RU2292458C1 - Device for suspension of bridge during drilling of deep shafts - Google Patents

Device for suspension of bridge during drilling of deep shafts Download PDF

Info

Publication number
RU2292458C1
RU2292458C1 RU2005124562/03A RU2005124562A RU2292458C1 RU 2292458 C1 RU2292458 C1 RU 2292458C1 RU 2005124562/03 A RU2005124562/03 A RU 2005124562/03A RU 2005124562 A RU2005124562 A RU 2005124562A RU 2292458 C1 RU2292458 C1 RU 2292458C1
Authority
RU
Russia
Prior art keywords
suspension
ropes
pulleys
shelf
bridge
Prior art date
Application number
RU2005124562/03A
Other languages
Russian (ru)
Inventor
Иван Савельевич Лутков (RU)
Иван Савельевич Лутков
Сергей Петрович Сыркин (RU)
Сергей Петрович Сыркин
Василий Васильевич Скобликов (RU)
Василий Васильевич Скобликов
Григорий Семенович Брагинский (RU)
Григорий Семенович Брагинский
Рэм Ойзерович Ступель (RU)
Рэм Ойзерович Ступель
Original Assignee
Закрытое акционерное общество "Объединенная шахтостроительная компания "Союзспецстрой" - ЗАО "ОШК "Союзспецстрой"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Закрытое акционерное общество "Объединенная шахтостроительная компания "Союзспецстрой" - ЗАО "ОШК "Союзспецстрой" filed Critical Закрытое акционерное общество "Объединенная шахтостроительная компания "Союзспецстрой" - ЗАО "ОШК "Союзспецстрой"
Priority to RU2005124562/03A priority Critical patent/RU2292458C1/en
Application granted granted Critical
Publication of RU2292458C1 publication Critical patent/RU2292458C1/en

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

FIELD: mining industry, namely, devices for suspension of bridges with drilling equipment positioned on the bridge during drilling of deep mine shafts, primarily by means of drilling and exploding method.
SUBSTANCE: device for suspension of bridge during drilling of deep shafts includes pulleys, winches, each one of which is connected to bridge by rope in suspension system of pulleys by means of hydro-cylinder held on bridge, rod hollow of which is connected to rod hollows of other hydro-cylinders for evening out stretching of ropes, device is also provided with beams, positioned above the bridge, with rigid mounting thereof in the shaft and possible remounting with deepening of shaft, while each beam is provided with pulleys, circled by ropes of suspension system of pulleys.
EFFECT: decreased weight of bridge suspension ropes in system of pulleys due to decreased length of ropes, possible drilling of deep mine shafts, increased operation reliability of mining equipment.
2 dwg

Description

Изобретение относится к горной промышленности, а именно к устройствам для подвески полков с размещенным на полке горнопроходческим оборудованием при проходке глубоких шахтных стволов, преимущественно буровзрывным способом.The invention relates to the mining industry, and in particular to devices for hanging shelves with mining equipment located on a shelf when driving deep shaft shafts, mainly by a blasting method.

Известны устройства для подвески полка при проходке глубоких стволов из обзора А.М.Цыпкис, А.В.Вышинский, В.М.Дубров "Проходческие лебедки для глубоких шахтных стволов", М.: НИИИНФОРМТЯЖМАШ, 1966, с.11-15, фиг.6 (прототип).Known devices for suspension of the regiment when driving deep trunks from a review by A.M. Tsypkis, A.V. Vyshinsky, V.M. Dubrov "Driving winches for deep mine shafts", M .: NIIINFORMTYAZHMASH, 1966, pp. 11-15, 6 (prototype).

Устройство состоит из многоэтажного полка, шкивов, лебедок (однобарабанной или двухбарабанной), соединенных с полком канатом по полиспастной схеме подвески, гидроцилиндров на свободных концах канатов, одноименные полости каждого из которых соединены между собой для выравнивания натяжения канатов. Тяжелый проходческий полок с помощью описанного устройства подвешивается следующим образом.The device consists of a multi-storey shelf, pulleys, winches (single-drum or double-drum), connected to the shelf by a rope according to the multi-bladed suspension scheme, hydraulic cylinders at the free ends of the ropes, the same cavity of each of which is interconnected to equalize the tension of the ropes. A heavy tunneling shelf using the described device is suspended as follows.

Канат от лебедки, огибая шкив на копре, шкив на многоэтажном полке, крепится на подшкивной площадке, а для выравнивания канатов подвески при наличии двухбарабанных лебедок с двукратной полиспастной схемой подвески свободные концы канатов соединены с гидроцилиндрами, одноименные полости каждого из которых соединены между собой.The rope from the winch, enveloping the pulley on the pile, the pulley on a multi-storey shelf, is mounted on the under-pulley platform, and for alignment of the suspension ropes in the presence of double-drum winches with a double pulley suspension scheme, the free ends of the ropes are connected to hydraulic cylinders, the same cavities of each of which are interconnected.

При проходке ствола глубиной 2000 м необходимо устройство для подвески полка с учетом размещенного на нем горнопроходческого оборудования, оснащенное трехкратной полиспастной подвеской. В этом случае длина каната составляет не менее 6500 м.When driving a barrel with a depth of 2000 m, a device is required for suspension of the shelf, taking into account the mining equipment located on it, equipped with a triple polyspast suspension. In this case, the rope length is at least 6500 m.

Известное устройство не может обеспечить безаварийную эксплуатацию тяжелого горнопроходческого оборудования на полке, подвешенном на канатах такой длины, и самое главное, что изготовление, транспортировка к месту эксплуатации и навивка на лебедки канатов больших длин является технически сложной, порой невыполнимой задачей.The known device cannot ensure the trouble-free operation of heavy mining equipment on a shelf suspended on ropes of such a length, and most importantly, the manufacture, transportation to the place of operation and winding on ropes of long ropes is a technically difficult, sometimes impossible task.

Техническая задача изобретения - снижение веса канатов подвески полка по полиспастной схеме за счет уменьшения длины канатов, обеспечение возможности проходки глубоких шахтных стволов, повышение надежности эксплуатации горнопроходческого оборудования.The technical task of the invention is to reduce the weight of the ropes of the suspension of the shelf according to the tackle scheme by reducing the length of the ropes, providing the possibility of penetration of deep shaft shafts, improving the reliability of mining equipment.

Поставленная задача решается за счет того, что устройство для подвески полка при проходке глубоких стволов, включающее шкивы, лебедки, каждая из которых соединена с полком канатом по полиспастной схеме подвески посредством гидроцилиндра, закрепленного на полке, штоковая полость которого соединена со штоковыми полостями других гидроцилиндров для выравнивания натяжения канатов, снабжено балками, размещенными над полком, с жестким закреплением их в стволе и возможностью переустановки по мере углубки ствола, при этом каждая балка снабжена шкивами, огибаемыми канатами полиспастной подвески.The problem is solved due to the fact that the device for suspension of the shelf when driving deep trunks, including pulleys, winches, each of which is connected to the shelf by a rope according to the tackle suspension circuit by means of a hydraulic cylinder mounted on the shelf, the rod cavity of which is connected to the rod cavities of other hydraulic cylinders for the alignment of the tension of the ropes, equipped with beams placed above the shelf, with their rigid fixing in the trunk and the ability to reinstall as the depths of the trunk, each beam is equipped with pulleys envelope polispastnoy suspension ropes.

Преимущества изобретения и его конструктивные особенности изложены ниже и поясняются чертежами, где:The advantages of the invention and its design features are set forth below and are illustrated by drawings, where:

на фиг.1 схематично изображено устройство для подвески (вариант с двумя двухбарабанными лебедками на трехкратных полиспастах);figure 1 schematically shows a device for suspension (option with two double-drum winches on triple sheaves);

на фиг.2 - то же, вид сверху.figure 2 is the same, a top view.

Устройство для подвески состоит из полка 1 (на фиг.1 изображен двухэтажный полок), шкивов: 2 - установленного на проходческом копре, 3 - установленного на полке 1, лебедок 4, соединенных с полком 1 канатом 5 по полиспастной схеме подвески. Над полком 1, параллельно ему, на некотором расстоянии размещены по меньшей мере две балки 6, концы которых в рабочем состоянии, при углубке ствола, жестко закреплены к стенкам ствола 7 с помощью кронштейнов 8 и анкеров 9. Балки 6 могут переустанавливаться по мере углубки ствола 7. На балках 6 смонтированы дополнительные шкивы 10. Таким образом, канаты 5, идущие от лебедок 4, огибают шкивы 2, установленные на копре, шкивы 3, установленные на полке 1 и далее, огибая дополнительные шкивы 10, установленные на балках 6, крепятся своими концами к смонтированным на полке 1 гидроцилиндрам 11, наполненным смазочным веществом. Для выравнивания натяжения канатов 5 штоковые полости гидроцилиндров 11 соединены между собой в единую гидросистему 12, снабженную прибором, реагирующим на превышение номинального давления в системе сверх допустимого предела и отключающим в этом случае привод лебедок 4 подвески полка 1.The suspension device consists of a shelf 1 (a two-story shelf is shown in FIG. 1), pulleys: 2 - mounted on a tunneling head, 3 - mounted on a shelf 1, winches 4 connected to the shelf 1 by a rope 5 according to the tackle suspension scheme. At least two beams 6 are placed above the shelf 1, parallel to it, at some distance, the ends of which are in working condition, with the barrel deep, rigidly fixed to the walls of the barrel 7 using brackets 8 and anchors 9. The beams 6 can be reinstalled as the barrel deep 7. On the beams 6, additional pulleys are mounted 10. Thus, the ropes 5 extending from the winches 4 bend around the pulleys 2 installed on the head, the pulleys 3 installed on the shelf 1 and beyond, fasten around the additional pulleys 10 mounted on the beams 6 ends to mounted m hydraulic cylinders 1 on the shelf 11, filled with lubricant. To equalize the tension of the ropes 5, the rod cavities of the hydraulic cylinders 11 are interconnected into a single hydraulic system 12, equipped with a device that responds to excess of the nominal pressure in the system over the allowable limit and disables in this case the winch drive 4 of the shelf 1 suspension.

Работает устройство для подвески полка 1 следующим образом.The device for hanging shelf 1 operates as follows.

Первый участок ствола, 500-600 м от верхней площадки, проходится с использованием известного устройства подвески полка 1, при этом длина канатов 5 составляет около 1900 м. В это время дополнительные шкивы 10 и балки 6 установлены на подшкивной площадке. Далее полок 1 с горнопроходческим стволовым оборудованием устанавливается на забой, к стенкам ствола 7 с помощью кронштейнов 8 и анкеров 9 жестко закрепляются на некотором расстоянии, 30-40 м, от полка 1 балки 6, на которых монтируются дополнительные шкивы 10. В этом случае канаты 5 огибают шкивы 2, 3 и 10 по полиспастной схеме, как это описано выше, и опускаются к заделкам на объединенных гидросистемой 12 гидроцилиндрах 11, закрепляемых к полку. Полок 1 приподнимается с помощью лебедок 4 и начинается процесс проходки ствола.The first section of the trunk, 500-600 m from the upper platform, is carried out using the known device for suspending shelf 1, while the length of the ropes 5 is about 1900 m. At this time, additional pulleys 10 and beams 6 are installed on the under-pin platform. Next, shelves 1 with mining tunneling equipment are installed on the bottom, to the walls of the barrel 7 using brackets 8 and anchors 9 are rigidly fixed at a certain distance, 30-40 m, from shelf 1 of the beam 6, on which additional pulleys are mounted 10. In this case, the ropes 5 round the pulleys 2, 3 and 10 according to the tackle scheme, as described above, and descend to the closures on the hydraulic cylinders 11 connected by the hydraulic system 12, fixed to the shelf. Shelves 1 are lifted by means of winches 4 and the process of sinking the trunk begins.

Как следует из описания и чертежа, вместо трех длинных ветвей каната 5 остается одна (от копра до полка 1), а две другие благодаря наличию балок 6 и дополнительных шкивов 10 являются короткими, что значительно сокращает общую длину канатов 5 подвески полка 1.As follows from the description and drawing, instead of the three long branches of the rope 5, one remains (from the copra to the shelf 1), and the other two, due to the presence of beams 6 and additional pulleys 10, are short, which significantly reduces the total length of the ropes 5 of the suspension of the shelf 1.

По мере углубки ствола 7 балки 6 со шкивами 10 могут переустанавливаться несколько раз, при этом проходка ведется с одной длинной и двумя короткими ветвями канатов 5. Длинная ветвь каната 5 может выполнять в том числе и функции направляющей, например, для бадьи.As the trunk 7 deepens, the beams 6 with pulleys 10 can be reinstalled several times, while driving is carried out with one long and two short branches of ropes 5. The long branch of the rope 5 can also carry out the functions of a guide, for example, for a bucket.

Для проходки шахтного ствола 7 глубиной 2 км с использованием описанного устройства для подвески полка 1 достаточно иметь канат длиной 2400 м.For the sinking of the mine shaft 7 with a depth of 2 km using the described device for suspension of the regiment 1, it is enough to have a rope 2400 m long.

Следовательно, предлагаемое устройство для подвески полка обеспечивает возможность проходки глубоких шахтных стволов, снижает вес канатов за счет уменьшения их длины, упрощает задачу изготовления каната уменьшенной длины, его транспортировки к месту эксплуатации и навивки на лебедки, что повышает в целом надежность эксплуатации горнопроходческого оборудования.Therefore, the proposed device for suspension of the shelf provides the possibility of sinking deep shaft shafts, reduces the weight of the ropes by reducing their length, simplifies the task of manufacturing a rope of reduced length, its transportation to the place of operation and winding on winches, which increases the overall reliability of operation of mining equipment.

Claims (1)

Устройство для подвески полка при проходке глубоких стволов, включающее шкивы, лебедки, каждая из которых соединена с полком канатом по полиспастной схеме подвески посредством гидроцилиндра, закрепленного на полке, штоковая полость которого соединена со штоковыми полостями других гидроцилиндров для выравнивания натяжения канатов, отличающееся тем, что устройство снабжено балками, размещенными над полком, с жестким закреплением их в стволе и возможностью переустановки по мере углубки ствола, при этом каждая балка снабжена шкивами, огибаемыми канатами полиспастной подвески.A device for suspending a shelf when driving deep trunks, including pulleys, winches, each of which is connected to the shelf by a cable according to the tackle suspension circuit by means of a hydraulic cylinder mounted on the shelf, the rod cavity of which is connected to the rod cavities of other hydraulic cylinders to align the tension of the ropes, characterized in that the device is equipped with beams located above the shelf, with their rigid fixing in the barrel and the ability to reinstall as the barrel deepens, with each beam equipped with pulleys, og aemymi polispastnoy suspension ropes.
RU2005124562/03A 2005-08-02 2005-08-02 Device for suspension of bridge during drilling of deep shafts RU2292458C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2005124562/03A RU2292458C1 (en) 2005-08-02 2005-08-02 Device for suspension of bridge during drilling of deep shafts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2005124562/03A RU2292458C1 (en) 2005-08-02 2005-08-02 Device for suspension of bridge during drilling of deep shafts

Publications (1)

Publication Number Publication Date
RU2292458C1 true RU2292458C1 (en) 2007-01-27

Family

ID=37773479

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2005124562/03A RU2292458C1 (en) 2005-08-02 2005-08-02 Device for suspension of bridge during drilling of deep shafts

Country Status (1)

Country Link
RU (1) RU2292458C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2601647C2 (en) * 2014-06-04 2016-11-10 Александр Александрович Кисель Method for erection of steel constructions of vertical mine opening shaft and armoring unit for implementation of the method
CN109812261A (en) * 2018-12-06 2019-05-28 中信重工机械股份有限公司 A kind of underwater tool attitude detection system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
А.М.ЦЫПКИС и др. Проходческие лебедки для глубоких шахтных стволов, Москва, НИИИНФОРМТЯЖМАШ, 1966, с.11-15. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2601647C2 (en) * 2014-06-04 2016-11-10 Александр Александрович Кисель Method for erection of steel constructions of vertical mine opening shaft and armoring unit for implementation of the method
CN109812261A (en) * 2018-12-06 2019-05-28 中信重工机械股份有限公司 A kind of underwater tool attitude detection system

Similar Documents

Publication Publication Date Title
CN103850684B (en) A kind of shaft excavation machine expands the sinking shaft technique of anti-well rig pilot shaft
CN103669351B (en) Full-stroke hole-leading hydraulic static pile driver
SU1703805A1 (en) Roundtrip device
RU2182883C2 (en) Deep-water load-lowering device
CN106639918A (en) Suspension device and suspension method of water-secluding pipe system for deepwater well drilling
RU2292458C1 (en) Device for suspension of bridge during drilling of deep shafts
CN105431613B (en) Guidance system
CN107344697A (en) Cable boom hoisting
CN102344086B (en) Method for replacing lifting ropes of multi-rope frictional geared winch
CN108438177B (en) Diving cage for underwater detection operation
RU2601647C2 (en) Method for erection of steel constructions of vertical mine opening shaft and armoring unit for implementation of the method
RU2538550C1 (en) Mobile telescopic drilling device of vertical drilling
US4503917A (en) Carriage feed system
SU775324A1 (en) Mine shaft rock-loading arrangement
CA3082045A1 (en) Elongate member handling system
CN105464590A (en) Heavy-load earth grabbing and hole drilling device
US4448246A (en) Apparatus for setting casing in an oil well
SU1224406A1 (en) Method of suspending working platform when sinking vertical mine shafts
SU1073176A1 (en) Method of hoisting when sinking deep mine shafts
SU1133406A1 (en) Shaft-sinking set
SU706537A1 (en) Method of sinking mine shaft with shaft-sinking cutter-loader
SU881329A1 (en) Mine shaft muck-loading device
CN210238519U (en) Underwater riprap ramming and flattening device
RU2634143C1 (en) Marine ice-strengthened platform
SU1273581A1 (en) Mechanism for drilling holes and introducing anchorage bars

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20070803

NF4A Reinstatement of patent

Effective date: 20080827

MM4A The patent is invalid due to non-payment of fees

Effective date: 20090803