RU2591994C1 - Connection node for column and floor slab for beamless non-column cap building frame - Google Patents
Connection node for column and floor slab for beamless non-column cap building frame Download PDFInfo
- Publication number
- RU2591994C1 RU2591994C1 RU2015147183/03A RU2015147183A RU2591994C1 RU 2591994 C1 RU2591994 C1 RU 2591994C1 RU 2015147183/03 A RU2015147183/03 A RU 2015147183/03A RU 2015147183 A RU2015147183 A RU 2015147183A RU 2591994 C1 RU2591994 C1 RU 2591994C1
- Authority
- RU
- Russia
- Prior art keywords
- working reinforcement
- anchors
- column
- plate
- columns
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Область техникиTechnical field
Изобретение относится к области строительства, а именно к узлам соединения колонн и плит перекрытия безригельного бескапительного железобетонного каркаса здания, и может быть использовано при возведении многоэтажных зданий жилого, социально-бытового и производственного назначения, находящихся в условиях эксплуатации под действием динамических и сейсмических нагрузок.The invention relates to the field of construction, namely, the nodes of the connection of columns and floor slabs of the bezrigelnogo capless reinforced concrete frame of the building, and can be used in the construction of multi-storey buildings for residential, social and industrial purposes, which are in operating conditions under the action of dynamic and seismic loads.
Предшествующий уровень техникиState of the art
Из уровня техники известны различные конструкции узлов соединения колонн и плит перекрытий зданий. В частности, известен узел соединения колонны и плиты перекрытия безригельного бескапительного каркаса здания, раскрытый в патенте RU 2203369, опубликованном 27.04.2003, содержащий сборную плиту перекрытия с прямоугольным отверстием, в котором жестко смонтирована стальная обечайка, выполненная в виде двух усеченных пирамид, сопряженных друг с другом своими малыми основаниями, и пропущенную сквозь обечайку колонну с обнаженной в зоне обечайки силовой арматурой, соединенной на сварке с обечайкой посредством стальных трапециевидных соединительных элементов.The prior art various designs of nodes connecting columns and floor slabs of buildings. In particular, a knot for connecting a column and a floor slab of a bezelless capless building frame disclosed in patent RU 2203369, published on 04/27/2003, containing a prefabricated floor slab with a rectangular hole in which a steel shell is rigidly mounted, made in the form of two truncated pyramids mated to each other with the other with its small bases, and the column passed through the shell with the exposed reinforcement in the zone of the shell connected to welding with the shell by means of steel trapezoidal connectors s elements.
К недостаткам данного узла следует отнести низкую жесткость и надежность узла при работе его на продавливание, т.к. обечайка не увеличивает контур продавливания.The disadvantages of this node include low stiffness and reliability of the node when it is working for punching, because the shell does not increase the bursting contour.
Известно также железобетонное перекрытие, описанное в патенте СН 635390, опубликованном 31.03.1983. В конструкции данного перекрытия углы деталей перекрытия армированы несущими элементами, плечи которых изогнуты под острым углом. Биссектриса угла проходит через ось опоры. Несущие элементы выполнены из листовой стали, причем плечи каждого элемента соединены друг с другом стальным уголковым профилем, к которому приварены несущие арматурные стержни перекрытия.Reinforced concrete slab is also known, described in patent CH 635390, published on 03/31/1983. In the design of this floor, the corners of the floor parts are reinforced with load-bearing elements, the shoulders of which are bent at an acute angle. The bisector of the angle passes through the axis of the support. Bearing elements are made of sheet steel, and the shoulders of each element are connected to each other by a steel corner profile to which the supporting reinforcing bars of the ceiling are welded.
В данном техническом решении при монтаже каркаса узел соединения частей сборной колонны должен располагаться вне узла стыка колонны с перекрытием, что усложняет процесс монтажа каркаса.In this technical solution, when mounting the frame, the node for connecting the parts of the prefabricated column should be located outside the node of the junction of the column with an overlap, which complicates the process of mounting the frame.
Наиболее близким по совокупности существенных признаков к заявленному изобретению является узел соединения колонны и плиты перекрытия, раскрытый в авторском свидетельстве SU 1114749, опубликованном 23.09.1984, содержащий сборную колонну, выполненную по высоте с разрывом бетона в уровне перекрытия, и сборную плиту перекрытия, снабженную центральным отверстием, обрамленным прикрепленной к рабочей арматуре плиты обечайкой, сквозь которую пропущена колонна. Обнаженная в месте разрыва бетона в уровне перекрытия арматура колонны соединена на сварке при помощи плоских стальных трапециевидных элементов с верхней частью обечайки двух смежных торцов отверстия плиты. После сварки всех элементов стыка узел замоноличивается бетоном.The closest set of essential features to the claimed invention is the assembly of the column and floor slab, disclosed in the copyright certificate SU 1114749, published 09/23/1984, containing a precast column made in height with a gap of concrete at the level of overlap, and a prefabricated floor slab equipped with a central a hole framed by a shell attached to the working reinforcement of the slab through which the column is passed. The column reinforcement exposed at the concrete break point at the level of overlap is welded using flat steel trapezoidal elements to the upper part of the shell of two adjacent ends of the plate opening. After welding all the elements of the joint, the assembly is monolithic with concrete.
Недостатком данного технического решения является недостаточно высокая жесткость и надежность узла при работе его на продавливание.The disadvantage of this technical solution is the insufficiently high rigidity and reliability of the node when it is working for punching.
Раскрытие изобретенияDisclosure of invention
Задачей, на решение которой направлено заявленное изобретение, является создание конструкции узла соединения колонн и плит перекрытия, позволяющей использовать данный узел при возведении многоэтажных безригельных бескапительных каркасов зданий жилого, социально-бытового и производственного назначения, находящихся в условиях эксплуатации под действием динамических и сейсмических нагрузок.The task to which the claimed invention is directed is to create a design for a node for connecting columns and floor slabs, which allows this unit to be used in the construction of multi-storey bezelless capless frames of residential, social, and industrial buildings under operational conditions under the action of dynamic and seismic loads.
При решении поставленной задачи достигается технический результат, заключающийся в повышении жесткости и надежности узла соединения колонны и плиты перекрытия при работе его на продавливание и увеличении несущей способности, а также в увеличении несущей способности самой плиты перекрытия и стыка верхней и нижней колонн в узле.When solving this problem, a technical result is achieved, which consists in increasing the rigidity and reliability of the connection node of the column and the floor slab when it is punching and increasing the bearing capacity, as well as in increasing the bearing capacity of the floor slab and the joint of the upper and lower columns in the node.
Указанный технический результат достигается за счет того, что узел соединения колонны и плиты перекрытия безригельного бескапительного каркаса здания включает соединенные между собой верхнюю и нижнюю колонны и сборную плиту перекрытия с монтажным отверстием для пропуска колонны, по периметру которого расположены анкеры рабочей арматуры плиты, каждый из которых выполнен из углового профиля, соединенные между собой усилительными угловыми элементами, установленными по углам монтажного отверстия плиты, плита перекрытия снабжена дополнительными арматурными стрежнями, прикрепленными к усилительным угловым элементам, рабочая арматура плиты перекрытия разнесена по высоте во взаимно перпендикулярных направлениях на величину, составляющую не менее диаметра стержня рабочей арматуры, а в стыкуемых верхней и нижней колоннах анкеры рабочей арматуры колонн выполнены в виде петель. Усилительные угловые элементы анкеров рабочей арматуры плиты свариваются с рабочей арматурой нижней колонны через металлические соединительные элементы. При этом анкеры рабочей арматуры плиты и усилительные угловые элементы могут быть выполнены в виде равнополочного или неравнополочного углового профиля.The specified technical result is achieved due to the fact that the connection node of the column and the floor slab of the bezelless non-storage frame of the building includes interconnected upper and lower columns and a prefabricated floor slab with a mounting hole for the passage of the column, along the perimeter of which there are anchors of the working reinforcement of the plate, each of which made of an angular profile, interconnected by reinforcing angular elements installed at the corners of the mounting hole of the plate, the floor slab is equipped with With reinforcing rods attached to reinforcing corner elements, the working reinforcement of the floor slab is spaced apart in height in mutually perpendicular directions by an amount not less than the diameter of the rod of the working reinforcement, and in the joined upper and lower columns, the anchors of the working reinforcement of the columns are made in the form of loops. The reinforcing angular elements of the anchors of the working reinforcement of the plate are welded to the working reinforcement of the lower column through metal connecting elements. In this case, the anchors of the working reinforcement of the plate and the reinforcing corner elements can be made in the form of an equal-shelf or unequal-angle profile.
Указанный технический результат достигается также за счет того, что дополнительные арматурные стержни могут быть расположены параллельно рабочей арматуре плиты или по диагонали между рабочей арматурой плиты во взаимно перпендикулярных направлениях, а рабочая арматура плиты может быть прикреплена к внутренней поверхности анкеров посредством сварки или пропущена сквозь отверстия с последующей сваркой с наружной стороны анкера, причем оси отверстий под рабочую арматуру на оппозитно расположенных анкерах могут быть смещены в горизонтальной и вертикальной плоскостях не менее чем на величину диаметра арматурного стержня.This technical result is also achieved due to the fact that additional reinforcing bars can be located parallel to the working reinforcement of the plate or diagonally between the working reinforcement of the plate in mutually perpendicular directions, and the working reinforcement of the plate can be attached to the inner surface of the anchors by welding or passed through holes with subsequent welding from the outside of the anchor, and the axis of the openings for the working reinforcement on opposite anchors can be shifted to the horizon Flax and vertical planes is not less than the value of the diameter of the rebar.
Анкеры рабочей арматуры плиты могут быть соединены между собой с образованием непрерывной окантовки монтажного отверстия плиты перекрытия или с образованием прерывистой окантовки в случае автономной установки анкеров каждого из рабочих стержней. Монтажное отверстие плиты перекрытия по своей форме выполняют соответствующим профилю поперечного сечения колонны, преимущественно прямоугольного сечения: в форме квадрата или в форме вытянутого прямоугольника. Но, независимо от наличия соединения анкеров рабочей арматуры между собой по сторонам монтажного отверстия плиты, анкеры рабочей арматуры обязательно соединяются между собой усилительными угловыми элементами, которые не только увеличивают жесткость узла в целом на восприятие изгибающего момента, в том числе при сейсмических нагрузках, но и позволяют установить дополнительные рабочие арматурные стержни, повышающие несущую способность плиты перекрытия. Проблема дополнительного армирования плиты перекрытия в соответствии с действующими нормативными требованиями является довольно ощутимой, поскольку расстояние между рабочими стержнями продольной и поперечной арматуры нормируется, а установка дополнительных стержней с соблюдением установленных требований невозможна. В этой связи снабжение плиты перекрытия усилительными угловыми элементами позволяет решить проблему дополнительного армирования с соответствующим увеличением несущей способности плиты перекрытия при сохранении минимального сечения.The anchors of the working reinforcement of the plate can be interconnected with the formation of a continuous edging of the mounting hole of the floor slab or with the formation of intermittent edging in the case of autonomous installation of the anchors of each of the working rods. The mounting hole of the floor slab in its shape is performed by the corresponding cross-sectional profile of the column, mainly of rectangular section: in the form of a square or in the form of an elongated rectangle. But, regardless of the presence of the connection of the working reinforcement anchors to each other on the sides of the plate mounting hole, the working reinforcement anchors are necessarily connected to each other by reinforcing angular elements, which not only increase the stiffness of the assembly as a whole on the perception of bending moment, including under seismic loads, but also allow you to install additional working reinforcing bars that increase the bearing capacity of the floor slab. The problem of additional reinforcement of the floor slab in accordance with the current regulatory requirements is quite tangible, since the distance between the working rods of the longitudinal and transverse reinforcement is normalized, and the installation of additional rods in compliance with the established requirements is impossible. In this regard, the supply of floor slabs with reinforcing corner elements allows to solve the problem of additional reinforcement with a corresponding increase in the bearing capacity of the floor slab while maintaining a minimum cross section.
Анкеры, установленные в монтажном отверстии плиты перекрытия под углом к плоскости колонны, обеспечивают максимальную работу бетона в узле на сжатие после того, как узел забетонирован, и увеличивают несущую способность узла в целом, петлевые анкеры в нижней и верхней колоннах увеличивают прочность стыка колонн в узле.Anchors installed in the mounting hole of the floor slab at an angle to the column plane ensure maximum compression of the concrete in the assembly after the assembly has been concreted, and increase the bearing capacity of the assembly as a whole, loop anchors in the lower and upper columns increase the strength of the joint of the columns in the assembly .
Кроме того, на жесткость плиты перекрытия и ее несущую способность значительное влияние оказывает расположение рабочей арматуры. Для обеспечения высокой прочности на продавливание в опорной зоне и увеличения несущей способности плиты перекрытия рабочая арматура плиты перекрытия должна быть разнесена по высоте во взаимно перпендикулярных направлениях на величину, составляющую не менее диаметра стержня рабочей арматуры, что обеспечит максимальное расстояние между верхними и нижними рабочими стержнями с установленными поперечными стержнями арматуры в опорной зоне на продавливание при соблюдении защитных слоев.In addition, the location of the working reinforcement has a significant effect on the rigidity of the floor slab and its bearing capacity. To ensure high bursting strength in the support zone and increase the bearing capacity of the floor slab, the working reinforcement of the floor slab should be spaced in height in mutually perpendicular directions by an amount not less than the diameter of the rod of the working reinforcement, which will provide the maximum distance between the upper and lower working rods with installed transverse reinforcement rods in the support zone for punching, subject to the protective layers.
Рабочая арматура плиты крепится к внутренней поверхности анкеров посредством сварки, но для удобства контроля качества при изготовлении плит перекрытия на производстве рабочая арматура плиты пропускается сквозь отверстия, выполненные в анкерах, и приваривается с наружной стороной анкера, причем оси отверстий под рабочую арматуру на оппозитно расположенных анкерах выполняются смещенными в горизонтальной и вертикальной плоскостях не менее чем на величину диаметра арматурного стержня, что обеспечивает установку рабочей арматуры с разнесением по высоте во взаимно перпендикулярных направлениях на величину, составляющую не менее диаметра стержня рабочей арматуры.The plate working reinforcement is attached to the inner surface of the anchors by welding, but for the convenience of quality control in the manufacture of floor slabs in production, the plate working reinforcement is passed through the holes made in the anchors and is welded to the outside of the anchor, and the axis of the holes for the working reinforcement on opposite anchors are displaced in the horizontal and vertical planes by at least the value of the diameter of the reinforcing bar, which ensures the installation of working reinforcement with carrying height in mutually perpendicular directions by an amount of not less than the diameter of the rod of the working reinforcement.
Краткое описание чертежейBrief Description of the Drawings
Сущность изобретения поясняется чертежами, где:The invention is illustrated by drawings, where:
на фиг. 1 показан узел соединения верхней и нижней колонны и плиты перекрытия безригельного бескапительного каркаса здания (фронтальный вид);in FIG. 1 shows the connection node of the upper and lower columns and floor slabs of the bezelless non-storage building frame (front view);
на фиг. 2 - разрез 1-1 на фиг. 1;in FIG. 2 is a section 1-1 in FIG. one;
на фиг. 3 показан узел соединения верхней и нижней колонны и плиты перекрытия безригельного бескапительного каркаса здания (вид сбоку);in FIG. 3 shows the connection node of the upper and lower columns and floor slabs of the bezrigelnogo capless building frame (side view);
на фиг. 4 - разрез 2-2 на фиг. 3;in FIG. 4 is a section 2-2 in FIG. 3;
на фиг. 5 показан узел соединения нижней колонны с арматурными выпусками и плиты перекрытия безригельного бескапительного каркаса здания;in FIG. 5 shows the connection node of the lower column with reinforcing outlets and the floor slab of the non-bezelless capless frame of the building;
на фиг. 6 - разрез 3-3 на фиг. 5;in FIG. 6 is a section 3-3 in FIG. 5;
на фиг. 7 показан узел соединения нижней колонны с монтажной петлей и плиты перекрытия безригельного бескапительного каркаса здания;in FIG. 7 shows the assembly of the connection of the lower column with the mounting loop and the floor slab of the bezelless coreless frame of the building;
на фиг. 8 - разрез 4-4 на фиг. 7;in FIG. 8 is a section 4-4 in FIG. 7;
на фиг. 9 показан узел соединения верхней и нижней колонны и плиты перекрытия безригельного бескапительного каркаса здания с рабочей арматурой плиты, соединенной с анкерами сваркой (фронтальный вид);in FIG. 9 shows the connection node of the upper and lower columns and floor slabs of the bezelless capless frame of the building with the working reinforcement of the plate connected to the welding anchors (front view);
на фиг. 10 - разрез 5-5 на фиг. 9;in FIG. 10 is a section 5-5 in FIG. 9;
на фиг. 11 показан узел соединения верхней и нижней колонны и плиты перекрытия безригельного бескапительного каркаса здания с рабочей арматурой плиты, соединенной с анкерами сваркой (вид сбоку);in FIG. 11 shows the connection node of the upper and lower columns and floor slabs of the bezelless capless building frame with the working reinforcement of the plate connected to the welding anchors (side view);
на фиг. 12 - разрез 6-6 на фиг. 11;in FIG. 12 is a section 6-6 in FIG. eleven;
на фиг. 13 показан промежуточный узел соединения колонны и плиты перекрытия безригельного бескапительного каркаса здания с рабочей арматурой колонны, соединенной с усилительными угловыми элементами сваркой (фронтальный вид);in FIG. 13 shows an intermediate node connecting the columns and slabs of the bezelless capless frame of the building with the working reinforcement of the column connected to the reinforcing corner elements by welding (front view);
на фиг. 14 - разрез 7-7 на фиг. 13;in FIG. 14 is a section 7-7 in FIG. 13;
на фиг. 15 показан промежуточный узел соединения колонны и плиты перекрытия безригельного бескапительного каркаса здания с рабочей арматурой колонны, соединенной с усилительными угловыми элементами сваркой (вид сбоку);in FIG. 15 shows an intermediate node connecting the columns and floor slabs of the bezelless capless building frame with the working reinforcement of the column connected to the reinforcing corner elements by welding (side view);
на фиг. 16 - разрез 8-8 на фиг. 15;in FIG. 16 is a section 8-8 in FIG. fifteen;
на фиг.17 показано непрерывное соединение анкеров рабочей арматуры с отверстиями, смещенными по часовой стрелке на величину, равную диаметру арматурного стержня;on Fig shows a continuous connection of the anchors of the working reinforcement with holes, shifted clockwise by an amount equal to the diameter of the reinforcing bar;
на фиг. 18 и фиг. 19 - смещение отверстий в анкерах по вертикали на величину, равную диаметру рабочей арматуры.in FIG. 18 and FIG. 19 - offset holes in the anchors vertically by an amount equal to the diameter of the working reinforcement.
Осуществление изобретенияThe implementation of the invention
Узел соединения колонны и плиты перекрытия безригельного бескапительного каркаса здания включает соединенные между собой колонны: верхнюю 1 (колонну верхнего яруса) и нижнюю 2 (колонну нижнего яруса) и сборную плиту перекрытия 3. В плите перекрытия 3 выполнено монтажное отверстие для пропуска колонн, образованное анкерами 4 рабочей арматуры 5 плиты перекрытия 3. Анкеры 4 преимущественно соединены между собой с образованием непрерывного углового профиля, окаймляющего монтажное отверстие плиты перекрытия. Рабочая арматура 5 либо жестко крепится к анкерам 4 посредством сварки, либо пропускается в соответствующие отверстия 6, выполненные в анкерах 4, и приваривается с наружной стороной анкеров 4. По углам монтажного отверстия плиты перекрытия установлены усилительные угловые элементы 7, сваренные с анкерами 4 рабочей арматуры 5.The node for connecting the column and the slab of the non-bezelless non-drip frame of the building includes interconnected columns: the top 1 (column of the upper tier) and the lower 2 (column of the lower tier) and the
Анкеры 4 через усилительный угловой элемент 7 посредством металлических соединительных элементов 8 свариваются с рабочей арматурой 10 нижней колонны 2. Преимущественно соединительные элементы 8 выполняются плоскими трапециевидной формы в плане.
К усилительным угловым элементам 7 приварены дополнительные арматурные стержни 9, которые могут быть установлены параллельно рабочей арматуре 5 и/или под углом к ней.
Между верхней и нижней рабочей арматурой 5 плиты перекрытия 3 в зоне продавливания приварены рабочие стержни 14.Between the upper and lower working
Анкеры рабочей арматуры 10 верхней 1 и нижней 2 колонн могут быть выполнены петлевыми 11 и 12 соответственно. Кроме того, завершение нижней колонны может быть выполнено в виде монтажной петли 13.Anchors of the
Монтаж узла на строительной площадке осуществляют следующим образом.Installation site at the construction site is as follows.
После установки нижней колонны 2 в проектное положение с помощью монтажной петли 13, на нее в проектное положение устанавливают плиту перекрытия 3 при помощи специального монтажного приспособления (на чертежах не показано) таким образом, чтобы нижняя колонна 2 проходила сквозь монтажное отверстие, образованное анкерами 4 рабочей арматуры 5 плиты перекрытия 3. В месте стыковки плиты перекрытия 3 и колонны 2 рабочая арматура колонны 10 оголена и посредством металлических соединительных элементов 8 анкеры 4 рабочей арматуры 5 плиты перекрытия 3 крепятся к рабочей арматуре колонны 10 через усилительный угловой элемент 7, после чего в проектное положение устанавливается верхняя колонна 1, имеющая соответствующий монтажной петле 13 канал (на чертеже не показан), и узел бетонируется.After the
Так как одна колонная 2 может устанавливаться для нескольких этажей, то промежуточный узел стыка плиты перекрытия 3 и колонны 2 в уровне каждого этажа и последний узел стыка плиты перекрытия 3 и колонны 2 выполняются в той же последовательности, но без установки верхней колонны.Since one
Claims (7)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015147183/03A RU2591994C1 (en) | 2015-11-03 | 2015-11-03 | Connection node for column and floor slab for beamless non-column cap building frame |
PCT/RU2016/000428 WO2017078567A1 (en) | 2015-11-03 | 2016-07-11 | Connection joint of a column and a floor slab of a girderless building frame without a capital |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015147183/03A RU2591994C1 (en) | 2015-11-03 | 2015-11-03 | Connection node for column and floor slab for beamless non-column cap building frame |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2591994C1 true RU2591994C1 (en) | 2016-07-20 |
Family
ID=56412797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015147183/03A RU2591994C1 (en) | 2015-11-03 | 2015-11-03 | Connection node for column and floor slab for beamless non-column cap building frame |
Country Status (2)
Country | Link |
---|---|
RU (1) | RU2591994C1 (en) |
WO (1) | WO2017078567A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327030A (en) * | 2017-08-30 | 2017-11-07 | 刘祥锦 | The plate-column structure node and its cap prefabricated components and construction method of a kind of steel column |
RU2657914C1 (en) * | 2017-09-21 | 2018-06-18 | Евгений Викторович Автономов | Column connection assembly and inter-floor slabs |
CN111677315A (en) * | 2020-04-21 | 2020-09-18 | 广东省建筑科学研究院集团股份有限公司 | Reinforcing member and reinforcing method for column cap of flat slab |
EA037678B1 (en) * | 2017-12-05 | 2021-04-29 | Лутфуллоджон Шарипов | Reinforced concrete frame without collar beams for seismic areas with combined reinforcement |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ307905B6 (en) * | 2018-05-18 | 2019-08-07 | České vysoké učenà technické v Praze | Multi-purpose prefabricated reinforced die-less concrete column system |
CN111827673B (en) * | 2020-07-20 | 2021-08-03 | 中国矿业大学(北京) | ECC (error correction code) enhanced coal gangue concrete beam column joint template and application thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1348445A (en) * | 1917-06-02 | 1920-08-03 | Earle P Press | Reinforced-concrete construction |
SU1114749A1 (en) * | 1982-05-04 | 1984-09-23 | Центральный Ордена Трудового Красного Знамени Научно-Исследовательский И Проектный Институт Типового И Экспериментального Проектирования Жилища | Joint between post and ceiling |
RU2203369C1 (en) * | 2001-08-27 | 2003-04-27 | Общество с ограниченной ответственностью "Фирма КУБ" | Joint connecting column and floor plate |
RU2355850C1 (en) * | 2008-01-09 | 2009-05-20 | Открытое акционерное общество "Оргтехстрой" | Connection of reinforced-concrete columns of frame building without collar beams |
RU2544350C1 (en) * | 2013-09-19 | 2015-03-20 | Валерий Михайлович Салихов | Connection point of column and floor slab of building without head of column and cross-bar |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2380494C1 (en) * | 2008-06-03 | 2010-01-27 | Андрей Михайлович Людковский | Butt joint of precast concrete columns with solid flooring |
RU96589U1 (en) * | 2010-02-25 | 2010-08-10 | Юрий Шакирович Соловьев | BUILDING FRAME |
-
2015
- 2015-11-03 RU RU2015147183/03A patent/RU2591994C1/en active
-
2016
- 2016-07-11 WO PCT/RU2016/000428 patent/WO2017078567A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1348445A (en) * | 1917-06-02 | 1920-08-03 | Earle P Press | Reinforced-concrete construction |
SU1114749A1 (en) * | 1982-05-04 | 1984-09-23 | Центральный Ордена Трудового Красного Знамени Научно-Исследовательский И Проектный Институт Типового И Экспериментального Проектирования Жилища | Joint between post and ceiling |
RU2203369C1 (en) * | 2001-08-27 | 2003-04-27 | Общество с ограниченной ответственностью "Фирма КУБ" | Joint connecting column and floor plate |
RU2355850C1 (en) * | 2008-01-09 | 2009-05-20 | Открытое акционерное общество "Оргтехстрой" | Connection of reinforced-concrete columns of frame building without collar beams |
RU2544350C1 (en) * | 2013-09-19 | 2015-03-20 | Валерий Михайлович Салихов | Connection point of column and floor slab of building without head of column and cross-bar |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327030A (en) * | 2017-08-30 | 2017-11-07 | 刘祥锦 | The plate-column structure node and its cap prefabricated components and construction method of a kind of steel column |
RU2657914C1 (en) * | 2017-09-21 | 2018-06-18 | Евгений Викторович Автономов | Column connection assembly and inter-floor slabs |
EA037678B1 (en) * | 2017-12-05 | 2021-04-29 | Лутфуллоджон Шарипов | Reinforced concrete frame without collar beams for seismic areas with combined reinforcement |
CN111677315A (en) * | 2020-04-21 | 2020-09-18 | 广东省建筑科学研究院集团股份有限公司 | Reinforcing member and reinforcing method for column cap of flat slab |
Also Published As
Publication number | Publication date |
---|---|
WO2017078567A1 (en) | 2017-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2591994C1 (en) | Connection node for column and floor slab for beamless non-column cap building frame | |
JP3180817U (en) | Building structure without formwork removal | |
KR101295740B1 (en) | Joint of Steel Column | |
RU2548627C2 (en) | Steel frame structure with usage of u-shaped composite beam | |
KR101191502B1 (en) | Structure system using bar truss integrated asymmetry h-beam and end beam | |
RU146196U1 (en) | CONNECTION JOINT FOR COLUMN AND FLAT REINFORCED CONCRETE FLOORING | |
RU128636U1 (en) | BASE ASSEMBLY JOINT REINFORCED CONCRETE COLUMN WITH FOUNDATION | |
KR101833949B1 (en) | Composite intergrated optimized cross-section | |
KR101345898B1 (en) | Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall | |
KR101738244B1 (en) | Built-up beam having truss reinforcement | |
WO2013187803A2 (en) | Method for increasing the load-bearing capacity of a girderless monolithic reinforced-concrete framework | |
JP7264690B2 (en) | METHOD FOR MANUFACTURING CONCRETE WALL STRUCTURE AND BUILDING STRUCTURE | |
RU2634139C1 (en) | Framework universal prefabricated architectural and construction system | |
WO2021058600A1 (en) | Reinforcing steel skeletal framework | |
KR101385554B1 (en) | Prefabricated construction using half slab | |
RU2657914C1 (en) | Column connection assembly and inter-floor slabs | |
KR100837831B1 (en) | Underground downward construction system | |
RU110784U1 (en) | CONSTRUCTION CONNECTION ASSEMBLY | |
RU2492298C1 (en) | Unit to rest wall crossbar onto pillar of reinforced prefabricated frame | |
RU110776U1 (en) | CONSTRUCTION CONNECTION ASSEMBLY | |
WO2017105296A2 (en) | Metal frame for a cast-in-situ reinforced concrete column | |
RU126722U1 (en) | REINFORCED CONCRETE MOUNT FOR MONOLITHIC COVERING | |
RU2632592C1 (en) | Reinforced formwork block and building structure | |
RU2383692C1 (en) | Butt joint of monolithic slab with column | |
RU2588272C1 (en) | Reinforced flat concrete beamless floor (variants) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
QB4A | Licence on use of patent |
Free format text: LICENCE Effective date: 20170524 |
|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20190606 Effective date: 20190606 |
|
QC41 | Official registration of the termination of the licence agreement or other agreements on the disposal of an exclusive right |
Free format text: LICENCE FORMERLY AGREED ON 20190606 Effective date: 20211229 |
|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20220112 Effective date: 20220112 |