RU96108876A - METHOD FOR LAYERED EXPLORATION OF ORE BODIES OF HYDRO-MINING - Google Patents
METHOD FOR LAYERED EXPLORATION OF ORE BODIES OF HYDRO-MININGInfo
- Publication number
- RU96108876A RU96108876A RU96108876/03A RU96108876A RU96108876A RU 96108876 A RU96108876 A RU 96108876A RU 96108876/03 A RU96108876/03 A RU 96108876/03A RU 96108876 A RU96108876 A RU 96108876A RU 96108876 A RU96108876 A RU 96108876A
- Authority
- RU
- Russia
- Prior art keywords
- mining
- ore body
- rocks
- depth
- layer
- Prior art date
Links
- 238000005065 mining Methods 0.000 title claims 7
- 239000011435 rock Substances 0.000 claims 5
- 238000004519 manufacturing process Methods 0.000 claims 2
- 239000000463 material Substances 0.000 claims 2
- 239000002699 waste material Substances 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000006073 displacement reaction Methods 0.000 claims 1
- 230000003628 erosive Effects 0.000 claims 1
- 238000005755 formation reaction Methods 0.000 claims 1
- 229910052500 inorganic mineral Inorganic materials 0.000 claims 1
- 239000011707 mineral Substances 0.000 claims 1
Claims (4)
где с - сцепление в массиве горных пород;
β- произведение объемной массы пород
γ на коэффициент бокового давления, равный 0,5;
где ρ и ρ1- углы вертикального трения соответственно горных пород и податливого материала;
Н - глубина отработки полезного ископаемого;
d - эквивалентный диаметр рудного тела,
а обрушение горных пород осуществляют методом регулируемой поэтажной посадки подрабатываемого массива, ограниченного с флангов вертикальной отрезной щелью, под действием собственного веса, для чего скважины располагают так, чтобы последовательный их ввод в эксплуатацию, а соответственно и формирование общей компенсационной полости осуществлялись по спирали, при этом очередную скважину вводят в эксплуатацию при достижении кровлей предыдущей камеры предельных значений, предшествующих ее обрушению.A method of layer-by-layer mining of ore bodies by hydraulic mining, including opening the ore body with boreholes, forming a closed vertical cutting gap and filling it with malleable material, installing equipment in wells, disintegrating rocks, forming a compensation cavity, hydraulic erosion of minerals, delivering the resulting pulp to the surface and laying the mold displacement of production waste, characterized in that. that during the exploitation of deposits with a pillar-like form of the ore body, a vertical cutting gap closed along the contour of the ore body in the interval of its mining is formed from the surface to a depth determined by the formula
where c is the adhesion in the rock mass;
β- product of bulk mass of rocks
γ by a lateral pressure coefficient of 0.5;
where ρ and ρ 1 are the angles of vertical friction of rocks and ductile material, respectively;
H is the depth of mining;
d is the equivalent diameter of the ore body,
and the collapse of rocks is carried out by the method of adjustable floor landing of the undermined array, limited from the flanks by a vertical cutting slot, under the influence of its own weight, for which the wells are positioned so that their subsequent commissioning, and, accordingly, the formation of a common compensation cavity is carried out in a spiral, the next well is put into operation when the roof of the previous chamber reaches the limit values preceding its collapse.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU96108876A RU2095571C1 (en) | 1996-04-25 | 1996-04-25 | Method for hydraulic mining of ore bodies layer-by-layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU96108876A RU2095571C1 (en) | 1996-04-25 | 1996-04-25 | Method for hydraulic mining of ore bodies layer-by-layer |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2095571C1 RU2095571C1 (en) | 1997-11-10 |
RU96108876A true RU96108876A (en) | 1998-01-10 |
Family
ID=20180186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU96108876A RU2095571C1 (en) | 1996-04-25 | 1996-04-25 | Method for hydraulic mining of ore bodies layer-by-layer |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2095571C1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2447287C1 (en) * | 2010-08-26 | 2012-04-10 | Общество с ограниченной ответственностью "Сибирский промышленный холдинг" (ООО "Сибирский промышленный холдинг") | Method to extract materials from thick underground formations |
RU2499129C1 (en) * | 2012-05-23 | 2013-11-20 | Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) | Method open underground mining of steep coal beds |
RU2513785C1 (en) * | 2012-12-03 | 2014-04-20 | Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) | Method for complex development of coal deposit |
RU2651746C1 (en) * | 2017-02-14 | 2018-04-23 | Михаил Георгиевич Коряга | Method for mine sloping inclined high coal beds in hydromining |
-
1996
- 1996-04-25 RU RU96108876A patent/RU2095571C1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105587318B (en) | A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip | |
CN102704934B (en) | High-yield and low-cost subsequent filling mining method for underground mine | |
CN108625856A (en) | A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine | |
CN107893658B (en) | Big thick ore body stage open stope afterwards filling mining methods in pole under strong ground pressure ring border | |
CN108798672B (en) | A kind of mining methods for the area's ore high-efficiency mining that collapses greatly | |
CN109668487A (en) | Micro-vibration rock and soil blasting controls construction method | |
US4230368A (en) | Method for displacing large blocks of earth | |
CN111322109A (en) | Waste stone and tailing synergistic cemented filling method | |
GB2079823A (en) | Mining method | |
RU96108876A (en) | METHOD FOR LAYERED EXPLORATION OF ORE BODIES OF HYDRO-MINING | |
US3964792A (en) | Explosive fluid transmitted shock method for mining deeply buried coal | |
US3917349A (en) | Mining method involving sliding block of overburden on gel lubricant | |
RU2563893C1 (en) | Method of detonation in open-cast minings of rock masses with different strength values | |
RU2348808C2 (en) | Method of preparing bottom of block | |
RU2095571C1 (en) | Method for hydraulic mining of ore bodies layer-by-layer | |
CN106709211A (en) | Method for using tailings mold bag wall to fill ore pillar recovery under pit | |
RU2455613C1 (en) | Method for explosion of rocks with solid inclusions | |
RU2723812C1 (en) | Method for development of gently sloping and inclined bump hazardous ore deposits | |
CN106284290B (en) | Construction method for blasting and silt squeezing of thick sand-gravel interlayer | |
CN217518699U (en) | Mining overburden rock trend subregion is kept apart slip casting and is filled structure | |
SU838096A1 (en) | Method of vibration compacting of filling area | |
SU1717821A1 (en) | Method for mining mineral deposits | |
SU1763665A1 (en) | Method of working sloping ore bodies | |
RU2014453C1 (en) | Method for control of rock pressure | |
SU1763661A1 (en) | Method of hydraulic laying of worked space in mining coal beds |