SU100918A1 - Precast cornice - Google Patents

Precast cornice

Info

Publication number
SU100918A1
SU100918A1 SU450128A SU450128A SU100918A1 SU 100918 A1 SU100918 A1 SU 100918A1 SU 450128 A SU450128 A SU 450128A SU 450128 A SU450128 A SU 450128A SU 100918 A1 SU100918 A1 SU 100918A1
Authority
SU
USSR - Soviet Union
Prior art keywords
eaves
blocks
cornice
building
precast
Prior art date
Application number
SU450128A
Other languages
Russian (ru)
Inventor
М.Е. Липницкий
Original Assignee
М.Е. Липницкий
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by М.Е. Липницкий filed Critical М.Е. Липницкий
Priority to SU450128A priority Critical patent/SU100918A1/en
Application granted granted Critical
Publication of SU100918A1 publication Critical patent/SU100918A1/en

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

Известные и примен ющиес  в строительной практике конструкции сборных карнизов зданнй, выполненные из железобетонных блоков уголкового профил , имеют существенные недостатки, так как укладываютс  на возводимую стену и заанкериваютс  специальными прогонами или анкерными болтами. Карнизные блоки имеют отверсти , которые должны точно совпадать с заранее выпущенными анкерными болтами илн с отверстн мн в анкерных прогонах. Так как отверсти  часто не совпадают, работа но сверлению отверстий в анкерных прогонах ведетс  наверху но мере установки карнизных блоков. Такой способ возведени  карнизов требует создани  специального производственного потока и задерживает окончание строительства зданн .Known and used in the construction practice of prefabricated building cornices, made of reinforced concrete blocks of the corner profile, have significant drawbacks, as they are laid on the wall being erected and anchored by special girders or anchor bolts. Eaves blocks have holes that must exactly match with previously released anchor bolts or holes with holes in anchor runs. Since the holes often do not coincide, the work but the drilling of holes in the anchor girders is carried out at the top but as far as installing the eaves blocks. This method of building eaves requires the creation of a special production flow and delays the completion of the construction of buildings.

Изобретенне имеет целью исключить отмеченные недостатки сборных карнизов известных конструкций.The invention aims to eliminate the noted disadvantages of prefabricated cornices of known structures.

Сборный карниз, согласно изобретению , выполнен из карнизных блоков в виде профилированных балок, которые укладываютс  вдоль стен на консоли, прикрепленные к несущим конструкци м здани  (каркасу, балкам покрыти  пли перекрыти  и т. п.) или  вл ющиес  продолжением этих конструкций. Карнизные блоки имеют корытообразную форму и укладываютс  на консолн ребрами вверх.The prefab cornice, according to the invention, is made of eaves blocks in the form of profiled beams that are laid along the walls on the cantilevers, attached to the supporting structures of the building (the frame, the floor beams, ceiling, etc.) or are a continuation of these structures. The eaves blocks are trough-shaped and are laid on the console with the ribs facing up.

Преимущество описываемой конструкции карниза заключаетс  в упрощеннн его монтажа при надежности креплени ; укладка крупноразмерного карнизного блока может осунл,ествл тьс  в одном производственном потоке с укладкой настила покрыти  н независимо от возведени  стен каркасных зданий.The advantage of the described structure of the eaves is the simplified installation with reliable fastening; The laying of the large-sized eaves block can be mounted in one production flow with the laying of the floor covering irrespective of the erection of the walls of frame buildings.

На фиг. 1 изображен поперечный разрез карниза, уложенного на консоли металлического каркаса; на фиг. 2 - разрез по АА на фнг. 1; на фиг. 3 - поперечный разрез карниза на железобетонной несзщей конструкнии; на фиг. 4 - разрез по ББ на фнг. 3; на фиг. 5 - аксонометрнческнй вид карнизного блока корытообразной формы.FIG. 1 shows a cross section of a cornice laid on the console of a metal frame; in fig. 2 - AA section on fng. one; in fig. 3 is a cross-section of the eaves on a reinforced concrete non-enclosing structure; in fig. 4 - a section on BB on fng. 3; in fig. 5 - axonometric view of the eaves block of the trough-shaped form.

Крунноразмерный карнизный блок 1 в виде железобетонной балкн укладываетс  на стальных ьгли железобетонных консол х 2, прикреплепных к основному каркасу здани . Балкн не опираютс  на стены здани  и укладываютс  независимо от стен. В бескаркасных здани х консоли дл  поддержани  карнизного блока  вл ютс  гфодолжением балок покрЕ т-гй или перекрытий. Карнизный блок (балка) имеет корытообразную форму и укладываетс  ребрами вверх; ребро блока, обращенное к внешней стороне здани , профилируетс  в завнсимости от архитектурных требований. Ребро, обращенное внутрь здани , имеет вертикальну о грань. Продольные ребра соедин ютс  между собой двум  торцевыми и несколькими поперечными ребрами и плитой.The core size eaves unit 1 in the form of a reinforced concrete beam is laid on steel reinforced concrete brackets 2, attached to the main frame of the building. Balkns do not rest on the walls of the building and are laid independently of the walls. In frameless cantilever buildings, to maintain the eaves block, there is a continuation of the beams on the ceiling or floors. The eaves block (beam) has a trough-like shape and is laid with the fins upwards; the block edge facing the outside of the building is profiled depending on the architectural requirements. The rib, facing the inside of the building, has a vertical edge. The longitudinal ribs are interconnected by two end and several transverse ribs and a plate.

Карьизные ботоки могут опиратьс  на консоли неносредственно нижней плитой (в этом случае консоль выступает наружу и подлежит обработке в соответствии с архитектурными требовани ми - фиг. 1 и 2) или специально сделанными у их концов четверт ми, чтобы консоли скрывались в теле карниза (в этом случае никаких элементов, выступаюпхнх за блоки, не будет - фиг. 3 и 4).The quarantine flow paths can be supported on the console directly by the bottom plate (in this case, the console protrudes outside and is subject to processing in accordance with architectural requirements - Figs. 1 and 2) or quarters specially made at their ends so that the consoles hide in the body of the eaves (in this In the case of any elements, the protrusions behind the blocks will not be - Fig. 3 and 4).

Карнизные блоки рассчитываютс  как балки на двух (или более) опорах с учетом в основном веса участка кровли и снега над карнизом.Eaves blocks are calculated as beams on two (or more) supports, taking into account mainly the weight of the roof section and the snow above the eaves.

Монтаж блоков в каркасных здани х ведетс  одновременно с монтажом основных несуишх констрзхций и насталов кровли тем же подъемным механизмом в общем производственном потоке; возведение стен может производитьс  позднее.The installation of blocks in frame buildings is carried out simultaneously with the installation of the main unholy structures and roofs with the same lifting mechanism in the general production flow; walls can be built later.

В здани х с несущил1и наружными кирпичными стенами карнизные блоки монтируютс  одновременно с панел ми покрытий тем же монтажпым мехлиизмом.In buildings with load-bearing walls with external brick walls, eaves blocks are mounted simultaneously with the covering panels with the same installation mechanism.

П р е /1, м е т и 3 о б р е т е н и  PRI / 1, MET and 3 about the third and

Claims (1)

1. Сборный карниз здани , вынолпенный из железобетонных блоков, отличающийс  тем, что кар1н- зные блоки в виде профилированных балок предназначены дл  укладки вдоль стен на консоли, прикрен;1енные к несущим конструкци м здани  (каркасу, балкам покрыти  или перекрыти  и т. п.) или  вл ющиес  продолжением этих конструкций.1. Prefabricated building cornice made of reinforced concrete blocks, characterized in that the skeleton blocks in the form of profiled beams are designed for laying along the walls on the cantilever, attached; to the supporting structures of the building (frame, floor beams or floors, etc.) .) or being a continuation of these constructions. 2t Форма выполненн  сборного карниза по п. 1, отличающа с   тем, что карнизные блоки выполнены корытообразной формы.2t. The form is made of precast cornice under item 1, characterized in that the eaves blocks are made in a trough-shaped form. Фиг. 2FIG. 2 пггpgg 1 one IfIf tt Фиг. 3FIG. 3
SU450128A 1954-11-11 1954-11-11 Precast cornice SU100918A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU450128A SU100918A1 (en) 1954-11-11 1954-11-11 Precast cornice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU450128A SU100918A1 (en) 1954-11-11 1954-11-11 Precast cornice

Publications (1)

Publication Number Publication Date
SU100918A1 true SU100918A1 (en) 1954-11-30

Family

ID=48374855

Family Applications (1)

Application Number Title Priority Date Filing Date
SU450128A SU100918A1 (en) 1954-11-11 1954-11-11 Precast cornice

Country Status (1)

Country Link
SU (1) SU100918A1 (en)

Similar Documents

Publication Publication Date Title
US5740643A (en) Fireproof building
RU92037U1 (en) QUICK BUILDING BUILDING
EA013175B1 (en) Outer multi-story frame building wall of arcos system and method of erection thereof
SU100918A1 (en) Precast cornice
US2280832A (en) Building
RU55804U1 (en) RESIDENTIAL FRAME BUILDING, BUILDING FRAME AND BUILDING WALL
US1988253A (en) Metallic structure
US4372088A (en) Structure with slab beams
RU74932U1 (en) FENCING DESIGN FOR BUILDING A BUILDING
RU2633602C1 (en) Method of accelerated building erection using method of screwdriver assembly and building from facade panels with decorative external finishing and metal framework
RU2119020C1 (en) Multistoried building with walls of small-size stones and method for its erection
SU1560692A1 (en) Multistorey large-panel building
RU210675U1 (en) facade building panel
EP1356167A1 (en) Integral prefabrication system with frame structure featuring finished lightweight components
RU189189U1 (en) Overlap
RU112702U1 (en) BLOCK SECTION OF A MULTI-STOREY BUILDING
RU2082859C1 (en) Face lintel for openings in stone building walls
RU2609035C2 (en) Carcass unit for modular construction of buildings and system of such blocks
CZ19995A3 (en) Living unit, process of its production and a floor frame for such living unit
RU37120U1 (en) SMALL MONOLITHIC BUILDING FROM CONCRETE MIX
SU896196A1 (en) Large-panel building constructed on poor soil
RU48338U1 (en) EXTERIOR HANGED WALL OF A FRAMEED MULTI-STOREY BUILDING
RU139830U1 (en) MONOLITHIC BUILDING DESIGN OF A BUILDING OR CONSTRUCTION
SU903532A1 (en) Method of stagewise construction of buildings of solid ferroconcrete
SU383816A1 (en) FORMWORK FOR WALLS UNLOCKED MONOLITHIC CELL