SG11201504307YA - Lng carrier construction method - Google Patents

Lng carrier construction method

Info

Publication number
SG11201504307YA
SG11201504307YA SG11201504307YA SG11201504307YA SG11201504307YA SG 11201504307Y A SG11201504307Y A SG 11201504307YA SG 11201504307Y A SG11201504307Y A SG 11201504307YA SG 11201504307Y A SG11201504307Y A SG 11201504307YA SG 11201504307Y A SG11201504307Y A SG 11201504307YA
Authority
SG
Singapore
Prior art keywords
construction method
lng carrier
carrier construction
lng
construction
Prior art date
Application number
SG11201504307YA
Other languages
English (en)
Inventor
Asok Kumar Nedumaran
Wen Sin Chong
Kok Seng Foo
Original Assignee
Keppel Offshore & Marine Technology Ct Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keppel Offshore & Marine Technology Ct Pte Ltd filed Critical Keppel Offshore & Marine Technology Ct Pte Ltd
Publication of SG11201504307YA publication Critical patent/SG11201504307YA/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
    • B63B83/10Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for increasing cargo capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/02Hulls assembled from prefabricated sub-units
    • B63B3/04Hulls assembled from prefabricated sub-units with permanently-connected sub-units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/10Building or assembling vessels from prefabricated hull blocks, i.e. complete hull cross-sections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
    • B63B83/20Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for conversion to a different use, e.g. for converting tankers into a FPSO-FLNG units

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
SG11201504307YA 2013-01-29 2013-01-29 Lng carrier construction method SG11201504307YA (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SG2013/000036 WO2014120080A1 (fr) 2013-01-29 2013-01-29 Procédé de construction de porteur de gaz naturel liquéfié

Publications (1)

Publication Number Publication Date
SG11201504307YA true SG11201504307YA (en) 2015-08-28

Family

ID=51262666

Family Applications (1)

Application Number Title Priority Date Filing Date
SG11201504307YA SG11201504307YA (en) 2013-01-29 2013-01-29 Lng carrier construction method

Country Status (6)

Country Link
US (1) US10668996B2 (fr)
EP (1) EP2951083B1 (fr)
AU (1) AU2013377134B2 (fr)
BR (1) BR112015016443A2 (fr)
SG (1) SG11201504307YA (fr)
WO (1) WO2014120080A1 (fr)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015152825A1 (fr) * 2014-04-03 2015-10-08 Keppel Offshore & Marine Technology Centre Pte Ltd Procédé d'intégration de blocs structurels et de flotteurs latéraux nouvellement construits à un méthanier existant
KR102127821B1 (ko) * 2016-01-25 2020-06-30 현대중공업 주식회사 운반선
CN108473180B (zh) * 2016-10-24 2020-04-03 千代田化工建设株式会社 浮动液化烃气处理装置的制造方法
US11383453B2 (en) * 2017-01-12 2022-07-12 Swift IP, LLC Methods of repairing and waterproofing articles
JP7442965B2 (ja) * 2018-10-10 2024-03-05 三菱造船株式会社 船舶の製造方法
JP7227728B2 (ja) * 2018-10-10 2023-02-22 三菱造船株式会社 既存船舶の利用方法
KR102577082B1 (ko) * 2018-10-11 2023-09-11 닛키 글로벌 가부시키가이샤 부체식 구조물
KR102631760B1 (ko) * 2018-12-03 2024-01-31 닛키 글로벌 가부시키가이샤 천연 가스 액화 장치를 구비하는 부체 설비의 제조 방법
CN112078758A (zh) * 2020-08-03 2020-12-15 沪东中华造船(集团)有限公司 一种用于lng船改装为fsru的方法
WO2023102595A1 (fr) * 2021-12-07 2023-06-15 Charlie Six Pty Ltd Navire à gaz liquéfié

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4936319B1 (fr) * 1966-03-16 1974-09-28
JPS54146398A (en) 1978-05-04 1979-11-15 Hitachi Zosen Corp Method of remodelling existing tanker into oil storing tank floating on sea
GB9617209D0 (en) * 1996-08-16 1996-09-25 Mcdermott Sa J Ray Vessel turret systems
EP1478875B1 (fr) * 2002-02-27 2009-07-22 Excelerate Energy Limited Partnership Procede et systeme de regazeification de gnl a bord d'un methanier
WO2005056377A2 (fr) 2003-08-12 2005-06-23 Excelerate Energy Limited Partnership Regazeification de bord pour navires de transport de gnl comprenant des appareils de propulsion interchangeables
WO2005113328A1 (fr) 2004-05-14 2005-12-01 Exxonmobil Upstream Research Company Transporteur de gaz naturel liquide à simple compartiment
US7823524B2 (en) 2008-02-20 2010-11-02 Single Buoy Moorings, Inc. Construction of FPDSO vessel
EP2228294A1 (fr) 2009-03-09 2010-09-15 RAM LNG Holdings Limited Récipient pour le transport de gaz naturel liquéfié
RU2433060C1 (ru) 2010-05-05 2011-11-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" Способ реконструкции судна
KR101195605B1 (ko) 2010-07-30 2012-10-29 삼성중공업 주식회사 액화 가스 수송 선박의 화물창

Also Published As

Publication number Publication date
US20150367915A1 (en) 2015-12-24
WO2014120080A1 (fr) 2014-08-07
EP2951083A1 (fr) 2015-12-09
EP2951083B1 (fr) 2018-12-19
US10668996B2 (en) 2020-06-02
AU2013377134B2 (en) 2017-08-31
AU2013377134A1 (en) 2015-07-02
EP2951083A4 (fr) 2017-03-08
BR112015016443A2 (pt) 2017-07-11

Similar Documents

Publication Publication Date Title
GB201314695D0 (en) Method
GB201318465D0 (en) Method
GB201309057D0 (en) Method
SG11201504307YA (en) Lng carrier construction method
GB201316744D0 (en) Method
AU354078S (en) Carrier
GB201309928D0 (en) Method
GB201316849D0 (en) Method
GB201313249D0 (en) Method
GB201309654D0 (en) Method
GB201305714D0 (en) Method
GB201301233D0 (en) Method
GB201300409D0 (en) Method
EP2985219A4 (fr) Méthanier
GB201301094D0 (en) Method
GB201314054D0 (en) Method
GB201312609D0 (en) Method
GB201311389D0 (en) Method
GB201319361D0 (en) Method
GB201318830D0 (en) Method
ZA201304544B (en) Carrier
GB201318490D0 (en) Method
GB201317970D0 (en) Method
GB201317826D0 (en) Method
GB201316878D0 (en) Method