RU2693981C1 - Two environmental-friendly drilling rig in arctic design - Google Patents

Two environmental-friendly drilling rig in arctic design Download PDF

Info

Publication number
RU2693981C1
RU2693981C1 RU2018140742A RU2018140742A RU2693981C1 RU 2693981 C1 RU2693981 C1 RU 2693981C1 RU 2018140742 A RU2018140742 A RU 2018140742A RU 2018140742 A RU2018140742 A RU 2018140742A RU 2693981 C1 RU2693981 C1 RU 2693981C1
Authority
RU
Russia
Prior art keywords
unit
drilling
echelon
electrical equipment
module
Prior art date
Application number
RU2018140742A
Other languages
Russian (ru)
Inventor
Эдуард Юрьевич Худайнатов
Сергей Анатольевич Балашов
Original Assignee
Акционерное Общество "Урало-Сибирская Промышленная Компания"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное Общество "Урало-Сибирская Промышленная Компания" filed Critical Акционерное Общество "Урало-Сибирская Промышленная Компания"
Priority to RU2018140742A priority Critical patent/RU2693981C1/en
Application granted granted Critical
Publication of RU2693981C1 publication Critical patent/RU2693981C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/002Down-hole drilling fluid separation systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

FIELD: drilling of soil and rocks.
SUBSTANCE: invention relates to drilling unit for cluster drilling of prospecting and operating oil and gas wells in cold climatic conditions, for example, Far North of Russia. Proposed unit comprises overhead winch unit with base and tower mounted on two-echelon guides of circulating system equipment, including drilling mud preparation, cleaning and storage unit and drilling fluid supply pump unit, as well as a receiving bridge unit and an electrical equipment unit connected to the circulating system equipment. Module of the electrical equipment unit containing the transformer, the complete thyristor device and the low-voltage complete device is located in the first tier, and the module of the electrical equipment unit containing the diesel power plant - in the second one. Installation has a shelter. First echelon comprises a hoisting unit with a U-shaped mast tower for cluster drilling, a drilling mud cleaning unit, a mud storage unit, a unit of electrical equipment containing a diesel power plant. Second echelon comprises a preparation unit, a unit of drilling pumps, a unit of electrical equipment containing a transformer, a complete thyristor device, a low-voltage complete device. Second tier houses a unit for cleaning drilling mud from the first echelon, as well as a receiving bridge unit located above the electrical equipment unit from the second echelon.
EFFECT: simplified and faster mounting, easier maintenance and repair, as well as higher environmental safety.
4 cl, 12 dwg

Description

Изобретение относится к нефтегазовому оборудованию, а именно к двухэшелонной двухярусной блочно-модульной буровой установке, которая может быть использована для кустового бурения разведочных и эксплуатационных нефтяных и газовых скважин в холодных климатических условиях, например Крайнего Севера России.The invention relates to oil and gas equipment, namely, two-echelon two-tier block-modular drilling rig, which can be used for cluster drilling of exploration and production oil and gas wells in cold climatic conditions, such as the Far North of Russia.

В компоновке буровых установках традиционно используют вышечно-лебедочный блок для спускоподъемных операций (ВЛБ), циркуляционную систему для обеспечения циркуляции бурового раствора (ЦС), включающую блок приготовления, очистки и хранения бурового раствора и насосный блок для подачи бурового раствора (НБ), блок или модуль приемного моста для подачи и хранения труб (ПМ), блоки электрооборудования и др.In the layout of drilling rigs, a winch block for tripping operations (VLB), a circulating system for circulating drilling mud (CS), including a drilling mud preparation, cleaning and storage unit and a pump block for supplying drilling mud (NB), a block or receiving bridge module for supplying and storing pipes (PM), electrical equipment blocks, etc.

При разработке компоновки буровых установок стремятся к компактности. В настоящее время компактность достигается за счет компоновки функциональных блоков в два эшелона. Двухэшелонная установка имеет меньшую протяженность коммуникаций, занимает меньшую площадь и требует меньше работ по подготовке кустовой площадки, наносит меньший, урон экологии. Двухэшелонные буровые установки размещают на направляющих, поэтому приемный мост, установленный на направляющих, может перемещаться вместе со всем оборудованием, и, как следствие, не требует демонтажа или специальных приспособлений при его перемещении.In the development of the layout of drilling rigs tend to compactness. At present, compactness is achieved by arranging functional blocks in two echelons. Two-echelon installation has a smaller length of communications, occupies a smaller area and requires less work on the preparation of the cluster site, causes less environmental damage. Two-echelon drilling rigs are placed on guides, therefore the receiving bridge mounted on the guides can move with all the equipment, and, as a result, does not require dismantling or special tools when it is moved.

Становятся востребованными двухэшелонные буровые установки со вторым ярусом, как например, буровая установка для кустового бурения нефтяных и газовых скважин (RU 133867, публ. 27.10.2013) [1]. В данной установке расположение приемного моста со стеллажами для буровых труб во втором ярусе дает этой установке дополнительные преимущества, т.к. позволяет без дополнительных механизмов ориентировки труб перемещать трубы к ВЛБ в направлении, параллельном направлению движения установки. В этом случае повороты трубы при подаче и разгрузке исключены.Two-echelon drilling rigs with a second tier, such as a drilling rig for well drilling of oil and gas wells (RU 133867, publ. 10/27/2013) [1], are becoming popular. In this installation, the location of the receiving bridge with racks for drill pipes in the second tier gives this installation additional advantages, since allows, without additional mechanisms of pipe orientation, to move pipes to the VLB in a direction parallel to the direction of installation movement. In this case, the turns of the pipe during feeding and unloading are excluded.

Двухэшелонная компоновка дает возможность установки дополнительных блоков, а также укрытия для обогрева рабочих зон, наличие которого уменьшает теплопотери и, соответственно, повышает энергоэффективность эксплуатации буровой установки. Задача по уменьшению теплопотерь особенно актуальна для так называемых арктических буровых установок, эксплуатируемых в крайне холодных климатических условиях.Two-echelon layout allows installation of additional units, as well as shelters for heating work areas, the presence of which reduces heat loss and, consequently, increases the energy efficiency of the operation of the drilling rig. The task of reducing heat loss is particularly relevant for the so-called Arctic drilling rigs, operated in extremely cold climatic conditions.

В качестве наиболее близкой к заявляемому изобретению выбрана компактная кустовая буровая установка в арктическом исполнении (RU 116558, публ. 27.05.2012) [2], известная под названием «Арктика» (см. электронный ресурс: http://naukams.com/burovaya-ustanovka-uralmash-6000-400-ek-bmch-arktika) [3]. Данная блочно-модульная установка выполнена в арктическом исполнении.As the closest to the claimed invention, a compact cluster drilling rig in the Arctic design was selected (RU 116558, publ. 27.05.2012) [2], known as “Arctic” (see electronic resource: http://naukams.com/burovaya -ustanovka-uralmash-6000-400-ek-bmch-arktika) [3]. This modular unit is made in the Arctic version.

Буровая установка «Арктика» содержит четыре рельсовые направляющие балки, на которых в два эшелона установлены технологически связанные функциональные блоки с необходимым оборудованием. Первый эшелон содержит вышечно-лебедочный блок с основанием и вышкой башенного типа, первый блок оборудования циркуляционной системы, блок насосного оборудования. Второй эшелон содержит блок приемного моста, расположенный напротив ВЛБ, второй блок оборудования ЦС, расположенный напротив первого блока ЦС, вслед за вторым блоком ЦС установлен модуль блока энергооборудования (БЭ). БЭ содержит комплектное тиристорное устройство (КТУ), низковольное коммутирующее устройство (КТУ) с немаслонаполненным оборудованием, резервную дизельэлектростанцию (ДЭС), парогенератор и теплогенератор. С двух сторон от приемного моста, расположенного во втором эшелоне, установлены модуль противовыбросового оборудования (ПВО) и дополнительный модуль энергооборудования с оборудованием гидростанции и парогенератором (ПГМ). В качестве дополнительных модулей на кровельной поверхности первого блока ЦС могут быть установлены модули для ИТР.The drilling rig "Arktika" contains four rail guide beams, on which technologically connected functional units with the necessary equipment are installed in two echelons. The first echelon contains a tower-winch unit with a tower-type base and tower, the first unit of the circulating system equipment, the unit of pumping equipment. The second echelon contains the receiving bridge unit located opposite the VLB, the second equipment unit of the CA, located opposite the first CA unit, after the second CA unit the power equipment module (BE) module is installed. BE contains a complete thyristor device (KTU), a low-level switching device (KTU) with non-oil-filled equipment, a back-up diesel power station (DES), a steam generator and a heat generator. On both sides of the receiving bridge, located in the second echelon, a blowout equipment module (AIR) and an additional module of power equipment with hydroelectric station equipment and a steam generator (PGM) are installed. As additional modules, modules for engineers and technicians can be installed on the roofing surface of the first CA unit.

Модули первого блока ЦС скомпонованы в два яруса таким образом, что первый ярус содержит модули приемных емкостей бурового раствора, второй ярус - модули оборудования для очистки бурового раствора. Второй блок оборудования ЦС содержит модули емкостей для хранения и приготовления бурового раствора. Модули блока энергооборудования, выполненные с силовым каркасом, а также блок оборудования ЦС скомпонованы в два яруса. Причем первый ярус блока оборудования ЦС образован модулями КТУ, НКУ и КТУ, второй ярус - модулями с резервной ДЭС, паро- и теплогенератора, а также двумя модулями, предназначенными для отдыха персонала и хранения инструмента. На кровельной поверхности второго блока ЦС установлены стеллажи для бурильных труб. Оба эшелона основных функциональных блоков кустовой буровой установки технологически объединены посредством системы коммуникаций, включающей кабельные трассы, нагнетательный манифольд, трубопроводы различного назначения.The modules of the first block of CS are arranged in two tiers in such a way that the first tier contains modules of the receiving mud tanks, the second tier - modules of the equipment for drilling mud cleaning. The second block of equipment CA contains modules of tanks for storage and preparation of drilling mud. The modules of the power equipment block, made with the power frame, as well as the equipment block of the CS are arranged in two tiers. Moreover, the first tier of the CA equipment block is formed by the KTU, NKU and KTU modules, the second tier - by the modules with the backup diesel power station, steam and heat generator, as well as by two modules designed for staff rest and tool storage. Racks for drill pipes are installed on the roofing surface of the second CS unit. Both echelons of the main functional blocks of a cluster drilling rig are technologically integrated through a communications system, including cable lines, a pressure manifold, and pipelines for various purposes.

Конструкция основания ВЛБ обусловлена конструкцией вышки башенного типа, четыре опоры которой установлены на два лонжерона, смонтированные двух блоках механизма перемещения, установленных вдоль направляющих. При такой конструкции основания противовыбросовое оборудование (ПВО) заводится под лонжероном между направляющими, что при замене ПВО на кусте может привести к повреждению арматуры пробуренных скважин. Соответствующее оборудование циркуляционной системы сгруппировано в модулях, установленных в два яруса благодаря тому, что данные модули выполнены с объемным силовым каркасом. Целесообразность выполнения остальных функциональных блоков из модулей, содержащих силовой каркас, объясняется возможностью установки модулей блока электрооборудования также в два яруса. При этом благодаря силовому каркасу на кровельной поверхности блоков становится возможным устанавливать дополнительные модули с необходимым оборудованием.The design of the base of the VLB is determined by the construction of a tower of a tower type, the four supports of which are mounted on two spars mounted by two blocks of a displacement mechanism installed along the guides. With such a base design, the blowout preventer (BOP) is started up under the side member between the guides, which, if the BOP system is replaced on the bush, can cause damage to the fittings of the drilled wells. The corresponding equipment of the circulating system is grouped in modules installed in two tiers due to the fact that these modules are made with a volumetric power frame. The feasibility of the remaining functional blocks of the modules containing the power frame, due to the possibility of installing modules of electrical equipment also in two tiers. In this case, thanks to the power frame on the roofing surface of the blocks, it becomes possible to install additional modules with the necessary equipment.

Поскольку данная установка предназначена для бурения скважин в условиях Крайнего Севера России, она полностью укрыта от вышечно-лебедочного блока до приемного моста со стеллажами для бурильных труб, включая межэшелонное пространство. Для обеспечения комфортных условий труда на рабочей площадке и палатях верхового рабочего башенная вышка, состоящая из восьми пространственных секций, имеет укрытие на всю высоту из светопроницаемого материала, при этом основные функциональные блоки: первый и второй блоки ЦС, НБ, модуль блока энергооборудования, модуль приемного моста, модули ПВО и дополнительный модуль ПГМ также оснащены элементами укрытия. Так, модули первого и второго блоков ЦС, НБ, и блока электрооборудования оснащены кровельными и боковыми (стеновыми) панелями там, где это необходимо. Модуль приемного моста, стеллажи для бурильных труб содержат кровельные панели, а боковые стороны могут быть сформированы из мягкого укрытия. Укрытие буровой вышки ВЛБ с буровой площадкой выполнено в виде щитов, закрепленных непосредственно на секциях вышки. Возможен вариант с мягким укрытием вышки с буровой площадкой.Since this installation is intended for drilling wells in the conditions of the Far North of Russia, it is completely covered from the winch block to the receiving bridge with racks for drill pipes, including inter-flight space. To ensure comfortable working conditions at the working site and the wards of the top working tower, the tower, consisting of eight spatial sections, has a shelter to the entire height of translucent material, with the main functional blocks: the first and second blocks of the CS, NB, power equipment module, receiving module bridge, air defense modules and an additional module PGM are also equipped with elements of the shelter. Thus, the modules of the first and second blocks of the CS, NB, and electrical equipment are equipped with roofing and side (wall) panels, where necessary. The receiving bridge module, drill pipe racks contain roofing panels, and the sides can be formed from a soft cover. The shelter of the VLB drilling tower with a drilling platform is made in the form of shields attached directly to the sections of the tower. The variant with a soft cover of the tower with a drilling site is possible.

Элементом укрытия стеллажей для бурильных труб и модулей приемного моста, ПВО и дополнительного модуля ПГМ является площадка для монтажа башенной вышки, опирающаяся на четыре стойки, установленные на элементах объемного силового каркаса модулей ПВО, модуля приемного моста, и дополнительного модуля ПГМ. В установке «Арктика» опорные конструкции укрытия расположены на каждом модуле, при этом возникает необходимость дополнительно устанавливать межмодульные нащельники, что добавляет трудоемкости монтажа укрытий. Кроме того, установка «Арктика» имеет комбинированную систему обогрева, включающую воздушный обогрев помещений от двух теплогенераторов и технологический обогрев емкостей, картеров буровой лебедки, насосов и подсвечников осуществляется от двух парогенераторов. Сборка вышки башенного типа в установке «Арктика» возможна только после сборки приемного моста, т.к. площадка для сборки секций вышки находится на его крыше. Это отрицательно сказывается на сроке монтажа. Кроме того, в установке «Арктика» не предусмотрена очистка воздуха от паров нефтепродуктов, притом, что при бурении на основе нефтесодержащих растворов активно выделяется сероводород и пары нефтепродуктов.The shelter element for shelving for drill pipes and receiving bridge modules, air defense systems and the additional PGM module is a platform for mounting the tower, supported by four racks mounted on the elements of the volumetric power frame of the air defense modules, the receiving bridge module, and the additional PGM module. In the “Arktika” installation, the supporting structures of the shelter are located on each module, thus there is a need to additionally install inter-module slats, which adds to the complexity of the installation of shelters. In addition, the “Arktika” unit has a combined heating system, including air heating of the rooms from two heat generators and technological heating of tanks, drawworks crankcases, pumps and candlesticks from two steam generators. Assembly of the tower tower in the installation "Arctic" is possible only after the assembly of the receiving bridge, because a platform for assembling tower sections is located on its roof. This adversely affects the installation time. In addition, the “Arktika” installation does not provide for the purification of air from the vapors of petroleum products, moreover, when drilling on the basis of oily solutions, hydrogen sulfide and vapors of petroleum products are actively released.

Задачей заявленного технического решения является упрощение и ускорение монтажа, повышение удобства обслуживания и ремонта оборудования, а также повышение экологической безопасности установки.The objective of the claimed technical solution is to simplify and speed up installation, increase the ease of maintenance and repair of equipment, as well as increase the environmental safety of the installation.

Для этого предложена двухэшелонная двухярусная буровая установка в арктическом исполнении, которая, как и прототип, содержит вышечно-лебедочный блок с основанием и вышкой, установленное на направляющих в два эшелона оборудование циркуляционной системы, включая блок приготовления, очистки и хранения бурового раствора и насосный блок для подачи бурового раствора, а также блок приемного моста и, соединенный с оборудованием циркуляционной системы блок электрооборудования, при этом модуль блока электрооборудования, содержащий трансформатор, комплектное тиристорное устройство, низковольтное комплектное устройство, расположен в первом ярусе, а модуль блока электрооборудования, содержащий дизельную электростанцию, - во втором. Кроме того, установка имеет укрытие. Новая установка отличается тем, что первый эшелон содержит вышечно-лебедочный блок с П-образной мачтовой вышкой для кустового бурения, блок очистки бурового раствора, блок хранения бурового раствора, блок электрооборудования, содержащий дизельную электростанцию, второй эшелон содержит блок приготовления, блок буровых насосов, блок электрооборудования, содержащий трансформатор, комплектное тиристорное устройство, низковольтное комплектное устройство, при этом во втором ярусе расположен блок очистки бурового раствора из первого эшелона, а также блок приемного моста, расположенный над блоком электрооборудования из второго эшелона.For this, a two-echelon two-tiered drilling rig in the Arctic design was proposed, which, like the prototype, contains a winch block with a base and a tower, installed on two-echelon guides of the circulation system, including a drilling mud preparation, cleaning and storage unit and a pumping unit for supply of drilling mud, as well as the receiving bridge unit and, connected to the equipment of the circulation system, an electrical equipment unit, wherein the module of the electrical equipment unit containing a op, complete thyristor unit, low-voltage device is located in the first tier, and the module electrical unit comprising a diesel power plant, - in the second. In addition, the installation has a shelter. The new unit is different in that the first echelon contains a U-shaped winch block with a U-shaped mast tower for well drilling, a drilling mud purification unit, a drilling mud storage unit, an electrical equipment unit containing a diesel power station, the second echelon contains a preparation unit, a drilling pump unit, an electrical unit containing a transformer, a complete thyristor device, a low-voltage complete device, while in the second tier there is a mud purification unit from the first echelo on, as well as the receiving bridge unit, located above the electrical equipment block from the second echelon.

Установка отличается также тем, что модули блоков циркуляционной, системы, буровых насосов, приемного моста, имеют единое укрытие, представляющее собой пространственные ферменные конструкции, на рамах которых установлены утепленные крышные, боковые, торцевые и коньковые панели. При этом крышные панели выполнены съемными, а на коньковых панелях имеются крышки, в которых смонтирована вытяжная система, содержащая фильтры для очистки воздуха от паров нефтепродуктов.The installation is also distinguished by the fact that the modules of the circulating units, the system, the drilling pumps, the receiving bridge, have a single shelter, which is a spatial truss structure, on the frames of which there are warmed roof, side, end and ridge panels. At the same time, the roof panels are made removable, and on the ridge panels there are covers in which an exhaust system is mounted containing filters for air purification from oil product vapors.

Компоновка оборудования циркуляционной системы для обеспечения циркуляции бурового раствора в заявленной буровой установке выполнена таким образом, что емкости хранения находятся в первом эшелоне непосредственно рядом с блоком очистки бурового раствора. При таком расположении емкостей хранения циклическое движение бурового раствора предполагает его сброс в емкости хранения после очистки пескоотделителем, илоотделителем, центрифугами. Это позволяет упростить обвязку трубопроводов между блоками очистки и хранения бурового раствора, обеспечить удобство обслуживания оборудования и контроля технологического процесса. За счет этого уменьшаются длины трубопроводов, количество соединений, количество запорно-регулирующей арматуры. То, что блок хранения бурового раствора выполнен в одноярусном исполнении означает, что над емкостями хранения нет других модулей. Это дает возможность для удобного доступа к оборудованию, такому как перемешиватели, датчики уровня, датчики плотности, для спуска в емкость, для отбора проб бурового раствора.The layout of the equipment of the circulation system to circulate the drilling fluid in the declared drilling rig is designed in such a way that the storage tanks are in the first echelon directly next to the mud cleaning unit. With such an arrangement of storage tanks, the cyclic movement of the drilling mud implies its discharge into the storage tanks after cleaning with a sand trap, a descaler, and centrifuges. This allows us to simplify the binding of pipelines between the blocks of cleaning and storage of drilling mud, to provide ease of equipment maintenance and process control. Due to this, reduced length of pipelines, the number of connections, the number of valves and control valves. The fact that the drilling mud storage unit is made in a single-tiered version means that there are no other modules above the storage tanks. This allows for convenient access to equipment, such as agitators, level sensors, density sensors, for lowering into a tank, for sampling drilling mud.

Расположение блока приготовления во втором эшелоне, свободном от других металлоконструкций, обеспечивает удобный подвоз химических реагентов спецтехникой для приготовления бурового раствора, а также замены вышедшего из строя оборудования. Расположение блока приемного моста над блоком электрооборудования позволяет вести работу с трубами, как с помощью механизма подачи, так и традиционным способом при помощи вспомогательной лебедки. При этом расположение блока электрооборудования, содержащего трансформатор, комплектное тиристорное устройство, низковольтное комплектное устройство, под приемным мостом минимизирует длину прокладки кабельной продукции и соответственно расходы при их замене.The location of the preparation unit in the second echelon, free from other metal structures, provides convenient supply of chemical reagents with special equipment for preparing drilling mud, as well as replacing broken equipment. The location of the receiving bridge unit above the electrical equipment allows you to work with pipes, either using the feeder or in the traditional way using an auxiliary winch. At the same time, the location of the electrical equipment block containing the transformer, the complete thyristor device, the low-voltage complete device, under the receiving bridge minimizes the length of the cable production and, accordingly, the cost of replacing them.

Использование П-образной мачтовой вышки для кустового бурения позволяет производить запасовку рабочего каната на этапе ее монтажа до подъема, то есть в горизонтальном положении, что гораздо удобнее, чем на вышке в вертикальном положении. Кроме того, монтаж П-образной вышки можно вести параллельно с монтажом остальных блоков, что по сравнению с установкой «Арктика» сокращает срок монтажа на 8 суток.The use of a U-shaped mast tower for cluster drilling makes it possible to stock the working rope at the stage of its installation prior to lifting, that is, in a horizontal position, which is much more convenient than on a tower in an upright position. In addition, the installation of the U-shaped tower can be carried out in parallel with the installation of the remaining units, which, compared with the installation of the "Arctic", reduces the installation time by 8 days.

Укрытие буровой установки представляет собой отдельные от блоков и модулей компактные в транспортном положении и удобные в монтаже панели, удобные для транспортировки пачкой, что существенно сокращает расходы на их транспортировку до места монтажа на буровой установке. Для сборки укрытий на месте монтажа требуется минимальное количество пальцевых и болтовых соединений. Элементы укрытия циркуляционной системы таковы, что уплотнения находятся прямо на них и не требуется установка межмодульных нащельников. Для ремонта и замены двигателей насосов и другого оборудования крышные панели выполнены съемными.The shelter of the drilling rig is separate from the blocks and modules compact in transport position and convenient to install panels, convenient for transporting a pack, which significantly reduces the cost of transporting them to the installation site on the drilling rig. For the assembly of shelters at the installation site requires a minimum number of finger and bolt connections. The elements of the shelter of the circulation system are such that the seals are located directly on them and no installation of inter-module strips is required. For repair and replacement of pump engines and other equipment, roof panels are removable.

Таким образом, новый технический результат, достигаемый заявленным решением, заключается в упрощении обвязки трубопроводов между блоками очистки и хранения бурового раствора, уменьшении длины трубопроводов, сокращения количества соединений, и запорно-регулирующей арматуры, минимизации длины прокладки кабельной продукции, а также в снижении расходов на транспортировку узлов до места монтажа на буровой установке.Thus, the new technical result achieved by the claimed solution consists in simplifying the piping between the cleaning and storage units of the drilling mud, reducing the length of the pipelines, reducing the number of connections, and valves, minimizing the length of the cable installation, and also reducing the cost of transportation of nodes to the place of installation on the drilling rig.

Заявленная буровая установка иллюстрируется следующими рисунками. На фиг. 1 изображен общий вид установки; на фиг. 2 - то же, вид сбоку; на фиг. 3 - общая компоновка первого и второго эшелонов первого яруса, вид сверху; на фиг. 4 - общая компоновка первого и второго эшелонов второго яруса, вид сверху; на фиг. 5 - компоновка модулей блоков первого и второго эшелонов первого яруса, вид сверху; на фиг. 6 - компоновка модулей блоков первого» и второго эшелонов второго яруса, вид сверху; на фиг. 7 - укрытие буровой установки, вид спереди; на фиг. 8 - укрытие буровой установки, вид сбоку; на фиг. 9 - укрытие буровой установки, вид сверху; на фиг. 10 - ферма укрытия буровой установки в рабочем положении; на фиг. 11 - ферма укрытия буровой установки в транспортном положении; на фиг. 12 - элемент укрытия буровой установки.The declared drilling rig is illustrated by the following figures. FIG. 1 shows a general view of the installation; in fig. 2 - the same, side view; in fig. 3 - the general layout of the first and second echelons of the first tier, top view; in fig. 4 - the general layout of the first and second echelons of the second tier, top view; in fig. 5 - layout of the modules of the blocks of the first and second echelons of the first tier, top view; in fig. 6 shows the layout of the modules of the first and second echelons of the second tier, top view; in fig. 7 - the shelter of the drilling rig, front view; in fig. 8 - shelter of the drilling rig, side view; in fig. 9 - shelter of the drilling rig, top view; in fig. 10 - farm shelter rig in the working position; in fig. 11 - farm shelter rig in transport position; in fig. 12 - the element of the shelter rig.

Буровая установка содержит установленные в два эшелона на двух парах направляющих 1, вышечно-лебедочный блок 2 и функциональные блоки-модули. Первый эшелон (I) содержит блок очистки бурового раствора 3, блок хранения бурового раствора 4, блок электрооборудования 5. Второй эшелон (II) содержит, блок буровых насосов 6, блок приготовления 7, блок электрооборудования 8, блок приемного моста 9. Второй ярус использован для расположенного в первом эшелоне блока очистки 3, и блока приемного моста 9, расположенного над блоком электрооборудования 8, расположенном во втором эшелоне. Во втором ярусе на емкостях блока хранения 4 расположено технологическое оборудование и трубопроводы (не показаны).The drilling rig contains installed in two echelons on two pairs of guides 1, winch block 2 and functional blocks-modules. The first echelon (I) contains a drilling mud cleaning unit 3, a drilling mud storage unit 4, an electrical equipment block 5. The second echelon (II) contains a drilling pump block 6, a preparation unit 7, an electrical equipment block 8, a receiving bridge unit 9. The second tier is used for the purification unit 3 located in the first echelon, and the reception bridge unit 9 located above the electrical equipment unit 8 located in the second echelon. In the second tier, the processing equipment and pipelines (not shown) are located on the tanks of the storage unit 4.

На направляющие 1 опирается механизм перемещения и выравнивания 10, на них установлены модули левого и правого лонжерона 11, которые служат опорой для П-образной мачтовой вышки для кустового бурения 12, которая монтируется в горизонтальном положении и затем поднимается в рабочее положение устройством для подъема вышки. На левую и правую опорные рамы 13 установлены модули ротора, подсвечников и рамы вспомогательной лебедки, которые образуют рабочую площадку 14. Данная конструкция основания ВЛБ позволяет заводить противовыбросовое оборудование под приемным мостом перпендикулярно направляющим, не задевая арматуру пробуренных скважин.The guides 1 are supported by the movement and alignment mechanism 10, they are equipped with modules of the left and right side member 11, which serve as a support for the U-shaped mast tower for well drilling 12, which is mounted in a horizontal position and then rises to the working position with a device for lifting the tower. On the left and right support frames 13, the rotor, candlesticks and auxiliary winch modules are installed, which form the working platform 14. This VLB base construction allows to start the blowout equipment under the receiving bridge perpendicular to the guides, without touching the reinforcement of the drilled wells.

Расположенный в первом эшелоне блок очистки 3 содержит модуль шламовых насосов 15, модуль грубой очистки 16, модуль тонкой очистки 17. Блок хранения 4 содержит модуль водяной емкости 18, модули хранения 19, модуль промежуточный с насосом 20. Расположенный за ними блок электрооборудования 5 в качестве аварийного источника электроснабжения содержит дизельную электростанцию 21.The cleaning unit 3 located in the first echelon contains a slurry pump module 15, a coarse cleaning module 16, a fine cleaning module 17. Storage unit 4 contains a water tank module 18, storage modules 19, an intermediate module with a pump 20. Electrical equipment block 5 behind them as emergency power source contains a diesel power station 21.

Расположенный во втором эшелоне блок электрооборудования 8 содержит складское помещение 22, компрессорную станцию 23, трансформатор 24, комплектное тиристорное устройство (КТУ) 25, низковольтное комплектное устройство (ЫКУ) 26. Следующий за ним блок буровых насосов 6: (НБ) содержит модуль обслуживания 27, модуль бурового насоса 28, модуль запорно-распределительного устройства (ЗРУ) 29, модуль бурового насоса 30, модуль промежуточный 31. Блок приготовления 7 содержит модуль приготовления с насосом и гидроворонкой 32, модуль приготовления с емкостью 33. В конце второго эшелона расположена площадка приземления эвакуатора верхового рабочего 34. Блок приемного моста 9 содержит стеллажи 35. Приемный мост имеет механизированную подачу трубы на рабочую площадку и возврат рабочего инструмента на приемный мост.The electrical equipment unit 8 located in the second echelon contains a storage room 22, a compressor station 23, a transformer 24, a complete thyristor device (KTU) 25, a low-voltage complete device (UCU) 26. The following block of drilling pumps 6: (NB) contains a service module 27 , a mud pump module 28, a locking-distribution device module (MRU) 29, a mud pump module 30, an intermediate module 31. Preparation block 7 contains a cooking module with a pump and a hydraulic funnel 32, a cooking module with a capacity 33. at the end of the second echelon, there is a landing site for a towing overhead worker 34. The receiving bridge unit 9 contains racks 35. The receiving bridge has a mechanized pipe feed to the working platform and the return of the working tool to the receiving bridge.

Механизм перемещения и выравнивания выполнен в виде 4-х опор, попарно соединенных площадками. Каждая опора содержит по 2 балансирных колеса, 4 винтовых домкрата и 6 гидродомкратов, посредством которых ВЛБ опирается на направляющие во время бурения, используются для выравнивания ВЛБ. Для перемещения эшелонов используются 4 гидроцилиндра, установленные попарно на каждом эшелоне.The mechanism of movement and alignment is made in the form of 4 pillars connected in pairs by platforms. Each support contains 2 balancing wheels, 4 screw jacks and 6 hydraulic jacks, through which the VLB rests on the guides while drilling, are used to align the VLB. To move the trains, 4 hydraulic cylinders are used, installed in pairs on each train.

Оборудование (ЦС), состоящее из блока очистки бурового раствора 3, блока хранения бурового раствора 4, блока приготовления 6 и насосного блока 7 позволяет выполнять очистку бурового раствора от выбуренной породы с возможностью дегазации в процессе бурения, готовить и хранить необходимый запас раствора, а также осуществлять его диспергацию. Полный объем системы составляет 535 м3. Насосный блок на базе двух трехпоршневых буровых насосов обеспечивает подачу бурового раствора на забой в процессе бурения, очистку забоя от выбуренной породы, суммирование потоков от буровых насосов, приведение в действие гидравлических забойных двигателей, охлаждение и смазку долота. Блок приготовления оснащен монорельсом с электроталью г/п 3,2 т. для перемещения мешков с химическими реагентами.Equipment (CS), consisting of a drilling mud purification unit 3, a drilling mud storage unit 4, a preparation unit 6 and a pump unit 7, allows cleaning the drilling mud from cuttings with the possibility of degassing during the drilling process, preparing and storing the necessary stock of mud, as well as disperse it. The total volume of the system is 535 m3. The pumping unit on the basis of two three-piston mud pumps provides the supply of drilling mud to the bottomhole during the drilling process, cleaning the bottomhole of the cuttings, summing up the flows from the mud pumps, actuating the hydraulic downhole motors, cooling and lubricating the bit. The cooking unit is equipped with a monorail with an electric hoist of 3,2 tons. To move bags of chemical reagents.

Блок электрооборудования 8, содержащий комплектное тиристорное устройство (КТУ), низковольтное комплектное устройство (НКУ), комплектное распределительное устройство (КРУ) позволяет осуществлять комбинированное электроснабжение установки, как от комплекса дизельных электростанций, включенных в параллельную работу, расположенных на кустовой площадке, так и от централизованной системы электроснабжения от ЛЭП напряжением 6,3 кВ, 50 Гц. Оптимальный режим бурения обеспечивается частотно-регулируемым приводом переменного тока всех основных механизмов. Установка оборудована системами контроля и управления процесса бурения.The electrical equipment block 8, containing a complete thyristor device (KTU), a low-voltage complete device (NKU), a complete switchgear (KRU), allows the installation to be combined power supply, both from a complex of diesel power plants included in parallel operation, located on a cluster site, and from centralized power supply system from 6.3 kV, 50 Hz power transmission lines. The optimal drilling mode is provided by a frequency-controlled AC drive of all the main mechanisms. The installation is equipped with control systems and management of the drilling process.

На последнем модуле первого эшелона расположен перекачивающий центробежный насос для работы с емкостями хранения и с доливной емкостью. При его отсутствии требовался бы переход во второй эшелон для запуска одного из находящихся в блоке приготовления насосов, что крайне неудобно в плане контроля за движением раствора. В блоке очистки расположена доливная емкость с двумя насосами для принудительного долива скважины. Один из насосов является резервным.On the last module of the first echelon, there is a pumping centrifugal pump for working with storage tanks and with additional capacity. If it is not available, a transition to the second echelon would be required to start one of the pumps in the preparation unit, which is extremely inconvenient in controlling the movement of the solution. In the cleaning unit there is a refilling tank with two pumps for forced topping up the well. One of the pumps is redundant.

На каждом модуле буровых насосов расположен подпорный насос. Это позволяет контролировать работу буровых насосов, следить за давлением в подпорной линии непосредственно находясь в насосном блоке. Размещение бухты талевого каната выполнено со свободной стороны второго эшелона, что позволяет произвести удобную замену. Расположение выкидных линий противовыбросового оборудования выполнено за первым эшелоном в отличие от традиционного расположения со стороны приемного моста, т.е. между двумя эшелонами. Это намного удобней для подъезда техники, обслуживания, ремонта, замены.A booster pump is located on each drilling pump module. This allows you to monitor the operation of drilling pumps, to monitor the pressure in the retaining line directly being in the pumping unit. The placement of the tackle bay is made from the free side of the second echelon, which allows for convenient replacement. The arrangement of discharge lines of the blowout equipment is performed behind the first echelon, in contrast to the traditional arrangement on the side of the receiving bridge, i.e. between two trains. It is much more convenient for the entrance of equipment, maintenance, repair, replacement.

Для отопления установки предусмотрена трехблочная котельная, которая обеспечивает простоту в обслуживании и не требует дополнительной водоподготовки. Котельная состоит из трех блоков, каждый из которых может работать как отдельно, так и совместно, в зависимости от необходимого потребления тепла и работает на жидком топливе. При бурении на основе нефтесодержащих растворов активно выделяется сероводород и пары нефтепродуктов, на заявленной буровой установке применена вытяжная система с использованием фильтровых элементов, что позволяет свести к минимуму загрязнение окружающей среды.For heating the installation, a three-block boiler room is provided, which provides ease of maintenance and does not require additional water treatment. The boiler room consists of three units, each of which can work both separately and jointly, depending on the required heat consumption and runs on liquid fuel. When drilling on the basis of oil-containing solutions, hydrogen sulfide and vapors of petroleum products are actively released, an exhaust system using filter elements is used at the stated drilling rig, which allows minimizing environmental pollution.

Вышечно-лебедочный блок обогревается и полностью укрыт от попадания осадков в рабочую зону, тем самым обеспечиваются комфортные условия работы. Помещение блока электрооборудования 8 и блока приемного моста 9 полностью выполнено из сэнвдич-панелей, в отличие от аналогов, в которых применяется недолговечное тентовое укрытие. В связи с этим внутри данных блоков также создается благоприятный для работы микроклимат.The winch block is heated and completely covered from precipitation into the work area, thereby ensuring comfortable working conditions. The room of the electrical equipment unit 8 and the receiving bridge unit 9 is completely made of sandwich panels, unlike its counterparts, which use a short-lived awning shelter. In this regard, a microclimate conducive to the work is also created inside these blocks.

Модули блоков циркуляционной системы, буровых насосов, приемного моста, имеют единое укрытие 36. Укрытие представляет собой пространственные ферменные конструкции с рамами и установленными на них утепленными панелями. Это панели крышные 37, панели боковые 38, панели торцевые 39, панели коньковые 40. Каждая панель в местах стыковки с соседними панелями имеет встроенные резиновые уплотнения 41. В коньковых панелях 40 имеются крышки, в которых смонтирована вытяжная система, содержащая фильтры 42 для очистки воздуха от паров нефтепродуктов. В нижних боковых панелях имеются распашные ворота для прохода тали с грузом; в боковых панелях имеются окна. Для ремонта и замены двигателей насосов и другого оборудования крышные панели выполнены съемными. Фермы и панели компактны в транспортном положении и удобны в монтаже (см. фиг. 10, 11). Таким образом, укрытие буровой установки представляет собой отдельные от блоков и модулей панели, удобные для транспортировки пачкой, что существенно сокращает расходы на их транспортировку до места монтажа на буровой установке. Для сборки укрытий на месте монтажа требуется минимальное количество пальцевых и болтовых соединений. Элементы укрытия циркуляционной системы таковы, что уплотнения находятся прямо на них и не требуется установка межмодульных нащельников. Для повышения экологической безопасности установки в раме каждого модуля имеются короба, соединенные с расположенным под рамами коллектором сбора утечек бурового раствора, сливаемых в емкость либо в устье скважины (не показаны).The modules of the circulation system, drilling pumps, receiving bridge, have a single shelter 36. The shelter is a spatial truss structure with frames and insulated panels installed on them. These are roof panels 37, side panels 38, end panels 39, ridged panels 40. Each panel has built-in rubber seals 41 at the joints with adjacent panels. Skate panels 40 have lids in which an exhaust system containing filters 42 for cleaning air is mounted from vapors of oil products. In the lower side panels there are hinged gates for the passage of hoists with cargo; There are windows in the side panels. For repair and replacement of pump engines and other equipment, roof panels are removable. Truss and panels are compact in transport position and convenient to install (see Fig. 10, 11). Thus, the shelter of the drilling rig is separate from the blocks and modules of the panel, convenient for transporting a pack, which significantly reduces the cost of transporting them to the place of installation on the drilling rig. For the assembly of shelters at the installation site requires a minimum number of finger and bolt connections. The elements of the shelter of the circulation system are such that the seals are located directly on them and no installation of inter-module strips is required. To improve the environmental safety of the installation, in the frame of each module there are ducts connected to a collection collector of leaks of drilling fluid located under the frames and drained into the reservoir or at the wellhead (not shown).

Заявленная буровая установка работает следующим образом. Автомобиль с трубами, связанными в пачку, подъезжает, встает рядом со вторым эшелоном, останавливается в зоне работы электротали. Оператор, управляя электроталью с пульта, поднимает пачку труб на уровень стеллажей, затаскивает под укрытие и выгружает на стеллажи для подачи труб или для их хранения. Рычажный механизм с гидроприводом полностью механизирует передачу труб со стеллажей на рабочую площадку и обратно.Declared drilling rig works as follows. A car with pipes tied up in a pack pulls up, stands next to the second echelon, stops in the working area of the electric hoist. The operator, controlling the electric hoist from the console, raises a stack of pipes to the level of the racks, pulls them under cover and unloads them onto the racks for feeding pipes or for storing them. The hydraulically operated linkage mechanism fully mechanizes the transfer of pipes from the racks to the working platform and back.

Бурильная колонна через вертлюг или систему верхнего привода подвешивается к талевой системе. Подача инструмента на забой и поддержание нагрузки на долото производится при помощи регулятора подачи долота (РПД) в двух режимах: ручном и автоматическом. В ручном режиме скорость подачи инструмента на забой или нагрузка на долото задаются с-пульта бурильщика сельсинным командоаппаратом вручную бурильщиком. В автоматическом режиме скорость подачи инструмента или заданная нагрузка на долото поддерживается автоматически.The drill string through the swivel or top drive system is suspended to the pulley system. The tool is fed to the face and the load on the bit is maintained using the bit feed adjuster (RPD) in two modes: manual and automatic. In manual mode, the tool feed rate to the face or load on the bit is set from the driller's console by the selsyn control unit manually by the driller. In automatic mode, the tool feed rate or set bit load is maintained automatically.

В блоке приготовления при помощи специального оборудования готовится буровой раствор, который попадает в блок хранения и перемешивается. Далее раствор перекачивается в насосный блок во всасывающий трубопровод буровых насосов, которые под высоким давлением направляют в скважину. Из скважины, через затрубное пространство раствор переносит разбуренную породу в блок очистки. После чего вновь попадает в емкости хранения для дальнейшей циркуляции.In the preparation unit with the help of special equipment, drilling mud is prepared, which flows into the storage unit and mixes. Next, the solution is pumped into the pumping unit in the suction pipe of the drilling pumps, which under high pressure is sent to the well. From the well, through the annulus, the solution transfers the drilled rock to the cleaning unit. After that, it re-enters the storage tanks for further circulation.

При необходимости извлечь части бурового насоса для ремонта используется монорельс с талью, расположенный в блоке буровых насосов. При необходимости замены бурового насоса целиком следует демонтировать две крышные панели и использовать автокран для погрузки на автотранспорт. В процессе бурения установку перемещают при помощи встроенного механизма перемещения и выравнивания по направляющим от одной скважины куста к другой.If necessary, remove parts of the mud pump for repair using a monorail with a hoist located in the block of mud pumps. If it is necessary to replace the entire mud pump, remove the two roof panels and use a truck crane to load onto vehicles. In the process of drilling, the installation is moved using the built-in mechanism for moving and leveling along the guides from one well to another.

Заявленная установка для кустового бурения скважин с двухэшелонным расположением функциональных блоков технологического оборудования будет изготовлена под торговым названием «Таймыр-01», глубиной бурения 6000 м, грузоподъемностью 400 тн. в арктическом исполнении. В дальнейшем буровая установка может эксплуатироваться в любых районах Российской Федерации без каких-либо изменений. Использование этой установки позволит снизить время спуско-подъемных операций, упростить и ускорить монтаж, обслуживание и ремонт оборудования, что в совокупности позволяет сэкономить значительные средства на бурение скважин по сравнению с аналогами. Применение в буровой установке вытяжной системы с фильтрами для очистки воздуха от паров нефтепродуктов, а так же конструктивных приспособлений для сбора утечек бурового раствора позволят свести к минимуму загрязнение окружающей среды, то есть обеспечит экологически безопасную эксплуатацию.The stated unit for well cluster drilling with a two-echelon arrangement of functional units of the process equipment will be manufactured under the trade name "Taimyr-01", a drilling depth of 6000 m, with a carrying capacity of 400 tons. in the arctic version. In the future, the drilling rig can be operated in any areas of the Russian Federation without any changes. The use of this installation will reduce the time of tripping, simplify and speed up the installation, maintenance and repair of equipment, which together allows you to save significant resources on drilling wells compared to counterparts. The use of an exhaust system in a drilling unit with filters for air purification from oil product vapors, as well as constructive devices for collecting leaks of drilling mud will minimize environmental pollution, that is, ensure environmentally safe operation.

Claims (4)

1. Двухэшелонная экологически безопасная буровая установка в арктическом исполнении, содержащая вышечно-лебедочный блок с основанием и вышкой, установленное на направляющих в два эшелона оборудование циркуляционной системы, включая блок приготовления, очистки и хранения бурового раствора и насосный блок для подачи бурового раствора, а также блок приемного моста и соединенный с оборудованием циркуляционной системы блок электрооборудования, при этом модуль блока электрооборудования, содержащий трансформатор, комплектное тиристорное устройство, низковольтное комплектное устройство, расположен в первом ярусе, а модуль блока электрооборудования, содержащий дизельную электростанцию, - во втором, кроме того, установка имеет укрытие, отличающаяся тем, что первый эшелон содержит вышечно-лебедочный блок с П-образной мачтовой вышкой для кустового бурения, блок очистки бурового раствора, блок хранения бурового раствора, блок электрооборудования, содержащий дизельную электростанцию, второй эшелон содержит блок приготовления, блок буровых насосов, блок электрооборудования, содержащий трансформатор, комплектное тиристорное устройство, низковольтное комплектное устройство, при этом во втором ярусе расположен блок очистки бурового раствора из первого эшелона, а также блок приемного моста, расположенный над блоком электрооборудования из второго эшелона.1. A two-echelon environmentally friendly drilling rig in the Arctic design, containing a winch block with a base and a tower, two-echelon equipment installed on a circulation system, including a drilling mud preparation, cleaning and storage unit and a pumping unit for supplying drilling mud, as well as the receiving bridge unit and the electrical equipment unit connected to the circulating system equipment; the electrical equipment module module containing the transformer is a complete thyristor unit The device, a low-voltage complete device, is located in the first tier, and the module of an electrical equipment block containing a diesel power station is in the second tier; in addition, the installation has a shelter, characterized in that the first echelon contains a tower-winding unit with a U-shaped mast tower for cluster drilling, drilling mud cleaning unit, drilling mud storage unit, electrical equipment block containing a diesel power station, the second echelon contains a preparation block, a drill pump block, an electrical equipment block, with an adherent transformer, a complete thyristor device, a low-voltage complete device, while in the second tier there is a drilling mud purification unit from the first echelon, as well as a receiving bridge unit located above the electrical equipment unit from the second echelon. 2. Установка по п.1, отличающаяся тем, что модули блоков циркуляционной системы, буровых насосов, приемного моста имеют единое укрытие, представляющее собой пространственные ферменные конструкции, на рамах которых установлены утепленные крышные, боковые, торцевые и коньковые панели.2. Installation under item 1, characterized in that the modules of the blocks of the circulation system, drilling pumps, receiving bridge have a single shelter, which is a spatial truss structure, the frames of which are equipped with warmed roof, side, end and ridge panels. 3. Установка по п.2, отличающаяся тем, что крышные панели выполнены съемными.3. Installation under item 2, characterized in that the roof panels are made removable. 4. Установка по п.2, отличающаяся тем, что в коньковых панелях имеются крышки, в которых смонтирована вытяжная система, содержащая фильтры для очистки воздуха от паров нефтепродуктов.4. Installation according to claim 2, characterized in that the ridge panels have covers in which an exhaust system is mounted, which contains filters for cleaning air from oil product vapors.
RU2018140742A 2018-04-16 2018-04-16 Two environmental-friendly drilling rig in arctic design RU2693981C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018140742A RU2693981C1 (en) 2018-04-16 2018-04-16 Two environmental-friendly drilling rig in arctic design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018140742A RU2693981C1 (en) 2018-04-16 2018-04-16 Two environmental-friendly drilling rig in arctic design

Publications (1)

Publication Number Publication Date
RU2693981C1 true RU2693981C1 (en) 2019-07-08

Family

ID=67251816

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018140742A RU2693981C1 (en) 2018-04-16 2018-04-16 Two environmental-friendly drilling rig in arctic design

Country Status (1)

Country Link
RU (1) RU2693981C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2777818C2 (en) * 2019-12-19 2022-08-11 Сычуань Хунхуа Петролеум Эквипмент Ко., Лтд. Drilling rig of movement of echelon type, made with the possibility of longitudinal movement

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0748924B1 (en) * 1995-06-17 2002-06-12 BENTEC GMBH Drilling & Oilfield Systems Tank system for drillingmud
RU51099U1 (en) * 2005-08-03 2006-01-27 Ооо Нпц "Металлург" MOBILE DRILLING RIG
RU97160U1 (en) * 2010-04-01 2010-08-27 Закрытое акционерное общество "УРБО" (ЗАО "УРБО") COMPACT ECHELON OF A DRILL DRILLING RIG
RU102044U1 (en) * 2010-06-25 2011-02-10 Общество с ограниченной ответственностью "Лицензионная Компания "КУНГУР" PIT DRILLING RIG WITH SIMPLIFIED LAYOUT DIAGRAM
RU116558U1 (en) * 2011-12-07 2012-05-27 Общество с ограниченной ответственностью "Уралмаш Нефтегазовое Оборудование Холдинг" (ООО "Уралмаш НГО Холдинг") COMPACT SPEED DRILLING RIG
RU133867U1 (en) * 2013-06-13 2013-10-27 Общество с ограниченной ответственностью "Генерация инжиниринг" TWO-TIER TWO-LEVEL UNIT FOR TEMPORAL DRILLING OF OIL AND GAS WELLS

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0748924B1 (en) * 1995-06-17 2002-06-12 BENTEC GMBH Drilling & Oilfield Systems Tank system for drillingmud
RU51099U1 (en) * 2005-08-03 2006-01-27 Ооо Нпц "Металлург" MOBILE DRILLING RIG
RU97160U1 (en) * 2010-04-01 2010-08-27 Закрытое акционерное общество "УРБО" (ЗАО "УРБО") COMPACT ECHELON OF A DRILL DRILLING RIG
RU102044U1 (en) * 2010-06-25 2011-02-10 Общество с ограниченной ответственностью "Лицензионная Компания "КУНГУР" PIT DRILLING RIG WITH SIMPLIFIED LAYOUT DIAGRAM
RU116558U1 (en) * 2011-12-07 2012-05-27 Общество с ограниченной ответственностью "Уралмаш Нефтегазовое Оборудование Холдинг" (ООО "Уралмаш НГО Холдинг") COMPACT SPEED DRILLING RIG
RU133867U1 (en) * 2013-06-13 2013-10-27 Общество с ограниченной ответственностью "Генерация инжиниринг" TWO-TIER TWO-LEVEL UNIT FOR TEMPORAL DRILLING OF OIL AND GAS WELLS

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2777818C2 (en) * 2019-12-19 2022-08-11 Сычуань Хунхуа Петролеум Эквипмент Ко., Лтд. Drilling rig of movement of echelon type, made with the possibility of longitudinal movement

Similar Documents

Publication Publication Date Title
CN113748256A (en) Single-conveyor mobile power plant
US8387704B2 (en) System and method for simultaneous sea drilling operations
EA006352B1 (en) Method and system for building modular structures from which oil and gas wells are drilled
EA021244B1 (en) Drilling rig and mounting method therefor
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
RU2693981C1 (en) Two environmental-friendly drilling rig in arctic design
CN108463610A (en) System and method for executing well operation
CN110173221A (en) Oil field drilling repairs operation ground environmental protection pipe heat-extraction system
CN103738480B (en) Skid-mounted type offshore platform module
US8662203B2 (en) Method and device for creating a deep borehole
CN216894347U (en) Unmanned well head platform upper portion chunk of standing
RU133867U1 (en) TWO-TIER TWO-LEVEL UNIT FOR TEMPORAL DRILLING OF OIL AND GAS WELLS
CN216892336U (en) Unmanned well head platform that stays with formula of salvaging well repair area
RU97160U1 (en) COMPACT ECHELON OF A DRILL DRILLING RIG
RU116558U1 (en) COMPACT SPEED DRILLING RIG
RU83280U1 (en) PIT DRILLING RIG
RU2189439C2 (en) Method of developing oil deposits and block complex system of plants for method embodiment
CA2738196C (en) Drilling rig for deep well drilling
SU1553644A1 (en) Mobile drilling unit
RU2467146C2 (en) Cluster drilling rig with simplified arrangement
WO1998016715A1 (en) Off-shore oil or gas production unit
CN219367434U (en) Electromechanical integrated pressurizing pry
RU2672892C2 (en) Cluster driller
Tudor et al. Borehole Drilling Rig and step-by-step Movement of a Stationary Drilling Installation.
McLean Jr Delta Rig 76