NL2010554C2 - Crane with connector for erecting a structure. - Google Patents

Crane with connector for erecting a structure. Download PDF

Info

Publication number
NL2010554C2
NL2010554C2 NL2010554A NL2010554A NL2010554C2 NL 2010554 C2 NL2010554 C2 NL 2010554C2 NL 2010554 A NL2010554 A NL 2010554A NL 2010554 A NL2010554 A NL 2010554A NL 2010554 C2 NL2010554 C2 NL 2010554C2
Authority
NL
Netherlands
Prior art keywords
crane
boom
base
assembly
connector
Prior art date
Application number
NL2010554A
Other languages
Dutch (nl)
Inventor
Hendrik Lambertus Lagerweij
Aart Pol
Andr Heinz Pubanz
Albertus Waaijenberg
Original Assignee
Valley Power B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Valley Power B V filed Critical Valley Power B V
Priority to NL2010554A priority Critical patent/NL2010554C2/en
Priority to PCT/NL2014/050196 priority patent/WO2014163490A1/en
Application granted granted Critical
Publication of NL2010554C2 publication Critical patent/NL2010554C2/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/207Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided by wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

Crane for erecting a structure (2), such as a wind turbine, comprising a base (4) for support on the ground, a telescopic boom (6) extendable to a predetermined height, and a top assembly (8) comprising a guide (30) for one or more hoist cables (9) connectable to a load. The crane (1) further has at least one connector (10) connected to the telescopic boom (6), the at least one connector (10) comprising a fixing assembly (11) for rigidly connecting the crane (1) to the structure (2) in operation.

Description

Crane with connector for erecting a structure
Field of the invention
The present invention relates to a crane for erecting a structure, such as a wind turbine, more particularly to a crane for erecting a structure such as a wind turbine, comprising a base, a telescopic boom extendable to a predetermined height, and a top assembly comprising a guide for one or more hoist cables connectable to a load.
Prior art
German patent publication DE 102005049 606 A1 discloses a portable crane on a vehicle comprising a telescopic boom suitable for erecting large structures such as wind turbines. The crane comprises a jib pivotable at a hinge point of the telescopic boom. The stability of the crane is solely provided by the vehicle.
In the art, several cranes and crane structures are known which can be applied for building wind turbines, i.e. which allow to get wind turbine parts in position for the entire build, including attachment of the wind turbine blades. Cranes exist which have a fixed structure, which is put together at the construction site. These types of cranes have the disadvantage that all parts need to be transported to the constructions site, assembled locally, and after use need to be transported to the next site. This leads to considerable costs and time needed. Also cranes exist which are transportable in nature, i.e. they are attached to a vehicle being able to transport the crane to the construction site. To make that possible, these type of cranes are usually fitted with a telescopic boom. To allow sufficient stability, all types of cranes are fitted with a base part, which is usually fitted with extending arms or outrigger jacks for proper lateral support. This of course makes the crane more complex and costly, and also the foot print needed for operating the crane is large.
Summary of the invention
Wind turbines are rapidly growing in size and weight, and installation requirements are subjected to tighter schedules and smaller budgets. The work involved for erecting a structure such as a large wind turbine becomes increasingly complex, dangerous, expensive and tends to require more time and preparatory work for each generation of wind turbines coming on the market. In case large numbers of wind turbines are to be installed in a timely manner, the total cost of erecting these wind turbines at various locations may become financially unattractive in view of e.g. amortization time.
The present invention seeks to provide a crane having an improved stability allowing erecting tall structures such as a wind turbine, at reasonable cost and time.
According to the present invention, a crane according to the preamble defined above is provided, wherein the crane further comprises at least one connector connected to the telescopic boom, the at least one connector comprising a fixing assembly for rigidly connecting the crane to the structure in operation. This allows to employ the crane in a flexible manner with a minimal foot print, as it can extend using the telescopic boom, and obtain sufficient rigidity and constructional strength using the connectors attached to the structure being erected.
According to a further aspect, the present invention provides a vehicle comprising a crane according to any one of the present invention embodiments, wherein the base is attached to the vehicle. The vehicle is e.g. a trailer, attachable to a truck, and allows for transporting and positioning the crane by a driver or operator with minimal effort and minimum handling steps.
Short description of drawings
The present invention will be discussed in further detail hereinafter based on a number of exemplary embodiments with reference to the drawings, wherein:
Fig. 1 is a perspective view of an embodiment of a crane according to the present invention.
Fig. 2 is a view of the embodiment of the crane of Fig. 1 in transport status, allowing transportation on a vehicle.
Detailed description of exemplary embodiments
According to the present invention embodiments, improvements are provided for erecting a structure such as a large wind turbine by means of a crane. The crane of the present invention seeks to further reduce the amount of work, time and cost involved for erecting a wind turbine. One of the cost savings relates to the fact that the crane according to the present invention embodiments can be transported as a single entity using e.g. a trailer and truck or a separate vehicle. Furthermore, the crane can be installed by e.g. a driver or crane operator with minimal effort.
According to an embodiment, Fig. 1 depicts a crane 1 for erecting a structure 2 such as a wind turbine, comprising a base 4 for support on the ground, a telescopic boom 6 extendable to a predetermined height, and a top assembly 8 comprising a guide (30) for one or more hoist cables 9 connectable to a load, wherein the crane 1 further comprises at least one connector 10 connected to the telescopic boom 6, the at least one connector 10 comprising a fixing assembly 11 for rigidly connecting the crane 1 to the structure 2 in operation. In an embodiment, the telescopic boom (6) comprises a plurality of movable boom sections (6a), each comprising a connector (10) with a fixing assembly (11). This allows the crane 1 to service tall structures 1 whilst making the crane 1 collapsible for transportation to and from a site where the structure 2 is to be erected. Also, the telescopic boom 6 may be provided with the at least one connector 10, but one or more of the moveable boom sections 6a may also be provided with a connecter 10, thereby further increasing the stability of the crane 1 for erecting tall structures.
A variety of embodiments exist for connecting the at least one connector 10 to the structure 2 using the fixing assembly 11. In an embodiment, the fixing assembly 11 comprises one or more bolt mounts 11 rigidly connecting the crane 1 to the structure 2 in the loading state. This embodiment allows the at least one connector 10 to be bolted onto the structure 2 (such as a wind turbine tower), which may require that said structure 2 is provided with corresponding mount assemblies before actual construction as well (which seems very well possible during manufacturing of e.g. the tower parts 2)·
In a further embodiment, the fixing assembly 11 comprises a clamp assembly 11, rigidly connecting the crane 1 to the structure 2 in the loading state. The clamp assembly allows the crane 1 to be stabilized by clamping the at least one connector 10 at or around parts or sections of the structure 2. In this way a generic and versatile connection is provided for various types of structures 2 during construction of e.g. a wind turbine. That is, the at least one connector 10 of the present invention need not be specifically adapted to one particular structure 2, such as special tower or mast geometries. Also, the structure 2 need not be specifically adapted for accommodating the at least one connector 10 of the present invention. The at least one connector 10 comprising a generic clamping assembly 11 further reduces preparatory work and the overall installation time and cost of the structure 2. Even further, the clamp assembly may be remotely operated, even further reducing time and cost needed for construction work using the present invention crane embodiments.
In an exemplary embodiment, the clamp assembly comprises a plurality of gripper fingers clamping or squeezing the structure 2 at suitable sections in the loading state. For example, the at least one connector 10 may comprise a two-finger clamping assembly that clamps a tower or mast of the structure 2 at the sides in the loading state.
In yet another embodiment, the clamping assembly comprises a belt arranged to be tightly wrapped around a section of a tower or mast of the structure 2 in the loading state. In yet another embodiment, the clamp assembly comprises one or more magnetic pads rigidly connecting the crane 1 to the structure in the loading state. In this embodiment, the magnetic pads may be locked to e.g. the encased reinforcing steel inside a concrete structure 2, or the magnetic pads may be locked to a steel lattice structure 2.
In yet a further embodiment, the at least one connector 10 is linearly moveable along the telescopic boom 6. In this embodiment, the at least one connector 10 is also provided with a suitable locking assembly in order to fix the connector 10 at a specific height onto the telescopic boom 6. This feature provides for a more flexible use of the crane 1, depending on the specific structure 2 being assembled.
The at least one connector 10 is pivotable around a longitudinal axis of the telescopic boom 6 in a further embodiment. This may be useful when fixing the fixing assembly 11 to the structure 2.
From the above a skilled person will readily envisage a myriad of arrangements of the at least one connector 10 with respect to the crane 1. For example, only the main boom 6 may be provided with the at least one connector 10, or the main boom 6 as well as one or more boom sections 6a may be provided with the at least one connector 10 and so forth. The main point of the present invention is to provide further stabilization to the crane 1 by means of the at least one connector 10 connecting the crane 1 to the structure 2 to be erected.
In typical embodiments, the one or more hoist cables 9 may be provided with a load connector 20, e.g. a hook, to connect the crane 1 to a load such as tower sections, rotor blades, generator parts, a nacelle and the like via the top assembly 8 and guide 30. The base 4 comprises a winch assembly (not shown) for raising or lowering the load to a desired height by means of the hoist cables 9 that are connected to the winch assembly and the load connector 20. The winch assembly may also be positioned at a different location on the crane 1.
In the embodiment shown, the base 4 comprises a plurality of base mounts 5a for e.g. bolting the base 4 to a structure provided in the ground, such as a (concrete) foundation of a wind turbine tower, which is prepared well before the wind turbine assembly. Firm attachment of the crane 1 using the base mounts 5a can be achieved e.g. using bolt connections, or other structural features allowing to secure the crane 1 to the structure. These other structural features may include, but are not limited to, securing mechanisms, e.g. using clamping elements, fastening elements, etc.
In the embodiment shown, the base 4 also comprises a slewing assembly 5 for rotating the crane 1 around a generally vertical axis. This allows the top assembly 8 of the crane 1 to swing around in a normal manner, allowing pick up of parts in the vicinity of the crane 1. The slewing assembly may be implemented as a bearing, allowing to transfer the forces involved in operation to be transferred to the base mounts 5 a.
According to the present invention, when erecting the structure 2, such as a wind turbine, the crane 1 is advantageously stabilized by the at least one connector 10, which rigidly connects the telescopic boom 6, hence the crane 1, in the loading state. The connector 10 thus stabilizes the crane 1 by utilizing the same structure 2 to be erected, e.g. the tower or mast of a wind turbine. The crane 1 can therefore be deployed for taller structures without increasing the size of the base 4 and the width and weight of the telescopic boom 6. Furthermore, the slewing assembly 5 of the base 4 can still rotate the crane 1 since the at least one connector 10 is rotatably disposed on the telescopic boom 6, i.e. the connector 10 is rotatable around the telescopic boom 6 by means of e.g. a bearing. Therefore, the at least one connector 10 of present invention stabilizes the crane 1 without sacrificing the rotational freedom of the crane 1.
In a further aspect, the present invention relates to a vehicle 3 comprising a crane (1) according to any one of the embodiments of the crane described herein, wherein the base (4) is attached to the vehicle 3. The vehicle is e.g. a trailer 3, attachable to a truck, as shown in Fig. 2, or a dedicated truck.
The vehicle 3 is arranged for transporting and positioning the crane 1 to or from a location at which the structure 2 is to be erected. In this embodiment, a single operator could transport and position the crane 1 with minimum effort and handling steps.
The crane 1 is collapsible and suitable for transportation by road using e.g. a trailer in a further embodiment. For this, the crane 1 further comprises a tilting assembly 3a connected to the trailer and the telescopic boom for rotating the telescopic boom 6 from a first angular position to a second angular position, e.g. from a generally horizontal position the a generally vertical position. This can e.g. be executed to erect the crane 1 after attachment to a foundation using the base mounts 5a.
To allow securing the crane 1 in the upright position, the base (4) and telescopic boom (6) are pivotally connected at one or more hinge elements (7) in a further embodiment. Once positioned in the generally vertical position, the one or more hinge elements 7 are locked, e.g. using corresponding locking elements 7a on the base 4.
The crane 1 of the present invention further comprises a boom tip 32 connecting the top assembly 8 to the telescopic boom 6. The boom tip 32 is generally adapted to withstand downward forces rather than moments imposed by the load connected to the load connector 20.
In an embodiment, the crane 1 comprises one or more boom lines 16 connecting the top assembly 8 to the base 4. The boom lines 16 further minimize the moments imposed on the boom tip 32. In another embodiment, the boom lines 16 can be shortened and lengthened as the height of the boom tip 32 varies according to the deployed length of the main boom 6 and the one or more boom sections 6a.
In an embodiment of the present invention, the top assembly 8 comprises a jib (14) and a counter jib (27). In an embodiment, the jib 14 comprises the guide or upper sheave 30 guiding the one or more hoist cables 9. In another embodiment, the jib 14 may comprise a jib trolley moveable parallel to said jib 14 and guiding the one or more hoist cables 9. In this embodiment the jib 14 may be positioned substantially horizontally and the job trolley is adapted to move the load along the jib 14 to or away from the telescopic boom 6.
The counter jib 27 is connected to one or more boom lines 16 and arranged for imposing an equal but opposite moment to the boom tip 32. More specifically, in the loading state the jib 14 imposes e.g. a clockwise moment on the boom tip 32, which would in turn impose a clockwise moment on the telescopic boom 6. The counter jib 27 on the other hand provides a generally equal but opposite moment, e.g. counter clockwise, due to the one or more boom lines 16. Hence, the boom tip 32 mainly transfers downward forces (i.e. compression) to the telescopic boom 6.
In an embodiment, the top assembly (8) further comprising one or more jib lines 24, 28, one or more jib struts 26, the one or more jib lines 24, 28 being connected with the jib 14, the counter jib 27 and the one or more jib struts 26. As indicated in the previous paragraph, the top assembly 8 is prevented from subjecting moments on the telescopic boom 6 due to the boom lines 16, which impose a generally equal but opposite moment to the top assembly 8 in e.g. the loading state. Consequently, the boom point 32 and the telescopic boom 6 are mainly subjected to a downward force (i.e. compression).
In an embodiment, the base 4 comprises a counter weight 4a to further balance moments imposed on the crane 1 in the loading state. Typically, the at least one connector 10 rigidly connects the crane 1 to the structure 2, thereby stabilizing the crane 1 and thus the base 4 against moments in the loading state. In an embodiment, the counter weight 4a further stabilizes the crane 1 in the event the at least one connector 10 cannot or need not be connected to the structure 2. This could be the case when the crane 1 is erected but no structure 2 is present yet, or no heavy lifting is needed. In another embodiment, the counter weight 4a may further reduce moments imposed on the slewing assembly 5, e.g. minimizing moments on a slewing ring gear.
The invention can be described as a number of embodiments:
Embodiment 1. Crane for erecting a structure (2) such as a wind turbine, comprising a base (4) for support on the ground, a telescopic boom (6) extendable to a predetermined height, and a top assembly (8) comprising a guide (30) for one or more hoist cables (9) connectable to a load, wherein the crane (1) further comprises at least one connector (10) connected to the telescopic boom (6), the at least one connector (10) comprising a fixing assembly (11) for rigidly connecting the crane (1) to the structure (2) in operation, [allows to obtain required height, sufficient rigidity and flexibility] Embodiment 2. Crane according to embodiment 1, wherein the telescopic boom (6) comprises a plurality of movable boom sections (6a), each comprising a connector (10) with a fixing assembly (11). [moveable boom sections having a connector of their own]
Embodiment 3. Crane according to embodiment 1 or 2, wherein the fixing assembly (11) comprises one or more bolt mounts, [bolted connection of connector to the wind turbine tower]
Embodiment 4. Crane according to embodiment 1 or 2, wherein the fixing assembly (11) comprises a clamp assembly, [e.g. squeeze gripper, belt around structure, magnetic clamping etc.]
Embodiment 5. Crane according to any one of embodiments 1-4, wherein the at least one connector (10) is linearly moveable along the telescopic boom (6). [and provided with locking assembly]
Embodiment 6. Crane according to any one of embodiments 1-5, wherein the at least one connector (10) is pivotable around a longitudinal axis of the telescopic boom (6) . [allows rotation over longitudinal axis of boom]
Embodiment 7. Crane according to any one of embodiments 1-6, wherein the base (4) comprises a plurality of base mounts (5a). [e.g. bolted to the foundation of the wind turbine or other types of securing mechanisms]
Embodiment 8. Crane according to any one of embodiments 1-7, wherein the base (4) comprises a slewing assembly (5). [allow rotation (slewing) of the crane around a generally vertical axis]
Embodiment 9. Crane according to any one of embodiments 1-8, wherein the base (4) comprises a counter weight (4a). [counter weight may be necessary when connector is not connected to the foundation]
Embodiment 10. Crane according to any one of embodiments 1-9, wherein the base (4) and telescopic boom (6) are pivotally connected at one or more hinge elements (7) . [crane is collapsible for transportation]
Embodiment 11. Crane according to any one of embodiments 1-10, further comprising one or more boom lines (16) connecting the top assembly (8) to the base (4).[minimizing moments on the main boom]
Embodiment 12. Crane according to any one of embodiments 1-11, wherein the top assembly (8) comprises a jib (14) and a counter jib (27). [tower crane configuration]
Embodiment 13. Crane according to embodiment 12, the top assembly (8) further comprising one or more jib lines (24, 28), one or more jib struts (26), the one or more jib lines (24, 28) being connected to the jib (14), the counter jib (27) and the one or more jib struts (26). [specific embodiment of top assembly as depicted in the figures] Embodiment 14. Vehicle comprising a crane (1) according to any one of embodiments 1-13, wherein the base (4) is attached to the vehicle (3). [vehicle = trailer, attachable to truck]
Embodiment 15. Vehicle according to embodiment 14, further comprising a tilting assembly (3a) connected to the vehicle (3) and the telescopic boom (6). [for erecting crane to vertical position]
The present invention embodiments have been described above with reference to a number of exemplary embodiments as shown in and described with reference to the drawings. Modifications and alternative implementations of some parts or elements are possible, and are included in the scope of protection as defined in the appended claims.

Claims (15)

1. Kraan voor het oprichten van een constructie (2), zoals een windturbine, omvattende een basis (4) voor ondersteuning op de grond, een telescopische mast (6) die uitschuifbaar is tot een vooraf bepaalde hoogte, en een topsamenstel (8) dat een geleider (30) omvat voor een of meer lierkabels (9) die verbindbaar zijn met een last, waarbij de kraan (1) verder ten minste één verbindingselement (10) omvat dat verbonden is met de telescopische mast (6), en het ten minste ene verbindingselement (10) een bevestigingssamenstel (11) omvat voor het star verbinden van de kraan (1) met de constructie (2) in bedrijf.A crane for erecting a structure (2), such as a wind turbine, comprising a base (4) for support on the ground, a telescopic mast (6) extendable to a predetermined height, and a top assembly (8) comprising a conductor (30) for one or more winch cables (9) connectable to a load, the crane (1) further comprising at least one connecting element (10) connected to the telescopic mast (6), and the at least one connecting element (10) comprises a mounting assembly (11) for rigidly connecting the tap (1) to the structure (2) in operation. 2. Kraan volgens conclusie 1, waarbij de telescopische mast (6) een veelvoud van verplaatsbare mastsecties (6a) omvat, die elk een verbindingselement (10) omvat met een bevestigingssamenstel (11).The crane according to claim 1, wherein the telescopic mast (6) comprises a plurality of movable mast sections (6a), each comprising a connecting element (10) with a mounting assembly (11). 3. Kraan volgens conclusie 1 of 2, waarbij het bevestigingssamenstel (11) één of meer boutbevestigingen omvat.A tap according to claim 1 or 2, wherein the mounting assembly (11) comprises one or more bolt fixings. 4. Kraan volgens conclusie 1 of 2, waarbij het bevestigingssamenstel (11) een klemsamenstel omvat.A tap according to claim 1 or 2, wherein the mounting assembly (11) comprises a clamping assembly. 5. Kraan volgens een van de conclusies 1-4, waarbij het ten minste een verbindingselement (10) lineair beweegbaar is langs de telescopische mast (6).A crane according to any one of claims 1-4, wherein the at least one connecting element (10) is linearly movable along the telescopic mast (6). 6. Kraan volgens een van de conclusies 1-5, waarbij het ten minste een verbindingselement (10) draaibaar is om een lengteas van de telescopische mast (6).A crane according to any one of claims 1-5, wherein the at least one connecting element (10) is rotatable about a longitudinal axis of the telescopic mast (6). 7. Kraan volgens een van de conclusies 1-6, waarbij de basis (4) een veelvoud van basisbevestigingen (5a) omvat.The tap of any one of claims 1-6, wherein the base (4) comprises a plurality of base attachments (5a). 8. Kraan volgens een van de conclusies 1-7, waarbij de basis (4) een draaisamenstel (5) omvat.Faucet according to any of claims 1-7, wherein the base (4) comprises a rotating assembly (5). 9. Kraan volgens een van de conclusies 1-8, waarbij de basis (4) een contragewicht (4a) omvat.Crane according to any of claims 1-8, wherein the base (4) comprises a counterweight (4a). 10. Kraan volgens een van de conclusies 1-9, waarbij de basis (4) en telescopische mast (6) draaibaar zijn verbonden bij een of meer schamierelementen (7).Crane according to any of claims 1-9, wherein the base (4) and telescopic mast (6) are rotatably connected to one or more hinge elements (7). 11. Kraan volgens een van de conclusies 1-10, verder omvattende één of meer mastlijnen (16) die het topsamenstel (8) aan de basis (4) verbinden.The crane of any one of claims 1-10, further comprising one or more mast lines (16) connecting the top assembly (8) to the base (4). 12. Kraan volgens een van de conclusies 1-11, waarbij het topsamenstel (8) een giek (14) en een contragiek (27) omvat.The crane of any one of claims 1 to 11, wherein the top assembly (8) comprises a boom (14) and a counter boom (27). 13. Kraan volgens conclusie 12, het topsamenstel (8) verder omvattende één of meer gieklijnen (24, 28), één of meer gieksteunen (26), waarbij de één of meer gieklijnen (24, 28) verbonden zijn met de giek (14), de contragiek (27) en de één of meer gieksteunen (26).The crane of claim 12, the top assembly (8) further comprising one or more boom lines (24, 28), one or more boom supports (26), wherein the one or more boom lines (24, 28) are connected to the boom (14) ), the counter boom (27) and the one or more boom supports (26). 14. Voertuig omvattende een kraan (1) volgens een van de conclusies 1-13, waarbij de basis (4) is bevestigd aan het voertuig (3).A vehicle comprising a crane (1) according to any of claims 1-13, wherein the base (4) is attached to the vehicle (3). 15. Voertuig volgens conclusie 14, verder omvattende een kantel samenstel (3a) die verbonden is met het voertuig (3) en de telescopische mast (6).The vehicle of claim 14, further comprising a tilt assembly (3a) connected to the vehicle (3) and the telescopic mast (6).
NL2010554A 2013-04-02 2013-04-02 Crane with connector for erecting a structure. NL2010554C2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NL2010554A NL2010554C2 (en) 2013-04-02 2013-04-02 Crane with connector for erecting a structure.
PCT/NL2014/050196 WO2014163490A1 (en) 2013-04-02 2014-04-01 Crane with connector for erecting a structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2010554A NL2010554C2 (en) 2013-04-02 2013-04-02 Crane with connector for erecting a structure.
NL2010554 2013-04-02

Publications (1)

Publication Number Publication Date
NL2010554C2 true NL2010554C2 (en) 2014-10-06

Family

ID=48703773

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2010554A NL2010554C2 (en) 2013-04-02 2013-04-02 Crane with connector for erecting a structure.

Country Status (2)

Country Link
NL (1) NL2010554C2 (en)
WO (1) WO2014163490A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2019462B1 (en) * 2017-01-16 2018-12-19 Mammoet Holding B V Method for onshore or offshore erecting an upstanding construction
WO2018132010A1 (en) * 2017-01-16 2018-07-19 Mammoet Holding B.V. Method for onshore or offshore erecting an upstanding construction
NL2018176B1 (en) 2017-01-16 2018-07-26 Mammoet Holding B V Method for onshore or offshore erecting an upstanding construction
CN115013253A (en) * 2022-06-30 2022-09-06 中广核新能源蚌埠有限公司 Reinforced concrete wind power tower construction equipment and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1944972A (en) * 1931-02-28 1934-01-30 Faurc Andre Transformable lifting appliance
DE20018890U1 (en) * 2000-08-02 2001-12-13 Liebherr Werk Ehingen Telescopic crane for lifting loads on towers or masts
NL1032591C2 (en) * 2006-09-28 2008-03-31 Mecal Applied Mechanics B V Crane and method.
WO2010095283A1 (en) * 2009-02-20 2010-08-26 三井造船株式会社 Method and structure for extending and retracting telescopic boom for construction crane for tower-like structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996005391A1 (en) * 1994-08-16 1996-02-22 Micon A/S Crane for raising longitudinal bodies, foundation for such a crane and method for raising of longitudinal bodies by means of such a crane
JP4402923B2 (en) * 2003-09-10 2010-01-20 株式会社タダノ Tower crane
DE102005049606B4 (en) 2005-10-17 2016-03-31 Liebherr-Werk Ehingen Gmbh Mobile crane with additional boom and procedure for disassembling the jib
US9266701B2 (en) * 2011-07-15 2016-02-23 Eli Bosco Enhanced stability crane and methods of use

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1944972A (en) * 1931-02-28 1934-01-30 Faurc Andre Transformable lifting appliance
DE20018890U1 (en) * 2000-08-02 2001-12-13 Liebherr Werk Ehingen Telescopic crane for lifting loads on towers or masts
NL1032591C2 (en) * 2006-09-28 2008-03-31 Mecal Applied Mechanics B V Crane and method.
WO2010095283A1 (en) * 2009-02-20 2010-08-26 三井造船株式会社 Method and structure for extending and retracting telescopic boom for construction crane for tower-like structure

Also Published As

Publication number Publication date
WO2014163490A1 (en) 2014-10-09

Similar Documents

Publication Publication Date Title
US9371215B2 (en) Method for erecting a crane boom
US7748547B2 (en) Movable independent crane system used temporarily for moving or replacing components and mounting wind generators
KR101123030B1 (en) Telescopic crane with self-mounting bracing device and method of mounting a bracing device
JP6002248B2 (en) Weight lifting device and method
RU2542828C2 (en) Method for assembling, dismantling and transportation of mobile crane
CN101324221A (en) Method for mounting of at least two components of a wind turbine and use of a handling device
KR102092810B1 (en) Lifting device for lifting components of wind power plant and method for assembling components of wind power plant
KR102360544B1 (en) Flange frames and assembly sets, and methods for pre-assembly and/or transport and/or assembly of tower segments for wind turbines
NL2010554C2 (en) Crane with connector for erecting a structure.
EP3372550A1 (en) Lifting system
DK3132137T3 (en) MOBILE CRANE DEVICE AND METHOD FOR THE TEMPORARY ASSEMBLY OF SUCH A CRANE DEVICE
US9701235B2 (en) Method of mounting a wind turbine
US20220073319A1 (en) A lifting assembly and a method for handling a component
CN107108186A (en) Method for shifting rotary tower crane
EP2665674B1 (en) Maintenance crane at elevated areas
US20230303366A1 (en) Crane system for hoisting of wind turbine components
EP3311024B1 (en) Portable and modular hoisting assembly for a wind turbine
US11724919B2 (en) System for repositioning a crane
US9249002B2 (en) Lift platform
US11873197B2 (en) Large crane with boom
NL2023067B1 (en) compact jib crane
CN107827003B (en) Device for stabilizing a crane
CA2919767C (en) Luffing cross member
RU2618853C1 (en) Compact hoisting machine "bogatyr" and method of its installation
WO2013014620A1 (en) A crane