RU2514331C1 - Method to install stiffening girder of cable-braced bridge - Google Patents

Method to install stiffening girder of cable-braced bridge Download PDF

Info

Publication number
RU2514331C1
RU2514331C1 RU2012154221/03A RU2012154221A RU2514331C1 RU 2514331 C1 RU2514331 C1 RU 2514331C1 RU 2012154221/03 A RU2012154221/03 A RU 2012154221/03A RU 2012154221 A RU2012154221 A RU 2012154221A RU 2514331 C1 RU2514331 C1 RU 2514331C1
Authority
RU
Russia
Prior art keywords
block
stiffening girder
cable
stiffener
bridge
Prior art date
Application number
RU2012154221/03A
Other languages
Russian (ru)
Inventor
Игорь Михайлович Гельфон
Алексей Викторович Евсеев
Булат Маратович Мухсинов
Сергей Евгеньевич Горбачев
Original Assignee
Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" filed Critical Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост"
Priority to RU2012154221/03A priority Critical patent/RU2514331C1/en
Application granted granted Critical
Publication of RU2514331C1 publication Critical patent/RU2514331C1/en

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

FIELD: construction.
SUBSTANCE: method to install a stiffening girder of a cable-braced bridge consists in pre-assembly for a full section of a space block of the stiffening girder on building slips and its delivery to the place of installation, slinging of the block to a weight-lifting device, movement of the block to the design position, its fixation on the previously assembled part of the stiffening girder and attachment of cable braces to the assembled blocks and their tightening. The space block of the stiffening girder after pre-assembly on the building slips is moved to the assembled part of the stiffening girder, it is aligned along the axis of the bridge and loaded onto rolling trolleys. The rolling trolleys with the space block of the stiffening girder located along the axis of the bridge are moved to the place of the assembly, locked via the weight-lifting device, and the rolling trolleys are turned outside the zone of attachment of the previously tightened cable braces by 90° together with the space block of the stiffening girder. Then they sling the space block of the stiffening girder to the weight-lifting device and move it to the zone of installation. After fixation of the space block the stiffening girder, the cable braces are fixed to the assembled part of the stiffening girder to the earlier mounted space block of the stiffening girder with their subsequent tightening, afterwards the installation process is repeated.
EFFECT: improved reliability.
2 dwg

Description

Изобретение относится к мостостроению и может быть использовано при монтаже балки жесткости вантового моста.The invention relates to bridge construction and can be used when installing a stiffener beam cable-stayed bridge.

Известен способ монтажа балки жесткости вантового моста, состоящий в укрупнительной сборке пространственного на полное сечение блока балки жесткости на стапеле, погрузке его на плашкоут или специальное транспортное средство и перевозке по воде или по земле к месту монтажа, строповке блока к грузоподъемному устройству, закреплении его на ранее собранной части балки жесткости, прикреплении к собранным блокам вант и их натяжении [1, 2].A known method of mounting a stiffener beam of a cable-stayed bridge, consisting in enlarging the assembly of a stiffener beam spatial on a full section on a slipway, loading it onto a die or special vehicle and transporting it by water or land to the installation site, slinging the block to a lifting device, securing it to the previously assembled part of the stiffener beam, attached to the assembled cable-staying blocks and their tension [1, 2].

Данный способ не может быть применен при невозможности перевозки блока по воде или по земле к месту монтажа.This method cannot be applied if it is impossible to transport the unit by water or by land to the installation site.

Задачей настоящего изобретения является обеспечение монтажа пространственного на полное сечение блока балки жесткости при его подаче по собранной части вантового пролетного строения.The objective of the present invention is the provision of mounting spatial on a full section of the block of the stiffness beam when it is fed along the assembled part of the cable-stayed span.

Поставленная задача решается за счет того, что в способе монтажа балки жесткости вантового моста, состоящем в укрупнительной сборке пространственного на полное сечение блока балки жесткости на стапеле и подаче его к месту монтажа, строповке блока балки жесткости к грузоподъемному устройству и закреплении его на ранее собранной части балки жесткости, прикреплении к собранным блокам балки жесткости вант и их натяжении, пространственный блок балки жесткости после укрупнительной сборки на стапеле передвигают на собранную часть балки жесткости, ориентируют его вдоль оси моста и перегружают на перекаточные тележки, после чего перекаточные тележки с расположенным вдоль оси моста пространственным блоком балки жесткости передвигают к месту монтажа, шлюзуют их через грузоподъемное устройство и производят вне зоны прикрепления ранее натянутых вант разворот на 90° перекаточных тележек вместе с пространственным блоком балки жесткости, после чего выполняют его строповку к грузоподъемному устройству и перемещают в зону монтажа и после закрепления пространственного блока к собранной части балки жесткости прикрепляют ванты с последующим натяжением к ранее смонтированному блоку, после чего процесс монтажа повторяют. The problem is solved due to the fact that in the method of mounting the stiffener beam of the cable-stayed bridge, consisting in enlarging the assembly of the stiffener block spatial on a full section on the slipway and feeding it to the installation site, sling the stiffener block to the lifting device and securing it to the previously assembled part stiffening beams, attaching to the assembled blocks the cable stiffeners and their tension, the spatial block of the stiffening beam after enlarging assembly on the slipway is moved to the assembled part of the beam bones, orient it along the axis of the bridge and load it onto the transfer trolleys, after which the transfer trolleys with the spatial block of the stiffener beam located along the axis of the bridge are moved to the installation site, lock them through the lifting device and make a 90 ° turn of the transfer trolleys outside the attachment area of the previously tensioned cables. together with the spatial block of the stiffener beam, after which it is slinged to the lifting device and moved to the installation area and after fixing the spatial block to the Anna stiffness of the beam is attached shrouds followed tension to the previously mounted unit, after which the installation process is repeated.

Изобретение поясняют чертежом, где:The invention is illustrated in the drawing, where:

- на фиг.1 изображен процесс сборки пространственной балки жесткости в момент перегрузки блока балки жесткости на перекаточные тележки;- figure 1 shows the assembly process of the spatial stiffener at the time of overloading the stiffener block on the transfer trolleys;

- на фиг.2 изображен процесс прикрепления пространственного на полное сечение пространственного блока балки жесткости к собранной части балки жесткости.- figure 2 shows the process of attaching spatial to a full section of the spatial block of the stiffener to the assembled part of the stiffener.

Способ монтажа балки жесткости 1 вантового моста состоит в укрупнительной сборке на полное сечение пространственного блока 2 балки жесткости 1 на стапеле (на чертеже не показан). После этого пространственный блок 2 балки жесткости 1 передвигают на собранную часть 3 балки жесткости 1 и ориентируют его вдоль оси моста. Затем пространственноый блок 2 балки жесткости перегружают на перекаточные тележки 4 и перемещают по собранной части 3 балки жесткости 1 к месту монтажа. При перемещении пространственного блока 2 балки жесткости на перекаточных тележках 4 осуществляют их шлюзование (свободный проход) через грузоподъемное устройство 5. Перекаточные тележки 4 с пространственным блоком 2 балки жесткости устанавливают в зоне, свободной от ранее натянутых вант 6, и производят их поворот на 90°, приводя тем самым пространственный блок 2 балки жесткости в проектное положение для монтажа. Затем осуществляют строповку пространственного блока 2 балки жесткости к грузоподъемному устройству 5, перемещают пространственный блок 2 балки жесткости в проектное положение и монтируют его в проектном положении путем прикрепления к ранее смонтированной части балки жесткости 1. Затем прикрепляют с последующим натяжением следующие ванты 7 к ранее смонтированному пространственному блоку 8 балки жесткости с тем, чтобы обеспечить на следующей стоянке свободный поворот на 90° перекаточных тележек 4 с пространственным блоком 2 балки жесткости. Грузоподъемное устройство 5 передвигают на новую стоянку, после чего процесс монтажа повторяют.The method of mounting the stiffener beam 1 of the cable-stayed bridge consists in an enlargement assembly for the full section of the space block 2 of the stiffener beam 1 on the slipway (not shown in the drawing). After that, the spatial block 2 of the stiffener 1 is moved to the assembled part 3 of the stiffener 1 and orient it along the axis of the bridge. Then the spatial block 2 of the stiffener is loaded onto the transfer trolleys 4 and moved along the assembled part 3 of the stiffener 1 to the installation site. When moving the space unit 2, the stiffening beams on the transfer trolleys 4 lock them (free passage) through the lifting device 5. The transfer trolleys 4 with the space unit 2 of the stiffening beams are installed in an area free of previously tensioned cables 6 and rotate 90 ° , thereby bringing the spatial block 2 of the stiffener to the design position for installation. Then, the spatial block 2 of the stiffening beam is slinged to the load-lifting device 5, the spatial block 2 of the stiffening beam is moved to the design position and mounted in the design position by attaching to the previously mounted part of the stiffening beam 1. Then, the following cables 7 are attached to the previously mounted spatial unit 8 of the stiffener beam in order to ensure free rotation of the transfer trolleys 4 with the spatial unit 2 of the rigid beam in the next parking lot tee. The lifting device 5 is moved to a new parking lot, after which the installation process is repeated.

Изобретение позволяет расширить сферу применения технологии навесного монтажа балки жесткости вантового моста в случае невозможности подачи пространственного блока 2 балки жесткости в зону монтажа с воды или с земли.The invention allows to expand the scope of the technology of wall-mounted mounting of the cable-stayed bridge stiffener in case of impossibility of supplying the space unit 2 of the beam-rigidity to the installation zone from water or from the ground.

Источники информацииInformation sources

1. Строительство вантовых мостов. WWW. http://glavzastroi.ru/>mosti/72-stroitelnie - raboti/180/. 1. Construction of cable-stayed bridges. WWW. http://glavzastroi.ru/>mosti/72-stroitelnie - raboti / 180 /.

2. «Мост камнерезов - вантовый мост с главным пролетом 1018 м (КНР)», Хелена Рассел, Мостостроение мира, №1 - 2, 2006, стр.11 - 20, рис.5.2. “Stonecutter bridge - cable-stayed bridge with a main span of 1018 m (China)”, Helena Russell, Peace Bridge, No. 1 - 2, 2006, pp. 11 - 20, Fig. 5.

Claims (1)

Способ монтажа балки жесткости вантового моста, состоящий в укрупнительной сборке на полное сечение пространственного блока балки жесткости на стапеле и подаче его к месту монтажа, строповке блока к грузоподъемному устройству, перемещении блока в проектное положение, закреплении его на ранее собранной части балки жесткости и прикреплении к собранным блокам вант и их натяжении, отличающийся тем, что пространственный блок балки жесткости после укрупнительной сборки на стапеле передвигают на собранную часть балки жесткости, ориентируют его вдоль оси моста и перегружают на перекаточные тележки, после чего перекаточные тележки с расположенным вдоль оси моста пространственным блоком балки жесткости передвигают к месту монтажа, шлюзуют их через грузоподъемное устройство и производят вне зоны прикрепления ранее натянутых вант разворот на 90° перекаточных тележек вместе с пространственным блоком балки жесткости, после чего производят строповку пространственного блока балки жесткости к грузоподъемному устройству и передвигают его в зону монтажа и после закрепления пространственного блока балки жесткости к собранной части балки жесткости прикрепляют к ранее смонтированному пространственному блоку балки жесткости ванты с последующим их натяжением, после чего процесс монтажа повторяют. The method of mounting the cable stay of the cable-stayed bridge stiffener, consisting in enlarging the assembly to the full cross section of the spatial block of the stiffening beam on the slipway and feeding it to the installation site, slinging the block to the lifting device, moving the block to the design position, securing it on the previously assembled part of the stiffening beam and attaching to to the assembled cable-staying blocks and their tension, characterized in that the spatial block of the stiffener beam after the enlargement assembly on the slipway is moved to the assembled part of the stiffener beam, orient it is loaded along the axle of the bridge and loaded onto transfer trolleys, after which the transfer trolleys with the spatial block of the stiffening beam located along the axis of the bridge are moved to the installation site, lock them through the lifting device and, outside the area of attachment of the previously tensioned cables, turn 90 ° transfer trolleys together with the spatial the stiffener block, after which the spatial block of the stiffener beam is slinged to the lifting device and move it to the installation area and after fixing it is simple anstvennogo stiffening beams block rigidity to the assembled part of the beam is attached to the previously mounted unit spatial beam stiffness shrouds followed their tension, then the assembly process is repeated.
RU2012154221/03A 2012-12-14 2012-12-14 Method to install stiffening girder of cable-braced bridge RU2514331C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012154221/03A RU2514331C1 (en) 2012-12-14 2012-12-14 Method to install stiffening girder of cable-braced bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012154221/03A RU2514331C1 (en) 2012-12-14 2012-12-14 Method to install stiffening girder of cable-braced bridge

Publications (1)

Publication Number Publication Date
RU2514331C1 true RU2514331C1 (en) 2014-04-27

Family

ID=50515629

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012154221/03A RU2514331C1 (en) 2012-12-14 2012-12-14 Method to install stiffening girder of cable-braced bridge

Country Status (1)

Country Link
RU (1) RU2514331C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484162A (en) * 2015-12-15 2016-04-13 中交一公局第三工程有限公司 Device and method for secondary swing and shift of onshore stiffening beams for construction of suspension bridge
CN110629677A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4352220A (en) * 1979-09-20 1982-10-05 Polensky & Zollner Method for the construction of a cable-stayed or rein-girth bridge
SU1030462A1 (en) * 1982-03-31 1983-07-23 Ордена Трудового Красного Знамени Центральный Научно-Исследовательский И Проектный Институт Строительных Металлоконструкций Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges
SU1030463A1 (en) * 1982-03-31 1983-07-23 Ордена Трудового Красного Знамени Центральный Научно-Исследовательский И Проектный Институт Строительных Металлоконструкций Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4352220A (en) * 1979-09-20 1982-10-05 Polensky & Zollner Method for the construction of a cable-stayed or rein-girth bridge
SU1030462A1 (en) * 1982-03-31 1983-07-23 Ордена Трудового Красного Знамени Центральный Научно-Исследовательский И Проектный Институт Строительных Металлоконструкций Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges
SU1030463A1 (en) * 1982-03-31 1983-07-23 Ордена Трудового Красного Знамени Центральный Научно-Исследовательский И Проектный Институт Строительных Металлоконструкций Method of installation of prefabricated reinforcing beam of suspended and guy-rope bridges

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484162A (en) * 2015-12-15 2016-04-13 中交一公局第三工程有限公司 Device and method for secondary swing and shift of onshore stiffening beams for construction of suspension bridge
CN105484162B (en) * 2015-12-15 2017-01-04 中交一公局第三工程有限公司 Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN110629677A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam
CN110629677B (en) * 2019-09-29 2021-01-26 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam

Similar Documents

Publication Publication Date Title
US9644392B2 (en) Barrier cable anchor rail
RU2514331C1 (en) Method to install stiffening girder of cable-braced bridge
US10125503B2 (en) Suspended scaffold cable diverter system
JP2018003526A (en) Replacement method for main cable of suspension bridge
US20110176904A1 (en) Method of transportation for wind turbine tower
JP2019504979A (en) Adjustable support
JP2019007206A (en) Method of installing non-scaffold for bridge inspection permanent scaffold
MX366476B (en) Bridge tie fastener system.
NL2010554C2 (en) Crane with connector for erecting a structure.
CN105019557B (en) Construction method for flying-wing-type formwork space truss structure
CN104594397B (en) Detachable pile tube beam test device
JP2000186310A (en) Method for erection of structure
DK177238B1 (en) A Transportation Method for a Wind Turbine Blade
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN105089291B (en) For installing the reinforcing steel structural roof of solar panel
CN204199672U (en) Footplate fixture
CN105350451B (en) Construction method for suspended overhauling platform not pulling or damaging structure object
JP6271801B1 (en) Road bridge inspection deck and road bridge inspection deck construction method
CN206667059U (en) A kind of suspension bridge cat road head-rope changes shifting displacement fixing device
CN107827003A (en) Equipment for stablizing crane
RU171265U1 (en) SWIVEL STAND OF THE SPRING SYSTEM FOR ROAD DIVIDING BRIDGES
RU2597216C1 (en) Method of mounting frame-arched structure
JP6963995B2 (en) Temporary passage and its construction method
CN103848359B (en) A kind of soft attaching structure of tower crane
CN207330151U (en) A kind of windproof ground anchorage of gantry crane

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees