RU2980U1 - LIFTING DEVICE - Google Patents

LIFTING DEVICE Download PDF

Info

Publication number
RU2980U1
RU2980U1 RU93036203/11U RU93036203U RU2980U1 RU 2980 U1 RU2980 U1 RU 2980U1 RU 93036203/11 U RU93036203/11 U RU 93036203/11U RU 93036203 U RU93036203 U RU 93036203U RU 2980 U1 RU2980 U1 RU 2980U1
Authority
RU
Russia
Prior art keywords
cantilever
dam
rack
lifting device
construction
Prior art date
Application number
RU93036203/11U
Other languages
Russian (ru)
Inventor
Ю.И. Евстратов
О.Л. Сандигурский
И.А. Худяков
Н.И. Кублановский
Original Assignee
Проектно-изыскательский институт "Ленгидропроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Проектно-изыскательский институт "Ленгидропроект" filed Critical Проектно-изыскательский институт "Ленгидропроект"
Priority to RU93036203/11U priority Critical patent/RU2980U1/en
Application granted granted Critical
Publication of RU2980U1 publication Critical patent/RU2980U1/en

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

Грузоподъемное устройство, содержащее стойку с лебедкой и полиспастом, размещенным на консоли стойки, отличающееся тем, что оно снабжено дополнительной консольной стойкой и колесной платформой, причем обе консольные стойки закреплены на колесной платформе, их консоли обращены друг к другу, а полиспасты консольных стоек сопряжены между собой посредством траверсы.A lifting device comprising a rack with a winch and a chain hoist located on the console of the rack, characterized in that it is equipped with an additional cantilever rack and a wheeled platform, both cantilever racks mounted on a wheeled platform, their consoles facing each other, and the tackle cantilever racks are paired between by means of a traverse.

Description

ГРУЗОГОДЪЕМНОЕ УСТРОЙСТВО.LOADING DEVICE.

ft3036203yft3036203y

предлагаемое конструктивное ршеше ©тн&сйтся к области proposed structural solution © tn & fit into the area

строительства, в частшети, к ррузошдъемшш механизмам, исшльзуемнм при возведении и эксплуатации гидросооружений, например, плотин.construction, in part, to load-lifting mechanisms, is used in the construction and operation of hydraulic structures, for example, dams.

Обычно возведение и эксплуатация плотины связаны с использованием дорогостоящих грузеподъемнБК устройств различных конструкций.Typically, the construction and operation of the dam associated with the use of expensive load-lifting BC devices of various designs.

Так, для маневрирования затворами, расположеннши в строительных отверстиях верхнего - бьефа плотины может бить использовано грузошдъемное устройство в виде козлового крана Г I . Однако такое грузоподъемдае устройство обладает возможностью перемещения только по , расположенным i& одном горизонтальном уровне. В то время как щрн шярусном, ступеш1атом, возведении плотины необходимо устанавливать грузоподъемные устройства на разных горизонтальных уровнях, что делает эксплуатацию козлового крана в верхне: бьефе плотины тоактически невозможной.So, for maneuvering the gates located in the construction openings of the upper - downstream dam, a load-lifting device in the form of a gantry crane GI can be used. However, such a load-lifting device has the ability to move only along i & one horizontal level. At the same time it is necessary to install hoisting devices at different horizontal levels, which means that it is necessary to operate the gantry crane at the top: the dam head is practically impossible.

Наиболее приемлемо для казанных целей стационарюе канатное грузоподъемное устройство Г 2 J , выбранное авторами в качестве прототипа заявляемого грузоподъемного устройства. Такое устройство может перемещаться по мере возведения плотины с яруса на ярус путем перестановки обычными башенными или кабельными строительными кранами.The most acceptable for the stated purposes is a stationary rope hoisting device G 2 J, selected by the authors as a prototype of the inventive hoisting device. Such a device can move as the dam is erected from tier to tier by rearrangement by ordinary tower or cable construction cranes.

Прототип включает консольную стойку с лебедкой и полиспастом, размещенным ш, консоли стойки.The prototype includes a cantilever rack with a winch and pulley, placed w, console racks.

Такое грузоподъемное устройство недостаточно эффективно и экономично в эксплуатации.Such a lifting device is not efficient enough and economical to operate.

,Это связаю с тем, что оно может быть исгользовадо лишь при возведении ( да ярусном, ступенчатом) плотины, в частшсти, для маневрирования затворами, расположенными в верхнем бьефе., This is due to the fact that it can only be used when erecting a (yes longline, stepped) dam, in part, for maneuvering with shutters located in the upper pool.

Для маневрирования же затворакш, расположенными .в нижнем бьефе плотинное площадкой, расположенной на одном горизонтальном уровне, это устройство непригодно невозможности самостоятельного ( без помощи строительнах кранов) перемещения его с одного места работы на другое.For maneuvering the shutter, located in the downstream dam area, located on one horizontal level, this device is unsuitable for the impossibility of independent (without the help of construction cranes) moving it from one place of work to another.

В связи с этим для управления затворами в нижнем бьефе плотины используют козловой кран, перемещащийся по горизонтальным путям.In this regard, to control the gates in the downstream of the dam using a gantry crane, moving along horizontal paths.

Предлагаемое конструктивное решение направлено на решение зaдatш повышешя эффективности и экономичности эксплуатации грузоподъемного устройства путем расширения его функциошльных возможностей за счет использования для маневрирования затворами как в верхнем, так и в нижнем бьефах плотины.The proposed constructive solution is aimed at solving the task of increasing the efficiency and economy of the operation of the lifting device by expanding its functional capabilities by using the shutters for maneuvering the shutters both in the upper and in the lower head of the dam.

Решение указанной зaдatщ достигается тем, что грузоподъемное устройство, включающее консольную стойку с лебедкой и полиспастом, размещенным на консоли стойки, снабжено дополнительной консольной стойкой и колесной платформой; при этом обе консольные стойки закреплены на колесной платформе, их консоли обращены друг к другу, а полиспасты обеих консольных стоек сог ряжены между собой посредством траверсы.The solution to this problem is achieved by the fact that the lifting device, including a cantilever rack with a winch and a chain hoist located on the rack console, is equipped with an additional cantilever rack and a wheeled platform; at the same time, both cantilever racks are mounted on a wheeled platform, their consoles are facing each other, and the tackles of both cantilever racks are connected to each other by means of a traverse.

Заявителю не известные конструктивные решения, обладающие такой же совокупностью существенных признаков, что и заявляемое, что свидетельствует о соответствии заявляемого объекта критерию новизна.The applicant does not know the constructive solutions that have the same set of essential features as the claimed one, which indicates the compliance of the claimed object with the novelty criterion.

Благодаря реализации отличительных признаков .заявляемого консгрзпктившго ретешя в совокупности с признаками общими с прототипом, расширяются функциональные возможности грузоподъемного устройства - его можно использовать как в верхнем бьефе при ступенчатом возведении плотины - тогда консольные стойки снимаются с колесной платформы и строительным краном устанавливаются в нзркном месте, г так и в нижнем бьефе при работе на горизонтальных щггях, когда консольные стойки указанным образом устанавливаются и закрепляются на колесной платформе.Thanks to the implementation of the distinguishing features of the inventive conservative bastard, together with the features common with the prototype, the functionality of the lifting device is expanded - it can be used as in the upstream for step-by-step dam construction - then the cantilever racks are removed from the wheel platform and installed with a construction crane in an open place, g and in the downstream when working on horizontal keys, when cantilever racks are installed and fixed on the wheel plate in this way Orme.

Предлагаемое техническое ранение иллюстрируется чертежами, где на фигД изображено грузоподъемное устройство в общем виде ( поперечный разрез), на фиг.2 - оно же - вед сбоку, фиг. 3 иллюстрирует работу предлагаемого устройства при поярусном возведении гидросооружения в верхнем бьефе, а фиг. 4 - работу устройства в нижнем бьефе.The proposed technical wound is illustrated by drawings, in which Fig. 1 shows a lifting device in general form (cross section), in Fig. 2, it is also a lead on the side, Fig. 3 illustrates the operation of the proposed device with a tiered construction of a hydraulic structure in the upper pool, and FIG. 4 - operation of the device in the downstream.

Устройство содержит консольные стойки I и 2, закрепленные с помощью жестких растяжек 3 на колесной платформе 4. Консоли обеих стоек обращены друг к другу. Огойки I и 2 содержат лебедки 5 и б, и полиспасты 7 и 8 соответственно, сопряженные между собой посредством траверсы 9,The device contains cantilever racks I and 2, fixed with rigid braces 3 on the wheeled platform 4. The consoles of both racks are facing each other. Lugs I and 2 contain winches 5 and b, and tackles 7 and 8, respectively, paired with each other by means of a yoke 9

Колесная платформа установлена с возмождастью перемещения по горизонгальньш путям Ю.A wheeled platform is installed with the possibility of moving along the horizontal tracks of the south

&) время работы в нижнем бьефе ( фиг.4 ) плотины полиспасты 7,8 сцеплена с затвором 11 через траверсу 9,.а при работе в верхнем бьефе (фиг.3) полиспасты непосредственно сцеплены с затвором 12 верхнего бьефа плотины.&) the operating time in the downstream reach (Fig. 4) of the tackle dam 7,8 is coupled to the shutter 11 through the yoke 9, and when working in the upper reach (Fig. 3), the tackle is directly engaged with the shutter 12 of the upstream dam.

Устройство работает следующм образом.The device operates as follows.

- Б процессе эксплуатации предлагаемого грузоподъемного устройства в нижнем бье$е плотины, где затворы расположены на одном горизонтальном уровне,.оно перемещается с одного места работы на другое, то есть от одного затвора к другому, ш горизонтальным путям 10. При этом на колесной платформе 4 закреплены обе консольные СТОЙКИ I и 2.- During the operation of the proposed lifting device in the bottom of the dam, where the valves are located at one horizontal level, it moves from one place of work to another, that is, from one valve to another, w horizontal tracks 10. Moreover, on a wheeled platform 4 fixed both cantilever Racks I and 2.

Шлиспасты 7 и 8 приводятся в действие пофедством лебедок 5 и 6 и благодаря (щеплешю траверсы 9 с затвором II осуществляется маневрирование последним.- ,Shlispasta 7 and 8 are driven by the department of winches 5 and 6 and thanks to (with a pinch of traverse 9 with shutter II, the latter is maneuvered .-,

%и эксш1уата1:р и предлагаемого, грузоподъемного устройства в верхнем бьефе плотины, при шярусном возведении ее, используется лишь одна ( любая ) из консольных сто: ш , например, 2. Для этогогснимается с колесной платформы и с помощью строительного башенного или кабельного крана устанавливается на очередщш отметку яруса бетонирования плотины и закрепляется на бетонной площадке. После этого шлиспаст 8 консольной-стойки 2 соединяется с затвором 12 и при помощи лебедки 6 приводится в действие. Так осуществляется ьаневрирование затвором 12 верхнего бьефа плотины.% and exh1uata1: p and the proposed load-lifting device in the upper downstream of the dam, in case of its tiered construction, only one (any) of the cantilever is used: w, for example, 2. It can be removed from the wheel platform and installed with the help of a construction tower or cable crane at the next level mark the concreting level of the dam and fixed on the concrete site. After that, the splint 8 of the cantilever rack 2 is connected to the shutter 12 and is driven by means of a winch 6. In this way, annealing of the shutter 12 of the upper pool of the dam is carried out.

Таким образом, предлагаемое устройство сочетает в себе функции грузоподъемных устройств, используемых как в верхнем, так и в нижнем бьефах плотины,, ото делает эксплуатацию его эффективной и экономичгой, так как позволяет ограничиться одним грузоподъемным устройством в процессе возведения и эксплуатации плотины.Thus, the proposed device combines the functions of lifting devices used both in the upper and lower pools of the dam, which makes its operation efficient and economical, as it allows you to limit yourself to one lifting device in the process of construction and operation of the dam.

Источниеи информации:Sources of information:

I.Гидроэнергетическое и вспомогательное оборудование гидроэлектростанций, под ред. Щавелева Д.С. М., 1990, т.2, с.20-21, рис.3-4.I. Hydropower and auxiliary equipment of hydroelectric power plants, ed. Shchaveleva D.S. M., 1990, v. 2, pp. 20-21, Fig. 3-4.

Claims (1)

Грузоподъемное устройство, содержащее стойку с лебедкой и полиспастом, размещенным на консоли стойки, отличающееся тем, что оно снабжено дополнительной консольной стойкой и колесной платформой, причем обе консольные стойки закреплены на колесной платформе, их консоли обращены друг к другу, а полиспасты консольных стоек сопряжены между собой посредством траверсы.A lifting device comprising a rack with a winch and a chain hoist located on the console of the rack, characterized in that it is equipped with an additional cantilever rack and a wheeled platform, both cantilever racks mounted on a wheeled platform, their consoles facing each other, and the tackle cantilever racks are paired between by means of a traverse.
RU93036203/11U 1993-07-13 1993-07-13 LIFTING DEVICE RU2980U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU93036203/11U RU2980U1 (en) 1993-07-13 1993-07-13 LIFTING DEVICE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU93036203/11U RU2980U1 (en) 1993-07-13 1993-07-13 LIFTING DEVICE

Publications (1)

Publication Number Publication Date
RU2980U1 true RU2980U1 (en) 1996-10-16

Family

ID=48265252

Family Applications (1)

Application Number Title Priority Date Filing Date
RU93036203/11U RU2980U1 (en) 1993-07-13 1993-07-13 LIFTING DEVICE

Country Status (1)

Country Link
RU (1) RU2980U1 (en)

Similar Documents

Publication Publication Date Title
GB971660A (en) Improvements in or relating to hoisting equipment
US4496277A (en) Lifting device and method
GB1008424A (en) Improvements in or relating to cranes
US3127996A (en) Climbing cranes
RU2980U1 (en) LIFTING DEVICE
GB1117234A (en) Improvements relating to hoists for masts
GB788086A (en) Improvements relating to observation towers
GB1035680A (en) Improvements relating to travelling cranes
SU88597A1 (en) Mobile boom crane
SU850560A1 (en) Device for erecting equipment with aid of boom crane
KR200254626Y1 (en) Installing Apparatus of Screen for Intake Tower
KR100437992B1 (en) Installing Apparatus of Screen for Intake Tower and The Installing Method Thereof
GB936227A (en) Improvements in or relating to lifts
SU421614A1 (en) METHOD OF INSTALLATION OF TOWER CRANES
SU810605A1 (en) Device for lifting guy ropes when erecting mast-like structure
SU419462A1 (en) SELF LIFT CRANE
DE4009744A1 (en) SHIP LIFTING SYSTEM
GB1393358A (en) Rotary tower cranes
GB1126780A (en) Improvements in or relating to methods of and means for constructing the frame work of metal buildings
FR2256894A1 (en) Building site tower crane - has tower of open sided sections forming lift shaft on completion
SU573436A1 (en) Cargo-lifting tower crane for operation at successively rising levels
GB1098232A (en) Improvements in or relating to hoists
RU45140U1 (en) DEVICE FOR LIFTING OR LOWERING HEAVY DUTY BRIDGE STRUCTURES
SU937316A1 (en) Tower crane and method of its transfer onto span structure of dridge crane
JPH0828031A (en) Traversable/movable gondola device