RU2574484C2 - Marine platform for controlled hydrocarbon localising - Google Patents

Marine platform for controlled hydrocarbon localising Download PDF

Info

Publication number
RU2574484C2
RU2574484C2 RU2012136640/13A RU2012136640A RU2574484C2 RU 2574484 C2 RU2574484 C2 RU 2574484C2 RU 2012136640/13 A RU2012136640/13 A RU 2012136640/13A RU 2012136640 A RU2012136640 A RU 2012136640A RU 2574484 C2 RU2574484 C2 RU 2574484C2
Authority
RU
Russia
Prior art keywords
platform
base
drilling
locking
seabed
Prior art date
Application number
RU2012136640/13A
Other languages
Russian (ru)
Other versions
RU2012136640A (en
Inventor
Фроде ЛОСНЕДАЛЬ
Роберт ФАРЕСТВЕЙТ
Пер АЛЬБРИКТСЕН
Ове Тобиас Гудместад
Геир Мортен ШЕЙЕ
Original Assignee
Одфьелль Дриллинг Текнолоджи Лтд.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Одфьелль Дриллинг Текнолоджи Лтд. filed Critical Одфьелль Дриллинг Текнолоджи Лтд.
Priority claimed from PCT/NO2011/000030 external-priority patent/WO2011093718A1/en
Publication of RU2012136640A publication Critical patent/RU2012136640A/en
Application granted granted Critical
Publication of RU2574484C2 publication Critical patent/RU2574484C2/en

Links

Images

Abstract

FIELD: oil and gas industry.
SUBSTANCE: invention is referred to the concept of controlled oil and condensate localising, as well as other types of liquids and chemical reagents in structures at potential failure of common known barriers used for marine prospecting and production of oil and gas, which are intended for usage at offshore depths. The marine platform consists a load-bearing structure; deck superstructure mounted on top of the load-bearing structure from where drilling may be performed, at that the load-bearing structure comprises collecting tanks forming an integrated part of the load-bearing structure; basis for the platform intended for support at the sea bottom and several interconnected buoyant hulls mounted on top of each other supported by the platform basis and pressed to it under own weight. The buoyant hulls are also interconnected with the platform basis by means of vertically stretched wire ropes at even intervals along periphery of the platform. Multitude of anchoring wire ropes passing up and down from the upper part of the platform is fixed by anchors at the sea bottom at distance from the marine platform. The anchoring wire ropes are coupled to the marine platform through fixed pulleys and winches.
EFFECT: provided strength, stability of the marine platform capable to withstand impact on natural forces occurring at the installation site.
10 cl, 12 dwg

Description

Область техники изобретенияThe technical field of the invention

Настоящее изобретение относится к концепции контролируемой локализации нефти и конденсата и возможно других жидкостей и химреагентов при выходе из строя барьеров безопасности на морских платформах, используемых в настоящее время в морской добыче углеводородного сырья, применяемой на нескольких различных морских глубинах.The present invention relates to the concept of controlled localization of oil and condensate and possibly other liquids and chemicals when the safety barriers on the offshore platforms fail, currently used in offshore hydrocarbon production used at several different depths of the sea.

Изобретение относится также к способу установки и/или демонтажа морской платформы такой концепции.The invention also relates to a method for installing and / or disassembling an offshore platform of such a concept.

Предпосылки изобретенияBACKGROUND OF THE INVENTION

При разведке углеводородного сырья в условиях очень жестких требований по защите окружающей среды и с требованиями нулевого загрязнения, новые общие концепции и решения должны разрабатываться для соответствия таким требованиям к окружающей среде и политическим требованиям. Концепция для нулевого загрязнения требует решения с тотальным и комплексным барьером на пути к окружающему морю и морской флоре и фауне, охватывающим все типы разливов при бурении и добыче, включающие в себя выбросы, загрязнение разливы из буровых систем от других случайных происшествий. Такая концепция должна обеспечивать выполнение операций бурения и добычи без любого типа воздействия на окружающую среду, прямого или косвенного в водах, где устанавливают морские платформы.When exploring hydrocarbon feedstocks under very stringent environmental requirements and with zero pollution requirements, new general concepts and solutions should be developed to meet such environmental and political requirements. The concept for zero pollution requires a solution with a total and comprehensive barrier to the surrounding sea and marine flora and fauna, covering all types of spills during drilling and production, including emissions, pollution spills from drilling systems from other accidental incidents. Such a concept should ensure that drilling and production operations are carried out without any type of environmental impact, direct or indirect, in the waters where offshore platforms are installed.

Для обычного типа разведки углеводородного сырья, такого как бурение, или операций эксплуатации добывающих скважин могут возникать ситуации, где могут происходить неуправляемые выбросы, и где углеводороды таких выбросов, в конце концов, попадают прямо в море. Когда эксплуатационные барьеры и барьеры предупреждения аварий выходят из строя, только традиционное оборудование сбора нефти с поверхности воды и откачки имеется в наличии для сбора разлива. Такое оборудование имеет, вместе с тем, большие внутренне присущие ему ограничения по эффективности, надежности или ограничения по температуре, волнению или ветру.For the conventional type of hydrocarbon exploration, such as drilling, or production operations of production wells, situations may arise where uncontrolled emissions may occur and where the hydrocarbons of such emissions eventually end up directly in the sea. When operational and accident prevention barriers fail, only traditional equipment for collecting oil from the surface of the water and pumping out is available to collect the spill. Such equipment, however, has great intrinsic limitations on its effectiveness, reliability, or limitations on temperature, wave or wind.

Традиционно блок бурения выполняют с полной вентиляцией и сбросом в море для избавления от неуправляемой утечки. Риски того, что нежелательные происшествия могут происходить в прибрежных водах, делает традиционные морские буровые платформы не подходящими для использования в специфических уязвимых и чувствительных зонах.Traditionally, the drilling unit is carried out with full ventilation and discharge into the sea to get rid of uncontrolled leakage. The risks that unwanted accidents can occur in coastal waters make traditional offshore drilling platforms unsuitable for use in specific vulnerable and sensitive areas.

Несколько решений для предотвращения такой нежелательной утечки в моря ранее уже были предложены. В документе US 3698198 описана морская платформа типа, опирающегося на морское дно, и состоящая из множества собираемых, обладающих плавучестью корпусов, устанавливаемых сверху друг на друга. В собранном состоянии различные, обладающие плавучестью корпуса удерживаются вместе натянутыми тросами, проходящими от палубы на верхнем, обладающем плавучестью корпусе, до основания для платформы, опирающейся на морское дно. Две смежные секции могут взаимно соединяться с помощью болтов и гаек. Морская платформа согласно данной публикации также оборудована одной ячейкой, проходящей между палубой, установленной над уровнем моря, и основанием для платформы на морском дне. Бурение ведут с палубы, вниз через вертикальную ячейку и вниз в морское дно, вертикальная ячейка не имеет дна. Каждый обладающий плавучестью корпус оборудован балластными танками, расположенными вокруг вертикальной ячейки. Дополнительно ячейка имеет отверстия, обеспечивающие перекачку воды из соседнего корпуса, установленного снизу или сверху. Каждый обладающий плавучестью корпус также снабжен выступающими вниз частями на своем нижнем конце и взаимодействующими с ними выступающими вверх запорными элементами на верхней поверхности каждого обладающего плавучестью корпуса, обеспечивающими установку и взаимное соединение со следующим, обладающим плавучестью корпусом.Several solutions to prevent such unwanted diversion into the seas have already been proposed. US 3,698,198 describes an offshore platform of a type based on the seabed and consisting of a plurality of assembled, buoyant hulls mounted on top of one another. In the assembled state, the various buoyant hulls are held together by tensioned cables extending from the deck on the upper buoyant hull to the base for the platform resting on the seabed. Two adjacent sections can be interconnected using bolts and nuts. The offshore platform according to this publication is also equipped with a single cell extending between the deck mounted above sea level and the base for the platform on the seabed. Drilling is conducted from the deck, down through a vertical cell and down to the seabed, a vertical cell has no bottom. Each buoyant hull is equipped with ballast tanks located around a vertical cell. Additionally, the cell has openings for pumping water from an adjacent casing, installed from below or from above. Each buoyant body is also equipped with protruding downward portions at its lower end and interacting upwardly protruding locking elements on the upper surface of each buoyant body, allowing installation and interconnection with the next buoyant body.

Документ GB 2063776 относится к решению для сбора нефти и газа при выбросе, где корпус в форме зонтика спускают над скважиной с протечкой, корпус в форме зонтика собирает нефть и газ и обеспечивает проход изливающейся текучей среды из зоны утечки в емкость и/или на факел. Дополнительно средство в форме зонтика может соединяться с расширяющейся цилиндрической воронкой, спускаемой в нужное место над зоной утечки, так что более или менее ограждающее кольцо или цилиндр создается над потоком изливающейся текучей среды и вокруг него.GB 2063776 relates to a solution for collecting oil and gas during an ejection, where an umbrella-shaped body is lowered over a leaky well, an umbrella-shaped body collects oil and gas and allows the flowing fluid from the leakage zone to the tank and / or to the flare. Additionally, the tool in the form of an umbrella can be connected to an expanding cylindrical funnel, lowered to the desired location above the leakage zone, so that a more or less enclosing ring or cylinder is created above and around the flow of the flowing fluid.

Вследствие возникновения трудностей, описанных выше, существует необходимость разработки улучшенных систем для сбора углеводородов при утечке и концепции для защиты окружающей среды, предотвращающей утечку углеводородов в море и одновременно создающей решения, обеспечивающие прочность, устойчивость и возможность противостоять воздействию природных сил, возникающих на морской площадке работ.Due to the difficulties described above, there is a need to develop improved systems for the collection of hydrocarbons during leakage and a concept for protecting the environment that prevents the leakage of hydrocarbons at sea and at the same time creates solutions that provide strength, stability and the ability to withstand the effects of natural forces arising on the offshore site .

Сущность изобретенияSUMMARY OF THE INVENTION

Задачей изобретения является создание решения, которое увеличивает безопасность и уменьшает риск случайной утечки нежелательных жидкостей в окружающее море и одновременно улучшает способ сборки и взаимного соединения отдельных, обладающих плавучестью элементов для образования устойчивой конструкции, благодаря которому конструкция должна лучше работать в условиях противодействия природным силам и выдерживать их воздействия, возникающие на площадке установки, а также делает возможным строительство морской платформы простым и эффективным способом и также делает возможным повторное использование отдельных блоков на другой площадке.The objective of the invention is to create a solution that increases safety and reduces the risk of accidental leakage of unwanted liquids into the surrounding sea and at the same time improves the method of assembly and interconnection of individual buoyant elements to form a stable structure, due to which the structure should work better in conditions of counteracting natural forces and withstand their effects arising at the installation site and also makes it possible to build an offshore platform simple and effective tive manner, and also makes possible the reuse of individual blocks at another site.

Дополнительной задачей изобретения является создание решения, где силы, вносящие вклад в удержание собранными различных конструктивных элементов, можно регулировать и корректировать, так что создаются достаточные силы преднапряжения, обеспечивающие собранной морской платформе в любое время способность выдерживать возникающие силы и моменты, действующие на платформу, обусловленные силами природы в окружающей среде.An additional object of the invention is to provide a solution where the forces contributing to the retention of the assembled various structural elements can be adjusted and adjusted, so that sufficient prestressing forces are created that provide the assembled offshore platform at any time with the ability to withstand the arising forces and moments acting on the platform due to forces of nature in the environment.

Дополнительной задачей настоящего изобретения является создание улучшенного способа предотвращения контакта нефти и газа при утечке из скважины или райзера с морем вокруг платформы.An additional objective of the present invention is to provide an improved method of preventing contact of oil and gas in the event of a leak from a well or riser with the sea around the platform.

Дополнительной задачей настоящего изобретения является создание улучшенного решения, благодаря которому после завершения работ не остается каких-либо приносящих ущерб препятствий на морском дне, затрудняющих рыбную ловлю сетями и тралами, или которые также простым способом можно удалять с площадки установки.An additional objective of the present invention is to provide an improved solution due to which, after completion of the work, there are no harmful obstacles on the seabed that impede fishing by nets and trawls, or which can also be removed from the installation site in a simple way.

Другой задачей изобретения является создание улучшенного решения, обеспечивающее возможность повторного использования, и с помощью простого средства возможность приспосабливаться к различным морским глубинам.Another objective of the invention is the creation of an improved solution, providing the possibility of reuse, and using a simple means the ability to adapt to various sea depths.

Дополнительной задачей настоящего изобретения является создание решения, при котором возможно временное хранение больших объемов нефти утечки.An additional objective of the present invention is to provide a solution in which it is possible to temporarily store large volumes of oil leakage.

Также задачей настоящего изобретения является создание решения, при котором возможно выполнение функции несения бурового и эксплуатационного оборудования.It is also an object of the present invention to provide a solution in which it is possible to carry out the function of carrying drilling and production equipment.

Дополнительной задачей настоящего изобретения является создание решения, которое может обеспечивать эффективный сбор нефти утечки, даже в бурных морях с высотой волн, обусловленной столетним жестоким штормом.An additional objective of the present invention is to provide a solution that can provide efficient collection of oil leakage, even in stormy seas with a wave height caused by a centenary severe storm.

Дополнительной задачей настоящего изобретения является создание решения, обеспечивающего предотвращение разлива также после столкновения с кораблем.An additional objective of the present invention is to provide a solution to prevent spillage also after a collision with a ship.

Задачи настоящего изобретения решаются с помощью решений, дополнительно определенных в независимых пунктах формулы изобретения. Возможные варианты осуществления и альтернативы даны в зависимых пунктах формулы изобретения.The objectives of the present invention are solved using solutions additionally defined in the independent claims. Possible embodiments and alternatives are given in the dependent claims.

Согласно изобретению создана морская платформа, содержащая несущую конструкцию и палубную надстройку, установленную сверху на несущую конструкцию, с которой можно вести бурение, и где возможен сбор углеводородов, изливающихся при утечке во время операций бурения, в случае выхода из строя обычных барьеров, причем несущую конструкцию, выполненную с конфигурацией, окружающей нефть утечки и направляющей в управляемом режиме такую нефть утечки в сборные емкости, выполненные как интегрированная часть несущей конструкции. Морская платформа включает в себя основания для платформы, предназначенные для опирания на морское дно, и некоторое число отдельных плавучих корпусов, устанавливаемых сверху друг на друга, взаимно соединяющихся, опирающихся на основания для платформы под действием веса плавучих корпусов и балластной воды, причем плавучие корпуса также прикрепляются к основанию для платформы с помощью вертикальных тросов с анкерами, расставленными с равными интервалами вокруг периферии платформы. Дополнительно система содержит множество тросов постановки на якорь, заякоренных на морском дне, на большом расстоянии от платформы, причем тросы постановки на якорь соединяются с платформой через направляющие блоки и лебедки.According to the invention, an offshore platform is created comprising a supporting structure and a deck superstructure mounted on top of a supporting structure with which drilling can be carried out, and where hydrocarbons can be collected that leak during drilling operations in the event of failure of conventional barriers, the supporting structure being made with the configuration surrounding the leakage oil and guiding in a controlled mode such leakage oil to prefabricated tanks made as an integrated part of the supporting structure. The offshore platform includes a base for the platform, designed to support the seabed, and a number of separate floating hulls mounted on top of each other, interconnected, resting on the base for the platform under the influence of the weight of the floating hulls and ballast water, and the floating hulls also they are attached to the platform base using vertical cables with anchors arranged at regular intervals around the periphery of the platform. Additionally, the system contains many anchor cables anchored on the seabed, at a great distance from the platform, and the anchor cables are connected to the platform through guide blocks and winches.

Согласно одному варианту осуществления изобретения каждый из вертикальных натянутых тросов может соединяться на одном конце с основанием для платформы и на другом конце с лебедкой на палубе платформы, предпочтительно через направляющие блоки.According to one embodiment of the invention, each of the vertical tensioned cables can be connected at one end to the platform base and at the other end to a winch on the platform deck, preferably via guide blocks.

Дополнительно основание для платформы может закрепляться на морском дне с помощью множества свай или обсадных колонн, вдавленных вглубь и зацементированных в грунте морского дна.Additionally, the base for the platform can be fixed on the seabed with the help of many piles or casing, pressed deep into and cemented in the soil of the seabed.

Места закрепления для вертикально натянутых тросов могут в таком случае предпочтительно совпадать с верхним концом свай или обсадных колонн.The fastening points for vertically stretched cables may then preferably coincide with the upper end of the piles or casing.

Согласно дополнительному варианту осуществления также могут быть использованы запорные болты или стяжки, установленные в цилиндрических каналах и проходящие через стык между двумя последовательно соединяющимися секциями платформы, каждый запорный болт или стяжка на верхнем и нижнем конце снабжен запорными поверхностями, взаимодействующими с соответствующими запорными поверхностями в цилиндрических каналах, причем эффект запирания получается поворотом болтов или стяжек относительно каналов.According to a further embodiment, locking bolts or couplers mounted in cylindrical channels and passing through a joint between two series-connected sections of the platform can also be used, each locking bolt or coupler at the upper and lower ends provided with locking surfaces cooperating with corresponding locking surfaces in the cylindrical channels moreover, the locking effect is obtained by turning the bolts or couplers relative to the channels.

Различные элементы конструкции, образующие морскую платформу, представляют собой независимые плавучие элементы, которые можно независимо перемещать в нужное положение, в основном буксировкой и балластировкой, и данные элементы можно предпочтительно собирать с помощью направляющего средства или шипов и соответствующих отверстий в противоположных поверхностях секций, устанавливаемых над или под направляющим средством или шипами.The various structural elements forming the offshore platform are independent floating elements that can be independently moved to the desired position, mainly by towing and ballasting, and these elements can preferably be assembled using guide means or spikes and corresponding holes in the opposite surfaces of the sections mounted above or under guide means or spikes.

Все элементы могут иметь вертикальные открытые ячейки ("шахтные стволы") для строительства скважины и с устройствами для вскрытия скважины в нижней части основания для платформы и с буровым оборудованием, расположенным сверху на палубе платформы.All elements can have vertical open cells (“mine shafts”) for well construction and with devices for opening a well in the lower part of the base for the platform and with drilling equipment located on top of the platform deck.

Шахтный ствол для бурения может быть изолирован от проникновения воды снаружи, причем сборка имеет такую конструкцию, что получается герметичной и водонепроницаемой. Дополнительно в состав можно вводить отсекающий клапан, установленный в элементе основания как дополнительный барьер, соединенный с райзером высокого давления и заканчивающийся на уровне палубы обычными противовыбросовыми превенторами и предохранительными клапанами.The shaft shaft for drilling can be insulated from the ingress of water from the outside, and the assembly has such a structure that it turns out airtight and waterproof. Additionally, a shut-off valve installed in the base element as an additional barrier connected to the high-pressure riser and ending at the deck level with conventional blowout preventers and safety valves can be introduced into the composition.

Один или несколько элементов, основание для платформы, промежуточные элементы или верхний элемент могут предпочтительно, но не обязательно, быть выполнены из бетона.One or more elements, the base for the platform, the intermediate elements or the upper element may preferably, but not necessarily, be made of concrete.

Настоящая концепция комплексной защиты представляет собой комбинации хорошо отработанных технологий, которая делает возможным выполнение разработки, разведки и добычи углеводородов в особенно чувствительной окружающей среде прибрежных вод с уровнем требований по безопасности по загрязнению, которая существенно выше требований к обычным мероприятиям нефтяной индустрии на норвежском континентальном шельфе или по всему миру.This comprehensive protection concept is a combination of well-established technologies that makes it possible to carry out the development, exploration and production of hydrocarbons in a particularly sensitive coastal water environment with a level of safety requirements for pollution that is significantly higher than the requirements for ordinary activities of the oil industry on the Norwegian continental shelf or Worldwide.

Концепция создает полную защиту уязвимых ресурсов окружающей среды и обеспечивает отсутствие угрозы от деятельности для традиционного рыболовства и интересов окружающей среды в прибрежных зонах. Концепция гарантирует нулевое загрязнение моря, основанное на новом способе объединения технологий.The concept provides complete protection for vulnerable environmental resources and ensures that there is no threat from activities for traditional fishing and environmental interests in coastal areas. The concept guarantees zero pollution of the sea, based on a new way of combining technology.

Согласно данной концепции все традиционные риски загрязнения могут быть минимизированы. Это означает учет следующих аспектов, если необходимо:According to this concept, all traditional pollution risks can be minimized. This means taking into account the following aspects, if necessary:

введение новых барьеров и принципов для возможности и последовательности уменьшения для всех типов инцидентов от, например, эксплуатационных отклонений до серьезных аварийных происшествий;the introduction of new barriers and principles for the possibility and consistency of mitigation for all types of incidents from, for example, operational deviations to serious accidents;

обратную закачку бурового раствора и полученного от операций бурения бурового шлама и, возможно, подтоварной воды;re-injection of drilling fluid and drilling cuttings and possibly commercial water obtained from drilling operations;

нулевой разлив буровых растворов для всех секций бурящегося ствола.zero spill of drilling fluids for all sections of the drilled hole.

Нулевой разлив, вводимый в концепции, должен применяться для всех секций бурения, которые на сегодня приняты согласно известным техническим решениям.Zero spill, introduced in the concept, should be applied to all drilling sections, which are accepted today according to well-known technical solutions.

Презумпцией для концепции является то, что она дает решение, соответствующее самым высоким требованиям для прочности барьеров, относящихся к разливу в море, при этом поддерживаются требования безопасности персонала.The presumption for the concept is that it provides a solution that meets the highest requirements for the strength of barriers related to spills at sea, while maintaining the safety requirements of personnel.

Согласно настоящему изобретению создана бетонная конструкция, содержащая встроенную емкость, окружающая конструкция или кольцевой корпус, окружающий палубное оборудование и буровую установку и представляющий собой несущую конструкцию для них. Установка имеет следующие свойства:According to the present invention, a concrete structure is created comprising a built-in container, a surrounding structure or an annular housing surrounding the deck equipment and the drilling rig and representing a supporting structure for them. The installation has the following properties:

1. Основание для платформы и юбка (удлиненная конструкция основания для вдавливания в морское дно) может быть выполнена для передачи нагрузки от конструкции в грунт морского дна (на основе геотехнических данных).1. The base for the platform and the skirt (elongated base structure for pressing into the seabed) can be made to transfer the load from the structure to the seabed soil (based on geotechnical data).

2. Конструкция должна противостоять воздействию течений и волн, также относительно мощных морских течений, которые могут существовать в прибрежных водах.2. The design must withstand the effects of currents and waves, also relatively powerful sea currents that may exist in coastal waters.

3. Верхний "элемент" морской платформы, несущий буровую установку, жилые помещения, вертолетные палубы, краны и средства эвакуации/спасения (спасательные плоты), переходные площадки и проходы эвакуации и зоны установки для материалов, подаваемых краном с судов снабжения. Общая площадь палуб может составлять порядка 10000 м2. Дополнительно можно также иметь площадь для стеллажей хранения/манипуляций с трубами.3. The upper “element” of the offshore platform that carries the rig, living quarters, helicopter decks, cranes and evacuation / rescue equipment (liferafts), walkways and evacuation passages and installation zones for materials supplied by the crane from supply vessels. The total area of decks can be about 10,000 m 2 . Additionally, it is also possible to have an area for storage / pipe handling racks.

4. Буровой агрегат (расчетная масса 3400 тонн) может подниматься и перемещаться на рельсовом пути, построенном на верхнем элементе конструкции.4. The drilling unit (estimated mass of 3400 tons) can be lifted and moved on a rail built on the upper structural member.

5. Ветровая нагрузка на внешнюю поверхность (бетон и буровая вышка) воспринимается остальной конструкцией. Буровая установка должна, скорее всего, быть закрытой/приспособленной к зимней эксплуатации по погодным и климатическим условиям, требующим от всех источников разлива обязательного дренирования в емкости, интегрированные в конструкции.5. The wind load on the external surface (concrete and oil rig) is perceived by the rest of the structure. The drilling rig should most likely be closed / adapted for winter operation under weather and climatic conditions, requiring mandatory drainage from all sources of spillage into containers integrated in the structure.

6. Расстояние сверху до уровня воды должно составлять минимум 30 метров. Для особо мелководных зон данную высоту можно корректировать в соответствии с местными условиями.6. The distance from above to the water level should be at least 30 meters. For particularly shallow areas, this height can be adjusted according to local conditions.

7. Объем емкостей хранения должен обеспечивать сбор углеводородов при выбросе (неуправляемое событие) и должен составлять порядка, по меньшей мере, 200000 м3, так чтобы можно было пробурить в управляемом режиме разгрузочную скважину.7. The volume of storage tanks must ensure the collection of hydrocarbons during the release (uncontrolled event) and should be of the order of at least 200,000 m 3 so that a discharge well can be drilled in a controlled manner.

8. Конструкция может иметь размеры для обеспечения уменьшения внутреннего уровня воды в буровых ячейках, при этом с получением большей буферной емкости для хранения углеводородов, вследствие возможного выброса.8. The design may be sized to provide a decrease in the internal water level in the drilling cells, while obtaining a larger buffer tank for storing hydrocarbons, due to possible release.

9. Элементы, образующие конструкцию, могут находиться на плаву, буксироваться и балластироваться во время установки, и различные блоки снабжены направляющим средством или центрирующим средством, обеспечивающим надлежащую сборку.9. The components forming the structure may be afloat, towed and ballasted during installation, and the various units are provided with guide means or centering means to ensure proper assembly.

10. Конструкция является герметичной и водонепроницаемой, так что может поддерживать внутри уровень нефтяной текучей среды выше внешнего уровня моря.10. The structure is airtight and waterproof, so that it can maintain the inside level of the oil fluid above the external sea level.

Решение согласно изобретению может функционировать как искусственный риф для рыб после завершения эксплуатации и демонтажа элементов 19-22. Другим преимуществом решения согласно изобретению является то, что предоставляется возможность изоляции зоны для бурения, добычи и жилых помещений. Дополнительно верхний блок 22 может также функционировать в качестве отдельного плавучего морского основания.The solution according to the invention can function as an artificial reef for fish after completion of operation and dismantling of elements 19-22. Another advantage of the solution according to the invention is that it is possible to isolate the drilling, production and residential areas. Additionally, the upper block 22 can also function as a separate floating marine base.

Другое преимущество заключается в том, что согласно настоящему изобретению является возможным устанавливать оконечные устройства скважин на уровне морского дна.Another advantage is that, according to the present invention, it is possible to install well terminals at sea level.

Краткое описание чертежейBrief Description of the Drawings

Вариант осуществления изобретения описан подробно ниже со ссылками на чертежи, на которых показано следующее.An embodiment of the invention is described in detail below with reference to the drawings, in which the following is shown.

На фиг.1 схематично показано сооружение, установленное на морское дно вблизи берега.Figure 1 schematically shows a structure installed on the seabed near the coast.

На фиг.2 схематично показан в перспективе вид сооружения с различными элементами, образующими часть сооружения.Figure 2 schematically shows in perspective a view of the structure with various elements forming part of the structure.

На фиг.3 схематично показан в перспективе вид сверху варианта осуществления основания для платформы, предназначенного для установки на морское дно.Figure 3 schematically shows in perspective a top view of an embodiment of the base for a platform intended for installation on the seabed.

На фиг.4 схематично показано вертикальное сечение основания для платформы в плоскости, проходящей по вертикальной оси основания для платформы.Figure 4 schematically shows a vertical section of the base for the platform in a plane passing along the vertical axis of the base for the platform.

На фиг.5 схематично показано вертикальное сечение элемента промежуточной опорной части платформы, предназначенной для установки сверху на основание для платформы, показанное на фиг.4.Figure 5 schematically shows a vertical section of an element of the intermediate supporting part of the platform, designed to be installed on top of the base for the platform, shown in figure 4.

На фиг.6 схематично показано вертикальное сечение верхней несущей конструкции 22 палубы, в плоскости, одинаковой с сечениями основания для платформы и промежуточной конструкции, показанной на фиг.4 и 5.FIG. 6 schematically shows a vertical section of the upper deck supporting structure 22, in a plane identical with the base sections for the platform and the intermediate structure shown in FIGS. 4 and 5.

На фиг.7 схематично показана в перспективе, частично в разрезе, верхняя, несущая палубу конструкция.7 is a schematic perspective view, partially in section, of an upper deck-bearing structure.

На фиг.8 показан вид сверху возможного расположения различных блоков на палубе, включающих в себя вертикальные колодцы, проходящие от палубы вниз к нижней части основания для платформы.On Fig shows a top view of the possible location of the various blocks on the deck, including vertical wells, passing from the deck down to the bottom of the base for the platform.

На фиг.9 показан в перспективе и частично в разрезе вариант осуществления изобретения, оборудованный средством для постановки морской платформы на якоря.Figure 9 shows in perspective and partially in section an embodiment of the invention, equipped with means for anchoring the offshore platform.

На фиг.10 схематично показана разъемная система для взаимного соединения смежных блоков, образующих платформу.Figure 10 schematically shows a detachable system for interconnecting adjacent blocks forming a platform.

На фиг.11 схематично показан в перспективе сверху и сбоку вариант осуществления основания для платформы согласно изобретению.11 is a schematic perspective view from above and side view of an embodiment of the base for the platform according to the invention.

На фиг.12 схематично показан вариант осуществления, в котором верхнюю конструкцию используют для транспортировки, погружения и установки элемента на основание для платформы.12 schematically shows an embodiment in which the top structure is used for transporting, dipping and mounting the element on the platform base.

Подробное описание изобретенияDETAILED DESCRIPTION OF THE INVENTION

На фиг.1 схематично показано в перспективе сооружение 10 согласно изобретению, установленное на морское дно 11. Как показано, сооружение 10 снабжено основанием 12 для платформы, вдавленной в морское дно 11, и цилиндрической формы блоком, выступающим вверх, описанными ниже и показанными на фиг.2. Над уровнем 13 моря сооружение 10 снабжено палубной надстройкой 14, оборудованной обычными блоками, такими как буровая вышка 15, жилые помещения 16, краны 17 и, например, спасательные шлюпки 18. Дополнительно палубная надстройка 14 несет все оборудование и блоки, необходимые для бурения и/или добычи углеводородов из скважин в морском дне.Figure 1 schematically shows in perspective a structure 10 according to the invention mounted on the seabed 11. As shown, structure 10 is provided with a base 12 for a platform pressed into the seabed 11 and of a cylindrical shape with a protruding block, described below and shown in FIG. .2. Above sea level 13, building 10 is equipped with a deck superstructure 14 equipped with conventional blocks, such as a derrick 15, living quarters 16, cranes 17 and, for example, lifeboats 18. Additionally, deck superstructure 14 carries all the equipment and blocks necessary for drilling and / or hydrocarbon production from wells in the seabed.

На фиг.2 показано, что сооружение 10 получено с помощью сборки из отдельных бетонных элементов круглого сечения. Элементы могут также иметь другую форму, не круглой геометрии, реальные техусловия являются решающим фактором для выбираемой формы. Вариант осуществления, показанный на фиг.2, содержит основание 12 для платформы, первую, нижнюю секцию 19, предназначенную для установки сверху на основание для платформы, второй промежуточный элемент 20 и верхнюю секцию 22 с конфигурацией для несения палубной надстройки 14. Каждый бетонный элемент 12, 19, 20, 22 является независимым блоком с дном, верхом и вертикальной стенкой (стенками), так что элементы могут плавать и балластироваться во время транспортировки и установки. Бетонные элементы 12, 19, 20, 22 снабжены направляющим средством 23 для скрепления c центровкой во время установки элемента на расстоянии от берега и направления в правильное положение относительно элемента под ним. В показанном варианте осуществления направляющее средство 23 имеет форму выступающих вверх шипов или "штырей" 23, а соответствующая поверхность на элементе, устанавливаемом сверху на нижний элемент, снабжена соответствующими углублениями 24, разработанными и выполненными с формой, подходящей к шипам или "штырям" 23. Как показано на фиг.2, нижняя секция 19 может на своем нижнем конце снабжаться выступающими вниз шипами или штырями, а основание 12 для платформы может снабжаться соответствующими углублениями или отверстиями 24. Такая форма выполнена для создания на основании 12 для платформы гладкой поверхности, на которой, когда элементы 9, 20, 22 в будущем удаляют, не должно оставаться выступающих вверх частей, за которые могут зацепиться тралы или в которых могут запутаться рыболовные снасти. Альтернативно направляющее и регулирующее средство 23, 24 может иметь форму шипов или штырей 23, выступающих вниз от нижней поверхности элементов, находящихся выше, а углубления или отверстия 24 могут располагаться на верхней поверхности элементов 12, 19, 20, 22, находящихся ниже. Если необходимо, морская платформа может содержать дополнительные промежуточные элементы (не показано). Число элементов определяется глубиной моря, на которой должна устанавливаться морская платформа, и высотой каждого из используемых элементов.Figure 2 shows that the structure 10 is obtained using the assembly of separate concrete elements of circular cross section. Elements can also have a different shape, not round geometry, real technical conditions are a decisive factor for the chosen shape. The embodiment shown in FIG. 2 comprises a base 12 for a platform, a first, lower section 19 designed to be mounted on top of the base for the platform, a second intermediate element 20 and an upper section 22 with a configuration for supporting the deck superstructure 14. Each concrete element 12 , 19, 20, 22 is an independent unit with a bottom, top and vertical wall (s), so that the elements can float and ballast during transportation and installation. Concrete elements 12, 19, 20, 22 are provided with guide means 23 for fastening with alignment during installation of the element at a distance from the coast and direction in the correct position relative to the element below it. In the embodiment shown, the guiding means 23 is in the form of upwardly projecting spikes or “pins” 23, and the corresponding surface on the element mounted on top of the lower element is provided with corresponding recesses 24 designed and made with a shape suitable for the spikes or “pins” 23. As shown in FIG. 2, the lower section 19 may be provided with spikes or pins protruding downward at its lower end, and the base 12 for the platform may be provided with corresponding recesses or holes 24. This form is made and creating on the basis of the platform 12 to a smooth surface, which, when the elements 9, 20, 22 is removed in the future, there should be no upwardly protruding portions, for trawls that can catch or which can become entangled fishing tackle. Alternatively, the guiding and adjusting means 23, 24 may be in the form of spikes or pins 23 protruding downward from the lower surface of the elements located above, and recesses or holes 24 may be located on the upper surface of the elements 12, 19, 20, 22 below. If necessary, the offshore platform may contain additional intermediate elements (not shown). The number of elements is determined by the depth of the sea on which the offshore platform should be installed, and the height of each of the elements used.

Для обеспечения создания водонепроницаемого и выдерживающего давление соединения между смежными секциями 19-22 замковые соединения и соединения смежных поверхностей могут цементироваться или в них может нагнетаться герметизирующий материал любого известного и обычного типа. Герметизирующий материал может предпочтительно, но не обязательно, относиться к типу, обеспечивающему или делающему возможным удаление секций 19-22 на более поздней стадии. Такой материал может, например, представлять собой плавучий эластомер.In order to ensure a watertight and pressure-resistant joint between adjacent sections 19-22, the locking joints and the joints of adjacent surfaces may be cemented or any known and conventional type of sealing material may be injected into them. The sealing material may preferably, but not necessarily, be of a type that provides or makes it possible to remove sections 19-22 at a later stage. Such a material may, for example, be a floating elastomer.

На фиг.3 показан в перспективе вид сверху варианта осуществления основания 12 для платформы согласно изобретению. Для предотвращения после завершения бурения или эксплуатации зацепления основания 12 для платформы рыболовными снастями или т.п. и их застревания в ней периферийная кромка 21 основания для платформы может иметь фаску (не показано). Как дополнительно показано на фиг.3, три углубления или отверстия 24 выполнены в верхней поверхности для приема соответствующим образом выполненных, проходящих или выступающих вниз шипов 23, закрепленных на нижней поверхности нижней промежуточной секции 19.Figure 3 shows a perspective top view of an embodiment of a base 12 for a platform according to the invention. To prevent the engagement of the base 12 for the platform with fishing gear or the like after completion of drilling or operation, and their jamming therein, the peripheral edge 21 of the base for the platform may have a chamfer (not shown). As further shown in FIG. 3, three recesses or holes 24 are provided in the upper surface for receiving appropriately formed, extending or protruding spikes 23 mounted on the lower surface of the lower intermediate section 19.

Как дополнительно показано на фиг.3, основание 12 для платформы снабжено двумя ячейками, предназначенными для коаксиального совмещения с соответствующими ячейками (не показано) в остальных элементах 19-22, образующими шахтный ствол 40 для бурения, проходящий от дна до палубы. Шахтные стволы 40 для бурения взаимно соединяются так, что получается водонепроницаемая герметичная конструкция. Этого достигают, применяя герметизирующий материал в подходящих местах в замковых соединениях. Ячейка 25 на своем нижнем конце заканчивается нижней плитой или плитой, закрывающей ячейки от притока воды в них, причем плита также несет большое число донных задвижек 26 для будущих скважин.As further shown in FIG. 3, the platform base 12 is provided with two cells designed for coaxial alignment with corresponding cells (not shown) in the remaining elements 19-22, forming a shaft for drilling 40, extending from the bottom to the deck. The shaft shafts 40 for drilling are interconnected so that a waterproof, sealed structure is obtained. This is achieved by applying sealing material in suitable places in the castle joints. The cell 25 at its lower end ends with a lower plate or a plate that covers the cells from the influx of water into them, and the plate also carries a large number of bottom valves 26 for future wells.

Основание 12 для платформы описано с дополнительными подробностями со ссылками на фиг.4 ниже. На фиг.4 показано вертикальное сечение основания 12 для платформы, проходящее по диаметральной плоскости. Основание 12 для платформы разработано для фактических геотехнических условий на площадке работ. На нижней поверхности основание 12 для платформы может быть снабжено открывающимися вниз юбками 27, проходящими вниз от нижней поверхности основания 12 для платформы, причем юбки 27 выполнены с возможностью вдавливания/засасывания в морское дно. Ячейки 25 могут также предпочтительно снабжаться выступающими вниз и открывающимися вниз юбками 28, предназначенными для вдавливания в морское дно, когда бетонный элемент устанавливают на морское дно и балластируют. Юбки, образующие продолжение стенок ячейки 25, предотвращают скольжение платформы на морском дне и также предотвращают разлив или утечку из карманов мелкого залегания газа в морском дне. Если необходимы длинные юбки, основание 12 для платформы можно оборудовать механизмом засасывания, таким как самозасасывающийся якорь. Полость между морским дном 11, юбками 27, 28 и фундаментной плитой 41 элемента 12 основания может предпочтительно цементироваться для получения устойчивости после установки на морское дно. Основание 12 для платформы дополнительно снабжено верхним перекрытием или плитой 44 и боковыми стенками 45. Для лучшего обеспечения устойчивости во время погружения и спуска и до завершения работ цементирования пространство, образованное между юбками и фундаментной плитой 41 основания 11 для платформы может разделяться на отдельные отсеки, например разделяющими стенками, юбками или т.п. (не показано) и возможно также дополнительными юбками.The platform base 12 is described in further detail with reference to FIG. 4 below. Figure 4 shows a vertical section of the base 12 for the platform, passing along the diametrical plane. Base 12 for the platform is designed for actual geotechnical conditions at the work site. On the lower surface, the platform base 12 may be provided with downward-opening skirts 27 extending downward from the lower surface of the platform base 12, the skirts 27 being able to be pressed into / sucked into the seabed. The cells 25 may also preferably be provided with protruding downward and opening downward skirts 28 for pressing into the seabed when the concrete element is installed on the seabed and ballasted. The skirts forming the extension of the cell walls 25 prevent the platform from sliding on the seabed and also prevent spills or leakage of small gas in the seabed from the pockets. If long skirts are needed, the platform base 12 can be equipped with a suction mechanism, such as a self-priming anchor. The cavity between the seabed 11, skirts 27, 28 and the foundation plate 41 of the base element 12 can preferably be cemented to provide stability after being installed on the seabed. The base 12 for the platform is additionally provided with a top floor or slab 44 and side walls 45. To better ensure stability during immersion and lowering and until cementing is completed, the space formed between the skirts and the base plate 41 of the base 11 for the platform can be divided into separate compartments, for example dividing walls, skirts or the like (not shown) and possibly also with optional skirts.

Вокруг установленного основания 12 для платформы могут отсыпаться слои 42 камня или гравия для предотвращения уноса океаническими или приливными течениями материала морского дна вокруг основания 12 для платформы. Юбки 28 под шахтным стволом или ячейками 25 могут быть сконструированы так, что данные юбки проходят глубже юбок 27, выполненных вдоль периферии основания 12 для платформы для создания наиболее высокой возможной прочности скрепления с окружающим грунтом морского дна. Основание 12 для платформы дополнительно снабжено несколькими стенками 43 ячеек, так что большое число ячеек образовано внутри основания 12 для платформы. В показанном на фиг.4 варианте осуществления основание 12 для платформы снабжено выступающими вверх шипами или штырями 23. Это расходится с вариантом осуществления, показанным на фиг.1-3. Данное должно означать, что нижний конец смежного элемента 19 должен снабжаться соответствующими углублениями или отверстиями 24.Around the installed base 12 for the platform, layers 42 of stone or gravel can be poured to prevent oceanic or tidal currents from seabed material around the base 12 for the platform. The skirts 28 under the shaft shaft or cells 25 can be designed so that these skirts extend deeper than the skirts 27 made along the periphery of the platform base 12 to create the highest possible bond strength with the surrounding seabed soil. The base 12 for the platform is further provided with several walls 43 of cells, so that a large number of cells are formed inside the base 12 for the platform. In the embodiment shown in FIG. 4, the platform base 12 is provided with upwardly projecting spikes or pins 23. This is at variance with the embodiment shown in FIGS. 1-3. This should mean that the lower end of the adjacent element 19 should be provided with corresponding recesses or holes 24.

Также концевые устройства 26 скважин показаны в нижней части ячеек 25, образующих вертикальный ствол шахты, предназначенный для прохода выше уровня моря. Ячейки заканчиваются на нижнем конце водонепроницаемой нижней плитой, выполненной с некоторым числом врезок для бурильных колонн/эксплуатационных райзеров. На уровне непосредственно над нижней плитой каждый из эксплуатационных райзеров оборудован запорным и штуцерным клапаном на уровне морского дна. Это обеспечивает использование райзеров высокого давления до уровня палубы, где установлены сборки противовыбросовых превенторов, причем верхняя часть также соединяется с системой штуцерного манифольда, которая может быть выполнена вместе с штуцерной/глушения системой с возвратом в систему сборных емкостей. Система может также снабжаться системой возврата текучей среды и/или системой отвода на уровне палубы с возвратом в сборную емкость.Also, the end devices 26 of the wells are shown in the lower part of the cells 25 forming a vertical shaft of the shaft, intended for passage above sea level. The cells end at the lower end with a waterproof bottom plate made with a number of tie-ins for drill string / production risers. At the level directly above the bottom plate, each of the operational risers is equipped with a shut-off and choke valve at the level of the seabed. This allows the use of high-pressure risers to the deck level where blowout preventer assemblies are installed, with the upper part also being connected to a choke manifold system, which can be completed with a choke / jamming system with a return to the prefabricated tank system. The system may also be provided with a fluid return system and / or a deck level exhaust system with return to the collection tank.

Когда операции бурения завершены, все элементы 19-21 платформы могут быть демонтированы, а элемент 12 основания остается на морском дне с закрытыми запорными клапанами; альтернативно эксплуатационные обсадные колонны цементируют. Как дополнительная альтернатива, фонтанное оборудование устья скважины с соответствующими трубными линиями может соединяться с фонтанным оборудованием для транспортировки добытого углеводородного сырья и соединяться с другой эксплуатационной установкой для транспортировки добытого углеводородного сырья на эксплуатационные и/или транспортные сооружения.When drilling operations are completed, all platform elements 19-21 can be dismantled, and the base element 12 remains on the seabed with shut-off valves closed; alternatively operational casing cements. As an additional alternative, the wellhead flowing equipment with associated pipe lines can be connected to the flowing equipment for transporting the produced hydrocarbon feedstock and connected to another production unit for transporting the produced hydrocarbon feedstock to production and / or transport facilities.

На фиг.5 схематично показано вертикальное сечение, проходящее через середину секции 19, предназначенной для установки сверху на основание 12 для платформы. Как показано на фигуре, данная промежуточная конструкция снабжена нижней плитой 41', снабженной отверстиями в плите и проходящими вверх углублениями 24, предназначенными для совместной работы с выступающими вверх шипами или штырями 23 на элементе 12, на который промежуточный элемент 19 должен устанавливаться. Дополнительно данный промежуточный элемент 19 также снабжен верхней плитой 44' и боковыми стенками 45'. Дополнительно средняя конструкция 19 снабжена некоторым числом стенок 43 ячеек, образующих отдельные ячейки. Данный конструктивный элемент 19 также снабжен одним или несколькими колодцами или ячейками 25 для бурения без дна или верха. Ячейка (ячейки) 23, проходящая через элемент 19, соосно ориентирована (ориентированы) относительно соответствующей ячейки (ячеек) в основании 12 для платформы.Figure 5 schematically shows a vertical section passing through the middle of the section 19, designed to be installed on top of the base 12 for the platform. As shown in the figure, this intermediate structure is provided with a bottom plate 41 ', provided with openings in the plate and upwardly extending recesses 24 for working together with upwardly projecting spikes or pins 23 on the element 12 onto which the intermediate element 19 is to be mounted. Additionally, this intermediate element 19 is also provided with a top plate 44 'and side walls 45'. Additionally, the middle structure 19 is provided with a certain number of walls 43 of the cells forming separate cells. This structural element 19 is also provided with one or more wells or cells 25 for drilling without a bottom or top. The cell (s) 23 passing through the element 19 are coaxially oriented (oriented) relative to the corresponding cell (s) in the base 12 for the platform.

На фиг.6 схематично показано соответствующее вертикальное сечение, проходящее через верхний блок 22, палубная надстройка не показана. Данный блок 22 снабжен нижней плитой 41", боковыми стенками 45" и палубной надстройкой 47. Блок 22 дополнительно снабжен одной или нескольким ячейками 25, открытыми с обоих концов и проходящими вертикально вверх через блок, выполненными коаксиально с ячейками 25 в блоках, установленных ниже, при этом образуется проходящий вертикально шахтный ствол для бурения. На нижнем конце конструкции, на уровне нижней плиты 41", выполнены соответствующие открытые снизу углубления 24 для совместной работы с проходящими вверх шипами 23 элемента, расположенного ниже.6 schematically shows the corresponding vertical section passing through the upper block 22, the deck superstructure is not shown. This block 22 is provided with a bottom plate 41 ", side walls 45" and a deck superstructure 47. Block 22 is additionally equipped with one or more cells 25, open at both ends and extending vertically upward through the block, made coaxially with cells 25 in the blocks installed below, this forms a vertically extending shaft shaft for drilling. At the lower end of the structure, at the level of the lower plate 41 ", there are made corresponding openings below the recesses 24 for working with upwardly extending spikes 23 of the element below.

На фиг.7 схематично показана в перспективе, с частичным вырезом, верхняя несущая конструкция 22 палубы. Как показано, данная конструкция 22 на своем верхнем конце оборудована палубной надстройкой, несущей две буровые вышки, установленные сверху каждой из буровых ячеек 25, кран 17, жилые помещения 16 с вертолетной палубой и спасательные шлюпки, подвешенные снаружи морской платформы. Как показано на фигуре, также верхний элемент оборудован некоторым числом ячеек 46, которые во время буксировки функционируют как создающие плавучесть и балластные емкости и во время работы, в случае непредусмотренной утечки нефти, также должны функционировать в качестве сборных емкостей для утечки нефти. Также другие элементы 12, 19, 20 могут снабжаться такими ячейками. В показанном варианте осуществления данные ячейки 46 имеют шестиугольное сечение. Должно быть ясно, вместе с тем, что ячейки могут иметь любое другое сечение подходящей формы, такое как треугольное, прямоугольное, круглое или форму сечения, являющуюся комбинацией круглой и многоугольной.Figure 7 schematically shows in perspective, with a partial cutaway, the upper supporting structure 22 of the deck. As shown, this structure 22 at its upper end is equipped with a deck superstructure carrying two drilling towers mounted on top of each of the drilling cells 25, a crane 17, living quarters 16 with a helicopter deck and lifeboats suspended from the outside of the offshore platform. As shown in the figure, also the top element is equipped with a number of cells 46, which during towing function as creating buoyancy and ballast tanks and during operation, in the event of an unintended oil leak, should also function as prefabricated tanks for oil leakage. Other elements 12, 19, 20 may also be provided with such cells. In the shown embodiment, these cells 46 have a hexagonal cross section. It should be clear, however, that the cells can have any other section of a suitable shape, such as a triangular, rectangular, circular or section shape, which is a combination of round and polygonal.

Высоту бетонного элемента 12 основания выбирают такой, чтобы бетонная конструкция в целом состояла из минимального числа элементов, которые могут устанавливаться друг на друга. Погружение каждого элемента 12, 19-22 выполняется в управляемом режиме с помощью балластных цистерн (не показано), например способом, одинаковым с применяемым для установки блоков донных якорей для платформы с натяжными опорами и избыточной плавучестью типа Heidrun.The height of the concrete base element 12 is chosen such that the concrete structure as a whole consists of a minimum number of elements that can be mounted on top of each other. The immersion of each element 12, 19-22 is carried out in a controlled manner using ballast tanks (not shown), for example, in the same way as used for installing blocks of bottom anchors for a platform with tension supports and excessive buoyancy of the Heidrun type.

Направляющее средство 24, которое может иметь форму углубления в верхней поверхности элемента 12 основания, может, например, представлять собой углубление в верхней плите, предназначенное для приема соответствующей формы вставного жесткого и прочного шипа 23 из подходящего материала различной длины (возможно 10 метров), встроенного в нижнюю секцию нижнего элемента 19 и выступающего вниз от нижней плиты, устанавливаемого коаксиально с углублением 24 в основание 12 для платформы. Направляющий шип 23, имеющий самую большую длину, входит первым в контакт, после чего положение приближающегося элемента 19, альтернативно элемента 20, 21 или 22, подлежащего соединению с основанием 12 для платформы, регулируется, так что следующий шип совмещается со своим углублением, и т.д. В показанном решении имеются три таких направляющих 23, 24 между каждым элементом. Должно быть ясно, вместе с тем, что данное число может изменяться в зависимости от требований для передачи нагрузок и сил между элементами 19-22. Основание 12 для платформы снабжено армированными упрочненными секциями (не показано), предназначенными для восприятия и противодействия нагрузкам и силам, создаваемым элементами 19-22, находящимися сверху. Предполагается прочная и жесткая конструкция. Альтернативно может быть необходимым создание основания 12 для платформы с выступающими вверх направляющими 23, выполненными совпадающими с углублениями или отверстиями 24 в нижней плите элементов 19-22, находящихся выше.The guide means 24, which may be in the form of a recess in the upper surface of the base element 12, may, for example, be a recess in the upper plate, designed to receive the corresponding shape of an inserted hard and strong stud 23 of suitable material of various lengths (possibly 10 meters), embedded in the lower section of the lower element 19 and protruding downward from the lower plate, mounted coaxially with a recess 24 in the base 12 for the platform. The guide spike 23, having the longest length, comes into contact first, after which the position of the approaching element 19, alternatively the element 20, 21 or 22, to be connected to the platform base 12, is adjusted so that the next spike is aligned with its recess, and t .d. In the solution shown, there are three such guides 23, 24 between each element. It should be clear, however, that this number may vary depending on the requirements for the transfer of loads and forces between elements 19-22. The base 12 for the platform is equipped with reinforced hardened sections (not shown), designed to perceive and counter the loads and forces created by the elements 19-22 located on top. A sturdy and rigid construction is assumed. Alternatively, it may be necessary to create a base 12 for the platform with upwardly extending guides 23 made coincident with recesses or holes 24 in the lower plate of the elements 19-22 above.

Основание 12 для платформы может снабжаться направляющими трубами для будущих скважин, образующими интегральную часть основания 12 для платформы, обеспечивающими возможность бурения скважины через них с площадки над уровнем моря после завершения установки элементов 12,19-22. По идее можно также вводить клапан-отсекатель (не показан), установленный в основании 12 для платформы в соединении с направляющими трубами или райзерами, как дополнительный барьер, соединенный с райзером высокого давления, заканчивающимися на уровне палубы обычными противовыбросовыми превенторами и предохранительными клапанами.The base 12 for the platform may be provided with guide pipes for future wells, forming an integral part of the base 12 for the platform, providing the possibility of drilling wells through them from the site above sea level after the installation of elements 12,19-22. In theory, you can also enter the shutoff valve (not shown) installed in the base 12 for the platform in connection with guide pipes or risers, as an additional barrier connected to the high-pressure riser, ending at the deck level with conventional blowout preventers and safety valves.

Когда другие элементы демонтируют, в случае когда они больше не требуются для сооружения 10, элемент 12 основания может быть сконструирован и разработан таким, что основание может оставаться на площадке, а другие элементы 19-22 демонтируют, при этом элемент основания разработан таким, что не обуславливает каких-либо препятствий или неудобств для рыболовства и одновременно функционирует как подстилающий слой для быстрого восстановления растительности для природной придонной фауны. Следует отметить, что углеводородное сырье не должно храниться в элементе 12 основания, чтобы элемент основания не содержал каких-либо загрязняющих веществ, когда остается на площадке.When other elements are dismantled, when they are no longer required for building 10, the base element 12 can be designed and designed so that the base can remain on the site, and other elements 19-22 are dismantled, while the base element is designed so that It causes any obstacles or inconvenience to fishing and at the same time functions as an underlayer for quick restoration of vegetation for the natural benthic fauna. It should be noted that the hydrocarbon feed should not be stored in the base element 12, so that the base element does not contain any contaminants when it remains on the site.

Высота элемента 12 основания определяется глубиной моря, геотехническими условиями и прогнозируемым погружением в грунт морского дна и подбирается с учетом высоты других элементов 19-22, которые являются демонтируемыми. Типичная высота может составлять 15 м. Высота не должна быть меньше 10 м, поскольку элемент 12 тогда может становиться недостаточно стойким к воздействию или недостаточно жестким, если становится слишком "мелким". С другой стороны, высота не должна превышать 25 метров над морским дном, поскольку предусмотрено оставление элемента основания на морском дне после завершения работ. На верхней плите 29 элемента 12 основания и на направляющем средстве 23, 24 может располагаться слой эластомера или другого материала (не показано) с толщиной 0,25 м, чтобы нагрузки от элементов 19-22, опирающихся сверху на конструкцию основания, равномерно распределялись по верхней плите 29.The height of the base element 12 is determined by the depth of the sea, geotechnical conditions and the predicted immersion in the soil of the seabed and is selected taking into account the height of the other elements 19-22, which are dismantled. A typical height may be 15 m. The height should not be less than 10 m, since element 12 may then become insufficiently resistant to impact or not sufficiently rigid if it becomes too “shallow”. On the other hand, the height should not exceed 25 meters above the seabed, since it is planned to leave the base element on the seabed after completion of work. A layer of elastomer or other material (not shown) with a thickness of 0.25 m can be located on the top plate 29 of the base element 12 and on the guide means 23, 24 so that the loads from the elements 19-22, resting on top of the base structure, are evenly distributed over the top stove 29.

Как показано на фиг.4-6, промежуточные элементы 19-22 устанавливаются последовательно сверху на элемент 12 основания и/или на предыдущий установленный элемент. На фиг.4 показан этап, где элемент 12 основания установлен на морское дно 11 с юбками 27, 28, вдавленными в морское дно 11, и где первый промежуточный элемент 19 еще не установлен над элементом 12 основания в нужное положение относительно элемента основания.As shown in FIGS. 4-6, the intermediate elements 19-22 are installed sequentially from above on the base element 12 and / or on the previous installed element. Figure 4 shows the stage where the base element 12 is installed on the seabed 11 with skirts 27, 28 pressed into the seabed 11, and where the first intermediate element 19 is not yet installed above the base element 12 in the desired position relative to the base element.

Все элементы 12, 19-22 снабжены вертикальными отверстиями или углублениями 24 для приема направляющего средства 23, возможно шипов, как части элемента, установленного ниже, или элемента, подлежащего установке на них сверху в зависимости от варианта, при этом направляющие элементы 19-22 в нужное положение. Промежуточные элементы 19-22 строятся независимо друг от друга и устанавливаются на плаву в нужное положение сверху и затем балластируются. Также промежуточные элементы 19-21 снабжены направляющим средством 23 для установки в нужное положение элементов 19-22. Промежуточные элементы 19-21 снабжены большими отверстиями или ячейками 25 ("шахтные стволы для бурения") проходящими через элементы, причем отверстиями, аксиально совмещающимися друг с другом так, что образуются ячейки, проходящие от палубы 15 до опорной фундаментной плиты или плиты элемента 12 основания. На фундаментной плите 41 устанавливаются направляющие обсадные колонны для будущих скважин, подлежащих бурению с буровой палубы 14 на верхнем элементе 12, причем скважинные обсадные колонны, проходящие через скважинные углубления в нижней части элемента 12 основания. Конструкция обеспечивает заполнение промежуточных элементов 19-21 углеводородным сырьем, если емкость верхнего элемента 22 этого требует. Армирующие и придающие жесткость конструкции требуются для структурной целостности. Эластомерные плиты (или плиты из другого подходящего материала) могут быть установлены между смежными элементами для распределения нагрузки на верхнюю плиту 29. Такие плиты можно также устанавливать сверху на направляющее средство 23 и возможно в отверстиях или углублениях 24 для направляющего средства 23.All elements 12, 19-22 are provided with vertical holes or recesses 24 for receiving guide means 23, possibly spikes, as part of an element installed below, or an element to be installed on top of them depending on the variant, while the guide elements 19-22 in desired position. Intermediate elements 19-22 are built independently of each other and are set afloat in the desired position from above and then ballast. Also, the intermediate elements 19-21 are provided with guide means 23 for setting the elements 19-22 in the desired position. Intermediate elements 19-21 are provided with large holes or cells 25 ("shaft shafts for drilling") passing through the elements, with holes axially aligned with each other so that cells are formed, passing from deck 15 to the base foundation plate or plate of the base element 12 . Guiding casing strings are installed on the foundation plate 41 for future wells to be drilled from the drill deck 14 on the upper member 12, the borehole casing passing through the bore holes in the lower part of the base member 12. The design provides filling of the intermediate elements 19-21 with hydrocarbon feed, if the capacity of the upper element 22 requires it. Reinforcing and stiffening structures are required for structural integrity. Elastomeric plates (or plates of another suitable material) can be installed between adjacent elements to distribute the load on the upper plate 29. Such plates can also be mounted on top of the guide means 23 and possibly in the holes or recesses 24 for the guide means 23.

"Шахтные стволы для бурения", проходящие через платформу 10, собирают таким способом, что достигают водонепроницаемости для замкового соединения. Данное достигается уплотнением замкового соединения подходящим герметизирующим материалом."Shaft shafts for drilling" passing through the platform 10 are assembled in such a way that they are watertight for the castle connection. This is achieved by sealing the locking joint with a suitable sealing material.

Высота промежуточных элементов 19-21 может, в общем, быть стандартной, поскольку элементы предназначаются для повторного использования на других площадках. Типичная высота элементов может составлять 25 и 50 метров при взаимном соединении с верхним элементом 22 (который имеет форму бетонного плавучего морского основания): такое плавучее морское основание может как напрямую соединяться с элементом 12 основания, так и с помощью промежуточных элементов 19-21. Таким образом, концепция согласно настоящему изобретению охватывает значительный диапазон морских глубин, одновременно предусматривая демонтаж. Верхний элемент 22 имеет типичную высоту 40 метров ниже среднего уровня моря, и считается, что высота над уровнем моря (обычно 30 м) должна быть достаточной для предотвращения заливания элемента 22 морской водой в ситуации экстремально больших волн.The height of the intermediate elements 19-21 may, in general, be standard, since the elements are intended to be reused at other sites. The typical height of the elements can be 25 and 50 meters when interconnected with the upper element 22 (which has the form of a concrete floating sea base): such a floating sea base can be directly connected to the element 12 of the base, and using intermediate elements 19-21. Thus, the concept according to the present invention covers a significant range of sea depths, while also providing for dismantling. The upper element 22 has a typical height of 40 meters below average sea level, and it is believed that the height above sea level (usually 30 m) should be sufficient to prevent the flooding of element 22 with sea water in extremely large waves.

Собранное сооружение 10 может, например, приспосабливаться к различным морским глубинам с использованием следующих комбинаций элементов 12, 19-22:The assembled structure 10 can, for example, adapt to various sea depths using the following combinations of elements 12, 19-22:

элемент 12 основания имеет высоту в диапазоне 10-27 м;the base element 12 has a height in the range of 10-27 m;

промежуточный элемент 19 может иметь стандартную высоту 25 м;the intermediate element 19 may have a standard height of 25 m;

следующий элемент 20 может иметь высоту 50 м;the next element 20 may have a height of 50 m;

верхний элемент может иметь высоту 35-42 м ниже ватерлинии и предпочтительно 30 м над уровнем моря.the upper element may have a height of 35-42 m below the waterline and preferably 30 m above sea level.

Пример собранной конструкции:An example of an assembled structure:

нет промежуточного элемента: 10-27 м плюс 35-42 м, охватывает глубину моря между 45 м и 69 м, см. решение, описанное выше и показанное на фиг.9;no intermediate element: 10-27 m plus 35-42 m, covers the depth of the sea between 45 m and 69 m, see the solution described above and shown in Fig.9;

промежуточный элемент: 10-27 м плюс 25 м плюс 35-42 м, охватывающий глубины между 70 м и 94 м;intermediate element: 10-27 m plus 25 m plus 35-42 m, covering depths between 70 m and 94 m;

большой промежуточный элемент: 10 м - 27 м плюс 50 м плюс 35-42 м, охватывающий диапазон морских глубин между 95 и 119 м;large intermediate element: 10 m - 27 m plus 50 m plus 35-42 m, covering the range of sea depths between 95 and 119 m;

два промежуточных элемента: 10-27 м плюс 25 м плюс 50 м плюс 35-42 м, охватывающий диапазон морских глубин между 120 м - 144 м, см. решение, описанное ниже и показанное на фиг.8.two intermediate elements: 10-27 m plus 25 m plus 50 m plus 35-42 m, covering the range of sea depths between 120 m - 144 m, see the solution described below and shown in Fig. 8.

Если планируют охват больших глубин, высоту промежуточных элементов следует отрегулировать. Представляется, например, возможным охват больших глубин при выборе конструкции верхнего элемента 22 с большей глубиной.If you plan to cover large depths, the height of the intermediate elements should be adjusted. It seems, for example, possible to cover greater depths when choosing the design of the upper element 22 with greater depth.

Верхний элемент 12 подлежит соединению с элементом (элементами) 19, 21, установленным под ним, как описано выше. Установку в нужное место получают введением направляющего средства 23 на нижнем элементе в отверстия 24 в конструкцию над ним так, как описано выше для способа установки промежуточных конструкции 19-21 сверху на основание 12 для платформы. На мелководье верхний элемент 22 можно устанавливать непосредственно сверху на основание 12 для платформы, находящейся под ним. Здесь верхний элемент 22 должен образовывать интегрированную часть всего сооружения 10 платформы. Для отсоединения данный элемент 22 должен опять превратиться в плавучее морское основание до установки сверху на новое основание 12 для платформы и другие уже установленные секции 19-22 на новой морской площадке. Следует отметить, что верхним элементом 12 можно осуществлять маневр легче, чем остальными элементами 19-21, поскольку такой элемент должен иметь значительный надводный объем. Верхний элемент 22 имеет достаточный объем для обеспечения сбора объема углеводородов утечки из скважины, потерявшей управление. Данный объем емкостей образуют разделяющие переборки, образующие более или менее разделенные ячейки 30 хранения, которые можно использовать для приема балласта в фазе установки. Положение переборок выбирают обеспечивающим прочность сооружения 10, отвечающей требованиям безопасности для такого типа сооружений во всех фазах и условиях нагружения.The upper element 12 is to be connected to the element (s) 19, 21 mounted below it, as described above. Installation in the right place is obtained by introducing guide means 23 on the lower element into the holes 24 in the structure above it, as described above for the method of installing intermediate structures 19-21 on top of the platform base 12. In shallow water, the upper element 22 can be mounted directly on top of the platform base 12 below it. Here, the upper element 22 should form an integrated part of the entire structure 10 of the platform. For detachment, this element 22 must again turn into a floating offshore base before being installed on top of the new base 12 for the platform and other sections already installed 19-22 on the new offshore platform. It should be noted that the upper element 12 can be maneuvered easier than the rest of the elements 19-21, since such an element must have a significant surface volume. The upper element 22 is of sufficient volume to provide for the collection of hydrocarbon leakage from a well that has lost control. This volume of tanks is formed by separating bulkheads, forming more or less divided storage cells 30, which can be used to receive ballast in the installation phase. The position of the bulkheads is chosen to ensure the strength of the structure 10, which meets the safety requirements for this type of structure in all phases and loading conditions.

Как упомянуто выше, на фиг.8 схематично показано вертикальное сечение, проходящее через верхнюю, несущую палубу секцию 22. Согласно варианту осуществления изобретения верхняя секция имеет верхнюю закраину 31, собирающую всю жидкость, выходящую из скважины в случае непредусмотренного события, где скважиной невозможно управлять с использованием барьеров известной техники. Показанный вариант осуществления имеет, в принципе, наиболее простую форму. Данная часть верхнего элемента 22 вентилируется по газу с достаточной производительностью, обусловленной производительностью факельной системы сжигания излишков газа (не показано). Скважинная жидкость проходит в регулируемом режиме в выделенные емкости 46, последовательно заполняющиеся нестабильной скважинной жидкостью, содержащей воду, газ и различные другие типы углеводородов. Согласно раскрытому принципиальному решению, жидкость должна последовательно заполнять шахтные стволы 25 до достижения уровнем жидкости в данной ячейке некоторой высоты, где жидкость проходит из шахтного ствола (стволов) для бурения в одну или несколько выделенных ячеек 46. Система может для данной цели снабжаться возвратными клапанами (не показано) для предотвращения ухода газа из емкостей 30 и трубной системой, обеспечивающей заполнение соответствующих емкостей 48. Данная смесь должна давать легковоспламеняющиеся газы, и поэтому газы должны удаляться вентиляцией из сооружения на факел (не показано). Верхний элемент 12 описан выше. Верхний элемент 12 должен нести палубную надстройку 14, содержащую буровое оборудование, т.e. буровую установку (установки) 15, циркуляционные системы и источник (источники) энергии. Палубная надстройка 14 должна обеспечивать возможность выполнения всех требуемых функций для нормального выполнения буровых работ. Система также включает в себя систему отгрузки, обеспечивающую непрерывное опорожнение емкостей для транспортировки из блока на станцию очистки транспортируемой текучей среды. Хотя естественная вентиляция не показана, следует отметить, что система также в дополнение к ней или вместо нее может содержать принудительный выпуск, например с помощью насосов и подходящей отдельной трубной системы.As mentioned above, FIG. 8 schematically shows a vertical section passing through the upper deck-carrying section 22. According to an embodiment of the invention, the upper section has an upper lip 31 collecting all the fluid leaving the well in the event of an unforeseen event where the well cannot be controlled with using barriers of the prior art. The embodiment shown has, in principle, the simplest form. This part of the upper element 22 is vented by gas with sufficient capacity, due to the performance of the flare system for burning excess gas (not shown). The borehole fluid passes in a controlled mode to the allocated tanks 46, successively filled with an unstable borehole fluid containing water, gas and various other types of hydrocarbons. According to the disclosed principle solution, the fluid must fill shaft shafts 25 sequentially until the fluid level in a given cell reaches a certain height, where the fluid passes from the shaft (s) for drilling into one or more selected cells 46. The system can be equipped with check valves for this purpose ( not shown) to prevent gas from escaping from containers 30 and a pipe system that fills the corresponding containers 48. This mixture should produce flammable gases, and therefore gases up to false should be removed by ventilation from the structure to the torch (not shown). The upper element 12 is described above. The upper element 12 should carry a deck superstructure 14 containing drilling equipment, i.e. drilling rig (s) 15, circulating systems and energy source (s). Deck superstructure 14 should provide the ability to perform all the required functions for the normal execution of drilling operations. The system also includes a shipment system that provides continuous emptying of containers for transportation from the unit to the cleaning station of the transported fluid. Although natural ventilation is not shown, it should be noted that the system may also, in addition to or instead of it, contain forced release, for example by means of pumps and a suitable separate pipe system.

Сооружение может также включать в себя системы добычи, так что оно может служить эксплуатационной морской платформой, если обнаружены достаточные объемы углеводородного сырья. Такая система добычи может устанавливаться, когда идентифицируют достаточную потребность переработки. Для транспортировки нефти или газа на берег обычным является присоединение системы первой ступени для отделения воды и компрессорной установки для транспортировки добытой жидкости. Поскольку систему добычи устанавливают после установки платформы, палуба 14 должна иметь площадь для размещения такой системы. При этом буровую установку устанавливают несколько внецентренно, с одной стороны палубы, а не по ее центру, что должно давать более выгодную геометрическую конфигурацию конструкции. Является также возможной замена верхнего элемента, со специальной конструкцией для бурения на верхний элемент со специальной конструкцией для долгосрочной эксплуатации.The facility may also include production systems so that it can serve as an offshore production platform if sufficient volumes of hydrocarbons are discovered. Such a production system can be installed when sufficient processing needs are identified. For transporting oil or gas to shore, it is common to attach a first stage system for separating water and a compressor unit for transporting the produced fluid. Since the production system is installed after the installation of the platform, deck 14 must have an area to accommodate such a system. In this case, the drilling rig is installed somewhat eccentrically, on one side of the deck, and not in its center, which should give a more favorable geometric configuration of the structure. It is also possible to replace the upper element with a special design for drilling with the upper element with a special design for long-term operation.

Если необходимо, концепция обеспечивает бурение большого числа скважин к нескольким коллекторам/участкам разведки. Реальное число может составлять 80 скважин. До 40 скважин могут, например, размещаться в каждом из двух вертикальных отверстий ("шахтных стволах") 25 для бурения. Скважины бурят с помощью буровых вышек 15, установленных над отверстиями. При бурении в новых коллекторах вся добыча из одной из групп скважин может быть остановлена для ведения добычи из другой группы скважин. Для обеспечения размещения 40 скважин в одной группе скважин диаметр ячейки 25 должен быть порядка 30 м или больше. Отверстия ячеек для скважин могут устанавливаться несколько внецентренно относительно палубы 11 для соответствия требованиям установки эксплуатационного оборудования, описанного выше.If necessary, the concept enables the drilling of a large number of wells to several reservoirs / exploration sites. The actual number may be 80 wells. Up to 40 wells can, for example, be located in each of two vertical holes ("shaft shafts") 25 for drilling. Wells are drilled using drill towers 15 mounted above the holes. When drilling in new reservoirs, all production from one of the group of wells can be stopped to conduct production from another group of wells. To ensure the placement of 40 wells in one group of wells, the diameter of the cell 25 must be of the order of 30 m or more. The cell openings for the wells can be installed somewhat eccentrically relative to deck 11 to meet the requirements for the installation of production equipment described above.

Геометрия выбирается для балластных и/или сборных емкостей для углеводородного сырья с переборками, обеспечивающими требуемую прочность. Типичный диаметр для верхнего элемента, дающий объем хранения приблизительно 200000 м3 для балластных и/или сборных емкостей, должен составлять 100-120 метров, лучший расчетный составляет 110 м. Силы волн, действующие на такую конструкцию, должны быть большими и должны являться критерием выбора размеров для направляющих, которые обычно могут иметь форму упрочненных стальных конусов с диаметром 5 м или больше и с высотой до 10 м.The geometry is selected for ballast and / or prefabricated tanks for hydrocarbons with bulkheads providing the required strength. A typical diameter for the top element, giving a storage volume of approximately 200,000 m 3 for ballast and / or prefabricated containers, should be 100-120 meters, the best design one is 110 m. The wave forces acting on such a structure should be large and should be a selection criterion sizes for rails, which can usually take the form of hardened steel cones with a diameter of 5 m or more and with a height of up to 10 m.

Отверстия ячеек для операций бурения ("шахтные стволы") проходят вертикально между элементами 19-22 и в элементе 12 основания, так что скважину можно закладывать и заканчивать на поверхности и можно бурить через буровые углубления 26 в основании 12 для платформы. Для обеспечения доступа, например, дистанционно управляемого аппарата в данные отверстия диаметр отверстия может быть больше в промежуточных элементах 19, 20, чем в верхнем элементе 22. Когда бурение завершается, считается что скважины затампонированы, так что элемент 12 основания больше не выполняет функции барьера.The openings of the cells for drilling operations (“shaft shafts”) extend vertically between the elements 19-22 and the base element 12, so that the well can be laid and completed on the surface and can be drilled through the drilling recesses 26 in the base 12 for the platform. To provide access, for example, of a remotely controlled device to these holes, the diameter of the hole can be larger in the intermediate elements 19, 20 than in the upper element 22. When the drilling is completed, it is considered that the wells are plugged so that the base element 12 no longer acts as a barrier.

На фиг.8 показана схема устройства палубы. Следует заметить, вместе с тем, что показанное решение не является единственным приемлемым. Схему устройства можно менять без отклонения, при этом, от сущности изобретения.On Fig shows a diagram of the device deck. It should be noted, however, that the solution shown is not the only acceptable one. The circuit of the device can be changed without deviating from the essence of the invention.

На фиг.9 схематично показан в перспективе и частично в разрезе, вариант осуществления изобретения, оборудованный средством закрепления. Средство закрепления содержит множество, по существу, вертикально натянутых тросов 50, где каждый трос 50 на своем нижнем конце закреплен к анкеру 51, встроенному в бетонную плиту 12 основания для платформы, причем зона вокруг встроенного анкера 51 армирована с учетом сил, прикладываемых к основанию для платформы вследствие натяжения натянутых тросов 50. От плиты 12 основания для платформы натянутые тросы проходят вверх к палубе через направляющие блоки 52, закрепленные на стенке платформы ниже уровня палубы и предпочтительно, но не обязательно, также ниже уровня моря, и далее к барабану механической лебедки 53 на палубе. С помощью лебедок 53, таким образом, должно обеспечиваться изменение натяжения натянутых тросов 50 в зависимости от высоты волн, появляющихся усилий от волн и их воздействия на платформу и направления волн.Figure 9 schematically shows in perspective and partially in section, an embodiment of the invention, equipped with a means of fastening. The fixing means comprises a plurality of substantially vertically stretched cables 50, where each cable 50 at its lower end is fixed to an anchor 51 integrated into the concrete base plate 12 of the platform, the area around the integrated anchor 51 being reinforced taking into account the forces applied to the base for platforms due to the tension of the tensioned cables 50. From the base plate 12 for the platform, the tensioned cables pass up to the deck through the guide blocks 52, mounted on the platform wall below the level of the deck and preferably, but not necessarily, also below sea level, and further to the mechanical winch drum 53 on the deck. With the help of winches 53, thus, a change in the tension of the tensioned cables 50 should be provided depending on the height of the waves, the emerging forces from the waves and their impact on the platform and the direction of the waves.

Дополнительно средство закрепления согласно настоящему изобретению содержит обычную систему постановки на якоря, содержащую некоторое число якорных оттяжек 55, где каждая якорная оттяжка 55 на одном конце закреплена на обычном самозасасывающемся якоре (не показано), засасываемом в морское дно 11 на большом расстоянии от платформы 11. Якорные оттяжки 55 могут на этом конце иметь форму обычных якорных оттяжек с длинной тяжелой цепью, ложащейся на морское дно 11, и проволочного троса или цепи, проходящей вверх на платформу через направляющие блоки 52 на платформе 10 в ее верхней части и далее на барабан лебедки 53, установленной на палубе платформы 10. Якорная оттяжка и самозасасывающийся якорь являются обычными устройствами, хорошо известными специалисту в данной области техники.Additionally, the fastening means according to the present invention comprises a conventional anchoring system comprising a number of anchor braces 55, where each anchor brace 55 at one end is secured to a conventional self-priming anchor (not shown) sucked into the seabed 11 at a great distance from the platform 11. Anchor braces 55 at this end may be in the form of ordinary anchor braces with a long heavy chain lying on the seabed 11 and a wire rope or chain extending upward to the platform through the guides and 52 on the platform 10 in its upper part and further to a winch drum 53 mounted on the deck of the platform 10. The mooring lines and anchor samozasasyvayuschiysya are conventional devices well known to those skilled in the art.

Число натянутых тросов 50 и якорных оттяжек 55 может изменяться в вариантах осуществления без отхода, при этом, от сущности изобретения. Дополнительно система постановки на якоря может иметь конфигурацию с меняющейся последовательностью между натянутыми тросами и якорными оттяжками. Также натяжение якорных оттяжек 55 может изменяться способом, аналогичным способу для натянутых тросов 50 для компенсации изменяющихся сил волн и направления волн.The number of tensioned cables 50 and anchor braces 55 may vary in embodiments without departing from the essence of the invention. Additionally, the anchoring system may have a configuration with a varying sequence between tensioned cables and anchor braces. Also, the tension of the anchor guy 55 can be changed in a manner similar to the method for the tensioned cables 50 to compensate for the changing wave forces and the direction of the waves.

Как показано на фиг.3, платформа может быть оборудована некоторым числом труб перекачки углеводородного сырья. На уровне нижней части основания для платформы располагаются герметичные углубления бурильных колонн, каждое оборудованное отсекающим клапаном 26, при этом предохранительные клапаны (не показано) предпочтительно могут быть установлены на уровне палубы. Райзеры высокого давления могут предпочтительно проходить между отсекающими клапанами на уровне нижней плиты и предохранительными клапанами на уровне палубы. Отсекающие клапаны 26 являются клапанами такого типа, которые могут как временно закрываться, так и отсекать поток текучей среды, так что поток углеводородов из скважины может быть остановлен на нижнем уровне сооружения 10. Это обеспечивает упрощенный демонтаж блоков, установленных сверху на основание для платформы, когда необходимо.As shown in FIG. 3, the platform may be equipped with a number of hydrocarbon feed pipes. At the level of the lower part of the base for the platform are sealed recesses of the drillstrings, each equipped with a shut-off valve 26, while safety valves (not shown) can preferably be installed at deck level. High pressure risers may preferably extend between the shutoff valves at the bottom plate level and the safety valves at the deck level. The shut-off valves 26 are valves of this type, which can both temporarily close and cut off the fluid flow, so that the flow of hydrocarbons from the well can be stopped at the lower level of the structure 10. This provides a simplified dismantling of the blocks mounted on top of the platform base when necessary.

В отношении к местам 51 встраивания анкеров в основание 12 для платформы 40-дюймовые (102 см) трубы 56 направления могут, например, забуриваться или забиваться в морское дно, такие трубы направления жестко крепятся к нижней плите основания 12 для платформы. Трубы направления могут выполнять функцию дополнительного крепления сооружения 10 на морском дне для противодействия любым опрокидывающим моментам морской платформы на уровне морского дна и в дополнение к функции нижнего прикрепления и места закрепления для вертикально натянутых тросов 50.In relation to the places 51 for embedding anchors in the base 12 for the platform, 40-inch (102 cm) directional pipes 56 may, for example, drill or clog into the seabed, such directional pipes are rigidly attached to the bottom plate of the platform base 12. Direction pipes can serve as an additional fastening of structure 10 on the seabed to counter any tipping moments of the sea platform at the level of the seabed and in addition to the function of the lower attachment and anchorage for vertically stretched cables 50.

На фиг.10 схематично показана разъемная система для взаимного соединения смежных секций 19-22. Для ясности секции 19-21 платформы показаны прозрачными и без установленных внутри шахт для бурения или ячеек. Система взаимного соединения является четвертым элементом, используемым для обеспечения прочного взаимного соединения различных секций, образующих морскую платформу 10. Четвертая система взаимного соединения содержит некоторое число вертикальных запорных болтов или стяжек 57, при этом только одна такая стяжка 57 показана на фиг.10. Стяжки 57 предназначены для вставления в соответствующие отверстия или каналы 54, проходящие через бетонную стенку в одной секции 19-21 и дополнительно предназначенные для связывания и аксиального совмещения с соответствующим проемом или отверстием 54 в соседней секции 19-21, находящейся ниже. Вертикальная стяжка 57 может, например, быть выполнена с корпусом трубчатой формы, на своем нижнем конце снабженной запорной поверхностью 70, предназначенной для совместной работы с соответствующей запорной поверхностью 58, встроенной в нижний конец смежного отверстия 54 в соседней секции 19, 20, находящейся ниже. Горизонтальное расстояние между двумя идущими подряд стяжками вокруг периферии секций может предпочтительно составлять 30 градусов, т.e. в таком варианте двенадцать стяжек 57 используют для взаимного соединения одной секции 22 с соседней секцией 21, находящейся ниже. Запорные стяжки 57 могут предпочтительно иметь такую конфигурацию и устанавливаться так, что запорная стяжка 57, для скрепления секции 21 с соседней секцией 20, находящейся ниже, смещена на 15 градусов относительно смежной запорной стяжки 57 для скрепления секции 20 с секцией 19, находящейся ниже. При таком способе устанавливается боковое смещение на 15 градусов, и соответствующее смещение должно быть действительным для соседних замковых соединений, находящихся ниже между следующими секциями, находящимися ниже, если данное релевантно (не показано). Согласно такому решению обеспечивается отличное распределение сил, действующих на замковые соединения между последовательно соединенными секциями 20-22.Figure 10 schematically shows a detachable system for interconnecting adjacent sections 19-22. For clarity, sections 19-21 of the platform are shown transparent and without drilling shafts or cells installed inside. The interconnection system is the fourth element used to provide a strong interconnection of the various sections forming the offshore platform 10. The fourth interconnection system contains a number of vertical locking bolts or couplers 57, with only one such coupler 57 shown in FIG. 10. Ties 57 are designed to be inserted into respective holes or channels 54 passing through a concrete wall in one section 19-21 and further designed to bond and axially align with a corresponding opening or hole 54 in an adjacent section 19-21 below. The vertical coupler 57 may, for example, be made with a tubular body provided at its lower end with a locking surface 70, designed to work together with the corresponding locking surface 58, built into the lower end of the adjacent hole 54 in the adjacent section 19, 20, located below. The horizontal distance between two successive screeds around the periphery of the sections may preferably be 30 degrees, i.e. in this embodiment, twelve couplers 57 are used to interconnect one section 22 with an adjacent section 21 below. The locking ties 57 may preferably be configured and installed so that the locking ties 57 for fastening the section 21 to the adjacent section 20 below are offset 15 degrees from the adjacent locking ties 57 for fastening the section 20 to the section 19 below. With this method, a lateral displacement of 15 degrees is established, and the corresponding displacement must be valid for adjacent castle joints located below between the following sections located below, if this is relevant (not shown). According to this solution, an excellent distribution of forces acting on the locking joints between the series-connected sections 20-22 is ensured.

Запорная функция нижнего конца 70 запорной стяжки 57 и соответствующего запорного средства 58, встроенного в секцию, находящуюся ниже, выполняется так, что силы запирания увеличиваются при повороте цилиндрической запорной стяжки 57, хотя максимальный возможный поворот цилиндрической стяжки может составлять 90 градусов для достижения максимальной силы запирания. Также верхний конец каждой запорной стяжки 57 может снабжаться запорным блоком 70, взаимодействующим с запорным блоком 58, встроенным в стенку отверстия или канала 54 для одновременного запирания также верхнего конца запорной стяжки 57, взаимно соединяющей две последовательные секции 20-22, так что две последовательные секции 12, 20, 22 становятся взаимно соединенными. Для вставления запорной стяжки 57 в канал 54 отверстие канала 54 может иметь форму замочной скважины, т.e. круглую с кубической формы продолжением в одном направлении, так что запорной стяжке 57 обеспечивается поворот, только когда верхнее и нижнее запорное средство 70, закрепленное на стяжке 57, находятся на одном уровне с соответствующим запорным средством 58 в каналах 54.The locking function of the lower end 70 of the locking coupler 57 and the corresponding locking means 58 integrated in the section below is performed so that the locking forces increase when the cylindrical locking coupler 57 is rotated, although the maximum possible rotation of the cylindrical coupler can be 90 degrees to achieve the maximum locking force . Also, the upper end of each locking screed 57 may be provided with a locking block 70 cooperating with the locking block 58 integrated in the wall of the hole or channel 54 to simultaneously lock also the upper end of the locking screed 57 interconnecting two consecutive sections 20-22, so that two consecutive sections 12, 20, 22 become mutually connected. To insert a locking screed 57 into the channel 54, the opening of the channel 54 may take the form of a keyhole, i.e. round with a cubic shape extending in one direction, so that the locking coupler 57 is rotated only when the upper and lower locking means 70 mounted on the coupler 57 are flush with the corresponding locking means 58 in the channels 54.

Если секции нужно разделить, например, для демонтажа морской платформы, цилиндрические запорные стяжки 57 поворачиваются на 90 градусов в противоположном направлении, при этом запирающее действие прекращается, и цилиндрические стяжки 57 затем можно вытаскивать и убирать из канала в бетонной конструкции, где они до этого служили запорным средством.If the sections need to be separated, for example, for dismantling the offshore platform, the cylindrical locking ties 57 rotate 90 degrees in the opposite direction, while the locking action stops, and the cylindrical ties 57 can then be pulled out and removed from the channel in the concrete structure where they previously served locking means.

На фиг.11 схематично показано в перспективе основание для платформы согласно настоящему изобретению. На фигуре показаны две шахты с нижними частями ячеек и углубления 26 труб в одной из двух шахт 25. Дополнительно на фигуре показаны трубы 57 направления для глубокой анкеровки основания 12 для платформы и места закрепления для нижних концов натянутых тросов (не показано). Кроме того, показаны три углубления 23 для приема центрирующих шипов (не показано). Для ясности каналы 54 для запорных стяжек, предназначенных для скрепления нижней секции 19 с основанием для платформы, не показаны.11 is a schematic perspective view of a base for a platform according to the present invention. The figure shows two shafts with the lower parts of the cells and the recesses 26 of the pipes in one of the two shafts 25. Additionally, the figure shows pipes 57 of the direction for deep anchoring of the base 12 for the platform and the place of fastening for the lower ends of the tensioned cables (not shown). In addition, three recesses 23 for receiving centering spikes (not shown) are shown. For clarity, the channels 54 for the locking screeds intended for fastening the lower section 19 to the base for the platform are not shown.

На фиг.12 схематично показано решение, где верхний корпус 22 используют для транспортировки и спуска элемента 19 на основание 12 для платформы. Согласно данному варианту осуществления верхний корпус 22 рассматривается как плавучее морское основание, которое также перед установкой фундаментной секции 12 может быть использовано для бурения скважин, если необходимо. Для подвески корпуса 19, подлежащего транспортировке по морю и погружению на основание 12 для платформы, можно использовать тросовую систему, содержащую лебедки 53, направляющие блоки 52 и вертикальные тросы, связывающие секции с основанием 12 для платформы.12 schematically shows a solution where the upper case 22 is used for transporting and lowering the element 19 to the platform base 12. According to this embodiment, the upper body 22 is considered as a floating offshore base, which can also be used for drilling wells, if necessary, before installing the foundation section 12. To suspend the housing 19, which must be transported by sea and immersed on the platform base 12, it is possible to use a cable system comprising winches 53, guide blocks 52 and vertical cables connecting sections to the platform base 12.

Секция 19 может, например, быть построена в доке и затем транспортироваться на промысел на подходящем судне и затем спускаться на воду, например с помощью балластировки транспортного судна для спуска секции 19 на воду. После этого секция 19 может соединяться с плавающей секцией с использованием вышеупомянутой системы закрепления для последующего регулируемого спуска секции 19 на основание 12 для платформы. Когда нижняя секция 19 установлена на основание для платформы, следующая секция 20 может быть установлена аналогичным способом и так далее, до завершения установки плавучего блока 22 и его соединения с основанием 12 для платформы с помощью лебедок 53, направляющих блоков 52 и вертикальных тросов 50. Параллельно устанавливают самозасасывающиеся якоря 54 и соединяют с цепью постановки на якорь, соединяя якорные оттяжки от лебедки с якорной цепью, проходящие через направляющие блоки 52. Плавучий блок оборудован камерами плавучести, балластными цистернами и насосами и системой труб для регулирования затопления плавучего блока. Такая система является хорошо известной специалистам в данной области техники.Section 19 can, for example, be built in a dock and then transported to fishing by a suitable vessel and then launched, for example, by ballasting a transport vessel to launch section 19 into the water. After that, the section 19 can be connected to the floating section using the aforementioned locking system for the subsequent adjustable descent of the section 19 onto the platform base 12. When the lower section 19 is installed on the platform base, the next section 20 can be installed in a similar way and so on, until the installation of the floating unit 22 and its connection to the platform base 12 with winches 53, guide blocks 52 and vertical cables 50 is completed. In parallel install self-absorbing anchors 54 and connect to the anchoring chain, connecting the anchor brackets from the winch to the anchor chain passing through the guide blocks 52. The floating block is equipped with buoyancy chambers, ballast cysts Cores and pumps and a pipe system for regulating flooding of a floating unit. Such a system is well known to those skilled in the art.

По меньшей мере, один из корпусов 19, 20, 21, 22 согласно изобретению можно полностью или частично использовать как резервуар для пресной воды. Для обеспечения устойчивости данные корпуса 20, 21, 22 могут оборудоваться балластными танками, достаточно заполненными воздухом для такой установки системы, чтобы центр плавучести находился над центром тяжести, даже не учитывая момент инерции по ватерлинии плавающего корпуса 20, 21, 22. Согласно данному варианту осуществления данный элемент может быть заполнен пресной водой, которую позже можно использовать в процессе эксплуатации для подачи жидкости во время опреснения, использующегося при нагнетании в коллектор для интенсификации добычи нефти.At least one of the housings 19, 20, 21, 22 according to the invention can be fully or partially used as a reservoir for fresh water. To ensure stability, these hulls 20, 21, 22 can be equipped with ballast tanks sufficiently filled with air for such a system installation so that the center of buoyancy is above the center of gravity, even without taking into account the moment of inertia along the waterline of the floating hull 20, 21, 22. According to this embodiment this element can be filled with fresh water, which can later be used during operation to supply liquid during desalination, which is used when injecting into the reservoir to intensify production oil.

Согласно второму варианту осуществления изобретения верхняя секция может быть снабжена выступающими наружу частями, предназначенными для разрушения и отклонения дрейфующего льда. Верхний плавающий корпус 22 для данной цели может быть оборудован выступающей наружу закраиной или бульбом 60, проходящим по всей периферии плавающего корпуса 22, причем бульб 22 устанавливается в зоне ватерлинии. Бульб может, например, иметь треугольную форму в сечении, где верхняя точка треугольника установлена непосредственно ниже уровня моря, так что дрейфующий лед должен скользить, поднимаясь по верхней поверхности бульба 60, и разламываться на более мелкие части, соскальзывать и проходить вокруг установленной платформы. Платформу 10 для данной цели могут снабжать стальной обшивкой в зоне ватерлинии, обеспечивая отсутствие эрозии бетона, обнажающей арматуру, в данной зоне.According to a second embodiment of the invention, the upper section may be provided with outwardly protruding parts for breaking and deflecting drifting ice. The upper floating body 22 for this purpose may be equipped with an outwardly extending flange or bulb 60 extending over the entire periphery of the floating housing 22, with the bulb 22 being installed in the waterline area. The bulb may, for example, have a triangular shape in cross section where the top of the triangle is set directly below sea level, so that the drifting ice should glide upward along the upper surface of the bulb 60 and break into smaller pieces, slip and pass around the installed platform. Platform 10 for this purpose can be provided with steel sheathing in the waterline zone, ensuring that there is no erosion of concrete exposing the reinforcement in this zone.

Хотя использован бетон, следует отметить, что платформа согласно изобретению в качестве альтернативы может быть выполнена стальной, альтернативно из стали и бетона.Although concrete is used, it should be noted that the platform according to the invention may alternatively be made of steel, alternatively of steel and concrete.

Claims (10)

1. Морская платформа для контролируемой локализации нефти и конденсата, предназначенная для использования на различных морских глубинах, содержащая несущую конструкцию (10); палубную надстройку (14), установленную сверху на несущую конструкцию (10), с которой можно вести бурение, причем несущая конструкция (10) содержит сборные емкости (46), образующие интегрированную часть несущей конструкции (10); основание (12) для платформы, предназначенное для опирания на морское дно, и несколько отдельных обладающих плавучестью корпусов (19-22), установленных сверху друг на друга и взаимно соединенных, опирающихся на основание платформы под действием веса обладающих плавучестью корпусов (19-22), причем обладающие плавучестью корпуса (19-22) также взаимно соединены с основанием (12) платформы с помощью вертикально натянутых тросов (50), расставленных через равные интервалы по периферии платформы (10), и причем множество тросов постановки на якорь, проходящих вверх и вниз от верхней части основания платформы, закреплены якорями на морском дне на расстоянии от морской платформы (10), причем тросы постановки на якорь соединяются с морской платформой (10) через направляющие блоки (52) и лебедки (53).1. An offshore platform for controlled localization of oil and condensate, intended for use at various sea depths, containing a supporting structure (10); a deck superstructure (14), mounted on top of the supporting structure (10), from which drilling can be carried out, the supporting structure (10) comprising prefabricated containers (46) forming an integrated part of the supporting structure (10); a base (12) for the platform, designed to support the seabed, and several separate buoyant hulls (19-22), mounted on top of each other and interconnected, resting on the base of the platform under the influence of the weight of the buoyant hulls (19-22) moreover, the buoyant hulls (19-22) are also mutually connected to the base (12) of the platform using vertically stretched cables (50) arranged at regular intervals along the periphery of the platform (10), and moreover, many anchor cables passing up and down from the upper part of the base of the platform, anchored on the seabed at a distance from the sea platform (10), and anchoring cables are connected to the sea platform (10) through guide blocks (52) and winches (53). 2. Платформа по п.1, в которой вертикально натянутые тросы (50) на одном конце соединяются с основанием (12) платформы и на противоположных концах соединяются с лебедками (53) на палубной надстройке (14) через направляющие блоки (52).2. The platform according to claim 1, in which vertically stretched cables (50) at one end are connected to the base (12) of the platform and at opposite ends are connected to the winches (53) on the deck superstructure (14) through the guide blocks (52). 3. Платформа по п.1, в которой основание платформы закреплено на морском дне с помощью множества свай или труб направления, вдавленных в морское дно и зацементированных в нем.3. The platform according to claim 1, in which the base of the platform is fixed on the seabed using a variety of piles or direction pipes, pressed into the seabed and cemented therein. 4. Платформа по п.3, в которой место закрепления для вертикально натянутых тросов (50) совпадает с верхними концами свай или труб направления.4. The platform according to claim 3, in which the place of fastening for vertically stretched cables (50) coincides with the upper ends of piles or pipes of direction. 5. Платформа по п.1, в которой используются запорные стяжки (57), подвижно установленные в каналах (54) направления и проходящие через замковое соединение между двумя последовательными секциями (12, 19-22) платформы, причем каждая запорная стяжка на своем верхнем и нижнем конце снабжена запорными поверхностями (70), взаимодействующими с соответствующими запорными поверхностями (58) в каналах (54) направления, причем запирающее действие обеспечивается поворотом запорной стяжки (54) относительно канала (54).5. The platform according to claim 1, in which the locking screeds (57) are used, movably mounted in the channels (54) of the direction and passing through the castle connection between two successive sections (12, 19-22) of the platform, each locking screed on its upper and the lower end is provided with locking surfaces (70) interacting with corresponding locking surfaces (58) in the direction channels (54), the locking action being provided by turning the locking screed (54) relative to the channel (54). 6. Платформа по п.1, в которой различные конструктивные элементы (12, 19-22), образующие несущую конструкцию, представляют собой независимые блоки, перемещение которых можно осуществлять независимо, в основном с помощью буксировки и балластировки.6. The platform according to claim 1, in which the various structural elements (12, 19-22) forming the supporting structure are independent units, the movement of which can be carried out independently, mainly by towing and ballasting. 7. Платформа по п.6, в которой различные конструктивные элементы (12, 19-22), образующие несущую конструкцию, можно собирать с помощью направляющего средства или шипов (23) и соответствующих отверстий или углублений (24) в элементах (12, 19-22), установленных над направляющим средством или шипами (23) или под ними.7. The platform according to claim 6, in which the various structural elements (12, 19-22) forming the supporting structure can be assembled using guide means or spikes (23) and the corresponding holes or recesses (24) in the elements (12, 19 -22) mounted above or below the guide means or spikes (23). 8. Платформа по п.1, в которой все элементы (12, 19-22), образующие несущую конструкцию (10), снабжены вертикальными отверстиями (шахтными стволами для бурения) (25), проходящими с совмещением по оси через платформу для установки в нужное положение скважин и скважинных углублений (26) в нижней части основания (12) платформы и дополнительно буровым оборудованием (15), установленным сверху на палубной надстройке (14).8. The platform according to claim 1, in which all the elements (12, 19-22) forming the supporting structure (10) are provided with vertical holes (shaft shafts for drilling) (25) passing along the axis along the platform for installation in the desired position of the wells and bore holes (26) in the lower part of the base (12) of the platform and additionally with drilling equipment (15) mounted on top of the deck superstructure (14). 9. Платформа по п.8, в которой шахтные стволы (25) для бурения выполнены с такой конфигурацией, что замковые соединения во время сборки герметизируются с созданием водонепроницаемой герметичной конструкции шахтных стволов в целом.9. The platform according to claim 8, in which the shaft shafts (25) for drilling are made with such a configuration that the locking joints are sealed during assembly with the creation of a waterproof sealed structure of the shaft shafts as a whole. 10. Платформа по п.1, в которой отсекающий клапан устанавливается в основании (12) платформы в качестве дополнительного барьера для райзера высокого давления, причем райзера, заканчивающегося на уровне палубы сборкой противовыбросовых превенторов и задвижек. 10. The platform according to claim 1, in which the shut-off valve is installed in the base (12) of the platform as an additional barrier for the high-pressure riser, the riser ending at the deck level with the assembly of blowout preventers and gate valves.
RU2012136640/13A 2010-01-28 2011-01-27 Marine platform for controlled hydrocarbon localising RU2574484C2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NO20100138 2010-01-28
NO20100138 2010-01-28
PCT/NO2011/000030 WO2011093718A1 (en) 2010-01-28 2011-01-27 Platform for controlled containment of hydrocarbons

Publications (2)

Publication Number Publication Date
RU2012136640A RU2012136640A (en) 2014-03-10
RU2574484C2 true RU2574484C2 (en) 2016-02-10

Family

ID=

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923115A (en) * 2016-05-16 2016-09-07 中国海洋大学 Floating type reinforced concrete production platform
RU2723799C1 (en) * 2019-06-21 2020-06-17 Публичное акционерное общество "Нефтяная компания "Роснефть" (ПАО "НК "Роснефть") "dome" type device for liquidation of underwater oil spills complete with process equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3698198A (en) * 1971-02-12 1972-10-17 Warren Petroleum Corp Deep-water drilling, production and storage system
US4170186A (en) * 1976-06-21 1979-10-09 J. Ray Mcdermott & Co., Inc. Anchored offshore structure with sway control apparatus
US4417831A (en) * 1980-04-30 1983-11-29 Brown & Root, Inc. Mooring and supporting apparatus and methods for a guyed marine structure
US6244785B1 (en) * 1996-11-12 2001-06-12 H. B. Zachry Company Precast, modular spar system
RU2307893C1 (en) * 2006-01-25 2007-10-10 Виктор Ильич Мищевич Method for marine production complex erection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3698198A (en) * 1971-02-12 1972-10-17 Warren Petroleum Corp Deep-water drilling, production and storage system
US4170186A (en) * 1976-06-21 1979-10-09 J. Ray Mcdermott & Co., Inc. Anchored offshore structure with sway control apparatus
US4417831A (en) * 1980-04-30 1983-11-29 Brown & Root, Inc. Mooring and supporting apparatus and methods for a guyed marine structure
US6244785B1 (en) * 1996-11-12 2001-06-12 H. B. Zachry Company Precast, modular spar system
RU2307893C1 (en) * 2006-01-25 2007-10-10 Виктор Ильич Мищевич Method for marine production complex erection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923115A (en) * 2016-05-16 2016-09-07 中国海洋大学 Floating type reinforced concrete production platform
CN105923115B (en) * 2016-05-16 2018-04-06 中国海洋大学 Floating type armored concrete production platform
RU2723799C1 (en) * 2019-06-21 2020-06-17 Публичное акционерное общество "Нефтяная компания "Роснефть" (ПАО "НК "Роснефть") "dome" type device for liquidation of underwater oil spills complete with process equipment

Similar Documents

Publication Publication Date Title
RU2719516C1 (en) Bottom-based platform and method of creating drilling terminal for drilling in shallow-water shelf
US8684630B2 (en) Underwater reinforced concrete silo for oil drilling and production applications
CA2981140C (en) Sea bed terminal for offshore activities
CA2089509A1 (en) Ice crush resistant caisson for arctic offshore oil well drilling
CN103270221B (en) For drilling and/or exploit offshore structure and the method thereof of submarine well
CA1201296A (en) Monopod jackup drilling system
CN103270239A (en) Offshore tower for drilling and/or production
RU86231U1 (en) MARINE CENTER FOR INDEPENDENT OIL, semi-submersible floating drilling platforms, marine mining RACK pumping oil, offshore ice-resistant floating platforms for enhanced oil, ice-resistant floating reservoirs for the collection and storage of oil, ANCHOR FOR FLOATING STRUCTURES AT SEA
CA2782168A1 (en) Assembly and method for subsea well drilling and intervention
US3380256A (en) Underwater drilling installation and method of construction
CA2788443C (en) Platform for controlled containment of hydrocarbons
US3624702A (en) Offshore platform support
RU2382849C1 (en) Ice resistant drilling complex for shallow continental shelf development
US3958426A (en) Offshore harbor tank and installation
NO143637B (en) SECTION FOR ANCHORING A CONSTRUCTION TO THE SEA
RU2574484C2 (en) Marine platform for controlled hydrocarbon localising
RU2499098C2 (en) Ice-resistant self-lifting platform for freezing shallow water and method of its installation
US8888407B2 (en) Method and a device for sealing and/or securing a borehole
CN107585269B (en) Seawater three-dimensional oil tank platform, system and construction method thereof
US4525282A (en) Method of loading and/or transferring environmentally harmful materials in shallow-water and mudland regions and artificial islands suitable therefor
RU2064553C1 (en) Immersed movable caisson provided with ice resistance for sea oil well drilling in arctic
RU2632085C2 (en) Method and system of funt well equipment installation
RU2779235C1 (en) Offshore production complex for the production, preparation and processing of raw gas for the production of liquefied natural gas, a wide fraction of light hydrocarbons and stable gas condensate based on gravity type (gtb)
WO1990015223A1 (en) Submerged bridge tunnel
EA004841B1 (en) A method for installing submerged oil and gas wells, and apparatus for the same