KR101345898B1 - Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall - Google Patents

Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall Download PDF

Info

Publication number
KR101345898B1
KR101345898B1 KR1020120009685A KR20120009685A KR101345898B1 KR 101345898 B1 KR101345898 B1 KR 101345898B1 KR 1020120009685 A KR1020120009685 A KR 1020120009685A KR 20120009685 A KR20120009685 A KR 20120009685A KR 101345898 B1 KR101345898 B1 KR 101345898B1
Authority
KR
South Korea
Prior art keywords
wall
steel
longitudinal
section steel
reinforcement
Prior art date
Application number
KR1020120009685A
Other languages
Korean (ko)
Other versions
KR20130088448A (en
Inventor
오정근
강순필
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020120009685A priority Critical patent/KR101345898B1/en
Publication of KR20130088448A publication Critical patent/KR20130088448A/en
Application granted granted Critical
Publication of KR101345898B1 publication Critical patent/KR101345898B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/18Spacers of metal or substantially of metal

Abstract

본 발명은 철근과 형강이 선 조립된 상태에서 블록형의 외장타일을 형강에 직접 부착시키게 되므로, 거푸집을 별도로 탈 부착시킬 필요가 없으며 프리캐스트의 외장타일은 그 상면이 편평하여 마감재들 간의 높이가 일정하고 수평으로 부착되도록, 가로 세로로 배근되어 벽체 형태를 가지는 철근과, 상기 철근 둘레를 따라 철근의 수직 길이 방향으로 일정 간격마다 부착되어 있는 프레임 형태의 형강으로 구성되는 철골과; 상기 철골의 양 측 벽면에서 상,하 양 단이 상기 형강과 형강 사이에 부착되되, 이들 모서리가 서로 연접하게 부착되는 직사각 평면 형태의 외장타일과; 상기 철골의 양 측 외장타일 사이의 공간을 메우는 콘크리트를 포함하여 구성되는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체 및 이를 이용한 벽체 시공 방법에 관한 것이다.In the present invention, since the block-type exterior tiles are directly attached to the section steel in a state where the rebar and the section steel are pre-assembled, there is no need to separate or detach the formwork, and the exterior tiles of the precast have a flat upper surface so that the height between the finishing materials is increased. Steel frame consisting of a reinforcing bar that is horizontally and vertically reinforcement having a wall shape and attached to each other at regular intervals in a vertical length direction of the reinforcing bar along the reinforcing bar so as to be fixed and horizontally attached thereto; Upper and lower ends of both sides of the steel frame are attached between the section steel and the section steel, and a rectangular planar exterior tile having these edges connected to each other; It relates to a wall having a pre-assembled reinforcement bundle and a wall construction method using the same, characterized in that it comprises a concrete filling the space between the two side facing tiles of the steel frame.

Description

선 조립된 철근다발을 가지는 벽체 및 이를 이용한 벽체 시공 방법{Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall}Wall having a pre-assembled reinforcement bundle and wall construction method using the same {Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall}

본 발명은 선 조립된 철근다발을 가지는 벽체 및 이를 이용한 벽체 시공 방법에 관한 것으로, 보다 상세하게는 벽체의 골격을 이루는 철근다발을 선 조립하여 철근다발의 측면에 직접 마감용 타일을 부착시키도록 하는 선 조립된 철근다발을 가지는 벽체 및 이를 이용한 벽체 시공 방법에 관한 것이다.
The present invention relates to a wall having a pre-assembled reinforcement bundle and a wall construction method using the same, and more specifically to pre-assemble the reinforcement bundle constituting the skeleton of the wall to directly attach the finishing tile to the side of the reinforcement bundle It relates to a wall having a pre-assembled rebar bundle and a wall construction method using the same.

일반적으로 건물의 벽체를 시공하기 위해서는 바닥의 콘크리트 상에 벽체의 골격이 되는 철근을 가로 및 세로로 배치하고 철근 사이의 조립 앵커로 거푸집을 부착시켜 철근 내부에 콘크리트를 부어 굳히게 된다.In general, in order to construct a wall of a building, the reinforcing bars are arranged horizontally and vertically on the concrete of the floor, and by attaching formwork with assembly anchors between the bars, the concrete is poured into the reinforcing bars.

또한 벽체의 외장 마감을 위해 거푸집을 떼어낸 후 벽체의 굳어진 콘크리트 벽면으로 외장타일 등을 부착시키게 되는 것이다.In addition, after removing the formwork for the exterior finish of the wall is to attach the exterior tile to the concrete concrete wall of the wall.

그러나 이러한 방식의 건물 벽체는 거푸집을 탈 부착해야 하는 번거로움이 있으며, 거푸집 사이에서 굳어진 콘크리트의 면이 울퉁불퉁하게 되어 마감재를 부착시킬 때 이들 마감재들 간의 높이가 일정하지 않거나 수평으로 부착되지 않는 문제점이 있다.
However, this type of building wall is cumbersome to remove the formwork, and the surface of the hardened concrete is uneven between the formwork, the height between these materials is not constant or attached horizontally when attaching the finishing material have.

따라서 본 발명의 목적은 가로 및 세로로 배근된 철근의 길이방향으로 일정 간격마다 형강을 선 조립시킨 후 상기 형강에 블록형 외장타일을 연접하게 부착시키도록 하는 선 조립된 철근다발을 가지는 벽체를 제공하기 위함이다.
Accordingly, an object of the present invention is to provide a wall having pre-assembled reinforcing bar bundles for attaching a block-type exterior tile to the section steel after pre-assembling the section steel at regular intervals in the longitudinal direction of the reinforcing bars that are horizontally and vertically arranged. To do this.

본 발명의 목적은, 가로 세로로 배근되어 벽체 형태를 가지는 철근과, 상기 철근 둘레를 따라 철근의 수직 길이 방향으로 일정 간격마다 부착되어 있는 프레임 형태의 형강으로 구성되는 철골과; 상기 철골의 양 측 벽면에서 상,하 양 단이 상기 형강과 형강 사이에 부착되되, 이들 모서리가 서로 연접하게 부착되는 직사각 평면 형태의 외장타일과; 상기 철골의 양 측 외장타일 사이의 공간을 메우는 콘크리트를 포함하여 구성되는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체에 의해 달성된다.An object of the present invention, the steel frame is composed of a reinforcement having a shape of the wall reinforcement vertically and horizontally, and a frame-shaped steel that is attached at regular intervals in the vertical longitudinal direction of the reinforcement along the reinforcing bar; Upper and lower ends of both sides of the steel frame are attached between the section steel and the section steel, and a rectangular planar exterior tile having these edges connected to each other; It is achieved by a wall having a pre-assembled reinforcement bundle characterized in that it comprises a concrete filling the space between the two sides of the steel frame.

또한 본 발명에 따르면, 상기 철골은, 벽체의 높이 및 너비를 형성하도록 일정 간격마다 세워진 동일 길이의 복수개의 세로철근과; 상기 세로철근의 둘레를 따라 세로 철근의 길이 방향으로 일정 간격마다 복수개 부착되는 형강과; 상기 세로철근의 둘레를 따라 세로 철근의 길이 방향으로 일정 간격마다 복수개 부착되는 가로철근을 포함하여 구성되는 것이 바람직하다.In addition, according to the present invention, the steel frame, a plurality of longitudinal reinforcing bars of the same length erected at regular intervals to form the height and width of the wall; A plurality of section steels attached at regular intervals along a circumference of the longitudinal bars in a longitudinal direction of the longitudinal bars; It is preferably configured to include a plurality of transverse reinforcing bar at a predetermined interval in the longitudinal direction of the longitudinal reinforcement along the circumference of the longitudinal rebar.

또한 본 발명에 따르면, 상기 형강은, 상기 외장타일과 면접하는 수직부와; 상기 수직부의 일 단으로부터 수직되는 수평면을 형성하는 수평부를 포함하여 구성되는 것이 바람직하다.In addition, according to the present invention, the section steel, and the vertical portion in contact with the exterior tile; It is preferably configured to include a horizontal portion forming a horizontal plane vertical from one end of the vertical portion.

또한 본 발명에 따르면, 상기 수직부는 외장타일의 일 측단과 볼트 결합되도록 상기 수직부의 수평 길이 방향을 따라 일정 간격으로 복수개의 볼트구를 더 포함하는 것이 바람직하다.According to the present invention, it is preferable that the vertical portion further includes a plurality of bolt holes at predetermined intervals along the horizontal length direction of the vertical portion so as to be bolted to one side end of the exterior tile.

또한 본 발명에 따르면, 상기 외장타일과 수직부가 볼트 결합되도록 상기 외장타일은 상기 수직부의 볼트구에 대응하는 복수개의 볼트공을 형성하는 것이 바람직하다.According to the present invention, it is preferable that the exterior tiles form a plurality of bolt holes corresponding to the bolt holes of the vertical sections so that the exterior tiles and the vertical sections are bolted together.

또한 본 발명에 따르면, 상기 수평부는 상기 세로철근이 끼워지도록 세로철근의 직경에 대응하도록 수평부의 일 단에 그 길이 방향을 따라 일정 간격으로 형성되는 홈부를 더 포함하는 것이 바람직하다.In addition, according to the present invention, it is preferable that the horizontal portion further includes grooves formed at regular intervals along the longitudinal direction at one end of the horizontal portion to correspond to the diameter of the longitudinal reinforcement so that the longitudinal reinforcement is fitted.

또한 본 발명에 따르면, 상기 형강은 'ㄱ'자형인 것이 바람직하다.In addition, according to the present invention, the section steel is preferably a 'b' shape.

또한 본 발명에 따르면, 상기 형강은 'ㄷ'자형인 것이 바람직하다.In addition, according to the present invention, the section steel is preferably '' 'shaped.

또한 본 발명에 따르면, 상기 형강은 'T'자형인 것이 바람직하다.In addition, according to the present invention, the section steel is preferably a 'T' shape.

또한 본 발명의 다른 목적은, 세로로 배근될 세로철근들이 형강의 홈부에 삽입되는 수직 철근 배열 단계와; 가로 철근을 세로 철근의 일정 간격마다 배근하여 철골을 완성하는 가로 철근 배열 단계와; 상기 철골의 형강 외부 둘레를 따라 외장타일을 부착하는 벽체 부착단계와; 상기 철골의 벽면 양측으로 부착되어 있는 외장타일 사이의 철골 공간에 콘크리트를 타설하는 콘크리트 타설 단계를 포함하는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체를 이용한 벽체 시공 방법에 의해서도 달성된다.In addition, another object of the present invention, the vertical reinforcing bar arrangement step in which the longitudinal reinforcement to be longitudinally reinforcement is inserted into the groove portion of the section steel; A horizontal rebar arrangement step of completing the steel frame by reinforcing the horizontal rebars at regular intervals of the vertical rebars; A wall attachment step of attaching an exterior tile along an outer circumference of the steel frame; It is also achieved by a wall construction method using a wall having a pre-assembled reinforcement bundle comprising a concrete placing step of placing concrete in the steel space between the exterior tiles attached to both sides of the wall of the steel frame.

또한 본 발명에 따르면, 상기 수직 철근 배열 단계에서, 세로철근에 부착할 형강들을 배열시키는 단계와; 상기 배열된 형강들의 프레임 내부로 세로 철근들을 삽입하여 세로 철근을 형강의 수평부 홈부에 각각 끼워 맞추는 단계로 구성되는 것이 바람직하다.According to the present invention, in the vertical rebar arrangement step, arranging the section steel to be attached to the longitudinal rebar; It is preferably configured to insert the longitudinal reinforcing bars into the frame of the arranged steel beams to fit the longitudinal reinforcing bars respectively to the horizontal groove portion of the steel.

또한 본 발명에 따르면, 최상단과 최하단의 형강은 1개만을 배열시키고 그 사이에 배열되는 형강은 한 쌍씩 서로 맞닿도록 배열시키는 것이 바람직하다.
In addition, according to the present invention, it is preferable to arrange only one of the upper and lower sections of the section steel, and the sections arranged therebetween to be in contact with each other.

따라서 상기의 과제 해결 수단에 의한 본 발명의 선 조립된 철근다발을 가지는 벽체 및 이를 이용한 벽체 시공 방법은 철근과 형강이 선 조립된 상태에서 블록형의 외장타일을 형강에 직접 부착시키게 되므로, 거푸집을 별도로 탈 부착시킬 필요가 없으며 프리캐스트의 외장타일은 그 상면이 편평하여 마감재들 간의 높이가 일정하고 수평으로 부착되어진다.
Therefore, the wall having the pre-assembled reinforcement bundle and the wall construction method using the same according to the problem solving means of the present invention is to directly attach the block-shaped exterior tile to the section steel in the pre-assembled reinforcing bars and section steel, formwork It does not need to be detached separately, and the precast exterior tile has a flat top surface so that the height between the finishing materials is fixed and attached horizontally.

도 1은 본 발명의 선 조립된 철근다발을 가지는 벽체의 형강의 부분 사시도,
도 2는 가로 및 세로 철근과 형강을 결합한 철골의 사시도,
도 3은 본 발명의 선 조립된 철근다발을 가지는 벽체의 전체 사시도,
도 4는 도 3의 단면도,
도 5는 본 발명의 선 조립된 철근다발을 가지는 벽체를 이용한 벽체 시공 방법의 전체 순서도.
1 is a partial perspective view of a section steel of a wall having a pre-assembled rebar bundle of the present invention,
Figure 2 is a perspective view of the steel frame combined the horizontal and vertical reinforcing bars and section steel,
3 is an overall perspective view of a wall having a pre-assembled rebar bundle of the present invention,
Fig. 4 is a sectional view of Fig. 3,
5 is a whole flow chart of the wall construction method using a wall having a pre-assembled rebar bundle of the present invention.

이하 본 발명의 선 조립된 철근다발을 가지는 벽체 및 이를 이용한 벽체 시공 방법에 대해 도면들을 통해 보다 상세하게 설명하도록 한다.Hereinafter, a wall having a pre-assembled rebar bundle of the present invention and a wall construction method using the same will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 선 조립된 철근다발을 가지는 벽체의 형강의 부분 사시도이며, 도 2는 가로 및 세로 철근과 형강을 결합한 철골의 사시도이다.1 is a partial perspective view of a section steel of a wall having a pre-assembled rebar bundle of the present invention, Figure 2 is a perspective view of a steel frame combined with horizontal and vertical reinforcing bars and section steel.

또한, 도 3은 본 발명의 선 조립된 철근다발을 가지는 벽체의 전체 사시도이며, 도 4는 도 3의 단면도이고, 도 5는 본 발명의 선 조립된 철근다발을 가지는 벽체를 이용한 벽체 시공 방법의 전체 순서도이다.3 is an overall perspective view of a wall having a pre-assembled rebar bundle of the present invention, Figure 4 is a cross-sectional view of Figure 3, Figure 5 is a wall construction method using a wall having a pre-assembled rebar bundle of the present invention The whole flowchart.

본 발명의 선 조립된 철근다발을 가지는 벽체는 형강과 철근다발로 구성되는 철골, 상기 철골의 형강과 서로 연접하게 부착되는 외장타일로 구성된다.The wall having the pre-assembled rebar bundle of the present invention is composed of a steel frame composed of a section steel and a reinforcing steel bundle, and an exterior tile attached to the steel section of the steel frame in contact with each other.

도 1에서 보는 바와 같이 형강(10)은 세로 철근 다발을 감싸도록 직사각 형태의 테두리를 가지는 프레임이다. As shown in Figure 1, the steel 10 is a frame having a rectangular border to surround the longitudinal reinforcement bundle.

상기 형강(10)은 외장타일과 볼트체결로 부착되도록 볼트구(14)를 형성하는 수직부(11)와, 상기 수직부(11)의 길이 방향을 따라 수직부(11)와 수직되게 형성되며 철근이 끼움되도록 홈부(13)를 형성하는 수평부(12)로 구성된다.The section steel 10 is formed to be perpendicular to the vertical portion 11 and the vertical portion 11 along the longitudinal direction of the vertical portion 11 to form a bolt sphere 14 so as to be attached to the outer tile and the bolt fastening. It consists of a horizontal portion 12 to form a groove portion 13 so that the reinforcing bar is fitted.

상기 수직부(11)는 하기에 설명될 블록형 외장타일(30)의 내면과 면접하도록 수직면으로 형성되며, 상기 수직부(110)의 길이 방향을 따라 동일 간격으로 볼트구(14)를 형성하게 된다.The vertical portion 11 is formed in a vertical plane to interview the inner surface of the block-type exterior tile 30 to be described later, to form the bolt holes 14 at equal intervals along the longitudinal direction of the vertical portion 110. do.

상기 수평부(12)는 상기 수직부(11)의 길이 방향을 따라 그 일 단으로부터 수직되는 수평면으로 상기 외장타일(30)과도 수직되는 면이다.The horizontal part 12 is a surface perpendicular to the exterior tile 30 in a horizontal plane perpendicular from one end thereof in the longitudinal direction of the vertical part 11.

상기 수평부(12)는 그 길이 방향을 따라 동일 간격으로 홈부(13)를 형성하게 된다.The horizontal portion 12 forms the groove portions 13 at equal intervals along the longitudinal direction.

상기 홈부(13)는 수평부(12)의 길이 방향을 따라 그 일 단에 동일 간격마다 형성되어 있는 복수개의 홈이며 상기 홈부(13)로 세로로 배근되는 철근들이 억지 끼움되도록 철근의 직경에 대응하는 치수를 가지게 된다.The groove 13 is a plurality of grooves formed at equal intervals at one end along the longitudinal direction of the horizontal portion 12 and corresponds to the diameter of the reinforcement so that the rebars vertically reinforced into the groove 13 are interposed. To have dimensions

이에 상기 형강(10)의 단면은 'ㄱ'자형, 'ㄷ'자형, 'T'자형 등의 다양한 형태를 가지게 되며, 본 발명에서는 'ㄱ'자형 혹은 'ㄴ'자형' 혹은 'T'자형'의 수직부와 수평부를 가지는 것을 예시적으로 설명하고 있다.Accordingly, the cross section of the section steel 10 may have various shapes such as 'a', 'c', and 't', and in the present invention, 'a' or 'b' or 't'. It has been exemplarily described to have a vertical portion and a horizontal portion.

이 밖에 'ㄷ'자형 역시 수직부와 상기 수직부의 양 단으로부터 수직되는 수평부를 구성하게 되며, 수직부에 볼트구를 형성하고 수평면에 홈부를 형성하게 된다.In addition, the 'c' shape also constitutes a vertical part and a horizontal part vertical from both ends of the vertical part, and forms a bolt hole in the vertical part and a groove part in the horizontal plane.

이와 마찬가지로 'T'자형 역시 수직부와 상기 수직부의 중앙으로부터 수직되는 수평부를 구성하게 되며, 수직부에 볼트구를 형성하고 수평면에 홈부를 형성하게 되며, 이는 'ㄱ'자형 혹은 'ㄴ'자형'의 수평부를 서로 맞대어 T자를 형성하도록 할 수 있다.Similarly, the 'T' shape also constitutes a vertical portion and a horizontal portion perpendicular to the center of the vertical portion, and forms a bolt hole in the vertical portion and a groove portion in the horizontal plane, which is 'a' or 'b'-shaped' It is possible to form a letter T to abut the horizontal portions of.

도 2에서 보는 바와 같이, 상기 형강(10)은 세로로 배근되는 철근의 길이 방향을 따라 동일 간격으로 세로 철근과 끼움맞춤 되어진다.As shown in Figure 2, the section steel 10 is fitted with the longitudinal reinforcement at equal intervals along the longitudinal direction of the longitudinally reinforcement.

도면에서 보는 바와 같이 최상단과 최하단은 'ㄱ'자형 혹은 'ㄴ'자형'의 1개의 형강들이 위치하며, 그 사이에는 'T자형' 형강들이 배열되도록 한다.As shown in the drawing, the top and bottom of the 'b' shape or 'b' shape 'is located in one section of the steel, between the' T-shape 'to be arranged.

혹은 최 상단과 최하단의 형강(10)은 1개만이 위치하게 되며, 최상단과 최 하단의 사이에 위치하는 형강(10)은 'ㄱ'자형 혹은 'ㄴ'자형'의 형강들이 한 쌍씩 서로 맞닿도록 위치하게 된다.Alternatively, only one top steel beam and the lowest steel beam 10 may be located, and the beam steel 10 located between the top and bottom ends may be paired with pairs of 'b' or 'b' shaped beams. Will be located.

보다 구체적으로 상기 한 쌍의 형강(10)은 상 하로 위치하되 이들 수평부(12)가 서로 면접하여 맞닿도록 하고 수직부(11)가 서로 연접하도록 한다.More specifically, the pair of section steels 10 are positioned up and down so that the horizontal portions 12 are in contact with each other and abut, and the vertical portions 11 are in contact with each other.

이는 하기에 설명될 상, 하 외장타일의 하부와 상부가 각각 부착되기 위함으로, 최상단의 형강은 외장타일 상부만이 부착되고 최하단의 형강은 외장타일 하부만이 부착되기 때문에 1개만이 위치하게 되는 것이다.This is to be attached to the lower and upper portions of the upper and lower exterior tiles, which will be described below, because only the upper portion of the upper section steel is attached to the upper portion of the outer tile and only the lower portion of the outer section tile is attached. will be.

상기와 같이 세로로 배근된 세로철근(21)과 형강(10)이 조립된 상태에서 세로 철근(21)의 일정 간격마다 가로철근(22)을 배근하게 됨으로써 철골을 완성하게 된다.As described above, the longitudinal reinforcing bars 21 and the section steel 10 are assembled in a state in which the horizontal rebars 22 are arranged at regular intervals of the longitudinal reinforcing bars 21 to complete the steel frame.

이때 가로철근과 세로철근의 연결은 이들이 서로 크로스되는 부위를 철사로 엮어 매는 일반적인 배근 방식에 따른다.At this time, the connection of the transverse rebar and the longitudinal reinforcement follows a general reinforcement method in which wires are tied to the areas where they cross each other.

도 3 및 도 4에서 보는 바와 같이, 상기 외장타일(30)은 철골을 구성하는 형강(10)에 부착되는 직사각 형태의 블록형 평판이다.As shown in FIGS. 3 and 4, the exterior tile 30 is a rectangular block-shaped flat plate attached to the shaped steel 10 constituting the steel frame.

상기 외장타일(30)은 동일한 형상의 평면으로 상 하로 복수개의 볼트공(31)을 형성하게 된다.The exterior tile 30 forms a plurality of bolt holes 31 up and down in the plane of the same shape.

상기 볼트공(31)은 앞서 설명되었던 형강의 볼트구(14)에 대응하여 동일 볼트가 삽입할 수 있도록 동일 직경으로 형성되어 있다.The bolt hole 31 is formed with the same diameter so that the same bolt can be inserted corresponding to the bolt hole 14 of the section steel described above.

또한 외장타일(30)이 서로 연접하게 부착될 수 있도록 상기 볼트공(31)은 상기 형강의 볼트구(14) 위치와 개수에 대응하게 형성되어 있다.In addition, the bolt hole 31 is formed to correspond to the position and number of the bolt hole 14 of the section steel so that the exterior tile 30 can be attached to each other.

이와 마찬가지로 외장타일(30)이 서로 연접하게 부착될 수 있도록 외장타일(30)의 세로 치수는 형강과 형강 사이의 너비 및 볼트공과 볼트구의 일치를 고려하여 이에 대응되는 치수를 가지게 된다.Likewise, the vertical dimension of the exterior tile 30 may have a corresponding dimension in consideration of the width between the section steel and the section steel and the matching of the bolt hole and the bolt hole so that the exterior tile 30 may be attached to each other.

상기와 같이 철골의 측면으로 모두 연접되게 부착되는 외장타일(30) 양 측의 공간부는 콘크리트로 채워지게 된다.As described above, the space parts on both sides of the exterior tile 30 which are all connected to the side of the steel frame are filled with concrete.

도 5는 본 발명의 선 조립된 철근다발을 가지는 벽체를 이용한 벽체 시공 방법의 전체 순서도를 도시하고 있다.Figure 5 shows the overall flow chart of the wall construction method using a wall having a pre-assembled rebar bundle of the present invention.

우선 세로로 배근될 세로철근(21)들이 형강의 홈부(13)에 삽입되는 수직 철근 배열 단계(S10)를 수행하게 된다.First, the vertical reinforcing bar 21 to be vertically reinforcement is performed to the vertical reinforcing bar array step (S10) is inserted into the groove portion 13 of the section steel.

상기 단계에서 우선 세로철근(21)에 부착할 형강(10)들을 배열시키게 된다.In this step, firstly, the steels 10 to be attached to the longitudinal rebar 21 are arranged.

이때 최상단과 최하단의 형강(10)은 1개만을 배열시키고 그 사이에 배열되는 형강(10)은 한 쌍씩 위치시키도록 한다.At this time, the top and bottom beams 10 are arranged only one, and the beams 10 arranged between them are placed in pairs.

상기 배열된 형강(10)들의 프레임 내부로 세로 철근(21)들을 삽입하고 세로 철근(21)을 형강의 수평부(12) 홈부(13)에 각각 끼워맞추게 된다.The longitudinal reinforcing bars 21 are inserted into the frame of the arranged steels 10 and the longitudinal reinforcing bars 21 are fitted to the grooves 13 of the horizontal part 12 of the steel.

이때 1개 혹은 한 쌍의 형강(10)들은 세로 철근(21)들의 길이 방향을 따라 일정 간격을 가지도록 배열되게 끼워맞추도록 한다.At this time, one or a pair of section steels 10 are fitted to be arranged to have a predetermined interval along the longitudinal direction of the longitudinal reinforcing bars (21).

상기와 같이 수직 철근 배열 단계(S10)를 수행한 후, 가로 철근(22)을 세로 철근(21)의 일정 간격마다 배근하는 가로 철근 배열 단계(S20)를 수행하게 된다.After performing the vertical reinforcing bar array step S10 as described above, the horizontal rebar bar array step S20 is performed to reinforce the horizontal rebars 22 at regular intervals of the vertical reinforcing bar 21.

상기 단계에서는 가로철근과 세로철근의 연결에 있어서 이들이 서로 크로스되는 부위를 철사로 엮어 매는 일반적인 배근 방식에 따른다.In this step, according to the general reinforcement method of weaving the wire cross section of the cross bars with each other in the connection of transverse rebar and longitudinal reinforcing bars.

상기 가로 철근 배열 단계(S20)를 수행한 후, 형강(10)의 외부 둘레를 따라 외장타일을 부착하는 벽체 부착단계(S30)를 수행하게 된다.After performing the horizontal reinforcing arrangement step (S20), the wall attachment step (S30) for attaching the exterior tile along the outer periphery of the section steel 10 is performed.

상기 단계에서는 상기 외장타일(30)의 볼트공(31)과 형강의 볼트구(14)를 서로 일치시키고 볼트를 삽입하여 볼트체결하도록 한다.In this step, the bolt hole 31 of the exterior tile 30 and the bolt hole 14 of the section steel coincide with each other, and bolts are inserted by bolts.

이때 외장타일(30)의 모서리들은 서로 연접하여 빈틈없이 부착되도록 한다.At this time, the edges of the exterior tile 30 are connected to each other to be attached without gaps.

또한 최 상단의 형강에는 최 상단 외장타일의 상단이 부착되도록 하고, 최 하단이 형강에는 최 하단 외장타일의 하단이 부착되도록 한다.In addition, the top of the top of the top of the outer profile tiles to be attached to the top, the bottom of the bottom of the bottom tiles to be attached to the bottom.

상기와 같이 외장타일이 형강의 앞 뒤로 서로 연접하게 부착된 상태에서 외장타일 사이의 철골 공간에 콘크리트를 타설하는 콘크리트 타설 단계(S40)를 수행하게 된다. As described above, in the state in which the exterior tiles are attached to each other in front of and behind the section steel, the concrete placing step (S40) of placing concrete in the steel space between the exterior tiles is performed.

상기 단계에서는 외장타일 사이의 철골 공간에 콘크리트를 부어 철골 사이를 메우도록 하며 콘크리트가 굳어지면 철골, 외장타일, 콘크리트로 구성되는 벽체를 완성하게 된다.
In this step, the concrete is poured into the steel frame space between the exterior tiles to fill the space between the steel frames, and when the concrete is hardened, a wall composed of steel, exterior tiles and concrete is completed.

10 : 형강 11 : 수직부
12 : 수평부 13 : 홈부
14 : 볼트구 20 : 철근
21 : 세로철근 22 : 가로철근
30 : 외장타일 31 : 볼트공
10: section steel 11: vertical portion
12: horizontal portion 13: groove portion
14 bolt hole 20 rebar
21: longitudinal rebar 22: horizontal rebar
30: exterior tile 31: bolt hole

Claims (12)

벽체의 높이 및 너비를 형성하도록 일정 간격마다 세워진 동일 길이의 복수개의 세로철근과, 상기 세로철근의 둘레를 따라 세로 철근의 길이 방향으로 일정 간격마다 복수개 부착되는 형강과, 상기 세로철근의 둘레를 따라 세로 철근의 길이 방향으로 일정 간격마다 복수개 부착되는 가로철근을 포함하여 구성되는 철골과;
상기 철골의 양 측 벽면에서 상,하 양 단이 상기 형강과 형강 사이에 부착되되, 이들 모서리가 서로 연접하게 부착되는 직사각 평면 형태의 외장타일과;
상기 철골의 양 측 외장타일 사이의 공간을 메우는 콘크리트를 포함하여 구성되며,
상기 형강은,
상기 외장타일과 면접하는 수직부와;
상기 수직부의 일 단으로부터 수직되는 수평면을 형성하는 수평부를 포함하여 구성되며,
상기 수평부는 상기 세로철근이 끼워지도록 세로철근의 직경에 대응하도록 수평부의 일 단에 그 길이 방향을 따라 일정 간격으로 형성되는 홈부를 더 포함하는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체.
A plurality of longitudinal bars of the same length that are erected at regular intervals to form a height and a width of the wall, a plurality of longitudinal steels that are attached at regular intervals in the longitudinal direction of the longitudinal reinforcement along the circumference of the longitudinal reinforcement, and along the circumference of the longitudinal rebars Steel frame including a plurality of horizontal reinforcing bars attached to each of the predetermined interval in the longitudinal direction of the longitudinal reinforcement;
Upper and lower ends of both sides of the steel frame are attached between the section steel and the section steel, and a rectangular planar exterior tile having these edges connected to each other;
Consists of a concrete filling the space between the two sides of the steel frame,
The section steel,
A vertical portion in contact with the exterior tile;
It comprises a horizontal portion forming a horizontal plane vertical from one end of the vertical portion,
The horizontal portion of the wall having a pre-assembled reinforcing bar bundles, characterized in that it further comprises grooves formed at regular intervals along its longitudinal direction at one end of the horizontal portion to correspond to the diameter of the longitudinal reinforcement so that the longitudinal reinforcement is fitted.
삭제delete 삭제delete 제 1항에 있어서,
상기 수직부는 외장타일의 일 측단과 볼트 결합되도록 상기 수직부의 수평 길이 방향을 따라 일정 간격으로 복수개의 볼트구를 더 포함하는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체.
The method of claim 1,
And the vertical portion further includes a plurality of bolt holes at predetermined intervals along a horizontal length direction of the vertical portion so as to be bolted to one side end of the exterior tile.
제 4항에 있어서,
상기 외장타일과 수직부가 볼트 결합되도록 상기 외장타일은 상기 수직부의 볼트구에 대응하는 복수개의 볼트공을 형성하는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체.
5. The method of claim 4,
The exterior tile is a wall having a pre-assembled reinforcement bundle, characterized in that the exterior tile to form a plurality of bolt holes corresponding to the bolt hole of the vertical portion so that the vertical portion is bolted.
삭제delete 제 1항에 있어서,
상기 형강은 'ㄱ'자형인 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체.
The method of claim 1,
The section steel wall having a pre-assembled reinforcement bundle, characterized in that the 'b' shape.
제 1항에 있어서,
상기 형강은 'ㄷ'자형인 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체.
The method of claim 1,
The section steel wall having a pre-assembled reinforcement bundle, characterized in that the 'c' shape.
제 1항에 있어서,
상기 형강은 'T'자형인 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체.
The method of claim 1,
The section steel wall having a pre-assembled reinforcement bundle, characterized in that the 'T' shape.
세로로 배근될 세로철근들이 형강의 홈부에 삽입되는 수직 철근 배열 단계(S10)와;
가로 철근을 세로 철근의 일정 간격마다 배근하여 철골을 완성하는 가로 철근 배열 단계(S20)와;
상기 철골의 형강 외부 둘레를 따라 외장타일을 부착하는 벽체 부착단계(S30)와;
상기 철골의 벽면 양측으로 부착되어 있는 외장타일 사이의 철골 공간에 콘크리트를 타설하는 콘크리트 타설 단계(S40)를 포함하며,
상기 수직 철근 배열 단계(S10)에서,
세로철근에 부착할 형강들을 배열시키는 단계와;
상기 배열된 형강들의 프레임 내부로 세로 철근들을 삽입하여 세로 철근을 형강의 수평부 홈부에 각각 끼워 맞추는 단계로 구성되는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체를 이용한 벽체 시공 방법.
A vertical reinforcing bar arrangement step S10 in which longitudinal reinforcing bars to be vertically reinforcement are inserted into groove portions of the section steel;
A horizontal rebar arrangement step (S20) of completing the steel frame by reinforcing the horizontal rebars at regular intervals of the vertical rebars;
Wall attachment step (S30) for attaching the exterior tile along the outer circumference of the steel frame;
It includes a concrete placing step (S40) for placing concrete in the steel frame space between the exterior tiles which are attached to both sides of the wall of the steel frame,
In the vertical rebar arrangement step (S10),
Arranging the sections to be attached to the reinforcing bars;
And inserting the vertical reinforcing bars into the frame grooves of the arranged sections, and fitting the vertical reinforcing bars to the horizontal grooves of the steel sections, respectively.
삭제delete 제 10항에 있어서,
최상단과 최하단의 형강은 1개만을 배열시키고 그 사이에 배열되는 형강은 한 쌍씩 서로 맞닿도록 배열시키는 것을 특징으로 하는 선 조립된 철근다발을 가지는 벽체를 이용한 벽체 시공 방법.
The method of claim 10,
A method for constructing a wall using a wall having a pre-assembled reinforcing bar bundle, characterized in that the uppermost and the lowermost section steels are arranged only one, and the beams arranged therebetween are arranged to abut each other.
KR1020120009685A 2012-01-31 2012-01-31 Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall KR101345898B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120009685A KR101345898B1 (en) 2012-01-31 2012-01-31 Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120009685A KR101345898B1 (en) 2012-01-31 2012-01-31 Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall

Publications (2)

Publication Number Publication Date
KR20130088448A KR20130088448A (en) 2013-08-08
KR101345898B1 true KR101345898B1 (en) 2013-12-30

Family

ID=49214792

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120009685A KR101345898B1 (en) 2012-01-31 2012-01-31 Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall

Country Status (1)

Country Link
KR (1) KR101345898B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101499811B1 (en) * 2014-01-02 2015-03-10 이승우 Prefabricated wall frame unit and construction method of prefabricated wall using the same
KR20220027411A (en) 2020-08-27 2022-03-08 (주)비케이철강 Construction Method of Reinforced Concrete Wall Using U-Bar Prefabricated Assembly
KR20230147322A (en) 2022-04-14 2023-10-23 이학재 the construction system for the surface finishing material simultaneous construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970011224A (en) * 1995-08-30 1997-03-27 소광민 Simultaneous Construction Structure and Construction Method of Prefabricated Reinforcement and Concrete Frame and Interior and Exterior Materials
KR20020025510A (en) * 2000-09-29 2002-04-04 소광민 A method of executing a building using an iron reinforcing rod
KR100873846B1 (en) * 2008-07-02 2008-12-15 (주)화인테크 Connector for pre-fabricating the reinforced bar

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970011224A (en) * 1995-08-30 1997-03-27 소광민 Simultaneous Construction Structure and Construction Method of Prefabricated Reinforcement and Concrete Frame and Interior and Exterior Materials
KR20020025510A (en) * 2000-09-29 2002-04-04 소광민 A method of executing a building using an iron reinforcing rod
KR100873846B1 (en) * 2008-07-02 2008-12-15 (주)화인테크 Connector for pre-fabricating the reinforced bar

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101499811B1 (en) * 2014-01-02 2015-03-10 이승우 Prefabricated wall frame unit and construction method of prefabricated wall using the same
KR20220027411A (en) 2020-08-27 2022-03-08 (주)비케이철강 Construction Method of Reinforced Concrete Wall Using U-Bar Prefabricated Assembly
KR20230147322A (en) 2022-04-14 2023-10-23 이학재 the construction system for the surface finishing material simultaneous construction

Also Published As

Publication number Publication date
KR20130088448A (en) 2013-08-08

Similar Documents

Publication Publication Date Title
JP3180817U (en) Building structure without formwork removal
KR20120011043A (en) Half precast floor plank, and slab construction method using same
RU2591994C1 (en) Connection node for column and floor slab for beamless non-column cap building frame
KR20100121866A (en) Pc slave for building having reinforcement structure as a set
KR20170032826A (en) Precast concrete dual wall structure and construction method thereof
EA025335B1 (en) Assemblable disposable shuttering for constructing modular formworks for making concrete foundations
KR101345898B1 (en) Wall Having the Pre-assembling Steel Frame and Method for Constructing the Wall
KR101798138B1 (en) Multi precast wall structure and its construction method
EP2657423B1 (en) A concrete slab
KR101286370B1 (en) Column having the pre-assembling steel frame and method for constructing the column
KR101329443B1 (en) Precast concrete frame and its construction method for buildings using precast concrete slab continued by post tensioning
KR101506620B1 (en) Precast concrete slab and Precast concrete slab assembly
EP2582503B1 (en) Mould for the construction of a protection and securing element of the mattress type
KR101287739B1 (en) Sheet pile combined modular bridge abutment and construction method of the same
KR101690886B1 (en) Rebar combined form
JP5382872B2 (en) building
KR101028372B1 (en) Construction for connection of the truss assembled deck plates
KR101677233B1 (en) Celling brick and celling constructure of building using the same and constructing method thereof
US20220356706A1 (en) Reinforcing Steel Skeletal Framework
KR102177744B1 (en) Underground parking lot structure with PC wall
KR101150369B1 (en) Complex girder for building
KR20130038089A (en) Precast concrete frame for buildings using precast concrete beam continued by post tensioning
KR101045000B1 (en) Attachable wall-support device
JP6576204B2 (en) Slab construction method
JPH0754361A (en) Construction method of wall for slope face, building, or the like, and built-up reinforcement used therefor

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee