US4945991A
(en)
|
1989-08-23 |
1990-08-07 |
Mobile Oil Corporation |
Method for gravel packing wells
|
US4949788A
(en)
*
|
1989-11-08 |
1990-08-21 |
Halliburton Company |
Well completions using casing valves
|
US5113315A
(en)
|
1990-08-07 |
1992-05-12 |
Cirqon Technologies Corporation |
Heat-conductive metal ceramic composite material panel system for improved heat dissipation
|
US5082052A
(en)
|
1991-01-31 |
1992-01-21 |
Mobil Oil Corporation |
Apparatus for gravel packing wells
|
US5113935A
(en)
|
1991-05-01 |
1992-05-19 |
Mobil Oil Corporation |
Gravel packing of wells
|
US5161618A
(en)
|
1991-08-16 |
1992-11-10 |
Mobil Oil Corporation |
Multiple fractures from a single workstring
|
US5161613A
(en)
|
1991-08-16 |
1992-11-10 |
Mobil Oil Corporation |
Apparatus for treating formations using alternate flowpaths
|
US5333688A
(en)
|
1993-01-07 |
1994-08-02 |
Mobil Oil Corporation |
Method and apparatus for gravel packing of wells
|
US5333689A
(en)
|
1993-02-26 |
1994-08-02 |
Mobil Oil Corporation |
Gravel packing of wells with fluid-loss control
|
US5664628A
(en)
|
1993-05-25 |
1997-09-09 |
Pall Corporation |
Filter for subterranean wells
|
US5419394A
(en)
|
1993-11-22 |
1995-05-30 |
Mobil Oil Corporation |
Tools for delivering fluid to spaced levels in a wellbore
|
US5396954A
(en)
|
1994-01-27 |
1995-03-14 |
Ctc International Corp. |
Subsea inflatable packer system
|
US5476143A
(en)
|
1994-04-28 |
1995-12-19 |
Nagaoka International Corporation |
Well screen having slurry flow paths
|
US5479986A
(en)
|
1994-05-02 |
1996-01-02 |
Halliburton Company |
Temporary plug system
|
US5417284A
(en)
|
1994-06-06 |
1995-05-23 |
Mobil Oil Corporation |
Method for fracturing and propping a formation
|
US5435391A
(en)
|
1994-08-05 |
1995-07-25 |
Mobil Oil Corporation |
Method for fracturing and propping a formation
|
US5515915A
(en)
|
1995-04-10 |
1996-05-14 |
Mobil Oil Corporation |
Well screen having internal shunt tubes
|
US5560427A
(en)
|
1995-07-24 |
1996-10-01 |
Mobil Oil Corporation |
Fracturing and propping a formation using a downhole slurry splitter
|
US5588487A
(en)
|
1995-09-12 |
1996-12-31 |
Mobil Oil Corporation |
Tool for blocking axial flow in gravel-packed well annulus
|
US5690175A
(en)
|
1996-03-04 |
1997-11-25 |
Mobil Oil Corporation |
Well tool for gravel packing a well using low viscosity fluids
|
US5848645A
(en)
|
1996-09-05 |
1998-12-15 |
Mobil Oil Corporation |
Method for fracturing and gravel-packing a well
|
US5803179A
(en)
|
1996-12-31 |
1998-09-08 |
Halliburton Energy Services, Inc. |
Screened well drainage pipe structure with sealed, variable length labyrinth inlet flow control apparatus
|
US5842516A
(en)
|
1997-04-04 |
1998-12-01 |
Mobil Oil Corporation |
Erosion-resistant inserts for fluid outlets in a well tool and method for installing same
|
US5868200A
(en)
*
|
1997-04-17 |
1999-02-09 |
Mobil Oil Corporation |
Alternate-path well screen having protected shunt connection
|
US5890533A
(en)
|
1997-07-29 |
1999-04-06 |
Mobil Oil Corporation |
Alternate path well tool having an internal shunt tube
|
US5881809A
(en)
|
1997-09-05 |
1999-03-16 |
United States Filter Corporation |
Well casing assembly with erosion protection for inner screen
|
EP0909875A3
(en)
|
1997-10-16 |
1999-10-27 |
Halliburton Energy Services, Inc. |
Method of completing well in unconsolidated subterranean zone
|
US6059032A
(en)
|
1997-12-10 |
2000-05-09 |
Mobil Oil Corporation |
Method and apparatus for treating long formation intervals
|
NO310585B1
(no)
|
1998-03-25 |
2001-07-23 |
Reslink As |
Rörkopling for sammenkopling av dobbeltveggete rör
|
EP1003108A1
(en)
|
1998-11-17 |
2000-05-24 |
Telefonaktiebolaget Lm Ericsson |
Apparatus and method for providing round-robin arbitration
|
US6405800B1
(en)
|
1999-01-21 |
2002-06-18 |
Osca, Inc. |
Method and apparatus for controlling fluid flow in a well
|
US6227303B1
(en)
|
1999-04-13 |
2001-05-08 |
Mobil Oil Corporation |
Well screen having an internal alternate flowpath
|
US6513599B1
(en)
|
1999-08-09 |
2003-02-04 |
Schlumberger Technology Corporation |
Thru-tubing sand control method and apparatus
|
US6220345B1
(en)
|
1999-08-19 |
2001-04-24 |
Mobil Oil Corporation |
Well screen having an internal alternate flowpath
|
US6409219B1
(en)
|
1999-11-12 |
2002-06-25 |
Baker Hughes Incorporated |
Downhole screen with tubular bypass
|
US6298916B1
(en)
|
1999-12-17 |
2001-10-09 |
Schlumberger Technology Corporation |
Method and apparatus for controlling fluid flow in conduits
|
AU782553B2
(en)
|
2000-01-05 |
2005-08-11 |
Baker Hughes Incorporated |
Method of providing hydraulic/fiber conduits adjacent bottom hole assemblies for multi-step completions
|
EP1160417A3
(en)
|
2000-05-30 |
2004-01-07 |
Halliburton Energy Services, Inc. |
Method and apparatus for improved fracpacking or gravel packing operations
|
US6644406B1
(en)
|
2000-07-31 |
2003-11-11 |
Mobil Oil Corporation |
Fracturing different levels within a completion interval of a well
|
US6848510B2
(en)
|
2001-01-16 |
2005-02-01 |
Schlumberger Technology Corporation |
Screen and method having a partial screen wrap
|
US6789621B2
(en)
|
2000-08-03 |
2004-09-14 |
Schlumberger Technology Corporation |
Intelligent well system and method
|
GB2399844B
(en)
|
2000-08-17 |
2004-12-22 |
Abb Offshore Systems Ltd |
Flow control device
|
US6464007B1
(en)
|
2000-08-22 |
2002-10-15 |
Exxonmobil Oil Corporation |
Method and well tool for gravel packing a long well interval using low viscosity fluids
|
OA13131A
(en)
|
2000-09-20 |
2006-12-13 |
Sofitech Nv |
Method for gravel packing open holes fracturing pressure.
|
US6695067B2
(en)
|
2001-01-16 |
2004-02-24 |
Schlumberger Technology Corporation |
Wellbore isolation technique
|
US6557634B2
(en)
|
2001-03-06 |
2003-05-06 |
Halliburton Energy Services, Inc. |
Apparatus and method for gravel packing an interval of a wellbore
|
US6789624B2
(en)
|
2002-05-31 |
2004-09-14 |
Halliburton Energy Services, Inc. |
Apparatus and method for gravel packing an interval of a wellbore
|
NO314005B1
(no)
|
2001-04-10 |
2003-01-13 |
Reslink As |
Anordning ved nedihulls kabelbeskyttelse
|
US6588506B2
(en)
|
2001-05-25 |
2003-07-08 |
Exxonmobil Corporation |
Method and apparatus for gravel packing a well
|
US6749023B2
(en)
|
2001-06-13 |
2004-06-15 |
Halliburton Energy Services, Inc. |
Methods and apparatus for gravel packing, fracturing or frac packing wells
|
US6575251B2
(en)
|
2001-06-13 |
2003-06-10 |
Schlumberger Technology Corporation |
Gravel inflated isolation packer
|
US6516881B2
(en)
|
2001-06-27 |
2003-02-11 |
Halliburton Energy Services, Inc. |
Apparatus and method for gravel packing an interval of a wellbore
|
US6581689B2
(en)
|
2001-06-28 |
2003-06-24 |
Halliburton Energy Services, Inc. |
Screen assembly and method for gravel packing an interval of a wellbore
|
CZ294535B6
(cs)
|
2001-08-02 |
2005-01-12 |
Ústav Experimentální Botaniky Avčr |
Heterocyklické sloučeniny na bázi N6-substituovaného adeninu, způsoby jejich přípravy, jejich použití pro přípravu léčiv, kosmetických přípravků a růstových regulátorů, farmaceutické přípravky, kosmetické přípravky a růstové regulátory tyto sloučeniny obsahující
|
US6752207B2
(en)
|
2001-08-07 |
2004-06-22 |
Schlumberger Technology Corporation |
Apparatus and method for alternate path system
|
US6830104B2
(en)
|
2001-08-14 |
2004-12-14 |
Halliburton Energy Services, Inc. |
Well shroud and sand control screen apparatus and completion method
|
US6749024B2
(en)
|
2001-11-09 |
2004-06-15 |
Schlumberger Technology Corporation |
Sand screen and method of filtering
|
US7051805B2
(en)
|
2001-12-20 |
2006-05-30 |
Baker Hughes Incorporated |
Expandable packer with anchoring feature
|
US7207383B2
(en)
|
2002-02-25 |
2007-04-24 |
Schlumberger Technology Corporation |
Multiple entrance shunt
|
US20030173075A1
(en)
|
2002-03-15 |
2003-09-18 |
Dave Morvant |
Knitted wire fines discriminator
|
DE10217182B4
(de)
|
2002-04-18 |
2009-05-07 |
Lurgi Zimmer Gmbh |
Vorrichtung zum Wechseln von Düsen
|
US6666274B2
(en)
|
2002-05-15 |
2003-12-23 |
Sunstone Corporation |
Tubing containing electrical wiring insert
|
US7243715B2
(en)
|
2002-07-29 |
2007-07-17 |
Schlumberger Technology Corporation |
Mesh screen apparatus and method of manufacture
|
NO318165B1
(no)
|
2002-08-26 |
2005-02-14 |
Reslink As |
Bronninjeksjonsstreng, fremgangsmate for fluidinjeksjon og anvendelse av stromningsstyreanordning i injeksjonsstreng
|
US6814139B2
(en)
|
2002-10-17 |
2004-11-09 |
Halliburton Energy Services, Inc. |
Gravel packing apparatus having an integrated joint connection and method for use of same
|
NO316288B1
(no)
|
2002-10-25 |
2004-01-05 |
Reslink As |
Brönnpakning for en rörstreng og en fremgangsmåte for å före en ledning forbi brönnpakningen
|
US6923262B2
(en)
|
2002-11-07 |
2005-08-02 |
Baker Hughes Incorporated |
Alternate path auger screen
|
US6814144B2
(en)
|
2002-11-18 |
2004-11-09 |
Exxonmobil Upstream Research Company |
Well treating process and system
|
NO318358B1
(no)
|
2002-12-10 |
2005-03-07 |
Rune Freyer |
Anordning ved kabelgjennomforing i en svellende pakning
|
US20040140089A1
(en)
|
2003-01-21 |
2004-07-22 |
Terje Gunneroed |
Well screen with internal shunt tubes, exit nozzles and connectors with manifold
|
US7048061B2
(en)
|
2003-02-21 |
2006-05-23 |
Weatherford/Lamb, Inc. |
Screen assembly with flow through connectors
|
US7870898B2
(en)
|
2003-03-31 |
2011-01-18 |
Exxonmobil Upstream Research Company |
Well flow control systems and methods
|
MXPA05010320A
(es)
*
|
2003-03-31 |
2005-11-17 |
Exxonmobil Upstream Res Co |
Aparato y metodo para completacion, produccion e inyeccion de sondeo.
|
US6883608B2
(en)
|
2003-08-06 |
2005-04-26 |
Schlumberger Technology Corporation |
Gravel packing method
|
US20050028977A1
(en)
|
2003-08-06 |
2005-02-10 |
Ward Stephen L. |
Alternate path gravel packing with enclosed shunt tubes
|
US7147054B2
(en)
|
2003-09-03 |
2006-12-12 |
Schlumberger Technology Corporation |
Gravel packing a well
|
US20050061501A1
(en)
|
2003-09-23 |
2005-03-24 |
Ward Stephen L. |
Alternate path gravel packing with enclosed shunt tubes
|
US7243732B2
(en)
|
2003-09-26 |
2007-07-17 |
Baker Hughes Incorporated |
Zonal isolation using elastic memory foam
|
US20050082060A1
(en)
|
2003-10-21 |
2005-04-21 |
Ward Stephen L. |
Well screen primary tube gravel pack method
|
CA2544887C
(en)
|
2003-12-03 |
2010-07-13 |
Exxonmobil Upstream Research Company |
Wellbore gravel packing apparatus and method
|
US7343983B2
(en)
|
2004-02-11 |
2008-03-18 |
Presssol Ltd. |
Method and apparatus for isolating and testing zones during reverse circulation drilling
|
US7866708B2
(en)
|
2004-03-09 |
2011-01-11 |
Schlumberger Technology Corporation |
Joining tubular members
|
US7243723B2
(en)
|
2004-06-18 |
2007-07-17 |
Halliburton Energy Services, Inc. |
System and method for fracturing and gravel packing a borehole
|
US7597141B2
(en)
|
2004-06-23 |
2009-10-06 |
Weatherford/Lamb, Inc. |
Flow nozzle assembly
|
GB2436500B
(en)
|
2005-01-14 |
2010-04-14 |
Baker Hughes Inc |
Gravel pack multi-pathway tube with control line retention and method for retaining control line
|
US20090283279A1
(en)
|
2005-04-25 |
2009-11-19 |
Schlumberger Technology Corporation |
Zonal isolation system
|
US7591321B2
(en)
|
2005-04-25 |
2009-09-22 |
Schlumberger Technology Corporation |
Zonal isolation tools and methods of use
|
US7441605B2
(en)
|
2005-07-13 |
2008-10-28 |
Baker Hughes Incorporated |
Optical sensor use in alternate path gravel packing with integral zonal isolation
|
US7407007B2
(en)
|
2005-08-26 |
2008-08-05 |
Schlumberger Technology Corporation |
System and method for isolating flow in a shunt tube
|
EP2520761B1
(en)
|
2005-09-30 |
2014-07-16 |
ExxonMobil Upstream Research Company |
Wellbore apparatus and method for completion, production and injection
|
US20070114020A1
(en)
|
2005-11-18 |
2007-05-24 |
Kristian Brekke |
Robust sand screen for oil and gas wells
|
CA2631565C
(en)
|
2005-12-19 |
2012-06-12 |
Exxonmobil Upstream Research Company |
Profile control apparatus and method for production and injection wells
|
AU2006337614B2
(en)
|
2006-02-03 |
2012-07-19 |
Exxonmobil Upstream Research Company |
Wellbore method and apparatus for completion, production and injection
|
BRPI0709898B1
(pt)
|
2006-04-03 |
2017-11-14 |
Exxonmobil Upstream Research Company |
Associated system with hydrocarbon production, and, method
|
US7562709B2
(en)
|
2006-09-19 |
2009-07-21 |
Schlumberger Technology Corporation |
Gravel pack apparatus that includes a swellable element
|
CN101535595B
(zh)
|
2006-11-15 |
2013-01-23 |
埃克森美孚上游研究公司 |
用于完井、开采和注入的井身方法和设备
|
US7661476B2
(en)
|
2006-11-15 |
2010-02-16 |
Exxonmobil Upstream Research Company |
Gravel packing methods
|
US7918276B2
(en)
|
2007-06-20 |
2011-04-05 |
Schlumberger Technology Corporation |
System and method for creating a gravel pack
|
US7828056B2
(en)
|
2007-07-06 |
2010-11-09 |
Schlumberger Technology Corporation |
Method and apparatus for connecting shunt tubes to sand screen assemblies
|
CA2700731C
(en)
|
2007-10-16 |
2013-03-26 |
Exxonmobil Upstream Research Company |
Fluid control apparatus and methods for production and injection wells
|
US8127845B2
(en)
|
2007-12-19 |
2012-03-06 |
Schlumberger Technology Corporation |
Methods and systems for completing multi-zone openhole formations
|
US7832489B2
(en)
|
2007-12-19 |
2010-11-16 |
Schlumberger Technology Corporation |
Methods and systems for completing a well with fluid tight lower completion
|
US7735559B2
(en)
|
2008-04-21 |
2010-06-15 |
Schlumberger Technology Corporation |
System and method to facilitate treatment and production in a wellbore
|
US7814973B2
(en)
|
2008-08-29 |
2010-10-19 |
Halliburton Energy Services, Inc. |
Sand control screen assembly and method for use of same
|
US7926565B2
(en)
|
2008-10-13 |
2011-04-19 |
Baker Hughes Incorporated |
Shape memory polyurethane foam for downhole sand control filtration devices
|
US7784532B2
(en)
|
2008-10-22 |
2010-08-31 |
Halliburton Energy Services, Inc. |
Shunt tube flowpaths extending through swellable packers
|
MX2011003280A
(es)
|
2008-11-03 |
2011-04-28 |
Exxonmobil Upstream Res Co |
Sistemas y metodos de control de flujo de pozos.
|
GB2466475B
(en)
|
2008-11-11 |
2012-07-18 |
Swelltec Ltd |
Wellbore apparatus and method
|
CN102639808B
(zh)
|
2009-11-20 |
2015-09-09 |
埃克森美孚上游研究公司 |
用于替代路径砂砾充填的裸眼封隔器以及完成裸眼井筒的方法
|
MY166117A
(en)
*
|
2010-12-17 |
2018-05-24 |
Exxonmobil Upstream Res Co |
Packer for alternate flow channel gravel packing and method for completing a wellbore
|
CA2819627C
(en)
|
2010-12-17 |
2016-10-18 |
Exxonmobil Upstream Research Company |
Wellbore apparatus and methods for zonal isolation and flow control
|
CN103688015B
(zh)
*
|
2010-12-17 |
2016-09-07 |
埃克森美孚上游研究公司 |
用于多层井完井、采油和注入的井筒装置和方法
|
CN103874827B
(zh)
|
2011-10-12 |
2016-06-22 |
埃克森美孚上游研究公司 |
用于井眼的流体过滤装置和完成井眼的方法
|
US9759046B2
(en)
*
|
2012-07-24 |
2017-09-12 |
Halliburton Energy Services, Inc. |
Pipe-in-pipe shunt tube assembly
|
US8931568B2
(en)
*
|
2013-03-14 |
2015-01-13 |
Weatherford/Lamb, Inc. |
Shunt tube connections for wellscreen assembly
|