SG11201707214YA - Hard road construction method for natural groundwater recharge - Google Patents

Hard road construction method for natural groundwater recharge

Info

Publication number
SG11201707214YA
SG11201707214YA SG11201707214YA SG11201707214YA SG11201707214YA SG 11201707214Y A SG11201707214Y A SG 11201707214YA SG 11201707214Y A SG11201707214Y A SG 11201707214YA SG 11201707214Y A SG11201707214Y A SG 11201707214YA SG 11201707214Y A SG11201707214Y A SG 11201707214YA
Authority
SG
Singapore
Prior art keywords
construction method
road construction
hard road
groundwater recharge
natural groundwater
Prior art date
Application number
SG11201707214YA
Other languages
English (en)
Inventor
Taize Zhou
Original Assignee
Taize Zhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taize Zhou filed Critical Taize Zhou
Publication of SG11201707214YA publication Critical patent/SG11201707214YA/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/003Pavings made of prefabricated single units characterised by material or composition used for beds or joints; characterised by the way of laying
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/22Pavings made of prefabricated single units made of units composed of a mixture of materials covered by two or more of groups E01C5/008, E01C5/02 - E01C5/20 except embedded reinforcing materials
SG11201707214YA 2015-03-12 2016-03-09 Hard road construction method for natural groundwater recharge SG11201707214YA (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510116269.0A CN104846712B (zh) 2015-03-12 2015-03-12 地下水自然回灌的硬路面施工方法
PCT/CN2016/000121 WO2016141770A1 (zh) 2015-03-12 2016-03-09 地下水自然回灌的硬路面施工方法

Publications (1)

Publication Number Publication Date
SG11201707214YA true SG11201707214YA (en) 2017-10-30

Family

ID=53846671

Family Applications (1)

Application Number Title Priority Date Filing Date
SG11201707214YA SG11201707214YA (en) 2015-03-12 2016-03-09 Hard road construction method for natural groundwater recharge

Country Status (14)

Country Link
US (1) US10233595B2 (es)
EP (1) EP3269879A4 (es)
JP (1) JP6574856B2 (es)
KR (1) KR20170128382A (es)
CN (2) CN104846712B (es)
AU (1) AU2016228704B2 (es)
BR (1) BR112017019339A2 (es)
CA (1) CA2979084A1 (es)
EA (1) EA201700452A1 (es)
MX (1) MX2017011636A (es)
PH (1) PH12017501665A1 (es)
SG (1) SG11201707214YA (es)
UA (1) UA118514C2 (es)
WO (1) WO2016141770A1 (es)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846712B (zh) * 2015-03-12 2017-02-01 周太泽 地下水自然回灌的硬路面施工方法
CN108266912A (zh) * 2018-03-27 2018-07-10 遵化市华通热力有限公司 一种利用浅层地热能的回灌系统及回灌方法
CN109554975A (zh) * 2018-05-31 2019-04-02 姬永生 现浇导孔透水混凝土及其制备装置和工艺
CN109505209A (zh) * 2018-06-11 2019-03-22 湖北文理学院 一种轻荷载道路的透水基层施工方法
CN113338112A (zh) * 2021-07-09 2021-09-03 杭州君辉建设有限公司 一种海绵城市生态道路
CN113733302B (zh) * 2021-09-27 2022-12-02 阜阳市鑫源建材有限公司 一种高渗透清洁透水砖的制备方法

Family Cites Families (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1606990A (en) * 1925-03-07 1926-11-16 Lawrence P Funk Freshet drain
US3837168A (en) * 1973-06-18 1974-09-24 D Alsberg Drainage system
US4199272A (en) * 1978-04-19 1980-04-22 Lacey Edward H System for recharging aquifer and apparatus therefor
US4523755A (en) * 1981-05-28 1985-06-18 Egon Turba Surface for sports areas, particularly tennis courts, and its manufacture
CN1014915B (zh) * 1988-09-21 1991-11-27 陈昭桐 地下建筑物渗排水方法
JPH082219B2 (ja) * 1992-06-29 1996-01-17 石岡建設株式会社 芝地の地盤改良方法
JPH07166504A (ja) * 1993-12-14 1995-06-27 Sekizai Center:Kk 透水性道路舗装構造
JPH0885906A (ja) * 1994-09-20 1996-04-02 Kotaro Matsumoto 透水性ある道路舗装の構造
US5746544A (en) * 1995-08-24 1998-05-05 Hovik Baghoomian Process and structure for reducing roadway construction period
US6206607B1 (en) * 1997-02-10 2001-03-27 John, J. Medico, Jr. Christine Meoli Medico Family Trust Environmental porous pavement construction, and method for manufacturing pavement construction
JP3628521B2 (ja) * 1998-08-28 2005-03-16 株式会社パリティジパング 舗装面形成用ブロック及び透水性舗装構造
JP3900404B2 (ja) * 2001-10-17 2007-04-04 ケミカルグラウト株式会社 舗装路
AU2005201779A1 (en) * 2004-05-28 2005-12-15 John Arthur Cummins Fluid permeable composite material and process for same
US7244076B2 (en) * 2004-07-19 2007-07-17 Bend Industries, Inc. Method for installing paving blocks
DE202005001850U1 (de) * 2005-02-05 2005-04-21 Weise, Marko Vertikale Rigole
US20060210358A1 (en) * 2005-03-17 2006-09-21 Jui-Wen Chen Constructive water resource recycling method
JP2007107258A (ja) * 2005-10-13 2007-04-26 Toshinori Haraguchi 住宅用雨水貯留構造
US8162563B2 (en) * 2006-07-19 2012-04-24 Oceansafe Llc Aquifer replenishment system with filter
US7351004B2 (en) * 2006-07-19 2008-04-01 Shaw & Sons, Inc. Aquifer replenishment system
CN200981968Y (zh) * 2006-12-18 2007-11-28 北京市市政工程设计研究总院 透水性人行步道
CN101024936B (zh) * 2007-02-22 2010-10-20 唐汉臣 一种全面积覆盖防蒸发节水方法
US8025456B2 (en) * 2007-09-07 2011-09-27 Reynolds Consumer Products, Inc. Hydrocarbon-adsorbing porous pavement structure
JP2009068240A (ja) * 2007-09-12 2009-04-02 Fiber Dain Kk 透水構造及び透水構造の施工方法
US7686540B2 (en) * 2007-12-11 2010-03-30 Astral Property Pty Ltd Transport corridor infiltration system
JP5010572B2 (ja) * 2008-11-26 2012-08-29 東北グリーン興産株式会社 湿潤地面の排水用空洞穴構造、及びこれを用いた芝面の排水促進方法
US20110064517A1 (en) * 2009-03-25 2011-03-17 Jon Dennis Sader Reinforced pervious concrete
HUE031240T2 (en) * 2009-04-16 2017-06-28 Andrew Niemczyk Method for injecting surface water into soil
CN201495621U (zh) * 2009-08-21 2010-06-02 曾妍 泄水井
US8834060B2 (en) * 2009-09-03 2014-09-16 Vilenna Investments Pty Ltd Arrangement and method for facilitating water usage
KR100939173B1 (ko) * 2009-10-19 2010-01-28 유흥식 홍수, 가뭄, 지구 온난화, 사막화, 해수면 상승 방지 및 토양지하수 복원을 위한 초고속 투수성 블록 도로포장 시스템과 그 시공 방법
KR100952192B1 (ko) * 2010-01-07 2010-04-09 임철웅 우수를 지중에 침투 저장하는 침투 관정을 이용한 워터 포켓
US8297874B2 (en) * 2010-02-26 2012-10-30 Vulcan Materials Company Traffic bearing structure with permeable pavement
CN201843042U (zh) * 2010-08-27 2011-05-25 傅饶 一种节水操场
JP2012046981A (ja) * 2010-08-27 2012-03-08 Takamura Sogyo Kk 透水性コンクリート板
CN102454143B (zh) * 2010-10-19 2015-02-04 陈瑞文 改善地球暖化人工铺面制造方法
CN202164521U (zh) * 2011-05-31 2012-03-14 叶小斌 多孔透水立体生态地坪框架
CN202099866U (zh) * 2011-06-01 2012-01-04 洛阳市淼泉给水排水设计院 道路雨水地下回灌装置
CN202718027U (zh) * 2012-02-09 2013-02-06 王宝和 一种储水回灌透水砖组合装置
CN104278608B (zh) * 2013-07-05 2016-06-08 杭州华水市政工程有限公司 一种公路路堤拓宽结构的施工方法
CN104846712B (zh) * 2015-03-12 2017-02-01 周太泽 地下水自然回灌的硬路面施工方法

Also Published As

Publication number Publication date
CN104846712A (zh) 2015-08-19
BR112017019339A2 (pt) 2018-06-05
EP3269879A4 (en) 2018-08-22
MX2017011636A (es) 2018-02-09
AU2016228704B2 (en) 2019-04-11
CN106836435A (zh) 2017-06-13
JP2018507972A (ja) 2018-03-22
US20170362779A1 (en) 2017-12-21
EA201700452A1 (ru) 2018-02-28
UA118514C2 (uk) 2019-01-25
CN104846712B (zh) 2017-02-01
JP6574856B2 (ja) 2019-09-11
WO2016141770A1 (zh) 2016-09-15
CA2979084A1 (en) 2016-09-15
US10233595B2 (en) 2019-03-19
KR20170128382A (ko) 2017-11-22
AU2016228704A1 (en) 2017-10-19
EP3269879A1 (en) 2018-01-17
PH12017501665A1 (en) 2018-03-19

Similar Documents

Publication Publication Date Title
PT3338105T (pt) Método para navegação assistida por acelerómetro
EP3228515A4 (en) Road condition determination method
EP3371699A4 (en) CAPACITY PLANNING METHOD
EP3180834A4 (en) Method for determining cross connection in wireless charging
EP3334891A4 (en) PROCEDURE FOR SIDE DRILLING
SG11201707214YA (en) Hard road construction method for natural groundwater recharge
EP3238323A4 (en) Method for 3 dimensional pocket-forming
IL247802A0 (en) Active road marker
IL248019B (en) road wheel
ZA201707328B (en) Gyro-based surveying tool and method for surveying
GB2549033B (en) Methods and systems for wellbore remediation
PL3505263T3 (pl) Sposób oczyszczania gleby podpowierzchniowej
EP3190258A4 (en) Method for calculating rock water saturation
SG11201708196PA (en) Piling construction management method
PL3337927T3 (pl) Agregat podbijający
SG11201702724XA (en) Ground improving method
SG11201609037UA (en) Ground improvement method
GB201420832D0 (en) Location method
GB201520319D0 (en) Pipe rehabilitation method
ZA201503784B (en) Tunneling method
EP3172355A4 (en) Method for forming three-dimensional anchoring structures
GB2528905B (en) Asphalt road repair
PL3014164T3 (pl) Sposób renowacji kanałów
SI3279399T1 (sl) Cestni spoj za cestno strukturo
EP3180913A4 (en) System and method for depth map coding for smooth depth map area