CN110173221A CN201910405294.9A CN201910405294A CN110173221A CN 110173221 A CN110173221 A CN 110173221A CN 201910405294 A CN201910405294 A CN 201910405294A CN 110173221 A CN110173221 A CN 110173221A
Authority
CN
China
Prior art keywords
folding
load
unfolding
collecting box
pond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910405294.9A
Other languages
Chinese (zh)
Inventor
代国伟
李琦
陈晓丹
代文君
陈中山
王荏巍
李妍喆
贾馨蕊
于奕晨
李晓彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910405294.9A priority Critical patent/CN110173221A/en
Publication of CN110173221A publication Critical patent/CN110173221A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/005Waste disposal systems

Abstract

The invention discloses oil field drillings to repair operation ground environmental protection pipe heat-extraction system, including oil pipe discharging and greasy dirt collection device, support bracket device, the oil pipe discharging and greasy dirt collection device include liquid-collecting box, drainage system, the liquid-collecting box is mounted on support bracket device, the quantity of the liquid-collecting box is at least arranged two, the liquid-collecting box is by bottom of pond frid, load-bearing cross-arm, load-bearing tile, side baffle, load-bearing cross-arm is arranged in the bottom of pond frid front side edge edge, load-bearing tile is arranged in bottom of pond frid back side edge edge, bottom of pond frid left side edge and right edge edge are respectively provided with side baffle, the bottom of pond frid opens up leakage fluid dram, the drainage system is connect with leakage fluid dram;The multiple liquid-collecting box discharges side by side, i.e. the load-bearing tile of the liquid-collecting box of the latter is buckled on the load-bearing cross-arm of previous liquid-collecting box.The present invention has quick, the light-weight, long service life of scene dismounting, eliminates the technical advantages such as the harsh weather abilities such as pollution risk, anti-sleet are strong.

Description

Oil field drilling repairs operation ground environmental protection pipe heat-extraction system
Technical field
The present invention relates to oil drillings, operation ground line bar environment-friendly type exhaust system technical field, specifically oil field Brill repairs operation ground environmental protection pipe heat-extraction system.
Background technique
At present both at home and abroad in drilling and repairing well operation process, crude oil, the sewage taken out of out of well to drilling rod, oil pipe bar are mainly used Plastic film, artificial cofferdam construct the simple accumulating sewage sump oil in ground, prevent sewage sludge oil from spreading.With domestic and international environmental protection reason It reads, the continuous promotion of regulation, environment protection control method can no longer meet environment-protecting clean production needs at present, it is mainly manifested in:
1, plastic film antiseepage mode generates a large amount of plastic garbage, and processing difficulty is big, the secondary pollution duration is long.
2, existing environmentally friendly prevention mode is laid with, in scale removal process in installation, and heavy workload causes workload to work production Increase.
3, the adverse circumstances ability such as anti-strong wind, heavy rain is poor, easily pollutes control failure in inclement weather, there are poles Big environmental protection risk.
4, low, damage oilfield enterprise's production management image of repairing live standardization level is bored.
5, use, waste processing cost are high, and a such cost of light maintenance operation team is not less than 30,000 yuan/year.
Application number: 201410643204.7 disclose a kind of oil field mechanization oil pipe tube drawbench, including comb elevator Structure, comb telescoping mechanism, comb tube pulling mechanism, comb scraping plate mechanism, comb baffle mechanism, electric walking mechanism, electric control operation Mechanism composition.Comb elevating mechanism design installation hydraulic cylinder realizes the lifting of rack pipe mechanism, is welded on the vehicle frame of walking mechanism; Comb telescoping mechanism, which designs idler wheel, slideway and turbine and worm and realizes, to be stretched, and is mounted on comb elevating mechanism sliding lifter plate;Row Pipe tube pulling mechanism is connected on comb scraping plate mechanism using banded structure is rolled;It is solid that comb scraping plate mechanism designs oil pipe hoop card slot Surely it is connected on comb telescoping mechanism pulley;Comb baffle mechanism is welded in comb elevating mechanism set girt(h);Electric control operation Mechanism installation is connected in electric walking mechanism;Electric walking mechanism and vehicle frame and rack pipe mechanism are connected, and realize oil pipe machine Toolization discharge, improves comb working efficiency, reduces the artificial comb labor intensity of worker.
Application number: 201510227310.1 disclose for the oil pipe automation tapping equipment of oil well repairing operation and side Method, wherein device, mainly includes comb component, and the comb component includes comb modular support frame, linear running mechanism, grabs Hand is taken, the linear running mechanism in tri- directions X, Y, Z is set on the comb modular support frame, and the end of Z axis is provided with rotation Rotation mechanism;The crawl hand is connect with the rotating mechanism of Z axis end, and crawl hand can move along a straight line along tri- directions X, Y, Z, Meanwhile grabbing hand rotatable certain angle under rotating mechanism effect;The comb component is additionally provided with for stacking cross-arm Cross-arm case.The automation discharge of oil pipe when oil well repairing operation can be achieved in the present invention, so that reaching reduces oil field operation worker labor Fatigue resistance improves operating efficiency and operational security, reduces the purpose of oil field operation well site environmental pollution, meanwhile, device tool Have that occupied area is small, feature easy for installation.
Application number: 201821109633.6 disclose a kind of automatic feeding apparatus of anti-pollution Portable oil pipe, are related to oil field and rise Lower tubular column technical field of operation, including oil pipe discharging and greasy dirt collection box, row are hung, drive a vehicle lower railway beam, driving frame, vertical beam, cross Beam boom, oil pipe grabbing device and PLC system, row is hung to be slidably connected with two tracks of oil pipe discharging and greasy dirt collection box, row Vehicle lower railway beam sets there are two and is arranged in parallel in the upper end that row is hung, and driving frame is slidably connected with two driving lower railway beams, erects Beam casing is set in driving frame and is slidably connected with driving frame, and vertical beam lower end is fixed with crossbeam boom, and crossbeam boom lower end is equipped with Multiple oil pipe bridges are fixed in oil pipe grabbing device, oil pipe discharging and greasy dirt collection box, each oil pipe bridge side is provided with multiple Adjustable tube rod bracket.The device oil pipe bar is realized draw send, sling, in place, comb integral automation operate, save people Power, it is reusable from dismounting and conveniently moving when transfer, placing space is saved, greasy dirt is avoided to land.
The technical solution of technology disclosed above and technical problem to be solved and the beneficial effect of generation with this hair It is bright not identical, for more technical characteristics of the invention and technical problem to be solved and beneficial effect, skill disclosed above Technical inspiration is not present in art file.
Summary of the invention
Repair operation ground environmental protection pipe heat-extraction system the purpose of the present invention is to provide oil field drilling, the present invention for oil drilling, During the discharge of underground work scene tube rod ground, storage, the collection of drilling rod, oil pipe, the adherency of sucker rod inside and outside sump oil, sewage With processing, meet safety and environmental protection needs, meets the discharge needs of work progress drilling rod, oil pipe and sucker rod.The present invention has existing Quick, the light-weight, long service life of dismounting eliminates the technical advantages such as the harsh weather abilities such as pollution risk, anti-sleet are strong.
In order to achieve the above objectives, present invention employs following technical solution, oil field drilling repairs operation ground environmental protection pipe row system System, including oil pipe discharging and greasy dirt collection device, support bracket device, the oil pipe discharging and greasy dirt collection device include liquid collecting Box, drainage system, the liquid-collecting box are mounted on support bracket device, and the quantity of the liquid-collecting box is at least arranged two, described Load-bearing cross-arm is arranged by bottom of pond frid, load-bearing cross-arm, load-bearing tile, side baffle, the bottom of pond frid front side edge edge in liquid-collecting box, Load-bearing tile is arranged in bottom of pond frid back side edge edge, and bottom of pond frid left side edge and right edge edge are respectively provided with side baffle, institute It states bottom of pond frid and opens up leakage fluid dram, the drainage system is connect with leakage fluid dram;The multiple liquid-collecting box discharges side by side, i.e. the latter The load-bearing tile of liquid-collecting box be buckled on the load-bearing cross-arm of previous liquid-collecting box, and so on;It is set on the support bracket device It is equipped with the angle adjusting mechanism for adjusting liquid-collecting box angle, the angle adjusting mechanism upper end is opposite with load-bearing cross-arm lower end It answers.
The support bracket device includes at least three track support mechanisms, at least two telescopic folding mechanisms, the rail Road bracket institution includes upper rail beam, lower railway beam, bracket supporting leg, each track support mechanism is correspondingly arranged at least three Bracket supporting leg, for bracket supporting leg uniform welding on upper rail beam, the stabilizer blade that contacts to earth, lower railway Liangping row peace are welded in bracket supporting leg bottom Loaded on upper rail beam lower section and lower railway beam is also welded with bracket supporting leg, constitutes strip between the upper rail beam, lower railway beam Gap, bracket supporting leg upper end soldering angle regulating mechanism;First track support mechanism and second track support mechanism It is connected by first telescopic folding mechanism, second track support mechanism and third track support mechanism are stretched by second The connection of contracting fold mechanism, and so on.
The telescopic folding mechanism include left front folding and unfolding beam, left back folding and unfolding beam, it is right before folding and unfolding beam, it is right after folding and unfolding beam, folding and unfolding Beam positioning disk, pulley yoke, the pulley yoke include pulley and the pulley spindle that is mounted in the middle part of pulley, and pulley, which slides, to get on the right track In strip gap between beam, lower railway beam, a pair of of pulley yoke of each track support mechanism configuration, respectively left chain wheel frame, Right pulley frame, the left front folding and unfolding beam rear end, left back folding and unfolding beam front end, it is right before folding and unfolding beam rear end, it is right after folding and unfolding beam front end simultaneously Hinged with folding and unfolding beam positioning disk, folding and unfolding beam front end is respectively hinged at previous track support before the left front folding and unfolding beam front end, the right side On the pulley spindle of the left chain wheel frame of mechanism, the pulley spindle of right pulley frame, folding and unfolding beam rear end point behind the left back folding and unfolding beam rear end, the right side It is not hinged on the pulley spindle of the left chain wheel frame of the latter track support mechanism, on the pulley spindle of right pulley frame.
Folding and unfolding beam offers the lifting limit of folding and unfolding beam behind folding and unfolding beam, the right side before the left front folding and unfolding beam, left back folding and unfolding beam, the right side Slot.
The angle adjusting mechanism includes adjusting screw, support body, and bracket supporting leg center opens up axial wire hole, is adjusted Section lead screw is installed in wire hole, and the adjusting screw upper end connects support body, and support body upper end support lives load-bearing cross-arm.
The outer bottom of the bottom of pond frid is arranged bottom of pond supporting beam, bottom of pond supporting beam both ends be respectively welded in load-bearing tile, Load-bearing cross-arm.
The drainage system includes by appointing formula quick coupling, plastics diversion pipe, electric submersible pump, sump, the plastics water conservancy diversion By the leakage fluid dram by appointing formula quick coupling connection pool bottom cut board, the other end connects sump for pipe one end, places electricity in sump Latent pump, dirt collection bottom of pond portion open up sewage draining exit.
Compared with the prior art, the invention has the following beneficial effects:
1, load-bearing pipe support system is only needed 1 crane to sling appointed part, quick receipts can be realized using semi-automatic design It puts, skilled operation completion well site pipe row, which puts, to be can be controlled within 5min.
2, pipe row liquid-collecting box uses the seamless mounting design of tile, and seamless installation can be realized without other components.
3, pipe row's liquid-collecting box is designed using special gravity natural drainage, and leakage fluid dram natural drainage amount (can up to 200L/min Meet naturally safe drain under extra torrential rain environment), effectively take precautions against pond risk of overflowing.
4, fluid is connect by mudhole, quickly by appointing connector to acquire pond with grease in pipe row liquid-collecting box, and grease acquires pond Explosion-proof type submergible motor pump, discharge capacity 5m are installed3/ h can meet drain demand under extra torrential rain environment, take precautions against pond risk of overflowing.
5, grease acquisition pond is under submersible motor pump system support, it can be achieved that well inner equilibrium under normal well pulling job operating condition The well control demand of liquid filling.
6, well head collection drainage system meets well head overflow collection, the small rig floor of well head, the first-class functional requirement of oil pipe pillow simultaneously, no Influence preventer fast switching operation.Well head sump converges fluid in sump by mudhole, by quick coupling, conduit Enter grease collecting and arranging equipment.
7, the pipe heat-extraction system being made of load-bearing pipe support, pipe row's drip tray, it is low to well site flatness requirement, pass through bearing frame height Adjusting screw is spent, it can be achieved that pipe row's drip tray plane is not less than 1.6 ° of tilt adjustments, and single-point maximal regulated height is not less than 270mm, it can be ensured that the balanced steady, drip tray of each position load-bearing and oil pipe are put and remain horizontality, prolong the service life. Under normal use environment (nonviolent destructive use), design service life 10 years.
8, well head residual liquid system is using preventer height as benchmark face, suspension height design-adjustable, specification well head installation mark It is quasi-, it is ensured that cleanliness without any pollution construction.
9, the use for casting off underground work ground system antiseepage cloth, cofferdam once and for all solves the use of plastic garbage, reduces and makees Industry team carrying and installation workload.
10, light weight.The more existing other similar product comparisons of this pipe heat-extraction system, kerb weight reduce nearly 4 tons, load bearing stength 1 times or more is improved, effective cross-arm quantity 4, tube rod unit-frame will not influence tube rod capability and performance.
Detailed description of the invention
Fig. 1 is the structural front view that oil field drilling of the present invention repairs operation ground environmental protection pipe heat-extraction system;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the partial enlarged view of bracket supporting leg and angle adjusting mechanism;
Fig. 4 is liquid-collecting box main view;
Fig. 5 is the bottom view of Fig. 3;
Fig. 6 is support bracket main view;
Fig. 7 is the top view of Fig. 6;
Fig. 8 is that the support bracket after dismantling lower liquid-collecting box shrinks folded state diagram.
Marked in the figure: the stabilizer blade 2-1 that contacts to earth, bracket supporting leg 2-2, pulley yoke 2-3, support body 2-4, folding and unfolding beam 2-5, folding and unfolding beam Lift limiting slot 2-6, folding and unfolding beam positioning disk 2-7, upper rail beam 2-8, lower railway beam 2-9, adjusting screw 2-10;Side baffle 1-1, Load-bearing cross-arm 1-2, load-bearing tile 1-3, bottom of pond supporting beam 1-4, leakage fluid dram 1-5, bottom of pond frid 1-6, load-bearing tile 1-7.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 to Fig. 8 is please referred to, the present invention provides a kind of technical solution:
Firstly, drawing is shown for clarity, only give basic unit and constitute mode, can according to live tubing length with And put demand and continue broadening growth, the repetition of modular unit is cumulative, without departing from the scope of protection of the present invention.
Oil field drilling repairs operation ground environmental protection pipe heat-extraction system, including oil pipe discharging and greasy dirt collection device, support bracket device, The oil pipe discharging and greasy dirt collection device include liquid-collecting box, drainage system, and the liquid-collecting box is mounted on support bracket device, The quantity of the liquid-collecting box is at least arranged two, the liquid-collecting box by bottom of pond frid 1-6, load-bearing cross-arm 1-2, load-bearing tile 1-7, Load-bearing cross-arm is arranged in side baffle 1-1, the bottom of pond frid front side edge edge, and load-bearing tile is arranged in bottom of pond frid back side edge edge, Bottom of pond frid left side edge and right edge edge are respectively provided with side baffle, and the bottom of pond frid opens up leakage fluid dram 1-5, the drain System is connect with leakage fluid dram;The multiple liquid-collecting box discharges side by side, i.e. the load-bearing tile of the liquid-collecting box of the latter is buckled in previous On the load-bearing cross-arm of liquid-collecting box, and so on;The angle for adjusting liquid-collecting box angle is provided on the support bracket device Regulating mechanism, the angle adjusting mechanism upper end are corresponding with load-bearing cross-arm lower end.
The support bracket device includes at least three track support mechanisms, at least two telescopic folding mechanisms, the rail Road bracket institution includes upper rail beam 2-8, lower railway beam 2-9, bracket supporting leg 2-2, each track support mechanism correspondence is set At least three bracket supporting legs are set, for bracket supporting leg uniform welding on upper rail beam, the stabilizer blade 2-1 that contacts to earth is welded in bracket supporting leg bottom, Lower railway beam is parallelly mounted to below upper rail beam and lower railway beam is also welded with bracket supporting leg, the upper rail beam, lower railway Strip gap, bracket supporting leg upper end soldering angle regulating mechanism are constituted between beam;First track support mechanism and second A track support mechanism passes through first telescopic folding mechanism connection, second track support mechanism and third track support machine Structure is connected by second telescopic folding mechanism, and so on.
The telescopic folding mechanism includes folding and unfolding beam 2-5, folding and unfolding beam positioning disk 2-7, pulley yoke 2-3, the folding and unfolding Liang Bao Include left front folding and unfolding beam, left back folding and unfolding beam, it is right before folding and unfolding beam, it is right after folding and unfolding beam;The pulley yoke includes pulley and is mounted on pulley The pulley spindle at middle part, pulley slide in the strip gap between upper rail beam, lower railway beam, each track support mechanism matches A pair of of pulley yoke, respectively left chain wheel frame, right pulley frame are set, is received before the left front folding and unfolding beam rear end, left back folding and unfolding beam front end, the right side Folding and unfolding beam front end is hinged with folding and unfolding beam positioning disk simultaneously after putting Liang Houduan, the right side, before the left front folding and unfolding beam front end, the right side before folding and unfolding beam End is respectively hinged at the pulley spindle of left chain wheel frame of previous track support mechanism, on the pulley spindle of right pulley frame, described left back Folding and unfolding beam rear end is respectively hinged at the pulley spindle of the left chain wheel frame of the latter track support mechanism, right cunning behind folding and unfolding beam rear end, the right side On the pulley spindle of wheel carrier.
Folding and unfolding beam offers the lifting limit of folding and unfolding beam behind folding and unfolding beam, the right side before the left front folding and unfolding beam, left back folding and unfolding beam, the right side Slot 2-6.
The angle adjusting mechanism includes adjusting screw 2-10, support body 2-4, and the center bracket supporting leg 2-2 opens up axis To wire hole, adjusting screw is installed in wire hole, and the adjusting screw upper end connects support body 2-4, and support body upper end support is lived Load-bearing cross-arm 1-2.Radial hole is opened up on adjusting screw, can be penetrated lever and be screwed.
The outer bottom of the bottom of pond frid is arranged bottom of pond supporting beam 1-4, bottom of pond supporting beam both ends be respectively welded load-bearing tile, Load-bearing cross-arm.
The drainage system includes by appointing formula quick coupling, plastics diversion pipe, electric submersible pump 3-2, sump 3-3, the modeling Diversion pipe one end is expected by the leakage fluid dram by appointing formula quick coupling connection pool bottom cut board, and the other end connects sump, in sump Electric submersible pump is placed, dirt collection bottom of pond portion opens up sewage draining exit 3-1.
Contact to earth the internal screw thread standpipe set on stabilizer blade 2-1 perpendicular to horizon bar, connect with adjusting screw 2-10 external screw thread;Bracket Supporting leg 2-2 uniform welding is distributed in below upper rail beam 2-8, and lower railway beam 2-9 is parallelly mounted to below upper rail beam 2-8;It is sliding Wheel carrier 2-3 is combined by wheel shaft in pairs, and built-in pulley is a pair of;Pulley yoke 2-3 peripheral hardware can bracket, connect the one end folding and unfolding beam 2-5;It receives Beam 2-5 other end is put in folding and unfolding beam positioning disk 2-7 by axis connection, is placed in inside folding and unfolding beam positioning disk 2-7;Folding and unfolding beam is close Pulley blocks one end peripheral hardware lifts limiting slot 2-6;By the connecting bracket of pulley yoke 2-3 peripheral hardware, accessory described above is installed in connection Until meeting job execution needs.
Liquid-collecting box is side baffle 1-1, load-bearing cross-arm 1-2, load-bearing tile 1-3, bottom of pond supporting beam 1-4, leakage fluid dram 1-5, pond The trench structure that bottom cut board 1-6, load-bearing tile 1-7 are constituted.
When support bracket device is launched into working condition, load-bearing cross-arm 1-2 is placed in support body 2-4, adjusting screw 2-10 Until pipe arranges in a row pumping equipment level without inclination.Second pipe arranges in a row pumping equipment load-bearing tile and is buckled in first piece of load-bearing cross-arm 1- On 2, and so on complete installation.
Drainage system includes by appointing formula quick coupling, plastics diversion pipe, electric submersible pump 3-2, sewage draining exit 3-1, sump 3-3 etc. It constitutes.The sump oil and sewage collected in liquid-collecting box flows under the influence of gravity into collection drain by leakage fluid dram 1-5, plastics diversion pipe In device sump 3-3, it is discharged in tank car or other returnable and is focused on by the immersible pump 3-2 inside sump.
1, load-bearing pipe support system is only needed 1 crane to sling appointed part, quick receipts can be realized using semi-automatic design It puts, skilled operation completion well site pipe row, which puts, to be can be controlled within 5min.
2, pipe row liquid-collecting box uses the seamless mounting design of tile, and seamless installation can be realized without other components.
3, pipe row's liquid-collecting box is designed using special gravity natural drainage, and leakage fluid dram natural drainage amount (can up to 200L/min Meet naturally safe drain under extra torrential rain environment), effectively take precautions against pond risk of overflowing.
4, fluid is connect by mudhole, quickly by appointing connector to acquire pond with grease in pipe row liquid-collecting box, and grease acquires pond Explosion-proof type submergible motor pump, discharge capacity 5m are installed3/ h can meet drain demand under extra torrential rain environment, take precautions against pond risk of overflowing.
5, grease acquisition pond is under submersible motor pump system support, it can be achieved that well inner equilibrium under normal well pulling job operating condition The well control demand of liquid filling.
6, well head collection drainage system meets well head overflow collection, the small rig floor of well head, the first-class functional requirement of oil pipe pillow simultaneously, no Influence preventer fast switching operation.Well head sump converges fluid in sump by mudhole, by quick coupling, conduit Enter grease collecting and arranging equipment.
7, the pipe heat-extraction system being made of load-bearing pipe support, pipe row's drip tray, it is low to well site flatness requirement, pass through bearing frame height Adjusting screw is spent, it can be achieved that pipe row's drip tray plane is not less than 1.6 ° of tilt adjustments, and single-point maximal regulated height is not less than 270mm, it can be ensured that the balanced steady, drip tray of each position load-bearing and oil pipe are put and remain horizontality, prolong the service life. Under normal use environment (nonviolent destructive use), design service life 10 years.
8, well head residual liquid system is using preventer height as benchmark face, suspension height design-adjustable, specification well head installation mark It is quasi-, it is ensured that cleanliness without any pollution construction.
9, the use for casting off underground work ground system antiseepage cloth, cofferdam once and for all solves the use of plastic garbage, reduces and makees Industry team carrying and installation workload.
10, light weight.The more existing other similar product comparisons of this pipe heat-extraction system, kerb weight reduce nearly 4 tons, load bearing stength 1 times or more is improved, effective cross-arm quantity 4, tube rod unit-frame will not influence tube rod capability and performance.
During the present invention is for oil drilling, the discharge of underground work scene tube rod ground, storage, drilling rod, oil pipe, oil pumping Bar inside and outside adheres to the collection and processing of sump oil, sewage, meets safety and environmental protection needs, meets work progress drilling rod, oil pipe and pumping The discharge of beam hanger needs.The present invention has quick, light-weight scene dismounting, long service life, elimination pollution risk, anti-sleet etc. The technical advantages such as harsh weather ability is strong.
In the description of the present invention, it is to be understood that, temporald eixis or positional relationship are orientation based on the figure Or positional relationship, it is merely for convenience of the description present invention, rather than the device or element of indication or suggestion meaning there must be spy Fixed orientation is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle and spirit of the invention, this The range of invention is defined by the appended claims and the equivalents thereof.

Claims (7)

1. oil field drilling repairs operation ground environmental protection pipe heat-extraction system, including oil pipe discharging and greasy dirt collection device, support bracket device, institute It states oil pipe discharging and greasy dirt collection device includes liquid-collecting box, drainage system, the liquid-collecting box is mounted on support bracket device, Be characterized in that, the quantity of the liquid-collecting box is at least arranged two, the liquid-collecting box by bottom of pond frid, load-bearing cross-arm, load-bearing tile, Load-bearing cross-arm is arranged in side baffle, the bottom of pond frid front side edge edge, and load-bearing tile, bottom of pond is arranged in bottom of pond frid back side edge edge Frid left side edge and right edge edge are respectively provided with side baffle, and the bottom of pond frid opens up leakage fluid dram, the drainage system with Leakage fluid dram connection;The multiple liquid-collecting box discharges side by side, i.e. the load-bearing tile of the liquid-collecting box of the latter is buckled in previous liquid-collecting box Load-bearing cross-arm on, and so on;The angular adjustment machine for adjusting liquid-collecting box angle is provided on the support bracket device Structure, the angle adjusting mechanism upper end are corresponding with load-bearing cross-arm lower end.
2. oil field drilling according to claim 1 repairs operation ground environmental protection pipe heat-extraction system, which is characterized in that the support bracket Device includes at least three track support mechanisms, at least two telescopic folding mechanisms, and the track support mechanism includes upper rail Beam, lower railway beam, bracket supporting leg, each track support mechanism are correspondingly arranged at least three bracket supporting legs, and bracket supporting leg is equal Even to be welded on upper rail beam, the welding of bracket supporting leg bottom is contacted to earth stabilizer blade, lower railway beam be parallelly mounted to below upper rail beam and Lower railway beam is also welded with bracket supporting leg, composition strip gap between the upper rail beam, lower railway beam, on the bracket supporting leg Hold soldering angle regulating mechanism;First track support mechanism and second track support mechanism pass through first telescopic folding machine Structure connection, second track support mechanism is connected with third track support mechanism by second telescopic folding mechanism, with this Analogize.
3. oil field drilling according to claim 2 repairs operation ground environmental protection pipe heat-extraction system, which is characterized in that the telescopic folding Mechanism include left front folding and unfolding beam, left back folding and unfolding beam, it is right before folding and unfolding beam, it is right after folding and unfolding beam, folding and unfolding beam positioning disk, pulley yoke, it is described Pulley yoke includes pulley and the pulley spindle that is mounted in the middle part of pulley, and pulley slides the strip between upper rail beam, lower railway beam In gap, each track support mechanism configures a pair of of pulley yoke, respectively left chain wheel frame, right pulley frame, the left front folding and unfolding Beam rear end, left back folding and unfolding beam front end, it is right before folding and unfolding beam rear end, it is right after folding and unfolding beam front end, institute hinged with folding and unfolding beam positioning disk simultaneously State left front folding and unfolding beam front end, it is right before folding and unfolding beam front end be respectively hinged at previous track support mechanism left chain wheel frame pulley Axis, right pulley frame pulley spindle on, the left back folding and unfolding beam rear end, it is right after folding and unfolding beam rear end be respectively hinged at the latter track branch On the pulley spindle of the left chain wheel frame of frame mechanism, the pulley spindle of right pulley frame.
4. oil field drilling according to claim 3 repairs operation ground environmental protection pipe heat-extraction system, which is characterized in that the left front folding and unfolding Folding and unfolding beam is provided with folding and unfolding beam lifting limiting slot behind folding and unfolding beam, the right side before beam, left back folding and unfolding beam, the right side.
5. repairing operation ground environmental protection pipe heat-extraction system according to oil field drilling described in Claims 2 or 3 or 4, which is characterized in that the angle Spending regulating mechanism includes adjusting screw, support body, and bracket supporting leg center opens up axial wire hole, and adjusting screw is installed on silk In hole, the adjusting screw upper end connects support body, and support body upper end support lives load-bearing cross-arm.
6. oil field drilling according to claim 1 or 2 or 3 or 4 repairs operation ground environmental protection pipe heat-extraction system, which is characterized in that institute The outer bottom setting bottom of pond supporting beam of bottom of pond frid is stated, bottom of pond supporting beam both ends are respectively welded in load-bearing tile, load-bearing cross-arm.
7. oil field drilling according to claim 1 or 2 or 3 or 4 repairs operation ground environmental protection pipe heat-extraction system, which is characterized in that institute Stating drainage system includes by appointing formula quick coupling, plastics diversion pipe, electric submersible pump, sump, and plastics diversion pipe one end passes through By appointing the leakage fluid dram of formula quick coupling connection pool bottom cut board, the other end connects sump, places electric submersible pump, sump in sump Bottom opens up sewage draining exit.
CN201910405294.9A 2019-05-15 2019-05-15 Oil field drilling repairs operation ground environmental protection pipe heat-extraction system Pending CN110173221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910405294.9A CN110173221A (en) 2019-05-15 2019-05-15 Oil field drilling repairs operation ground environmental protection pipe heat-extraction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910405294.9A CN110173221A (en) 2019-05-15 2019-05-15 Oil field drilling repairs operation ground environmental protection pipe heat-extraction system

Publications (1)

Publication Number Publication Date
CN110173221A true CN110173221A (en) 2019-08-27

Family

ID=67691244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910405294.9A Pending CN110173221A (en) 2019-05-15 2019-05-15 Oil field drilling repairs operation ground environmental protection pipe heat-extraction system

Country Status (1)

Country Link
CN (1) CN110173221A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617033A (en) * 2019-10-26 2019-12-27 新疆克拉玛依市采丰实业有限责任公司 Clean construction device and method for oil field downhole operation
CN111677464A (en) * 2020-06-26 2020-09-18 西安石油大学 Automatic pipe arranging device for pipe bridge frame
CN114713589A (en) * 2022-02-22 2022-07-08 海洋石油工程股份有限公司 Liquid collecting device used in hose recovery

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1393389A (en) * 1971-08-19 1975-05-07 Ruston Bucyrus Ltd Well drilling rig
US20060266511A1 (en) * 2005-05-30 2006-11-30 High Arctic Energy Services Limited Partnership Load bearing support structure for rigs above a wellhead
CN203756080U (en) * 2014-03-14 2014-08-06 王克峰 Automatic pipe racker of drilling platform
CN104632265A (en) * 2015-01-31 2015-05-20 邹城上达机电设备制造有限公司 Overhead rail type temporary supporting device
US20160060979A1 (en) * 2014-08-27 2016-03-03 Nabors Industries, Inc. Laterally moving racker device on a drilling rig
CN205936451U (en) * 2016-06-12 2017-02-08 中国石油化工股份有限公司 Modular tubing conveyed device
CN206233880U (en) * 2016-11-25 2017-06-09 东营瑞奥工贸有限责任公司 Packaged type rig floor pipe arranging robot lifting platform
CN106869852A (en) * 2017-03-14 2017-06-20 东北石油大学 A kind of environmentally friendly operation wellhead simple platform system of fast demountable
CN107060749A (en) * 2017-03-22 2017-08-18 沈阳重机重矿机械设备制造有限公司 Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter
WO2017181674A1 (en) * 2016-04-19 2017-10-26 江苏省金峰石油机械制造有限公司 Environmentally friendly oil pipe arrangement device
CN207161055U (en) * 2017-09-07 2018-03-30 刘少杰 A kind of oil well operation clean environment firendly device
CN108166224A (en) * 2018-04-01 2018-06-15 周佰平 A kind of electric clothes hanger
CN108222861A (en) * 2018-01-22 2018-06-29 辽宁瑞丰专用车制造有限公司 A kind of oil pipe storage cleaning device and application method
CN207863929U (en) * 2018-01-19 2018-09-14 王文 Oil sludge recycles re-injection and cleans integrated apparatus
CN108609498A (en) * 2018-07-13 2018-10-02 东营玺诺石油科技有限公司 The anti-pollution automatic feeding apparatus of Portable oil pipe
CN208106346U (en) * 2018-04-08 2018-11-16 石城 A kind of height-adjustable oil pipe stool
CN109750883A (en) * 2019-01-25 2019-05-14 西南交通大学 A kind of omnidirectional's vehicle conveying mechanism
CN210659989U (en) * 2019-05-15 2020-06-02 代国伟 Ground environment-friendly pipe row system for oil field drilling and repairing operation

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1393389A (en) * 1971-08-19 1975-05-07 Ruston Bucyrus Ltd Well drilling rig
US20060266511A1 (en) * 2005-05-30 2006-11-30 High Arctic Energy Services Limited Partnership Load bearing support structure for rigs above a wellhead
CN203756080U (en) * 2014-03-14 2014-08-06 王克峰 Automatic pipe racker of drilling platform
US20160060979A1 (en) * 2014-08-27 2016-03-03 Nabors Industries, Inc. Laterally moving racker device on a drilling rig
CN104632265A (en) * 2015-01-31 2015-05-20 邹城上达机电设备制造有限公司 Overhead rail type temporary supporting device
WO2017181674A1 (en) * 2016-04-19 2017-10-26 江苏省金峰石油机械制造有限公司 Environmentally friendly oil pipe arrangement device
CN205936451U (en) * 2016-06-12 2017-02-08 中国石油化工股份有限公司 Modular tubing conveyed device
CN206233880U (en) * 2016-11-25 2017-06-09 东营瑞奥工贸有限责任公司 Packaged type rig floor pipe arranging robot lifting platform
CN106869852A (en) * 2017-03-14 2017-06-20 东北石油大学 A kind of environmentally friendly operation wellhead simple platform system of fast demountable
CN107060749A (en) * 2017-03-22 2017-08-18 沈阳重机重矿机械设备制造有限公司 Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter
CN207161055U (en) * 2017-09-07 2018-03-30 刘少杰 A kind of oil well operation clean environment firendly device
CN207863929U (en) * 2018-01-19 2018-09-14 王文 Oil sludge recycles re-injection and cleans integrated apparatus
CN108222861A (en) * 2018-01-22 2018-06-29 辽宁瑞丰专用车制造有限公司 A kind of oil pipe storage cleaning device and application method
CN108166224A (en) * 2018-04-01 2018-06-15 周佰平 A kind of electric clothes hanger
CN208106346U (en) * 2018-04-08 2018-11-16 石城 A kind of height-adjustable oil pipe stool
CN108609498A (en) * 2018-07-13 2018-10-02 东营玺诺石油科技有限公司 The anti-pollution automatic feeding apparatus of Portable oil pipe
CN109750883A (en) * 2019-01-25 2019-05-14 西南交通大学 A kind of omnidirectional's vehicle conveying mechanism
CN210659989U (en) * 2019-05-15 2020-06-02 代国伟 Ground environment-friendly pipe row system for oil field drilling and repairing operation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617033A (en) * 2019-10-26 2019-12-27 新疆克拉玛依市采丰实业有限责任公司 Clean construction device and method for oil field downhole operation
CN111677464A (en) * 2020-06-26 2020-09-18 西安石油大学 Automatic pipe arranging device for pipe bridge frame
CN114713589A (en) * 2022-02-22 2022-07-08 海洋石油工程股份有限公司 Liquid collecting device used in hose recovery

Similar Documents

Publication Publication Date Title
CN110173221A (en) Oil field drilling repairs operation ground environmental protection pipe heat-extraction system
RU2487983C2 (en) Monolithic moved drilling plant for rotor drilling of wells
CN201554369U (en) Fast-transported petroleum drilling rig capable of transporting large module integrally and automatically traveling
CN106255800A (en) Bar rotary apparatus
CN107191159A (en) Oil well tube rod moving tube bridge sewage collection system and oil well tube rod moving tube bridge dirt collection system
CN106194060A (en) A kind of global design of Cabon-fibre continuous sucker rod operating vehicles
CN107059609A (en) Bridge maintenance system span formula steel structure platform
CN210659989U (en) Ground environment-friendly pipe row system for oil field drilling and repairing operation
CN206035412U (en) Automatic mechanized device of oil field safety ring guarantee well
RU74949U1 (en) PORTABLE DRILLING RIG
CN108334021A (en) A kind of comprehensive ocean engineering platform
CN107288664A (en) A kind of spray-on tunnel film waterproof construction device and construction method
CN111058609A (en) Construction and protection integrated portable operation platform and method
CN206888658U (en) A kind of power construction is stood up device with shaft tower
CN217005961U (en) Hydraulic engineering water level monitoring terminal equipment
CN206529691U (en) Bridge maintenance system steel construction inspection platform
CN211895469U (en) Ocean lift wire rope winch dish cable system
CN214763622U (en) Novel sewage treatment device with anti-blocking performance
CN213270239U (en) Hydraulic engineering construction drainage device
CN211597995U (en) Building construction safety device
CN102817558A (en) Support device for inclined strut of pile frame
CN206053355U (en) A kind of tower concrete spreader
CN207313191U (en) A kind of oil slick cleaning plant
CN208022659U (en) A kind of civil engineering elevator
CN207960977U (en) A kind of sliding submerged pump system of deep water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination