building
flue
shelf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010233066A
Other languages
Chinese (zh)
Other versions
CN101870872B (en
Inventor
徐超
张晓宁
夏春
黎耀南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN 201010233066 priority Critical patent/CN101870872B/en
Publication of CN101870872A publication Critical patent/CN101870872A/en
Application granted granted Critical
Publication of CN101870872B publication Critical patent/CN101870872B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for building a vault lining of a flue. The method comprises the following steps of: during building a fire-proof vault lining of a coke oven flue (1) by using fire-proof bricks (2), supporting and moving a mould (3) for building a vault by using a movable operating platform and mould support integrated bracket so as to facilitate the construction of constructors on an operating platform of the bracket, and laying a fire-proof material on the operating platform at the same time. Because a mould adjustment support is arranged on the upper part of the movable bracket, the elevation control of the mould is simple; because the movable bracket adopts truckles and the lower part of the movable bracket is provided with a bracket adjustment support, the operating platform is convenient to move and has stronger bearing capacity; the operating platform and the movable bracket which are convenient to move are adopted so as to meet the construction requirement and reasonably allocate the labor force; and the movable bracket has a simple structure, is made of a common material, has the characteristics of economy, practicability and simple and convenient operation, and is easy to popularize.

Description

A kind of method of building vault lining of flue
Technical field
The present invention relates to flue, particularly relate to a kind of method of utilizing movable operation platform, mold to support the integral support building vault lining of flue.
Background technology
When flue was remained silent (flue vault concrete is built and finished) construction, the construction of vault had limited construction speed because refractory brick closes the construction technology of door, toward the sequence of construction on both sides, also needed the engineering time of several months in the middle of adopting.Installing of mold often relies on the method for reserving bracket on the walling of flue apart from the place of four layers of arch springings, spacing 1500mm is as supporting point, above four layers of brick push down bracket, the two-layer standard square of plain cushion on bracket, put the horizontal lumps of wood on the fragment of brick, so that mold installs in the above, the length of mold is 700mm, wherein 100mm is and the part of building the vault overlap joint that finishes by laying bricks or stones, avoid the faulting of slab ends of brick and brick, 600mm is that new vault is built part by laying bricks or stones, is workmen's proficiency brachium substantially, be convenient to operation, the absolute altitude control of mold is regulated with timber wedge.Need to put refractory materials on workmen's the operator's console, the dead weight of platform with suitable supporting capacity needs 8 people to move freely, and like this, each construction distance is 600mm, and personnel need 8 people, have work holdup phenomenon.
Summary of the invention
Technical problem to be solved by this invention is: at the problems referred to above, provide a kind of energy to satisfy the construction needs, the method for building vault lining of flue that again can the reasonable disposition labor force.
The technical scheme that the present invention solves its technical problem employing is: in build the vault refractory lining process of coke oven flue by laying bricks or stones with refractory brick, utilize movable operation platform, mold to support integral support and install and the very useful mold of mobile masonry arch, construct on the service platform on this support with the convenient construction personnel, on service platform, put refractory materials simultaneously.
Beneficial effect of the present invention mainly is:
1. regulate support owing to be provided with mold, thereby make the absolute altitude control of mold simple on traversing carriage top.
2. because traversing carriage has adopted castor, the bottom is provided with bracket adjustment and supports, and so not only make the service platform conveniently moving, and bearing capacity is stronger.
3. owing to adopted the service platform and the traversing carriage of conveniently moving, thereby can satisfy the construction needs, again can the reasonable disposition labor force.
4. traversing carriage is simple in structure, is made by common material, has characteristics economic, practical, easy and simple to handle, is easy to promote.
Description of drawings
Fig. 1 is that movable operation platform of the present invention, mold support the synoptic diagram that integral support is constructed.
Fig. 2 is the structural perspective of traversing carriage of the present invention.
Among the figure: 1. coke oven flue; 2. refractory brick; 3. the very useful mold of masonry arch; 4. guardrail; 5. the horizontal lumps of wood; 6. mold is regulated and is supported; 7. service platform; 8. steel pipe frame; 9. cat ladder; 10. bracket adjustment supports; 11. castor.
Embodiment
In order to understand the present invention better, technical scheme of the present invention is described further below in conjunction with embodiment and accompanying drawing.
The method of building vault lining of flue provided by the invention, referring to Fig. 1 and Fig. 2, this method is: in the vault refractory lining process of building coke oven flue 1 with refractory brick 2 by laying bricks or stones, utilize movable operation platform, mold to support integral support and install and the very useful mold 3 of mobile masonry arch, construct on the service platform on this support with the convenient construction personnel, on service platform, put refractory materials simultaneously.
The movable operation platform that the present invention adopts, mold support integral support, its structure as depicted in figs. 1 and 2: mainly by traversing carriage, mold regulate support 6 and service platform 7 forms, this mold is regulated support and service platform 7 is set up on traversing carriage.
Described traversing carriage mainly supports 10 by guardrail 4, steel pipe frame 8, cat ladder 9 and bracket adjustment and forms.
Described steel pipe frame 8, it is made up of shelf, bracket adjustment support 10 and castor 11, wherein: shelf by many crisscross and interconnective vertical support bar and horizon bar form, present embodiment provides 16 vertical support bar, with the steel pipe buckle these vertical support bar is connected with horizon bar; Four vertical support bar are one group, the middle construction passage of reserving.A castor 11 is respectively installed in bottom by the vertical support bar outside the shelf two ends, in vertical support bar upper end, middle two groups of limits mold is installed and is regulated support 6, put the horizontal lumps of wood 5 in this support, when regulating the absolute altitude of the very useful mold 3 of masonry arch, only need the knob mold to regulate the screw mandrel that supports on 6; The bottom of remaining vertical support bar is equipped with bracket adjustment and supports 10.
On the top at steel pipe frame 8 two ends a guardrail 4 is installed respectively, this guardrail is formed by connecting by the steel pipe buckle by two vertical support bar and two horizon bars.
The exit of reserving the construction passage in the middle of steel pipe frame 8 is provided with cat ladder 9, and this cat ladder is to be formed by connecting by the steel pipe buckle by the vertical support bar of steel pipe frame 8 and horizon bar.
The movable operation platform that the present invention adopts, mold support integral support; its use is during with the vault inside lining building of coke oven flue 1; the construction process of the mold that installed is an example to begin at first: traversing carriage to vault lining of flue is built point of beginning by laying bricks or stones; mounting bracket is regulated and is supported 10 under the vertical support bar of soaring; regulate the screw mandrel that supports on 10 by swinging mounting; 4 castors 11 of traversing carriage bottom are adjusted to the state that does not stress; effectively the work-ing life of protection and prolongation castor, also make the supporting capacity of service platform 7 stronger.In vertical support bar upper end, middle two groups of limits mold is installed and is regulated support 6, put the horizontal lumps of wood 5 in this support, the very useful mold 3 of masonry arch (abbreviation mold) is placed on the horizontal lumps of wood 5, absolute altitude position with tape measure and definite mold top, regulate the screw mandrel that supports on 6 by regulating mold, make the top absolute altitude of mold be adjusted to correct absolute altitude position, reach the standard that to build by laying bricks or stones.After this section was built by laying bricks or stones and finished, at first Panasonic's mold was regulated and is supported 6, and the very useful mold of masonry arch is moved on on one side, cleans the operation of colluding brickwork joint, and Panasonic's bracket adjustment supports 10 again, for installing of next mold prepared.
Effect: the service platform bearing capacity is strong, conveniently moving, and the absolute altitude that installs the very useful mold of masonry arch is regulated simple.The effect that the inventive method is described is remarkable.
More than explanation only is an Application Example of the present invention, can not limit the present invention's interest field certainly with this, and therefore the equivalence of being done according to the present patent application claim changes, and still belongs to protection scope of the present invention.

Claims (5)

1. the method for a building vault lining of flue, it is characterized in that building by laying bricks or stones with refractory brick (2) in the vault refractory lining process of coke oven flue (1), utilize movable operation platform, mold to support integral support and install and the very useful mold of mobile masonry arch (3), construct on the service platform on this support with the convenient construction personnel, on service platform, put refractory materials simultaneously.
2. the method for building vault lining of flue according to claim 1, it is characterized in that described movable operation platform, mold support integral support and be made up of mold adjusting support (6), service platform (7) and traversing carriage, traversing carriage is equipped with castor (11), and mold adjusting support (6) and service platform (7) are set up the top at traversing carriage.
3. the method for building vault lining of flue according to claim 2, it is characterized in that described traversing carriage mainly is made up of guardrail (4), steel pipe frame (8) and cat ladder (9), wherein: a guardrail (4) is respectively installed at the place, two ends on the shelf top of steel pipe frame (8), and cat ladder (9) is positioned at the exit of reserving the construction passage in the middle of the shelf.
4. the method for building vault lining of flue according to claim 3, it is characterized in that described steel pipe frame (8) supports (10) by shelf, bracket adjustment and castor (11) is formed, wherein: shelf by many crisscross and interconnective vertical support bar and horizon bar form, a castor (11) is respectively installed in bottom by the vertical support bar outside the shelf two ends, vertical support bar upper end, two groups of limits is installed mold and is regulated support (6) in the middle of shelf, put the horizontal lumps of wood (5) in this support, the bottom of remaining vertical support bar is equipped with to regulate supports (10).
5. the method for building vault lining of flue according to claim 3 is characterized in that described cat ladder (9) is formed by connecting by the steel pipe buckle by the vertical support bar and the horizon bar of steel pipe frame (8).
CN 201010233066 2010-07-22 2010-07-22 Method for building vault lining of flue Expired - Fee Related CN101870872B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010233066 CN101870872B (en) 2010-07-22 2010-07-22 Method for building vault lining of flue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010233066 CN101870872B (en) 2010-07-22 2010-07-22 Method for building vault lining of flue

Publications (2)

Publication Number Publication Date
CN101870872A true CN101870872A (en) 2010-10-27
CN101870872B CN101870872B (en) 2012-12-26

Family

ID=42995961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010233066 Expired - Fee Related CN101870872B (en) 2010-07-22 2010-07-22 Method for building vault lining of flue

Country Status (1)

Country Link
CN (1) CN101870872B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287057A (en) * 2011-05-24 2011-12-21 天津三建建筑工程有限公司 Construction method of large-span brick flat arch
CN103059883A (en) * 2011-10-24 2013-04-24 五冶集团上海有限公司 Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN106753446A (en) * 2015-11-23 2017-05-31 中冶天工集团有限公司 A kind of combination loose tool and its construction method for the construction of coke oven flue top arch
CN107090971A (en) * 2017-06-14 2017-08-25 中国五冶集团有限公司 A kind of method and apparatus for quick and precisely installing flue arch top template
CN106147800B (en) * 2015-04-14 2019-01-15 五冶集团上海有限公司 A kind of coke oven flue lining construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457477B (en) * 2018-03-28 2020-08-18 中国一冶集团有限公司 Construction vehicle for building arch tyre of industrial furnace flue and arch tyre erecting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0613787B2 (en) * 1985-11-27 1994-02-23 太平電業株式會社 Working method inside the hemisphere of the containment vessel
CN2242927Y (en) * 1995-03-28 1996-12-18 中国地质大学(武汉) Scarfold-type digging construction platform
CN2707887Y (en) * 2004-06-11 2005-07-06 王大展 Scaffolding
CN201362954Y (en) * 2009-02-09 2009-12-16 中国矿业大学 Lift scaffold device for interior of tank

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0613787B2 (en) * 1985-11-27 1994-02-23 太平電業株式會社 Working method inside the hemisphere of the containment vessel
CN2242927Y (en) * 1995-03-28 1996-12-18 中国地质大学(武汉) Scarfold-type digging construction platform
CN2707887Y (en) * 2004-06-11 2005-07-06 王大展 Scaffolding
CN201362954Y (en) * 2009-02-09 2009-12-16 中国矿业大学 Lift scaffold device for interior of tank

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287057A (en) * 2011-05-24 2011-12-21 天津三建建筑工程有限公司 Construction method of large-span brick flat arch
CN102287057B (en) * 2011-05-24 2012-10-17 天津三建建筑工程有限公司 Construction method of large-span brick flat arch
CN103059883A (en) * 2011-10-24 2013-04-24 五冶集团上海有限公司 Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN103059883B (en) * 2011-10-24 2015-02-04 五冶集团上海有限公司 Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN106147800B (en) * 2015-04-14 2019-01-15 五冶集团上海有限公司 A kind of coke oven flue lining construction method
CN106753446A (en) * 2015-11-23 2017-05-31 中冶天工集团有限公司 A kind of combination loose tool and its construction method for the construction of coke oven flue top arch
CN107090971A (en) * 2017-06-14 2017-08-25 中国五冶集团有限公司 A kind of method and apparatus for quick and precisely installing flue arch top template

Also Published As

Publication number Publication date
CN101870872B (en) 2012-12-26

Similar Documents

Publication Publication Date Title
CN101870872B (en) Method for building vault lining of flue
CN205531315U (en) Can dismantle steel bar truss building carrier plate support system
CN104912320A (en) Synchronous construction method of shear walls on the two sides of settlement joint
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN206189859U (en) A big -arch shelter for protection is built by laying bricks or stones to coke oven
CN103669872B (en) A kind of walling method and walling equipment
CN104962296A (en) Coke oven basis flue fast construction method free of top die erecting
JP2008266533A (en) Method for constructing coke oven and temporary shed for constructing the coke oven
CN207003861U (en) A kind of prefabricated scissor stair structure system
CN201794283U (en) Movable operating platform and fixture supporting integrated support
CN102605988B (en) Synchronous construction method for chimney lining external concrete
CN105421458B (en) Concrete spreader pouring system
CN206632972U (en) The mobile assembled steel reinforced former material stockyard of one kind
CN107386638B (en) The construction method of cast-in-place Decorative hanging board structure under a kind of beam
EP0048870B1 (en) Apparatus for the construction of prefabricated wall units
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN201406843Y (en) Adjustable flue arch stuffing supporting frame
CN103286854A (en) Manufacturing and lap construction methods of ultra-wide autoclaved aerated concrete cantilever slabs
JP6115444B2 (en) Structure update method and structure construction method
CN116180991A (en) Construction method for improving concrete compactness of sloping roof
RU2293822C1 (en) Building and method of building erection
CN211595513U (en) Coke oven flue vault masonry device
JP2006036934A (en) Method for construction of temporary shed for coke oven and coke oven
CN102535935A (en) Method for constructing template of chimney shaft wall
CN112854774A (en) Flame-retardant anti-cracking composite heat-insulation wall body stacking construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121226

Termination date: 20210722

CF01 Termination of patent right due to non-payment of annual fee