SU1002722A2 - Steam preparatory system - Google Patents

Steam preparatory system Download PDF

Info

Publication number
SU1002722A2
SU1002722A2 SU813349593A SU3349593A SU1002722A2 SU 1002722 A2 SU1002722 A2 SU 1002722A2 SU 813349593 A SU813349593 A SU 813349593A SU 3349593 A SU3349593 A SU 3349593A SU 1002722 A2 SU1002722 A2 SU 1002722A2
Authority
SU
USSR - Soviet Union
Prior art keywords
steam
compressors
jet
compressor
injector
Prior art date
Application number
SU813349593A
Other languages
Russian (ru)
Inventor
Яков Израилович Дубинский
Петр Иосифович Елисеев
Original Assignee
Предприятие П/Я А-1094
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я А-1094 filed Critical Предприятие П/Я А-1094
Priority to SU813349593A priority Critical patent/SU1002722A2/en
Application granted granted Critical
Publication of SU1002722A2 publication Critical patent/SU1002722A2/en

Links

Landscapes

  • Apparatus For Disinfection Or Sterilisation (AREA)

Description

Изобретение относитс  к теплоэнергетике и может быть использовано при утилизации тепла в .энергетических установках.The invention relates to a power system and can be used for heat recovery in power plants.

По основному авт. св. 956912 известна система пароподготовки, содержаща  парожидкостный инжектор, установленный на трубопроводе свежего пара и подключенный своим выходом к теплообменнику, соединенному обводным трубопроводом с приемной камерой инжектора и с паровым пространством емкости вторичного вскипани , и регул торы температуры и давлени  с соответствующими датчиками и исполнительными органами, причем на трубопроводе свежего пара перед парожидкостным инжектором дополнительно установлен пароструйный- ком-гпрессор , приемна  камера соединена с паровым пространством емкости вторичного вскипани , исполнительный орган регул тора температуры установлен на обводном трубопроводе, а исполнительный орган регул тора давлени  - на трубопроводе свежего па- ра перед входом пароструйного компрессора 1 .According to the main author. St. 956912 a steam-preparation system is known that includes a vapor-liquid injector installed in a fresh steam pipeline and connected by its output to a heat exchanger connected by an exhaust conduit to an injector receiving chamber and to the vapor space of the secondary flashing, and temperature and pressure regulators with appropriate sensors and actuators in the pipeline of fresh steam in front of the vapor-liquid injector, an additional steam-jet compressor is installed, the receiving chamber is connected to the steam th secondary boiling of the container, actuator temperature controller torus mounted on the bypass line, and actuator pressure regulator - to the conduit fresh PA-pa before entering a steam compressor 1.

Однако известна  система характеризуетс  пониженной эффективностькHowever, the known system is characterized by reduced efficiency.

использовани  пара при переменной нагрузке.using steam at variable load.

Цель изобретени  - повышение эффективности использовани  пара при переменной нагрузке.The purpose of the invention is to increase the efficiency of using steam at a variable load.

Цель достигаетс  тем, что в систему пароподготовки, содержащую парожидкостн дй инжектор, установленный на трубопроводе свежего пара и The goal is achieved by the fact that the injector installed on the fresh steam pipeline and in the steam preparation system contains a vapor-liquid injection system.

Claims (1)

10 подключенный своим выходом к теплообменнику , соединенному обводным трубопроводом с приемной камерой инжектора и с паровым пространством емкости вторичного вскипани , и ре15 гул торы температуры и давлени  с соответствующими датчиками и испол ительными органами, причем на трубопроводе свежего пара перед парожидкостным инжектором дополнительно ус20 тановлен пароструйный компрессор, приемна  камера которого соединена с паровым пространством емкости вторичного вскипани , исполнительный орган регул тора температуры установ25 лен на обводном трубопроводе, а исполнительный , орган регул тора давлени  - на трубопроводе свежего пара перед входом пароструйного компрессора , введены дополнительные парожид30 костные инжекторы и пароструйные компрессоры, обратные клапаны и логическое устройство с датчиком расхода и отсекател ми, причем каждый дополнительный инжектор соединен по следсЗвательно с одним из дополнител ных компрессоров., и эти инжекторы и компрессоры подключены параллельно основным.инжектору и компрессору перед в-ходом каждого компрессора, -установлен отсекатель, на выходе ка дого инжектора - обратный клапан, а на входе в теплообменник - датчик расхода. На чертеже приведена схема системы пароподготовки. Система содержит на трубопроводе свежего пара параллельные ветви последовательно соединенных пароструй ных компрессоров 2.1, 2.2, ..., 2п и парожидкостных инжекторов 3.1, 3.2, ..., Зп. Приемные камеры 4.1, 4.2, ..., 4п пароструйных компрессоров подключены к паровому пространству емкости 5 вторичного вскипани , а на входе установлены отсекатели 6.1, 6.2, ..., 6п, соединенные через логическое устройство 7 с датчиком 8 расхода. Приемные камеры 9.1, 9.2, ..., 9п парожидкостных инжекторов соединены обводным трубопроводом 10 с теплообменником а на выходе установлены обратные клапаны 12.1, 12.2, ..., 12п. Датчи ки 13 ,:авлени  на трубопроводе 14 насыще ного пара соединены через ре гул тор 15 давлени  с исполнительным механизмом 16 на трубопроводе 1 свежего пара, а датчик температуры 17 через регул тор 18 температуры с исполнительным механизмом 19 на обводном трубопроводе 10. Пар высокого давлени  поступает в пароструйные компрессоры 2.1, 2.2 ..., 2п, где совершает работу по сжатию пара вторичного вскипани  из емкости 5 и его увлажнению в пароструйных компрессорах 3.1, 3.2, ..., Зп высокотемпературным конденсатором из трубопровода 10. Поддержание параметров пара на заданном уровне обеспечиваетс  двум  контурами регулировани  по температуре и давлению. При изменении нагрузки по пару логическое устройство 7 отключает или подключает одну или несколько ветвей. Анализ математической модели.с помощью ЭВМ показывает, что эффективность работы предлагаемой системы пароподготовки при уменьшении нагрузки выше, чем в известной системе (за меру эффективности работы системы прин ты коэффициент инжекции пароструйного компрессора и потребление свежего пара). При этом во всем диапазоне изменени  нагрузки сохран етс  максимально возможный коэффициент инжекции при минимальном количестве ветвей и затрат на оборудование. Формула изобретени  Система пароподготовки по авт. ев, 956912, отличающа с  тем, что, с целью повышени  эффективности использовани  пара при переменной нагрузке, в систему введены дополнительные парожидкостные инжекторы и пароструйные компрессоры, обратные клапаны и логическое устройство с датчиком расхода и отсекател ми, причем каждый дополнительный инжектор соединен последовательно с одним из дополнительных компрессоров, и эти инжекторы и компрессоры подключены параллельно основным инжектору и компрессору, перед входом каждого компрессора установлен отсекатель, на выходе каждого инжектора - обратный клапан, а на входе в теплообменник - датчик расхода. Источники информации, прин тые во внимание при экспертизе 1. Авторское свидетельство СССР № 956912, кл. F 22 J 5/12, 1980.10 connected by its output to a heat exchanger connected to the injector receiving chamber and to the steam space of the secondary flashing tank by means of a bypass pipeline, and temperature and pressure regulators with appropriate sensors and executive bodies , the receiving chamber of which is connected to the vapor space of the secondary boiling-up tank, the executive body of the temperature controller is set to on the bypass pipeline, and the executive one, the pressure regulator organ — on the fresh steam pipeline in front of the steam jet compressor inlet; additional vapor-liquid30 bone injectors and steam-jet compressors, non-return valves and logic device with flow sensor and cutters were introduced; one of the additional compressors., and these injectors and compressors are connected in parallel to the main injector and the compressor before the in-stroke of each compressor, is installed a shut-off valve, at the outlet of each injector a non-return valve, and at the inlet to the heat exchanger a flow sensor. The drawing shows a diagram of the system steam. The system contains parallel branches of series-connected steam-jet compressors 2.1, 2.2, ..., 2n and vapor-liquid injectors 3.1, 3.2, ..., Zn on the fresh steam pipeline. Receiving chambers 4.1, 4.2, ..., 4p of steam-jet compressors are connected to the steam space of the secondary boiling-up tank 5, and at the entrance there are cut-off switches 6.1, 6.2, ..., 6n connected via logic device 7 to the flow sensor 8. Receiving chambers 9.1, 9.2, ..., 9p of vapor-liquid injectors are connected to the heat exchanger bypass pipe 10 with a heat exchanger and check valves 12.1, 12.2, ..., 12p are installed at the outlet. The sensors 13,: the ports on the saturated steam line 14 are connected via the pressure regulator 15 to the actuator 16 on the fresh steam line 1, and the temperature sensor 17 via the temperature regulator 18 to the actuator 19 on the bypass 10. High pressure steam enters the steam-jet compressors 2.1, 2.2 ..., 2n, where it performs work on the compression of the secondary boil-off from the tank 5 and its humidification in the steam-jet compressors 3.1, 3.2, ..., Sn with the high-temperature condenser from the pipeline 10. Maintaining parameters ara at a predetermined level is provided two control circuits for temperature and pressure. When you change the load on a pair of logical device 7 disconnects or connects one or more branches. Analysis of the mathematical model using a computer shows that the efficiency of the proposed steam preparation system with a decrease in load is higher than in the known system (the coefficient of injection of a steam-jet compressor and the consumption of fresh steam are taken as a measure of the efficiency of the system). At the same time, the maximum possible injection coefficient with the minimum number of branches and equipment costs is maintained throughout the entire range of load changes. Claims: Steam preparation system according to aut. Eve, 956912, characterized in that, in order to increase the efficiency of using steam at variable load, additional steam-liquid injectors and steam-jet compressors, check valves and logic device with flow sensor and shut-off devices are introduced into the system, each additional injector connected in series with one of additional compressors, and these injectors and compressors are connected in parallel to the main injector and compressor, there is a shut-off valve at the entrance of each compressor, at the output of each Injector - return valve and the inlet to the heat exchanger - the flow sensor. Sources of information taken into account during the examination 1. USSR Author's Certificate No. 956912, cl. F 22 J 5/12, 1980.
SU813349593A 1981-10-14 1981-10-14 Steam preparatory system SU1002722A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813349593A SU1002722A2 (en) 1981-10-14 1981-10-14 Steam preparatory system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813349593A SU1002722A2 (en) 1981-10-14 1981-10-14 Steam preparatory system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU956912 Addition

Publications (1)

Publication Number Publication Date
SU1002722A2 true SU1002722A2 (en) 1983-03-07

Family

ID=20980987

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813349593A SU1002722A2 (en) 1981-10-14 1981-10-14 Steam preparatory system

Country Status (1)

Country Link
SU (1) SU1002722A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105589352A (en) * 2016-03-08 2016-05-18 北京国电龙源环保工程有限公司 Parallel control system of vapor recompression equipment and control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105589352A (en) * 2016-03-08 2016-05-18 北京国电龙源环保工程有限公司 Parallel control system of vapor recompression equipment and control method thereof

Similar Documents

Publication Publication Date Title
DK172176B1 (en) Plant for generating mechanical energy by means of a gaseous fluid and using the plant
SU1002722A2 (en) Steam preparatory system
KR900018499A (en) Improved reheater piping and condensate cooler system
SU956912A1 (en) Steam preparation system
CN112282872A (en) Adjustable heat recovery system of ultra supercritical steam turbine
CN114961890B (en) Sliding pressure operation optimization method for steam turbine unit in heat supply period
GB778941A (en) Improvements relating to power plant including a nuclear reactor
RU10219U1 (en) REGENERATIVE INSTALLATION OF HEAT STEAM TURBINE
RU139178U1 (en) HEATING MACHINE LIQUID COOLING SYSTEM
GB1125103A (en) Improvements in and relating to the compression of vapour
CN215411835U (en) Exhaust steam recovery energy-saving device of boiler deaerator
SU1590565A1 (en) Contact gas-turbine unit
CN209539409U (en) Gas-steam combined cycle set tandem condensed water booster system
RU1815336C (en) Load control method for multicylinder regenerative-extraction steam turbine
SU777247A1 (en) Steam-gas unit
SU1505843A1 (en) Ship propulsion unit
SU1320462A1 (en) Power plant
SU1114804A1 (en) Steam turbine unit
JPS5823206A (en) Thermal power plant equipped with stored steam power generation system
SU1097812A1 (en) Steam power plant
SU769037A1 (en) Heat-generating turbine operating method
SU1090900A1 (en) Power plant
SU1353893A1 (en) Method of operation of thermal steam-turbine plant with two-flow low-pressure cylinder
SU775504A1 (en) Boiler equipment
SU1240925A1 (en) Steam-gas heat supply installation