CN106753446A - Combined forming die for construction of coke oven flue crown and construction method thereof - Google Patents

Combined forming die for construction of coke oven flue crown and construction method thereof Download PDF

Info

Publication number
CN106753446A
CN106753446A CN201510817603.5A CN201510817603A CN106753446A CN 106753446 A CN106753446 A CN 106753446A CN 201510817603 A CN201510817603 A CN 201510817603A CN 106753446 A CN106753446 A CN 106753446A
Authority
CN
China
Prior art keywords
arch
tire
underframe
construction
coke oven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510817603.5A
Other languages
Chinese (zh)
Inventor
牛泽海
王裕民
李青燃
贾立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201510817603.5A priority Critical patent/CN106753446A/en
Publication of CN106753446A publication Critical patent/CN106753446A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

A combined tire mold for construction of a coke oven flue top arch comprises a rectangular bottom frame and a tire framework; high-strength angle brackets are arranged at four corners of the rectangular bottom frame; two side arch tire frameworks and a middle arch tire framework are respectively arranged on the two side frames and the middle support of the bottom frame; the skewback framework comprises a semicircular skewback edge, a vertical support and an inclined support; the two ends of the semicircular arch tire edges of the arch tire frameworks at the two sides are connected with the four corners of the bottom frame, the two ends of the semicircular arch tire edges of the middle arch tire framework are connected with the two ends of the middle support of the bottom frame, and vertical supports and inclined supports are arranged between the middle points of the side frames at the two sides of the bottom frame and the middle point of the middle support and the semicircular arch tire edges. The mould has high precision, high strength, light weight and adjustable size, can be repeatedly used in arch top masonry with different camber, not only takes the advantages of steel arch and wood arch into account, but also makes up the respective disadvantages. The construction quality is guaranteed, the construction efficiency is improved, and the construction cost is greatly reduced.

Description

A kind of combination loose tool and its construction method for the construction of coke oven flue top arch
Technical field
It is related to a kind of new coke oven flue top arch group the invention belongs to the construction industry construction field of resistance to material Close tyre mould making and application process
Background technology
Traditional coke oven flue construction is general to be respectively using two methods:" concrete structure of first constructing, After build flue lining by laying bricks or stones " sequentially constructed;It is most of later to use " flue lining of first constructing After construct top plate concrete ".Wherein top arch refractory material laying is the emphasis and difficult point of fluc project, Arch tire must be made in construction, the material of arch tire, structure, size, precision, intensity and weight Amount directly influences construction quality and project progress.Due to construction in the middle of need repeatedly branch tire, under Tire, move horizontally, so arch tire light, the indeformable, high precision of requirement.
The making of tradition top arch loose tool typically using fixed dimension steel arch and wooden two kinds of arch, separately there is few Number unit in charge of construction is constructed using the method for " all round victory " branch arch tire, but need to use a large amount of deal boards Material, cost is very high, and is unfavorable for environmental protection.Steel arch high precision, heaviness;Wooden arch construction is light, Low precision, weight is slightly light, is easily deformed.And both fixed dimensions, tire is long wide with tire Can not adjust, for the flue top construction of different spans and camber, can only again remake arch Tire.Used arch tire can only be as waste disposal.
The content of the invention
It is an object of the invention to provide a kind of combination loose tool for the construction of coke oven flue top arch, should Loose tool high precision, intensity are high, carcass is light, adjustable dimension, are built by laying bricks or stones on the arch top of different cambers Central repeatable utilization, had both taken into account the advantage of steel arch and wooden arch, the drawbacks of compensate for respective again. Both ensure construction quality, efficiency of construction is improved again, construction cost is substantially reduced.
The technical solution adopted in the present invention is:A kind of combination for the construction of coke oven flue top arch Loose tool, is made up of rectangle underframe and arch tire bone frame;Rectangle underframe corner is installed by high-strength corner bracket; Both sides arch tire bone frame and middle part arch tire bone frame are respectively mounted on the side frame of underframe two and midfoot support; The arch tire bone frame includes semicircle arch tyre bead edge, vertically support and inclined shore;The both sides The two ends of the semicircle arch tyre bead edge of arch tire bone frame are connected with underframe corner, the middle part arch tire bone The two ends of the semicircle arch tyre bead edge of frame are connected with the two ends of underframe midfoot support, and underframe both sides Support vertically is installed between the midpoint of frame and the midpoint of midfoot support and semicircle arch tyre bead edge And inclined shore.
Underframe diagonal brace is installed between the midfoot support and the side frame of underframe two of above-mentioned underframe.
Above-mentioned underframe bottom can install four universal wheels.
Above-mentioned underframe, vertically support and inclined shore use streamline aluminium profile.
Above-mentioned semicircle arch tyre bead edge uses screw-thread steel.
The two ends of above-mentioned semicircle arch tyre bead edge and underframe corner and underframe midfoot support two ends Connection point of intersection is all connected with strengthening steel slab.
The above-mentioned construction method of combination loose tool for the construction of coke oven flue top arch is:According to following Step is completed:
1. the wooden track that moves horizontally of arch tire is installed steadily;In flue building wall, every one Segment distance reserves clay brick and protrudes metope outside fixed absolute altitude, is arranged in inverted ladder-shaped body, it is ensured that Ledge moves horizontally that rail contact face width is identical with wooden, is supported by prominent clay brick It is wooden to move horizontally track, arch tire is installed after track is levelling, arch tire bottom adds timber wedge to be adjusted Section, makes arch accurately be placed into horizontal elevation location;
2. arch tire checks again for flue bent pipe position after installing and top mark is high, determine it is errorless after open Beginning builds the top semi-circular arch body portion of point flue lining by laying bricks or stones, and all purlins are not fixed on arch tire, When workman builds by laying bricks or stones, hand holds purlin, and purlin is propped up with the working face of wedge type clay brick, and purlin is close to Screw thread steel surface is built by laying bricks or stones, after lower tire, then purlin is removed cleans out, and is recycled, and is built by laying bricks or stones When according to progress along flitch track movement arch tire built by laying bricks or stones paragraph by paragraph.
3. after arch construction in whole flue tops is finished, arch tire is cleaned out, tear group storage open in case its Its flue masonry project is recycled.
The present invention has the advantage that and good effect:
1st, combination arch tire high precision of the invention, intensity is high, light (weight is only same chi to carcass 2/3 or so of very little steel tire half, wooden tire weight), it is easy to assembly, it is unlikely to deform.
2nd, four universal wheels can be installed in underframe bottom so that moved horizontally by original in the middle of construction The manpower (4 people of general minimum needs) for coming, lifts movement and is changed to move horizontally track along wooden Roll (pulling), it is very light.Reduced in the middle of practice of construction artificial usage amount, Branch tire, lower parity number are reduced, project progress is accelerated.(one well matched 2, the arch tire of traditional 1m Big work, 2 unskilled labourers, each 4 times of daily branch tire, lower tire, daily 4 meters of propulsion.Use brand-new After the 3m arch tires of work, with 4 big works, two unskilled labourers, each 3 times of branch tire, lower tire, daily 9 meters of propulsion).
3rd, all purlins are not fixed on arch tire (this make carcass weight lighter), when workman builds by laying bricks or stones, Hand holds purlin, and purlin is propped up with the working face of wedge type clay brick, and purlin is close to screw thread steel surface block Build.After lower tire, then purlin is removed clean out, recycle.
4th, the resistance to material seam of vault after constructing is few, with reference to tightr, flat appearance.
5th, arch tire can recycled for multiple times.Different spans are constructed with the arch of camber, as long as with again New production arch tyre bead edge.Internal aluminum alloy framework does and cuts or use special connecting bar accordingly Lengthening can just meet the making of different size arch loose tool.This significantly improves coke oven flue construction speed With quality, the waste of material is reduced, reduce construction cost.
Brief description of the drawings:
Fig. 1 is flue top arch arch tire underframe making figure;
Fig. 2 is flue top arch arch sidewall face making figure;
Fig. 3 is flue top arch arch tire construction and erection drawing;
Fig. 4 is arch tire threedimensional model schematic diagram.
Specific embodiment:
As shown in Fig. 1,2,4:A kind of combination loose tool for the construction of coke oven flue top arch, by Rectangle underframe 1 and arch tire bone frame are constituted;Rectangle underframe corner is installed by high-strength corner bracket 3, bottom Underframe diagonal brace 2 is installed between the midfoot support and the side frame of underframe two of frame.The side frame of underframe two and Both sides arch tire bone frame and middle part arch tire bone frame, the arch tire bone frame bag are respectively mounted on midfoot support Include semicircle arch tyre bead edge 5, vertically 4 and inclined shore 6 of support;The both sides arch tire bone frame Semicircle arch tyre bead edge two ends be connected with underframe corner, the semicircle of the middle part arch tire bone frame The two ends of shape arch tyre bead edge are connected with the two ends of underframe midfoot support, and in the side frame of underframe two Support vertically is installed between the midpoint and semicircle arch tyre bead edge of point and midfoot support and branch is inclined Support.
The two ends of above-mentioned semicircle arch tyre bead edge and underframe corner and underframe midfoot support two ends Connection point of intersection is by the bolt connection strengthening steel slab 7 that punches.
Above-mentioned underframe, vertically support and inclined shore use streamline aluminium profile.
Above-mentioned semicircle arch tyre bead edge uses screw-thread steel.
As shown in Figure 3:The construction method of the above-mentioned combination loose tool for the construction of coke oven flue top arch It is:Completed according to the following steps:
1. the wooden track 8 that moves horizontally of arch tire is installed steadily;In flue building wall, every One segment distance reserves clay brick and protrudes metope 9 outside fixed absolute altitude, is arranged in inverted ladder-shaped body, Ensure that ledge is identical with the wooden rail contact face width that moves horizontally, by prominent clay brick Support is wooden to move horizontally track, and arch tire is installed after track is levelling, and arch tire bottom adds timber wedge to enter Row regulation, makes arch accurately be placed into horizontal elevation location;
2. arch tire checks again for flue bent pipe position after installing and top mark is high, determine it is errorless after open Beginning builds the top semi-circular arch body portion of point flue lining by laying bricks or stones, and all purlins are not fixed on arch tire, When workman builds by laying bricks or stones, hand holds purlin, and purlin is propped up with the working face of wedge type clay brick, and purlin is close to Screw thread steel surface is built by laying bricks or stones, after lower tire, then purlin is removed cleans out, and is recycled, and is built by laying bricks or stones When according to progress along flitch track movement arch tire built by laying bricks or stones paragraph by paragraph.
3. after arch construction in whole flue tops is finished, arch tire is cleaned out, tear group storage open in case its Its flue masonry project is recycled.When different spans of constructing are with camber flue top arch, screw thread Steel outer arc portions remake.Internal aluminum alloy framework will increase or shorten according to different arch radiuses Skeleton aluminium alloy backbone length.Increase part to connect using the high-strength groove bar connector of supporting galvanized steel Connect.As shortened, it is cut to size.

Claims (7)

1. it is a kind of for coke oven flue top arch construction combination loose tool, by rectangle underframe and arch Tire bone frame is constituted;Rectangle underframe corner is installed by high-strength corner bracket;The side frame of underframe two and middle part branch Both sides arch tire bone frame and middle part arch tire bone frame are respectively mounted in support;The arch tire bone frame includes semicircle Shape arch tyre bead edge, vertically support and inclined shore;The semicircle arch tire of the both sides arch tire bone frame The two ends at edge are connected with underframe corner, the semicircle arch tyre bead edge of the middle part arch tire bone frame Two ends are connected with the two ends of underframe midfoot support, and the side frame of underframe two midpoint and midfoot support Midpoint and semicircle arch tyre bead edge between support and inclined shore vertically are installed.
2. it is according to claim 1 it is a kind of for coke oven flue top arch construction sectional casing Mould, it is characterised in that:Underframe is installed between the midfoot support and the side frame of underframe two of above-mentioned underframe Diagonal brace.
3. it is according to claim 1 it is a kind of for coke oven flue top arch construction sectional casing Mould, it is characterised in that:Above-mentioned underframe bottom can install four universal wheels.
4. it is according to claim 1 it is a kind of for coke oven flue top arch construction sectional casing Mould, it is characterised in that:Above-mentioned underframe, vertically support and inclined shore use streamline aluminium profile.
5. it is according to claim 1 it is a kind of for coke oven flue top arch construction sectional casing Mould, it is characterised in that:Above-mentioned semicircle arch tyre bead edge uses screw-thread steel.
6. it is according to claim 1 it is a kind of for coke oven flue top arch construction sectional casing Mould, it is characterised in that:The two ends of above-mentioned semicircle arch tyre bead edge and underframe corner and underframe middle part The connection point of intersection at two ends is supported to be all connected with strengthening steel slab.
7. it is a kind of it is according to claim 1 for coke oven flue top arch construction sectional casing The construction method of mould, it is characterised in that:Completed according to the following steps:
1. the wooden track that moves horizontally of arch tire is installed steadily;In flue building wall, every one Segment distance reserves clay brick and protrudes metope outside fixed absolute altitude, is arranged in inverted ladder-shaped body, it is ensured that Ledge moves horizontally that rail contact face width is identical with wooden, is supported by prominent clay brick It is wooden to move horizontally track, arch tire is installed after track is levelling, arch tire bottom adds timber wedge to be adjusted Section, makes arch accurately be placed into horizontal elevation location;
2. arch tire checks again for flue bent pipe position after installing and top mark is high, determine it is errorless after open Beginning builds the top semi-circular arch body portion of point flue lining by laying bricks or stones, and all purlins are not fixed on arch tire, When workman builds by laying bricks or stones, hand holds purlin, and purlin is propped up with the working face of wedge type clay brick, and purlin is close to Screw thread steel surface is built by laying bricks or stones, after lower tire, then purlin is removed cleans out, and is recycled, and is built by laying bricks or stones When according to progress along flitch track movement arch tire built by laying bricks or stones paragraph by paragraph.
3. after arch construction in whole flue tops is finished, arch tire is cleaned out, tear group storage open in case its Its flue masonry project is recycled.
CN201510817603.5A 2015-11-23 2015-11-23 Combined forming die for construction of coke oven flue crown and construction method thereof Pending CN106753446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510817603.5A CN106753446A (en) 2015-11-23 2015-11-23 Combined forming die for construction of coke oven flue crown and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510817603.5A CN106753446A (en) 2015-11-23 2015-11-23 Combined forming die for construction of coke oven flue crown and construction method thereof

Publications (1)

Publication Number Publication Date
CN106753446A true CN106753446A (en) 2017-05-31

Family

ID=58962946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510817603.5A Pending CN106753446A (en) 2015-11-23 2015-11-23 Combined forming die for construction of coke oven flue crown and construction method thereof

Country Status (1)

Country Link
CN (1) CN106753446A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612321A (en) * 2018-03-28 2018-10-02 中国冶集团有限公司 The assembled arch tire and construction method of motorized adjustment absolute altitude
CN108612544A (en) * 2018-05-21 2018-10-02 金川集团股份有限公司 A kind of method in tunnel reservation device and reserved tunnel
CN110686513A (en) * 2019-11-12 2020-01-14 都江堰瑞泰科技有限公司 Universal support device for preassembling arch of kiln

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101870872A (en) * 2010-07-22 2010-10-27 中国一冶集团有限公司 Method for building vault lining of flue
CN103059883A (en) * 2011-10-24 2013-04-24 五冶集团上海有限公司 Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN103590420A (en) * 2013-11-26 2014-02-19 山西省第五建筑工程公司 Top-formwork-erection-free construction method of coke oven base smoke dividing flue
CN104962296A (en) * 2015-06-25 2015-10-07 天津二十冶建设有限公司 Coke oven basis flue fast construction method free of top die erecting

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101870872A (en) * 2010-07-22 2010-10-27 中国一冶集团有限公司 Method for building vault lining of flue
CN103059883A (en) * 2011-10-24 2013-04-24 五冶集团上海有限公司 Arch stuffing supporting technology by bricking arch apex for division of flue in coke oven
CN103590420A (en) * 2013-11-26 2014-02-19 山西省第五建筑工程公司 Top-formwork-erection-free construction method of coke oven base smoke dividing flue
CN104962296A (en) * 2015-06-25 2015-10-07 天津二十冶建设有限公司 Coke oven basis flue fast construction method free of top die erecting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方海滨: "《浅谈焦炉机焦两侧烟道弯管及烟道顶板模板加固方法》", 《科技风》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612321A (en) * 2018-03-28 2018-10-02 中国冶集团有限公司 The assembled arch tire and construction method of motorized adjustment absolute altitude
CN108612321B (en) * 2018-03-28 2021-04-02 中国一冶集团有限公司 Assembled arch-shaped tire construction method capable of electrically adjusting elevation
CN108612544A (en) * 2018-05-21 2018-10-02 金川集团股份有限公司 A kind of method in tunnel reservation device and reserved tunnel
CN108612544B (en) * 2018-05-21 2023-09-15 金川集团股份有限公司 Roadway reservation device and roadway reservation method
CN110686513A (en) * 2019-11-12 2020-01-14 都江堰瑞泰科技有限公司 Universal support device for preassembling arch of kiln

Similar Documents

Publication Publication Date Title
CN102704672A (en) Installation construction method for large all-steel formwork at internal corner of shear wall
CN205063331U (en) Slipform architecture
CN207582956U (en) A kind of one-time formed constructing device of concrete window tongue and groove
CN203321538U (en) Variable-cross-section tunnel lining mold
CN104196055B (en) Outer wall of basement lower die board construction method
CN204960296U (en) Adjustable shaped steel stencil assembly
CN204040458U (en) A kind of aluminum template system aluminium extruded sections
CN107090971A (en) A kind of method and apparatus for quick and precisely installing flue arch top template
CN106753446A (en) Combined forming die for construction of coke oven flue crown and construction method thereof
CN106930192A (en) Assembled variable cross-section contracture sliding mode system and its construction method
CN204298742U (en) For the supporting and protection structure of Bridge High-pier construction
CN109252879B (en) Tool type formwork for lining of highway tunnel drainage ditch and construction method
CN109778911B (en) Underground pipe gallery composite plastic formwork assembling and disassembling construction method
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN205100119U (en) Steel form device in self -propelled
CN104962296A (en) Coke oven basis flue fast construction method free of top die erecting
CN202401753U (en) Sliding die device
CN203640278U (en) Stair construction die shelf
CN202220434U (en) Aluminum-alloy building formwork component
CN202247907U (en) Supporting structure of urban track traffic super-large section cut-and-cover section tunnel
CN113550522A (en) Seamless special-shaped plug-in type corrugated aluminum profile veneer system and construction method thereof
CN102322138A (en) The modular sliding formwork
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN108487307B (en) Five-in-one construction method for comprehensive pipe gallery construction
CN207244455U (en) Assembled variable cross-section contracture sliding mode system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication