CN105019557B - Construction method for flying-wing-type formwork space truss structure - Google Patents

Construction method for flying-wing-type formwork space truss structure Download PDF

Info

Publication number
CN105019557B
CN105019557B CN201510486311.8A CN201510486311A CN105019557B CN 105019557 B CN105019557 B CN 105019557B CN 201510486311 A CN201510486311 A CN 201510486311A CN 105019557 B CN105019557 B CN 105019557B
Authority
CN
China
Prior art keywords
truss
drag
jack
line
main couple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510486311.8A
Other languages
Chinese (zh)
Other versions
CN105019557A (en
Inventor
石海伟
徐烨
徐小烈
刘胜林
黄鑫
孙玉霞
严美
范贵元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201510486311.8A priority Critical patent/CN105019557B/en
Publication of CN105019557A publication Critical patent/CN105019557A/en
Application granted granted Critical
Publication of CN105019557B publication Critical patent/CN105019557B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to the field of steel structure construction, and particularly discloses a construction method for a flying-wing-type formwork space truss structure. The flying-wing-type formwork space truss structure comprises main trusses, auxiliary trusses and parallel chord member trusses. The main trusses, the auxiliary trusses and the parallel chord member trusses are welded and fixedly connected to form a formwork space truss structure body. The flying-wing-type formwork space truss structure further comprises flying-wing-type trusses located above the formwork space truss structure body. The flying-wing-type trusses are connected with the auxiliary trusses of the formwork space truss structure body through draglines. The invention further discloses the construction method of the flying-wing-type formwork space truss structure. The construction method includes the construction steps of support installing, main truss installing, hemisphere auxiliary truss installing, steel dragline constructing and the like. By means of the flying-wing-type formwork space truss structure, a whole structure is more stable, a chain block and a wall pulley are matched to carry out steel structure installing and steel dragline tensioning, the construction method is simple, the number of adopted machines is small, the site safety is guaranteed, the construction quality is also guaranteed, and the construction cost is greatly reduced.

Description

Flying wing type formwork space truss structure construction method
Technical field
The invention belongs to field of steel structure construction, specially flying wing type formwork space truss structure construction method.
Background technology
Steel construction has intensity high, and from heavy and light, speed of application is fast, anti-seismic performance is good, energy-conserving and environment-protective and industrialization degree are high The advantages of, therefore it becomes one of China's key popularized project, corresponding steel cable is also obtained in Large Span Spatial Truss To being widely applied.
As the continuous progressive and people of society also require that more and more higher to feature building, not requiring nothing more than public building has Beautiful outward appearance, meets again using function and safety and stability, and common firm version and construction method can not Meet the needs of engineering construction.
The content of the invention
For being actually needed for steel construction construction, the invention provides a kind of new steel structure form, meets people couple The requirement of practicality and perfect tube exterior and security.
Concrete scheme is:Flying wing type formwork space truss structure includes main couple, jack truss and parallel-chord truss, main truss Frame, jack truss are welded to each other with parallel-chord truss and are fixedly connected, and form " hemispherical " formwork space truss structure, the truss Structure also includes being located at " arc-shaped " the flying wing type truss on formwork space truss structure, and flying wing type truss is by drag-line and mould The jack truss of shell-space truss structure is connected, and two arc ends of flying wing type truss are fixed on bearing.
Further, the jack truss that many Pin are parallel to each other is provided between main couple and parallel-chord truss, is connected between jack truss It is connected to and links bar, link top boom of the bar perpendicular to jack truss, and is welded to connect with jack truss top boom.
Further, the main couple and parallel-chord truss are provided with parallel with the top boom of jack truss, vertical with bar is linked Support bar;Support bar is welded to connect with the top boom of main couple and parallel-chord truss, is welded to connect with bar is linked.
Further, the jack truss includes jack truss top boom, jack truss lower boom, on jack truss top boom and main couple Chord member and parallel-chord truss top boom are welded to connect, jack truss lower boom and main couple lower boom and parallel-chord truss lower edge Bar is welded to connect.
Further, the drag-line upper end is connected on flying wing type truss lower boom, and drag-line lower end is connected to jack truss and winds up On bar and the crosspoint for linking bar.
Further, the two ends of the main couple and flying wing type truss are respectively by spherical bearing and main couple base and all-wing aircraft Type truss base is fixedly connected;The parallel-chord truss lower boom of parallel-chord truss is welded with spherical bearing, spherical bearing with Parallel-chord truss base is fixedly connected.
Further, drag-line is steel tendon drag-line made by 1670 grades of high tensile steel wires, a diameter of22mm。
The invention also discloses flying wing type formwork space truss structure construction method, including following construction procedure:
The first step, bearing is installed:Node is intuitively three-dimensional model diagram by the method modeled using Digital Three-Dimensional, Can be then converted to be positioned bearing in live practice of construction according to axis, absolute altitude is put on embedded part from model;
Second step, main couple is installed:Set up scaffold and be supported main couple, it is ensured that the globality of scaffold with it is stable Property, scaffold sets up the road of horizontal cross brace 3, and scissors is fully supported and set on the outside of support body;4 points of the main couple truck crane for having spliced is entered Row is installed, and middle part is supported using scaffold, and two ends are attached with bearing, and using ground collimation method control main couple is thrown Axis, side oblique pull positioning is carried out to main couple at 3 points after in place with steel wire rope and chain block;
3rd step, hemisphere jack truss is installed:Jack truss is formed using steel-pipe welding, adopts in jack truss installation process at 2 points Lifting, with chain block setting angle is adjusted, and top is docked with main couple node, and bottom steelframe ball is connected with bearing Connect, main couple adopts scaffold building operating platform with jack truss connecting portion, it is ensured that the safety of workmen;
4th step, steel cable construction:
1)Early-stage preparations
Scene preparation before drag-line construction:Part stacks neat after job site is transported to, by number, lower chock a tree, used in making timber for boats, field Require smooth clean and tidy, and to take whether fire prevention, rain-proof, damp proof safeguard measure inspection dragline anchorage, PE sheaths have damage, Drag-line burr nearby is eliminated if any should immediately correcting or repairing, it is to avoid injury protection set;
2)Hanging cable
Upper end drag-line is fixed, and by the use of the scaffold of main couple is installed as operating platform, will be drawn using truck crane coordinating Rope fixing end is sling, and hoisting point position should meet the slightly sagging required length in anchorage upper end, and node installation personnel exist on truss Scaffold operating platform is manually worn axle connection, the upper node peace of drag-line using the instrument such as chain block and fiber hanging belt Install;
Lower node drag-line install, lower node distal end arrange pulley, using manually by drag-line lower end cooperation jack be drawn to Installation site, colligation point should ensure that there is certain oscillating quantity anchorage end during traction, drag-line is tackled in distraction procedure and is strictly protected, Avoid cable body and anchorage screw thread impaired, and every drag-line of close inspection in position installation process when in time adjustment drag-line is hanging Torsion situation, prevents drag-line from reversing with node and is connected;
3)Tensioning:The determination of stretching plan, selected, the concrete stretching plan of tensioning equipment;
4)Cable wire is adjusted:Suo Caiyong torque spanneres are adjusted to be controlled, by setting wrenching torque, to sleeve after locking Suo Li Tightened;Successively Suo Li loadings are carried out to every cable wire using torque spanner.
Beneficial effect:Truss each section is coupled together by solder sphere, two hemisphere is formed, in order to ensure two hemisphere Stability and steadiness, each hemisphere increased a flying wing type truss and coupled together with the truss of hemisphere by drag-line.So that Total is more stable.Being coordinated using chain block and chest expander carries out Steel Structure Installation and steel zip tensioning, construction method Simply, what is adopted in constructing is mechanical less, it is ensured that site safety, while also ensure that construction quality, considerably reduces and applies Work cost.
Description of the drawings
Fig. 1 is the overall perspective view being made up of two flying wing type formwork space truss structures;
Fig. 2 is flying wing type formwork space truss structure side view;
Fig. 3 is single flying wing type formwork space truss structure front elevation;
Fig. 4 is single flying wing type formwork space truss structure side partial enlarged drawing;
In figure, 1- main couples;11- main couple top booms;12- main couple lower booms;2- jack truss;21- jack truss winds up Bar;22- jack truss lower booms;3- parallel-chord trusses;31- parallel-chord truss top booms;32- parallel-chord truss lower edges Bar;4- flying wing type truss;42- flying wing type truss lower booms;5- drag-lines;6- links bar;7- support bars;81- main couple bases; 82- flying wing type truss bases;83- parallel-chord truss bases.
Specific embodiment
This engineering ground floor B1, underground is exhibition room, is on the ground business steel truss structure, predominantly space triangular Shape tube truss structure engineering;Including solder sphere, space drag-line.Truss each section is coupled together by solder sphere, is formed Two hemisphere, in order to ensure the stability and steadiness of two hemisphere, each hemisphere increases a flying wing type truss and passes through drag-line Couple together with the truss of hemisphere.So that total is more stable.Global shape is to grow the two symmetrical lobes for having all-wing aircraft respectively Formwork shape, novel in design, moulding is unique, uniform force.Roof system floor projection size is about 38.2m × 38.8m, its coverage rate General 750 square meter of product, the high 9.746m of steel truss top mark, primary and secondary truss is mainly spatial triangle truss, and truss span is 38.8m.It is P114x4.5 that chord member of truss section is P180x8, web member, and material is Q235B.Adopt high with 1670 grades simultaneously Steel tendon drag-line made by strong steel wire, a diameter of 22mm.
Flying wing type formwork space truss structure includes main couple 1, jack truss 2 and parallel-chord truss 3, main couple 1, secondary purlin Frame 2 is welded to each other with parallel-chord truss 3 and is fixedly connected, and forms " hemispherical " formwork space truss structure, the truss structure Also include being located at " arc-shaped " the flying wing type truss 4 on formwork space truss structure, flying wing type truss is by drag-line 5 and formwork The jack truss of space truss structure is connected, and two arc ends of flying wing type truss are fixed on bearing.
The jack truss 2 that many Pin are parallel to each other is provided between main couple 1 and parallel-chord truss 3, is connected between jack truss 2 Bar 6 is linked, top boom 21 of the bar 6 perpendicular to jack truss 2 is linked, and is welded to connect with jack truss top boom 21.
Main couple 1 and parallel-chord truss 3 are provided with parallel with the top boom 21 of jack truss 2, vertical with bar 6 is linked support Bar 7;Support bar 7 is welded to connect with the top boom of main couple 1 and parallel-chord truss 3, is welded to connect with bar 6 is linked.
Jack truss 2 includes jack truss top boom 21, jack truss lower boom 22, jack truss top boom 21 and main couple top boom 11 and parallel-chord truss top boom 31 be welded to connect, jack truss lower boom 22 and main couple lower boom 12 and parallel-chord truss Lower boom 32 is welded to connect.
The upper end of drag-line 5 is connected on flying wing type truss lower boom 42, and the lower end of drag-line 5 is connected to jack truss top boom 21 and connects On the crosspoint of tie-rod 6, the design of the concrete drawknot structure of drag-line will be through specific Mechanics Calculation, shown in Figure 1, drag-line V-shaped alternating is connected between flying wing type truss and jack truss, shown in Figure 3, and flying wing type truss is with flying wing type truss secondary Drawknot has drag-line between the jack truss component of the both sides projected on truss.
The two ends of main couple 1 and flying wing type truss 4 are respectively by spherical bearing and main couple base 81 and flying wing type truss Base 82 is fixedly connected;The parallel-chord truss lower boom 32 of parallel-chord truss 3 is welded with spherical bearing, spherical bearing with it is flat Row chord truss base 83 is fixedly connected.
Preparative work before construction:For the technology priority and difficulty of this engineering construction, the scientific and rational construction of establishment before construction Scheme and safety prevention measure, and can construct Jing after the examination & approval of management construction unit, the personnel to participating in construction are had in advance Targetedly technical training and safety training, make all workmens to be familiar with the related request in arrangement and method for construction, it is ensured that to apply Work scheme is implemented execution in work progress.
Construction of Steel Structure order:Surveying setting-out → built-in fitting process → bearing installation → component transhipment → main couple splicing → Support scaffolding sets up → and main couple installation → jack truss installs → links bar installation → support bar installation → welding → fringe truss Splicing → fringe truss installation → drag-line installation → welding → polishing → repairing paint → fireproof coating.
Node is three-dimensional model diagram by the method modeled using Digital Three-Dimensional, can intuitively be reacted from model Go out the connected mode at each position, positioned bearing according to axis, absolute altitude is put on embedded part, control errors minimum zone with It is interior.
Specific construction step is:
The first step, bearing is installed:Node is intuitively three-dimensional model diagram by the method modeled using Digital Three-Dimensional, Can be then converted to be positioned bearing in live practice of construction, error according to axis, absolute altitude is put on embedded part from model Within control minimum zone, recycling is manually adjusted, and accomplishes that bearing is installed accurate;
Second step, hemisphere main couple is installed:Because main couple hoisting height reaches 10m, in order to avoid the truss in hoisting process Swing and facilitate personnel to adjust the angle of truss, therefore need to carry out setting up scaffold and be supported main couple, scaffold is set up Highly it is 9m, adopts48 × 3.0mm steel pipes, vertical pole's span 1m, step pitch spacing 1.2m, it is ensured that the globality of scaffold with it is stable Property, scaffold sets up the road of horizontal cross brace 3, and scissors is fully supported and set on the outside of support body.So both ensure that truss there are enough strong points Also bring operating space to workmen simultaneously.The main couple for having spliced is installed for 4 points with 100T truck cranes, it is middle Position is supported using scaffold, and two ends are attached with bearing, and using ground collimation method control main couple axis is thrown, and treats at 3 points Side oblique pull positioning is carried out to main couple with steel wire rope and chain block after in place.
3rd step, hemisphere jack truss is installed:Jack truss is formed using A114 × 4.5mm steel-pipe weldings, and jack truss was installed Using 2 points of liftings in journey, setting angle is adjusted with chain block, top is docked with main couple node, bottom steelframe ball It is attached with bearing, main couple adopts scaffold building operating platform with jack truss connecting portion, it is ensured that the peace of workmen Entirely.
4th step, steel cable construction:
1. early-stage preparations
Scene preparation before drag-line construction:1)Part stacks neat after job site is transported to, by number, lower chock a tree, used in making timber for boats, Site requirements is smooth clean and tidy, and to take fire prevention, rain-proof, damp proof safeguard measure.2)Check whether dragline anchorage, PE sheaths have Damage, if any should immediately correct or repair.3)Eliminate drag-line burr nearby, it is to avoid injury protection set.
2. hanging cable
Upper end drag-line is fixed, and by the use of the scaffold of main couple is installed as operating platform, will be drawn using truck crane coordinating Rope fixing end is sling, and hoisting point position should meet the slightly sagging required length in anchorage upper end, and node installation personnel exist on truss Scaffold operating platform is manually worn axle connection, the upper node peace of drag-line using the instrument such as chain block and fiber hanging belt Install complete.
Lower node drag-line install, lower node distal end arrange pulley, using manually by drag-line lower end cooperation jack be drawn to Installation site, colligation point should ensure that there is certain oscillating quantity anchorage end during traction, drag-line is tackled in distraction procedure and is strictly protected, Avoid cable body and anchorage screw thread impaired, and position when in time adjustment drag-line is hanging.Every drag-line of close inspection in installation process Torsion situation, prevent drag-line and node from reversing and be connected.
3. tensioning
The determination of 3.1 stretching plans
Before tensioning, calculated according to designing unit and analyzed, combination defined by designing unit, supervisor, unit in charge of construction and adopted With the tension construction technology of grading tension, drag-line stretch value and chest expander dual control.
3.2 tensioning equipments select
Because this project stretching force is that 15KN and LS2 is 30KN for LS1, cable tension value is not very big, while considering The limitation of this project construction frock input, tensioning adopts chain block(Jack)+ chest expander is constituted.
3.3 concrete stretching plans
According to stretching force size, workmen carries out Suo Li loadings using chain block, and the stretching force of cucurbit passes through pulling force The reading of device is controlled, and just cold tensioning is no less than 2 times, and each tensioning time is no less than 50min.
Successively Suo Li loadings are carried out to every cable wire using cucurbit, cable wire is stretched and tentatively control is to design Suo Li, During drawing, necessary monitoring should be carried out, it is to avoid structure itself occurs larger STRESS VARIATION.
LS1a cable wires to be first installed and is tensioned, then LS2 cable wires are installed, LS1 Suo Li are 15KN, LS2 after the completion of tensioning Suo Li is 30KN.
4. cable wire is adjusted:
4.1 are being carried out in stretching process to cable wire, tensioning can be caused to complete steel cable force and changed, it is therefore necessary to Cable wire to completing tensioning is adjusted, to guarantee that steel cable force reaches design requirement.
4.2 tune Suo Caiyong torque spanneres are controlled, and by setting wrenching torque, sleeve are twisted after locking Suo Li Tightly, due to torque spanner particularity, if steel cable force is reduced, load after being tightened by spanner, after reaching pre- standing wire power Automatically locking, it is impossible to continue to load, if Suo Li does not change, due to the construction of torque spanner, cannot load.
4.3 carry out Suo Li loadings using torque spanner to every cable wire successively.
4.4 adjust during rope, should carry out necessary monitoring, it is to avoid structure occurs larger STRESS VARIATION.
Steel truss tension deformation is monitored:Before tensioning, absolute altitude monitoring, record data, to purlin are carried out to main couple and jack truss The bolt of frame and agent structure connecting portion carries out inspection record, again to main couple and jack truss absolute altitude after the completion of tensioning Monitoring, record data checks whether there is loosening and de- head to the bolt of truss and agent structure junction.Premenstrual rear data pair Than deforming and absolute altitude error being in allowed band.
It was verified that coordinate carrying out Steel Structure Installation and steel zip tensioning, construction method using chain block and chest expander Simply, what is adopted in constructing is mechanical less, it is ensured that site safety, while also ensure that construction quality, considerably reduces and applies Work cost.

Claims (9)

1. flying wing type formwork space truss structure construction method, its spy is that the truss structure includes main couple(1), secondary purlin Frame(2)And parallel-chord truss(3), main couple(1), jack truss(2)And parallel-chord truss(3)It is welded to each other and is fixedly connected, " hemispherical " formwork space truss structure is formed, the truss structure also includes being located at " the circle on formwork space truss structure Arcuation " flying wing type truss(4), flying wing type truss is by drag-line(5)It is connected with the jack truss of formwork space truss structure, all-wing aircraft Two arc ends of type truss are fixed on bearing;
Its construction method includes following construction procedure:
The first step, bearing is installed:Node is intuitively three-dimensional model diagram by the method modeled using Digital Three-Dimensional, from mould According to axis, absolute altitude is put on embedded part in type, it is then converted to be positioned bearing in live practice of construction;
Second step, main couple is installed:Set up scaffold support main couple, it is ensured that the globality and stability of scaffold, scaffold The road of horizontal cross brace 3 is set up, scissors is fully supported and set on the outside of support body;The main couple for having spliced is installed for 4 points with truck crane, in Between position be supported using scaffold, two ends are attached with bearing, using ground throw collimation method control main couple axis, treat three Side oblique pull positioning is carried out to main couple with steel wire rope and chain block after point is in place;
3rd step, jack truss is installed:Jack truss is formed using steel-pipe welding, using 2 points of liftings in jack truss installation process, is used Chain block adjusts setting angle, and top is docked with main couple node, and bottom steelframe ball is attached with bearing, main truss Frame adopts scaffold building operating platform with jack truss connecting portion, it is ensured that the safety of workmen;
4th step, steel cable construction:
1)Early-stage preparations
Scene preparation before drag-line construction:Part stacks neat after job site is transported to, by number, and lower chock a tree, used in making timber for boats, place will Ask smooth clean and tidy, and to take fire prevention, rain-proof, damp proof safeguard measure, check whether dragline anchorage, PE sheaths have damage, such as Having should immediately correct or repair elimination drag-line burr nearby, it is to avoid injury protection set;
2)Hanging cable
Upper end drag-line is fixed:By the use of installing the scaffold of main couple as operating platform, then coordinate and consolidated drag-line using truck crane Fixed end is sling, and hoisting point position should meet the slightly sagging required length in anchorage upper end, and node installation personnel are in pin hand on truss Frame operating platform is manually worn axle connection using chain block and fiber hanging belt, and the upper node of drag-line is installed;
Lower node drag-line is installed:Lower node distal end arrange pulley, using manually by drag-line lower end cooperation jack be drawn to installation Position, colligation point should ensure that there is certain oscillating quantity anchorage end during traction, drag-line is tackled in distraction procedure and is strictly protected, it is to avoid Cable body and anchorage screw thread are impaired, and adjust in time drag-line it is hanging when position installation process in every drag-line of close inspection torsion Situation, prevents drag-line from reversing with node and is connected;
3)Tensioning:The selected and concrete stretching plan of the determination, tensioning equipment including stretching plan;
4)Cable wire is adjusted:Adjust Suo Caiyong torque spanneres to be controlled, by setting wrenching torque, sleeve is carried out after locking Suo Li Tighten;Successively Suo Li loadings are carried out to every cable wire using torque spanner.
2. flying wing type formwork space truss structure construction method according to claim 1, it is characterised in that the main couple (1)And parallel-chord truss(3)Between be provided with the jack truss that many Pin are parallel to each other(2), jack truss(2)Between be connected with and link bar (6), link bar(6)Perpendicular to jack truss(2)Top boom(21), and with jack truss top boom(21)It is welded to connect.
3. flying wing type formwork space truss structure construction method according to claim 2, it is characterised in that the main couple (1)And parallel-chord truss(3)It is provided with and jack truss(2)Top boom(21)It is parallel, and link bar(6)Vertical support bar (7);Support bar(7)With main couple(1)And parallel-chord truss(3)Top boom be welded to connect, and link bar(6)Welding connects Connect.
4. flying wing type formwork space truss structure construction method according to claim 1, it is characterised in that the jack truss (2)Including jack truss top boom(21), jack truss lower boom(22), jack truss top boom(21)With main couple top boom(11)With Parallel-chord truss top boom(31)It is welded to connect, jack truss lower boom(22)With main couple lower boom(12)With parallel chord member purlin Frame lower boom(32)It is welded to connect.
5. flying wing type formwork space truss structure construction method according to claim 1, it is characterised in that the drag-line (5)Upper end is connected to flying wing type truss lower boom(42)On, drag-line(5)Lower end is connected to jack truss top boom(21)With link bar (6)Crosspoint on.
6. flying wing type formwork space truss structure construction method according to claim 1, it is characterised in that the main couple (1)With flying wing type truss(4)Two ends respectively by spherical bearing and main couple base(81)With flying wing type truss base(82) It is fixedly connected;Parallel-chord truss(3)Parallel-chord truss lower boom(32)Be welded with spherical bearing, spherical bearing with it is parallel Chord truss base(83)It is fixedly connected.
7. flying wing type formwork space truss structure construction method according to claim 1, it is characterised in that the drag-line (5)The steel tendon drag-line made by 1670 grades of high tensile steel wires, it is a diameter of22mm。
8. construction method according to claim 1, it is characterised in that in the steel cable construction of the 4th step, according to tensioning Power size, workmen carries out Suo Li loadings using chain block, and the stretching force of cucurbit is controlled by the reading of chest expander, Just cold tensioning is no less than 2 times, and each tensioning time is no less than 50min;Successively Suo Li loadings are carried out to every cable wire using cucurbit, Cable wire is stretched and tentatively design Suo Li is arrived in control.
9. construction method according to claim 1, it is characterised in that before tensioning, absolute altitude is carried out to main couple and jack truss Monitoring, record data carries out inspection record, again to master after the completion of tensioning to the bolt of truss and agent structure connecting portion The monitoring of truss and jack truss absolute altitude, record data, loosening is checked whether there is to the bolt of truss and agent structure junction with And de- head.
CN201510486311.8A 2015-08-11 2015-08-11 Construction method for flying-wing-type formwork space truss structure Active CN105019557B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510486311.8A CN105019557B (en) 2015-08-11 2015-08-11 Construction method for flying-wing-type formwork space truss structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510486311.8A CN105019557B (en) 2015-08-11 2015-08-11 Construction method for flying-wing-type formwork space truss structure

Publications (2)

Publication Number Publication Date
CN105019557A CN105019557A (en) 2015-11-04
CN105019557B true CN105019557B (en) 2017-05-17

Family

ID=54409824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510486311.8A Active CN105019557B (en) 2015-08-11 2015-08-11 Construction method for flying-wing-type formwork space truss structure

Country Status (1)

Country Link
CN (1) CN105019557B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235770B (en) * 2018-11-16 2023-08-11 中建二局安装工程有限公司 Large-span special-shaped cross truss structure and mounting method thereof
CN113700311B (en) * 2021-09-28 2022-10-11 中能建西北城市建设有限公司 Construction method for high-altitude positioning of steel casting of steel structure building
CN114635566B (en) * 2022-04-07 2023-07-07 中电建路桥集团有限公司 French style dome structure construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2597910B2 (en) * 1989-05-16 1997-04-09 清水建設株式会社 Top structure of dome frame
JP2903945B2 (en) * 1993-06-10 1999-06-14 株式会社大林組 Large span structure and construction method thereof
CN101660326A (en) * 2009-09-07 2010-03-03 张金贵 Demountable flowing building framework
CN201746935U (en) * 2010-05-24 2011-02-16 贺拥军 Super-span spherical reticulated mega-structure
CN102296883B (en) * 2011-07-04 2012-12-19 南京际华三五二一特种装备有限公司 Large-span tent frame device
CN103790388B (en) * 2014-03-05 2015-08-05 江苏南通六建建设集团有限公司 Greatly install improve one's methods across the waft high-altitude of eaves of cantilever roofing steel
CN204418372U (en) * 2014-11-12 2015-06-24 江苏南通六建建设集团有限公司 The steel beam column venue be made up of arch component space tubular truss
CN204876064U (en) * 2015-08-11 2015-12-16 中建二局第三建筑工程有限公司 All -wing aircraft section mould shell space truss structure

Also Published As

Publication number Publication date
CN105019557A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN107524261B (en) Construction method of roof steel net rack
US10329781B2 (en) Safety barrier netting system
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
CN103061520B (en) Annular crossing funicular truss structure mounting method
CN110468724B (en) Auxiliary device for main cable construction of space cable suspension bridge and main cable construction method
CN105019557B (en) Construction method for flying-wing-type formwork space truss structure
CN103061506A (en) Construction method of steel structure dome
CN211691069U (en) Installation and displacement monitoring structure of spoke type beam string
CN112761348A (en) Hanging basket suspension system without counter weight and installation method
CN105189889B (en) Girder truss for weather protection roof and the weather protection roof with some girder trusses
CN114775882B (en) Membrane-stainless steel-aluminum alloy-inhaul cable combined structure
US2878498A (en) Bridge construction
JP2019052477A (en) Safety device for temporary scaffold
CN104278779B (en) The rope net of a kind of larger decorative curtain wall and the method for installation Tension Forming thereof
CN204876064U (en) All -wing aircraft section mould shell space truss structure
CN108190808A (en) The anti-furred ceiling high-altitude slide apparatus of color steel and anti-ceiling construction engineering method
JP2006265899A (en) Scaffolding construction method
CN106013755A (en) Cantilever frame for existing building and construction method
CN208054857U (en) The anti-furred ceiling high-altitude slide apparatus of color steel
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN104264781A (en) Grid-shaped, cylindrical-surface and steel structured latticed shell and construction method thereof
CN209619862U (en) A kind of hoist cable arch rib installation support frame big suitable for environmental restrictions
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN113006498A (en) Large-span spherical roof truss pull rod lifting construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant