CN106639918A CN201710004606.6A CN201710004606A CN106639918A CN 106639918 A CN106639918 A CN 106639918A CN 201710004606 A CN201710004606 A CN 201710004606A CN 106639918 A CN106639918 A CN 106639918A
Authority
CN
China
Prior art keywords
hydraulic cylinder
marine riser
drilling
acceleration
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710004606.6A
Other languages
Chinese (zh)
Inventor
盛磊祥
许亮斌
周建良
刘健
李朝玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Research Institute Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201710004606.6A priority Critical patent/CN106639918A/en
Publication of CN106639918A publication Critical patent/CN106639918A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/02Rod or cable suspensions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling

Abstract

The invention relates to a suspension device and suspension method of a water-secluding pipe system deepwater well drilling, wherein the suspension device comprises a fixed tray, hydraulic cylinders, pulleys and a movable tray. The fixed tray is fixedly connected on a well drilling table face, and a through hole allowing for passing of a water-secluding pipe string is formed in the middle of the fixed tray. The number of the hydraulic cylinders are two or above, and the hydraulic cylinders are installed uniformly on the fixed tray along the edge of the trough hole. The top end of a piston rod of each hydraulic cylinder is connected with the corresponding pulley in a rotating mode. A through hole allowing for passing of the water-secluding pipe string is formed in the middle of the movable tray, the outer side of the movable tray is connected with one end of a steel wire rope, and the other end of the steel wire rope bypasses the pulleys and then connected to the fixed tray.

Description

A kind of suspension arrangement and hanging method of Deep Water Drilling Riser system
Technical field
The present invention relates to a kind of suspension arrangement and hanging method, more particularly to a kind of Deep Water Drilling Riser system it is outstanding Hang device and hanging method.
Background technology
The installation of deepwater drilling and completion process marine riser and urgent suspension are all to hang chuck by marine riser to realize, The conventional chuck that hangs is hung temporarily by the step surface of mechanical voussoir and marine riser bump joint, chuck overall structure seat It is placed on drilling rotary table face, therefore is a kind of rigidly connected relation between marine riser string and chuck, drilling platforms, when sea situation ratio When more severe, especially in typhoon, drill ship can occur under the wave action violent heave movement, due to being rigidly connected Relation, chuck and marine riser string can occur heave movement with the heave movement of drill ship, when the marine riser string for hanging compared with When long, the position that riser top is connected with drilling floor surface upper chuck can in real time heave with platform, but in deepwater drilling, Water proof length of tube is longer, and water proof bottom of the tube is because apart from platform, farther out, the motion of platform in place, causes water proof without transmission in time Pipe top and the bottom direction of motion produce difference, thus can cause marine riser be compressed axially that (i.e. marine riser somewhere is subject to negative drawing Power), according to the job specification (API RP16Q) of marine riser, this operating mode is not allowed, and can have a strong impact on suspension marine riser Safety.It is the installation exercise for not allowing to carry out drilling water-separation pipe under severe sea condition to tackle such case, if made Typhoon is predicted during industry will be through position of platform, and platform needs to reclaim all of marine riser string, after typhoon dissipates, then again Under enter marine riser.In this case the workload for removing marine riser string repeatedly can be increased, the progress of whole drillng operation is caused Very big impact, increased the operating cost of drilling well.If typhoon overtakes, platform is in order to alleviate the possible axle of marine riser string To compression, the mode of soft suspension marine riser string can be considered as, i.e., be hung using hydraulic tensioner, this mode needs Dangerous moon pool area carries out respectively associative operation, including connection stretcher, installs marine riser telescopic joint etc., and operation procedure is complicated It is time-consuming, and operational risk is higher, in emergency circumstances operability is poor.
The content of the invention
For the problems referred to above, it is an object of the invention to provide a kind of simple to operate, in emergency circumstances workable and energy Enough improve the suspension arrangement and hanging method of the Deep Water Drilling Riser system of riser system suspension security.
For achieving the above object, the present invention is employed the following technical solutions:A kind of suspension dress of Deep Water Drilling Riser system Put, it is characterised in that:It includes fixed tray, hydraulic cylinder, pulley and movable tray;The fixed tray is fixedly connected on drilling well On table top, the through hole passed through for marine riser string is offered in the middle part of the fixed tray;The hydraulic cylinder be two or more and Uniformly it is arranged on the fixed tray along the through hole edge, the piston rod top of the hydraulic cylinder is rotatably connected to pulley; The through hole passed through for marine riser string, the outside of the movable tray and one end of steel wire rope are offered in the middle part of the movable tray Connection, the other end of the steel wire rope is bypassed and is connected to after the pulley on the fixed tray.
Two or more guiding slide rail is set on the fixed tray, and the guiding slide rail passes through movable tray.
The top of the guiding slide rail is provided with limited block.
Present invention also offers a kind of hanging method of the suspension arrangement for Deep Water Drilling Riser system, including it is following Step:
1) it is fixed on movable tray to hang chuck, hang and be provided with chuck suspension voussoir, marine riser string passes through drilling platform Face is transferred, and the suspension that voussoir completes marine riser string of hanging set in chuck is hung in the joint flange connection on marine riser string top;
2) hydraulic cylinder upper chamber pumps into nitrogen, and lower chambers pump into hydraulic oil, forms pressure reduction and promotes shifting on piston rod, drives and lives Move in dynamic pallet, suspension chuck and marine riser string and depart from drilling well table top;
3) monitor drilling platform lifting motion acceleration and hydraulic cylinder epicoele room in nitrogen pressure change, set up hydraulic pressure The computation model of cylinder inner high voltage oil, the pressure of the hydraulic cylinder lower chambers hydraulic oil adjusted by hydraulic pump adds piston rod movement Speed is with drilling platforms acceleration of motion conversely, marine riser string is with the motion of drilling platforms and the motion of piston rod drive marine riser Offset, reduce marine riser string and occur being compressed axially.
In the step 2) in, the pressure for pumping into nitrogen is 3000psi.
In the step 3) in, the acceleration of the drilling platform lifting motion is measured or monitored by real-time monitoring platform Platform heave movement time history data seeking time derivative is obtained.
In the step 3) in, the computation model method for building up of the hydraulic cylinder inner high voltage oil is as follows:
1. when drilling platforms acceleration of motion upwards, then piston rod is moved downward, and by movable tray, hangs chuck and water proof Pipe string draws as entirety according to Newton's second law:
Mg-nTcos α=Mat (1)
M is movable tray, the gross mass for hanging chuck and marine riser string in formula, and T is the pulling force of steel wire rope, and n is hydraulic cylinder Number, α is the angle of steel wire rope and vertical direction, and g is acceleration of gravity, atFor drilling platforms real time kinematics accekeration;
Force analysis is carried out for piston rod, its stress balance equation is:
POilS1=PGas(S1-S2)+2nTcosα (2)
P in formulaOilFor the pressure of hydraulic cylinder lower chambers hydraulic oil, PGasFor the pressure of hydraulic cylinder upper chamber nitrogen, S1For hydraulic pressure The cross-sectional area of cylinder inner carrier, S2For the cross-sectional area of piston in hydraulic cylinder bar;
Show that the computation model of hydraulic oil is with reference to (1) (2) formula:
2. when drilling platforms moves downward acceleration, then piston rod is moved upwards, by movable tray, hangs chuck and water proof Pipe string can be obtained as entirety according to Newton's second law:
NTcos α-Mg=Mat (4)
M is movable tray, the gross mass for hanging chuck and marine riser string in formula, and T is the pulling force of steel wire rope, and n is hydraulic cylinder Number, α is the angle of steel wire rope and vertical direction, and g is acceleration of gravity, atFor drilling platforms real time kinematics accekeration;
Force analysis is carried out for piston rod, its stress balance equation is:
POilS1=PGas(S1-S2)+2nTcosα (5)
P in formulaOilFor the pressure of hydraulic cylinder lower chambers hydraulic oil, PGasFor the pressure of hydraulic cylinder upper chamber nitrogen, S1For hydraulic pressure The cross-sectional area of cylinder inner carrier, S2For the cross-sectional area of piston in hydraulic cylinder bar;
Show that the computation model of hydraulic oil is with reference to (4) (5) formula:
3. the direction of drilling platforms acceleration is considered, orientation is lower to be upwards negative just, and the computation model of hydraulic oil is:
M is movable tray, the gross mass for hanging chuck and marine riser string in formula, and T is the pulling force of steel wire rope, and n is hydraulic cylinder Number, α is the angle of steel wire rope and vertical direction, and g is acceleration of gravity, atFor drilling platforms real time kinematics acceleration, POil For the pressure of hydraulic cylinder lower chambers hydraulic oil, PGasFor the pressure of hydraulic cylinder upper chamber nitrogen, S1For the transversal of piston in hydraulic cylinder Area, S2For the cross-sectional area of piston in hydraulic cylinder bar.
Due to taking above technical scheme, it has advantages below to the present invention:1st, the present invention connects steel by movable tray Cord, steel wire rope bypasses the pulley on the piston rod of hydraulic cylinder and is connected pallet, then adjusts high in hydraulic cylinder by hydraulic pump The pressure of force feed, makes the motion of piston rod and moving conversely, can reduce because the up and down motion of drilling platforms is drawn for drilling platforms Being compressed axially for marine riser string is played, the suspension security of marine riser string is improved.2nd, the calculating mould by setting up hydraulic oil of the invention Type, can accurately calculate the pressure of adjustment hydraulic oil, and the motion of piston rod is changed in good time to reduce being compressed axially for marine riser string, It is simple to operate, in emergency circumstances workable.3rd, the present invention changes according to the suspended load of suspension arrangement, along fixed tray Through hole edge two or more hydraulic cylinder is uniformly installed, it is possible to increase the load-carrying ability of whole suspension arrangement.4th, it is of the invention to consolidate Determine to arrange two or more guiding slide rail on pallet, guiding slide rail top is provided with limited block, movable tray passes through guiding slide rail motion, The horizontal jitter of movable tray can be reduced, the direction of motion difference of marine riser string top and bottom is reduced.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
As shown in figure 1, the present invention proposes a kind of suspension arrangement of Deep Water Drilling Riser system, it include fixed tray 1, Hydraulic cylinder 2, pulley 3 and movable tray 4.Fixed tray 1 is fixedly connected on drilling well table top 12, is opened at the middle part of fixed tray 1 It is provided with the through hole passed through for marine riser string 10.Hydraulic cylinder 2 is two or more and is uniformly arranged on fixed tray 1 along through hole edge On, the piston rod top of hydraulic cylinder 2 is rotatably connected to pulley 3.The middle part of movable tray 4 offers what is passed through for marine riser string 10 Through hole, its outside is connected with one end of steel wire rope 5, and the other end of steel wire rope 5 is bypassed and is connected to after pulley 3 on fixed tray 1.
Further, two or more guiding slide rail 6 is set on fixed tray 1, and guiding slide rail 6 top is provided with limited block 7, leads Draw slide rail 6 through movable tray 4, the up and down motion to movable tray 4 plays guide and limit effect, reduces the water of movable tray 4 It is flat to rock, reduce the direction of motion difference of the top of marine riser string 10 and bottom.
Based on above-mentioned suspension arrangement, present invention also offers a kind of suspension side of Deep Water Drilling Riser system hangs device Method, comprises the following steps:
1) it is fixed on movable tray 4 to hang chuck 8, hang and be provided with chuck 8 suspension voussoir, marine riser string 10 is passed through bores Raised platform around a well face 12 is transferred, and the joint flange connection on the top of marine riser string 10 is hung the suspension voussoir set in chuck 8 and completes marine riser string 10 suspension.
2) upper chamber of hydraulic cylinder 2 pumps into nitrogen, and lower chambers pump into hydraulic oil, forms pressure reduction and promotes shifting on piston rod, drives Move in movable tray 4, suspension chuck 8 and marine riser string 10 and depart from drilling well table top.
3) monitor drilling platform lifting motion acceleration and the epicoele room of hydraulic cylinder 2 in nitrogen pressure change, set up liquid The computation model of the inner high voltage of cylinder pressure 2 oil, the pressure of the lower chambers hydraulic oil of hydraulic cylinder 2 adjusted by hydraulic pump (not shown) By force, piston rod movement acceleration and drilling platforms acceleration of motion are made conversely, marine riser string 10 with drilling platforms motion and work Stopper rod drives the motion of marine riser to offset, and reduces marine riser string 10 and occurs being compressed axially, and improves the suspension peace of marine riser string 10 Quan Xing.
In above-described embodiment, step 2) pressure of nitrogen that pumps into is 3000psi.
In above-described embodiment, step 3) in drilling platform lifting motion acceleration can be measured by real-time monitoring platform or Monitoring platform heave movement time history data seeking time derivative is obtained.
In above-described embodiment, step 3) in the inner high voltage of hydraulic cylinder 2 oil computation model method for building up it is as follows:
1. when drilling platforms acceleration of motion upwards, then piston rod is moved downward, by movable tray 4, hang chuck 8 and every Water pipe string 10 can be obtained as entirety according to Newton's second law:
Mg-nTcos α=Mat (1)
M is movable tray 4, the gross mass for hanging chuck 8 and marine riser string 10 in formula, and T is the pulling force of steel wire rope 5, and n is liquid The number of cylinder pressure, α is the angle of steel wire rope 5 and vertical direction, and g is acceleration of gravity, atFor the acceleration of drilling platforms real time kinematics Angle value.
Force analysis is carried out for piston rod, its stress balance equation is:
POilS1=PGas(S1-S2)+2nTcosα (2)
P in formulaOilFor the pressure of the lower chambers hydraulic oil of hydraulic cylinder 2, PGasFor the pressure of the upper chamber's nitrogen of hydraulic cylinder 2, S1For liquid The cross-sectional area of the inner carrier of cylinder pressure 2, S2For the cross-sectional area of the inner piston rod of hydraulic cylinder 2.
The computation model that can obtain hydraulic oil with reference to (1) (2) formula is:
2. when drilling platforms moves downward acceleration, then piston rod is moved upwards, by movable tray 4, hang chuck 8 and every Water pipe string 10 can be obtained as entirety according to Newton's second law:
NTcos α-Mg=Mat (4)
M is movable tray 4, the gross mass for hanging chuck 8 and marine riser string 10 in formula, and T is the pulling force of steel wire rope 5, and n is liquid The number of cylinder pressure, α is the angle of steel wire rope 5 and vertical direction, and g is acceleration of gravity, atFor the acceleration of drilling platforms real time kinematics Angle value.
Force analysis is carried out for piston rod, its stress balance equation is:
POilS1=PGas(S1-S2)+2nTcosα (5)
P in formulaOilFor the pressure of the lower chambers hydraulic oil of hydraulic cylinder 2, PGasFor the pressure of the upper chamber's nitrogen of hydraulic cylinder 2, S1For liquid The cross-sectional area of the inner carrier of cylinder pressure 2, S2For the cross-sectional area of the inner piston rod of hydraulic cylinder 2.
The computation model that can obtain hydraulic oil with reference to (4) (5) formula is:
3. if it is considered that the direction of platform acceleration, downwards to be upwards negative just, the computation model of hydraulic oil is:
M is movable tray 4, the gross mass for hanging chuck 8 and marine riser string 10 in formula, and T is the pulling force of steel wire rope 5, and n is liquid The number of cylinder pressure, α is the angle of steel wire rope 5 and vertical direction, and g is acceleration of gravity, atFor the acceleration of drilling platforms real time kinematics Degree, it is upwards negative, P just to be under orientationOilFor the pressure of the lower chambers hydraulic oil of hydraulic cylinder 2, PGasFor the upper chamber's nitrogen of hydraulic cylinder 2 Pressure, S1For the cross-sectional area of the inner carrier of hydraulic cylinder 2, S2For the cross-sectional area of the inner piston rod of hydraulic cylinder 2.
The present invention is only illustrated with above-described embodiment, and the structure of each part, set location and its connection all can be have Changed.On the basis of technical solution of the present invention, all individual part is carried out improvement according to the principle of the invention or equivalent Conversion, should not exclude outside protection scope of the present invention.

Claims (7)

1. a kind of suspension arrangement of Deep Water Drilling Riser system, it is characterised in that:It includes fixed tray, hydraulic cylinder, pulley And movable tray;The fixed tray is fixedly connected on drilling well table top, is offered in the middle part of the fixed tray and is supplied water proof The through hole that pipe string is passed through;The hydraulic cylinder is uniformly arranged on the fixed tray for two or more and along the through hole edge, The piston rod top of the hydraulic cylinder is rotatably connected to pulley;Offer what is passed through for marine riser string in the middle part of the movable tray Through hole, the outside of the movable tray is connected with one end of steel wire rope, and the other end of the steel wire rope is bypassed and connected after the pulley It is connected on the fixed tray.
2. a kind of suspension arrangement of Deep Water Drilling Riser system as claimed in claim 1, it is characterised in that:The fixed support Two or more guiding slide rail is set on disk, and the guiding slide rail passes through movable tray.
3. a kind of suspension arrangement of Deep Water Drilling Riser system as claimed in claim 2, it is characterised in that:The guiding is slided The top of rail is provided with limited block.
4. a kind of suspension arrangement based on the Deep Water Drilling Riser system as described in any one of claims 1 to 3 and implement Hanging method, comprises the following steps:
1) it is fixed on movable tray to hang chuck, hang and be provided with chuck suspension voussoir, marine riser string is through under drilling well table top Put, the suspension that voussoir completes marine riser string of hanging set in chuck is hung in the joint flange connection on marine riser string top;
2) hydraulic cylinder upper chamber pumps into nitrogen, and lower chambers pump into hydraulic oil, forms pressure reduction and promotes shifting, drive activity support on piston rod Move in disk, suspension chuck and marine riser string and depart from drilling well table top;
3) monitor drilling platform lifting motion acceleration and hydraulic cylinder epicoele room in nitrogen pressure change, set up in hydraulic cylinder The computation model of hydraulic oil, the pressure of the hydraulic cylinder lower chambers hydraulic oil adjusted by hydraulic pump, makes piston rod movement acceleration With drilling platforms acceleration of motion conversely, marine riser string drives the motion of marine riser to offset with the motion of drilling platforms with piston rod Disappear, reduce marine riser string and occur being compressed axially.
5. a kind of hanging method of the suspension arrangement for deep water riser system as claimed in claim 4, it is characterised in that: In the step 2) in, the pressure for pumping into nitrogen is 3000psi.
6. a kind of hanging method of the suspension arrangement for deep water riser system as claimed in claim 4, it is characterised in that: In the step 3) in, the acceleration of the drilling platform lifting motion is measured or monitoring platform heave by real-time monitoring platform Run duration course data seeking time derivative is obtained.
7. a kind of hanging method of the suspension arrangement for deep water riser system as claimed in claim 4, it is characterised in that: In the step 3) in, the computation model method for building up of the hydraulic cylinder inner high voltage oil is as follows:
1. when drilling platforms acceleration of motion upwards, then piston rod is moved downward, and by movable tray, hangs chuck and marine riser string As entirety, drawn according to Newton's second law:
Mg-nTcos α=Mat (1)
M is movable tray, the gross mass for hanging chuck and marine riser string in formula, and T is the pulling force of steel wire rope, and n is the individual of hydraulic cylinder Number, α is the angle of steel wire rope and vertical direction, and g is acceleration of gravity, atFor drilling platforms real time kinematics accekeration;
Force analysis is carried out for piston rod, its stress balance equation is:
POilS1=PGas(S1-S2)+2nTcosα (2)
P in formulaOilFor the pressure of hydraulic cylinder lower chambers hydraulic oil, PGasFor the pressure of hydraulic cylinder upper chamber nitrogen, S1To live in hydraulic cylinder The cross-sectional area of plug, S2For the cross-sectional area of piston in hydraulic cylinder bar;
Show that the computation model of hydraulic oil is with reference to (1) (2) formula:
2. when drilling platforms moves downward acceleration, then piston rod is moved upwards, by movable tray, hangs chuck and marine riser string As entirety, can be obtained according to Newton's second law:
NTcos α-Mg=Mat (4)
M is movable tray, the gross mass for hanging chuck and marine riser string in formula, and T is the pulling force of steel wire rope, and n is the individual of hydraulic cylinder Number, α is the angle of steel wire rope and vertical direction, and g is acceleration of gravity, atFor drilling platforms real time kinematics accekeration;
Force analysis is carried out for piston rod, its stress balance equation is:
POilS1=PGas(S1-S2)+2nTcosα (5)
P in formulaOilFor the pressure of hydraulic cylinder lower chambers hydraulic oil, PGasFor the pressure of hydraulic cylinder upper chamber nitrogen, S1To live in hydraulic cylinder The cross-sectional area of plug, S2For the cross-sectional area of piston in hydraulic cylinder bar;
Show that the computation model of hydraulic oil is with reference to (4) (5) formula:
3. the direction of drilling platforms acceleration is considered, orientation is lower to be upwards negative just, and the computation model of hydraulic oil is:
M is movable tray, the gross mass for hanging chuck and marine riser string in formula, and T is the pulling force of steel wire rope, and n is the individual of hydraulic cylinder Number, α is the angle of steel wire rope and vertical direction, and g is acceleration of gravity, atFor drilling platforms real time kinematics acceleration, POilFor liquid The pressure of cylinder pressure lower chambers hydraulic oil, PGasFor the pressure of hydraulic cylinder upper chamber nitrogen, S1For the cross-sectional area of piston in hydraulic cylinder, S2For the cross-sectional area of piston in hydraulic cylinder bar.
CN201710004606.6A 2017-01-04 2017-01-04 Suspension device and suspension method of water-secluding pipe system for deepwater well drilling Pending CN106639918A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710004606.6A CN106639918A (en) 2017-01-04 2017-01-04 Suspension device and suspension method of water-secluding pipe system for deepwater well drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710004606.6A CN106639918A (en) 2017-01-04 2017-01-04 Suspension device and suspension method of water-secluding pipe system for deepwater well drilling

Publications (1)

Publication Number Publication Date
CN106639918A true CN106639918A (en) 2017-05-10

Family

ID=58844224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710004606.6A Pending CN106639918A (en) 2017-01-04 2017-01-04 Suspension device and suspension method of water-secluding pipe system for deepwater well drilling

Country Status (1)

Country Link
CN (1) CN106639918A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386144A (en) * 2018-04-26 2018-08-10 四川宏华石油设备有限公司 A kind of marine riser conveyer
CN109209262A (en) * 2018-10-24 2019-01-15 兰州兰石石油装备工程股份有限公司 For clamping the hydraulic rotating chuck of marine drilling platform marine riser
CN109307584A (en) * 2018-11-28 2019-02-05 西南石油大学 A kind of device for simulating marine riser stress when deepwater drilling platform keeps away platform
CN109505537A (en) * 2018-12-25 2019-03-22 中国海洋石油集团有限公司 A kind of water proof tube suspension device and hanging method
CN111691834A (en) * 2020-06-12 2020-09-22 广州海洋地质调查局 Emergency hanging tubular column system and method for deepwater marine riser
CN112709539A (en) * 2020-12-29 2021-04-27 中国电建集团中南勘测设计研究院有限公司 Heave compensation device and method for deepwater drilling water-resisting casing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4620692A (en) * 1984-10-31 1986-11-04 Nl Industries, Inc. Crown block compensator
US20110005768A1 (en) * 2009-07-13 2011-01-13 Coles Robert A Method and apparatus for motion compensation during active intervention operations
CN102330541A (en) * 2011-08-05 2012-01-25 宝鸡石油机械有限责任公司 Marine drilling riser tensioning system
CN102628341A (en) * 2012-04-06 2012-08-08 宝鸡石油机械有限责任公司 Top tensioning device for waterproof casing tube
CN203321369U (en) * 2013-05-20 2013-12-04 宝鸡石油机械有限责任公司 Direct hydraulic cylinder type drill string heave compensation device
CN104265217A (en) * 2014-08-07 2015-01-07 中国海洋石油总公司 Hanging device for water isolating pipes and hanging method thereof
CN105649560A (en) * 2016-03-31 2016-06-08 中国石油大学(华东) Marine floating type drilling riser flexible hanger

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4620692A (en) * 1984-10-31 1986-11-04 Nl Industries, Inc. Crown block compensator
US20110005768A1 (en) * 2009-07-13 2011-01-13 Coles Robert A Method and apparatus for motion compensation during active intervention operations
CN102330541A (en) * 2011-08-05 2012-01-25 宝鸡石油机械有限责任公司 Marine drilling riser tensioning system
CN102628341A (en) * 2012-04-06 2012-08-08 宝鸡石油机械有限责任公司 Top tensioning device for waterproof casing tube
CN203321369U (en) * 2013-05-20 2013-12-04 宝鸡石油机械有限责任公司 Direct hydraulic cylinder type drill string heave compensation device
CN104265217A (en) * 2014-08-07 2015-01-07 中国海洋石油总公司 Hanging device for water isolating pipes and hanging method thereof
CN105649560A (en) * 2016-03-31 2016-06-08 中国石油大学(华东) Marine floating type drilling riser flexible hanger

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386144A (en) * 2018-04-26 2018-08-10 四川宏华石油设备有限公司 A kind of marine riser conveyer
CN108386144B (en) * 2018-04-26 2024-04-09 四川宏华石油设备有限公司 Riser conveying device
CN109209262A (en) * 2018-10-24 2019-01-15 兰州兰石石油装备工程股份有限公司 For clamping the hydraulic rotating chuck of marine drilling platform marine riser
CN109209262B (en) * 2018-10-24 2023-08-22 兰州兰石石油装备工程股份有限公司 Hydraulic rotary chuck for clamping marine drilling platform riser
CN109307584A (en) * 2018-11-28 2019-02-05 西南石油大学 A kind of device for simulating marine riser stress when deepwater drilling platform keeps away platform
CN109505537A (en) * 2018-12-25 2019-03-22 中国海洋石油集团有限公司 A kind of water proof tube suspension device and hanging method
CN111691834A (en) * 2020-06-12 2020-09-22 广州海洋地质调查局 Emergency hanging tubular column system and method for deepwater marine riser
CN112709539A (en) * 2020-12-29 2021-04-27 中国电建集团中南勘测设计研究院有限公司 Heave compensation device and method for deepwater drilling water-resisting casing

Similar Documents

Publication Publication Date Title
CN106639918A (en) Suspension device and suspension method of water-secluding pipe system for deepwater well drilling
CN107107998B (en) offshore drilling system, vessel and method
JP3187726B2 (en) Composite pipe lifting device for deep water drilling
CN109098675A (en) A kind of deep compensation device of passive type deep-sea liter for ocean platform drilling well
CN203798596U (en) Testing device used for drill column heaving compensation system
CN105217453B (en) Shock loading buffer
EP0141570B1 (en) Marine heave compensating method and device
US3189093A (en) Well drilling platform
CN105970960A (en) Walking pile driver
CN106044585A (en) Offshore wind turbine integral hoisting device with multi-degree of freedom compensation
CN116607921B (en) Direct-drive tower type oil pumping machine
WO2020024604A1 (en) Submarine drilling rig core-fetching cable device employing two-stroke pushing of cylinder
EP3155206A2 (en) Winches and hoisting systems with heave compensation
CN105507827A (en) Lifting oil cylinder type well drilling device
JP2002540329A (en) Method of mounting a plurality of risers or tendons and a ship performing the method
CN205918365U (en) Ocean reconnaissance ship hydraulic pressure plays to rise a type derrick drilling system
CN206161433U (en) Assembly pulley formula pneumatic cylinder loading test device
CN204827251U (en) Novel suit derrick upright
CN205822188U (en) A kind of stride piling machine
CN103979416A (en) Wave compensation execution device for crane ship A support
US2685378A (en) Method for handling drill pipe
CN205063835U (en) Novel hydraulic drive derrick mechanism
CN208486842U (en) A kind of tower-type headframe jack up unit
CN209908424U (en) Simple hydraulic workover rig for offshore platform
CN109368514B (en) Wave compensation device for offshore floating crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC research institute limited liability company

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC Research Institute

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510