METHOD FOR WORKING STEEP LAYERS

Info

Publication number
RU97109393A
RU97109393A RU97109393/03A RU97109393A RU97109393A RU 97109393 A RU97109393 A RU 97109393A RU 97109393/03 A RU97109393/03 A RU 97109393/03A RU 97109393 A RU97109393 A RU 97109393A RU 97109393 A RU97109393 A RU 97109393A
Authority
RU
Russia
Prior art keywords
coal
sub
floor
guard
pillar
Prior art date
Application number
RU97109393/03A
Other languages
Russian (ru)
Other versions
RU2123597C1 (en
Inventor
Н.Л. Разумняк
Ю.Н. Кулаков
Ю.Д. Торф
Г.Е. Лукашев
М.Э. Мильграм
Е.А. Пантелеев
А.Н. Малахов
В.Н. Кулаков
Г.В. Сухарев
И.А. Файнер
В.В. Хан
Г.А. Ефентьев
Original Assignee
Институт горного дела СО РАН
Filing date
Publication date
Application filed by Институт горного дела СО РАН filed Critical Институт горного дела СО РАН
Priority to RU97109393A priority Critical patent/RU2123597C1/en
Priority claimed from RU97109393A external-priority patent/RU2123597C1/en
Application granted granted Critical
Publication of RU2123597C1 publication Critical patent/RU2123597C1/en
Publication of RU97109393A publication Critical patent/RU97109393A/en

Links

Claims (1)

Способ отработки крутых пластов, включающий подготовку подэтажей проведением верхних и нижних подэтажных штреков с формированием охранных целиков, бурение скважин в подэтаже, взрывную отбойку угля на охранный целик с последующим погашением охранного целика и выпуском угля, отличающийся тем, что при подготовке подэтажей соответственно нижние и верхние подэтажные штреки соединяют углеспускными промежуточными печами, а охранный целик формируют над нижними подэтажными штреками проведением компенсационного штрека, из которого бурят скважины до верхних подэтажных штреков с последующей одновременной взрывной отбойкой угля в блоке на охранный целик, а погашение охранного целика производят буровзрывной отбойкой угля одновременно по всей длине блока на установленный на длину вынимаемого блока на нижнем подэтажном штреке конвейер, с помощью которого осуществляют транспортировку угля к углеспускным промежуточным печам.A method of working out steep seams, including preparing sub-floors by conducting upper and lower sub-floor drifts with the formation of guard pillars, drilling holes in the sub-floor, blasting the coal into a guard pillar, followed by paying off the guard pillar and releasing coal, characterized in that when preparing the sub-floors, the lower and upper sub-floor drifts are connected by coal-run intermediate furnaces, and a security pillar is formed above the lower sub-floor drifts by conducting a compensation drift, from which wells are drilled dinners to the upper sub-floor drifts with the subsequent simultaneous explosive breaking of coal in the block for the guard pillar, and the guard pillar is extinguished by drilling and blasting the coal at the same time along the entire length of the block to the conveyor installed on the length of the block to be removed on the lower floor drift, with which coal is transported to the coal discharge intermediate furnaces.
RU97109393A 1997-06-06 1997-06-06 Method for mining steep seams RU2123597C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU97109393A RU2123597C1 (en) 1997-06-06 1997-06-06 Method for mining steep seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU97109393A RU2123597C1 (en) 1997-06-06 1997-06-06 Method for mining steep seams

Publications (2)

Publication Number Publication Date
RU2123597C1 RU2123597C1 (en) 1998-12-20
RU97109393A true RU97109393A (en) 1999-05-20

Family

ID=20193813

Family Applications (1)

Application Number Title Priority Date Filing Date
RU97109393A RU2123597C1 (en) 1997-06-06 1997-06-06 Method for mining steep seams

Country Status (1)

Country Link
RU (1) RU2123597C1 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011588A (en) * 2010-11-30 2011-04-13 淄博市王庄煤矿 House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN102108868B (en) * 2010-12-15 2013-07-24 中国神华能源股份有限公司 Balanced excavation method for room and pillar mining method
CN102704934B (en) * 2012-06-28 2014-07-09 中钢集团马鞍山矿山研究院有限公司 High-yield and low-cost subsequent filling mining method for underground mine
CN103089266B (en) * 2012-12-18 2014-12-10 鞍钢集团矿业公司 Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN103410514A (en) * 2013-07-31 2013-11-27 鞍钢集团矿业公司 Pressure relief and coal extraction method for deeply-compressed ore body
CN103510956A (en) * 2013-08-30 2014-01-15 中国矿业大学(北京) Method for reducing reserved width of waterproof coal pillars of inclined coal seam
CN103821515B (en) * 2014-02-20 2016-05-04 山西晋煤集团技术研究院有限责任公司 A kind of double face filling coal mining technique
CN104358573B (en) * 2014-09-04 2016-08-31 广东安元矿业勘察设计有限公司 The stage open stope of big thick ore body and stage avalanche combined mining method
CN104265294B (en) * 2014-10-22 2017-01-18 四川广旺能源发展(集团)有限责任公司 Coal pillar-free mining method for blasting mining face of steeply dipping seam
CN104775817B (en) * 2015-03-05 2016-12-28 路彬 Full negative pressure Lian Cailian fills step-by-step replacement railways and water-bodies method
CN106523010B (en) * 2015-09-15 2019-01-18 四川达竹煤电(集团)有限责任公司金刚煤矿 Half-edge coal seam coal working face and coal-mining method
CN105673012B (en) * 2016-01-02 2018-08-21 武汉科技大学 It is a kind of to adopt the block stoping filled in conjunction with continuously exploiting
CN105971610A (en) * 2016-06-27 2016-09-28 安徽金联地矿科技有限公司 Process for recycling and collecting open residual ore
CN113216964B (en) * 2021-05-18 2022-05-27 中钢集团马鞍山矿山研究总院股份有限公司 Recovery method of deposit ore in process of transferring caving method to filling method
CN117722181B (en) * 2024-02-07 2024-04-26 贵州息烽磷矿有限责任公司 Method and system for mining steep-inclined thick and large ore body protection column

Similar Documents

Publication Publication Date Title
RU97109393A (en) METHOD FOR WORKING STEEP LAYERS
RU2270338C1 (en) Method for preparation and excavation of inclined and steep mineral bed
SU1652560A1 (en) Method for mining steep orebodies by sublevel caving
RU2052111C1 (en) Method for mining steeply dipping ore bodies
SU1652562A1 (en) Method for roof control in outburst-risky seams
RU2261329C1 (en) Method for coal excavation from thick steeply beds
SU768983A1 (en) Method of working steep coal seams
RU2039260C1 (en) Method for formation of caving slot in longwall face-to-gate junctions
SU1451273A1 (en) Method of mining thick slanting ore bodies
SU1263856A1 (en) Method of mining thick steep deposits by level-wise caving-in
RU2013549C1 (en) Method for artificial interhorizontal pillar building by mining steep and inclined formations
RU2285122C1 (en) Method for extraction of steep coal beds of average power and thin ones
SU1647123A1 (en) Method of underground gasification of underworked coal bed
RU1813178C (en) Method of mining steeply inclined and steeply dipping coal seams
SU1673731A1 (en) Method for working gently sloping coal seams
RU2205954C1 (en) Method of mining of thick steep mineral beds
RU2078211C1 (en) Method of mining thick steep coal seams
SU1666710A1 (en) Method for development of mineral deposits
SU787656A1 (en) Solid roof control method
SU1735583A1 (en) Method for protection of development workings used repeatedly in coal mining
SU1666726A1 (en) Method for mining sloping coal beds
RU2148713C1 (en) Method for opencast mining of sloping and steep deposits of minerals
RU2001271C1 (en) Steep-dipping ore body working method
SU1082953A1 (en) Method of mining gently-sloping coal seams
SU1444521A1 (en) Method of combined mining of steep ore bodies