RU2177548C1 - Method of mining the tailings dumps - Google Patents
Method of mining the tailings dumps Download PDFInfo
- Publication number
- RU2177548C1 RU2177548C1 RU2000109645/03A RU2000109645A RU2177548C1 RU 2177548 C1 RU2177548 C1 RU 2177548C1 RU 2000109645/03 A RU2000109645/03 A RU 2000109645/03A RU 2000109645 A RU2000109645 A RU 2000109645A RU 2177548 C1 RU2177548 C1 RU 2177548C1
- Authority
- RU
- Russia
- Prior art keywords
- tailings
- trench
- mining
- belt conveyer
- deposits
- Prior art date
Links
Images
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
Description
Изобретение относится к горному делу и может быть использовано при разработке маломощных и мощных техногенных месторождений, в частности для извлечения ценных компонентов редких и благородных металлов из старых, осушенных хвостохранилищ. The invention relates to mining and can be used in the development of low-power and powerful technogenic deposits, in particular for the extraction of valuable components of rare and precious metals from old, drained tailings.
Известен способ разработки хвостохранилищ [а.с. N 1642016, мкл. 5 E 21 C 41/32, публ. БИ N 14, 88]. Он заключается в том, что хвосты отрабатываются прямым ходом экскаватора при отработке слоями сверху вниз с погрузкой их в транспортные средства и транспортировкой за пределы хвостохранилища. A known method for the development of tailings [and.with. N 1642016, μl. 5 E 21 C 41/32 publ. BI N 14, 88]. It consists in the fact that the tails are worked out by the forward stroke of the excavator when working out in layers from top to bottom with their loading in vehicles and transportation outside the tailing dump.
Однако известный способ обладает недостатками, связанными с тем, что хвостохранилища отрабатываются валовым способом, не позволяющим избирательно извлекать только богатые прослойки полезных компонентов, что требует дополнительных затрат на добычу и обогащение руды. However, the known method has disadvantages associated with the fact that the tailings are mined by the gross method, which does not allow selective extraction of only rich layers of useful components, which requires additional costs for the extraction and concentration of ore.
Задачей предлагаемого изобретения является повышение эффективности путем селективного извлечения ценных компонентов редких и благородных металлов техногенных месторождений, в частности, из старых, осушенных хвостохранилищ. The objective of the invention is to increase efficiency by selective extraction of valuable components of rare and precious metals from industrial deposits, in particular, from old, drained tailings.
Поставленная задача достигается тем, что в способе разработки хвостохранилищ, заключающемся в прохождении траншеи, формировании дна траншеи и отработке хвостов по обе стороны траншеи, погрузке и транспортировке их за пределы хвостохранилища, площадь хвостохранилища делят на выемочные блоки, по центру которых проходят траншею и дно траншеи оформляют ниже обогащенных прослоек, в которых бурят горизонтальные скважины с оставлением между ними целиков, причем руду из пропластка перемещают до устья скважины, где перегружают на ленточный конвейер для дальнейшего транспортирования на обогатительную фабрику. The problem is achieved in that in the method of developing tailings, which consists in passing the trench, forming the bottom of the trench and working the tails on both sides of the trench, loading and transporting them outside the tailings, the area of the tailings is divided into excavation blocks, in the center of which pass the trench and the bottom of the trench form below the enriched interlayers in which horizontal wells are drilled with the pillars left between them, and the ore from the interlayer is moved to the wellhead, where it is reloaded onto a tape Weier for further transport to the processing plant.
Сущность предлагаемого изобретения поясняется нижеследующим описанием и прилагаемыми к нему чертежами, где на фиг. 1 изображен поперечный разрез хвостохранилища по Б-Б; на фиг. 2 - план по разрезу А-А фиг. 1. The essence of the invention is illustrated by the following description and the accompanying drawings, where in FIG. 1 shows a transverse section of the tailing dump along BB; in FIG. 2 is a plan along section AA of FIG. 1.
1 - выемочные блоки;
2 - траншея;
3 - ленточный конвейер;
4 - бурошнековая установка;
5 - пустые породы;
6 - пропласток, обогащенный полезным компонентом;
7 - межходовые целики;
8 - скважины.1 - excavation blocks;
2 - trench;
3 - belt conveyor;
4 - a screw screw installation;
5 - gangue;
6 - interlayer enriched with a useful component;
7 - cross-pass pillars;
8 - wells.
Предлагаемый способ осуществляется следующим образом. Площадь хвостохранилища делится на выемочные блоки 1, по центру которых с помощью землеройной техники (драглайна) проходят траншею 2 с формированием ее дна ниже обогащенных пропластков, в которой устанавливается ленточный конвейер 3 для транспортирования полезного ископаемого. Для бурения горизонтальных скважин 8 в массиве применяется бурошнековая установка 4, располагаемая на платформе, перемещаемой по раме ленточного конвейера 3. Транспортирование отделенного от массива полезного ископаемого производится шнеком до устья скважины 8, где буровая мелочь поступает на ленточный конвейер 3 для дальнейшего транспортирования на обогатительную фабрику. Отбойку ведут одновременно с двух сторон траншеи. Между параллельно пробуренными горизонтальными скважинами 8 предусматривается оставление целиков 7, которые дадут возможность производить выемку полезного ископаемого без зажима бурошнековой установки 4. Под действием горного давления межходовые целики 7 будут разрушаться, а вышележащие горные породы плавно опускаться, заполняя выработанное пространство. The proposed method is as follows. The tailing dump area is divided into mining blocks 1, in the center of which, using earthmoving equipment (dragline), a
Использование предлагаемого способа позволит предусмотреть более рациональное использование отходов запасов месторождений и значительно повысить эффективность извлечения ценных полезных компонентов редких и благородных металлов техногенных месторождений из старых, осушенных хвостохранилищ. Using the proposed method will allow for more rational use of waste reserves of deposits and significantly increase the efficiency of extraction of valuable useful components of rare and noble metals from industrial deposits from old, drained tailings.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2000109645/03A RU2177548C1 (en) | 2000-04-17 | 2000-04-17 | Method of mining the tailings dumps |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2000109645/03A RU2177548C1 (en) | 2000-04-17 | 2000-04-17 | Method of mining the tailings dumps |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2177548C1 true RU2177548C1 (en) | 2001-12-27 |
Family
ID=20233448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2000109645/03A RU2177548C1 (en) | 2000-04-17 | 2000-04-17 | Method of mining the tailings dumps |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2177548C1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101936166A (en) * | 2010-08-03 | 2011-01-05 | 江西稀有金属钨业控股集团有限公司 | In-situ leaching, drainage and liquid collection process with diversion holes |
RU2465462C1 (en) * | 2011-04-22 | 2012-10-27 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Tailing storage development method |
RU2466274C1 (en) * | 2011-05-10 | 2012-11-10 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method to mine tailing storage facility |
RU2773166C1 (en) * | 2021-10-27 | 2022-05-31 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тульский государственный университет" (ТулГУ) | Method for dismantling conical and ridge technogenic mineral formations |
-
2000
- 2000-04-17 RU RU2000109645/03A patent/RU2177548C1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
РАХИМОВ З.Р. и др. Некоторые вопросы геомеханики при эксплуатации хвостохранилищ. - Ташкент: ФАИ, 1978, с.8. * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101936166A (en) * | 2010-08-03 | 2011-01-05 | 江西稀有金属钨业控股集团有限公司 | In-situ leaching, drainage and liquid collection process with diversion holes |
CN101936166B (en) * | 2010-08-03 | 2013-03-13 | 江西稀有金属钨业控股集团有限公司 | In-situ leaching, drainage and liquid collection process with diversion holes |
RU2465462C1 (en) * | 2011-04-22 | 2012-10-27 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Tailing storage development method |
RU2466274C1 (en) * | 2011-05-10 | 2012-11-10 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method to mine tailing storage facility |
RU2773166C1 (en) * | 2021-10-27 | 2022-05-31 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Тульский государственный университет" (ТулГУ) | Method for dismantling conical and ridge technogenic mineral formations |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hustrulid et al. | Underground mining methods: Engineering fundamentals and international case studies | |
US3712677A (en) | Mining method | |
RU2303132C1 (en) | Method for bedded deposit development with heading-and-stall method | |
RU2558051C1 (en) | Method of open development of deposits of solid mineral resources | |
RU2177548C1 (en) | Method of mining the tailings dumps | |
RU2524716C1 (en) | Strip mining of minerals including working of ore bodies in contact between ore and capping in sub-benches | |
RU2439321C1 (en) | Open-underground method of bedded deposits mining | |
RU2248448C1 (en) | Method for extraction of steep-falling deposits of weak ores | |
RU2488693C1 (en) | Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system | |
RU2400625C1 (en) | Method for combined development of mineral deposits | |
RU2285121C1 (en) | Method for open underground extraction of series of slightly inclined coal beds | |
RU2360118C1 (en) | Method of open development of bedded deposit of minerals | |
RU2148713C1 (en) | Method for opencast mining of sloping and steep deposits of minerals | |
SU987103A1 (en) | Method of working thick horizontal and gently sloping deposits | |
RU2099524C1 (en) | Combined method of mining of formation of steeply dipping coal seams | |
RU2312988C1 (en) | Method for selective hollow coal bed cutting | |
RU2204721C1 (en) | Method of opencast mining of mineral beds | |
RU2232894C1 (en) | Method for subterranean excavation of mineral deposits by means of chamber-column method | |
CN111946393B (en) | Coal mining system and method for overlong solid filling working face | |
CN111456742B (en) | High-grade common mining opposite-drawing working face roadway of thin coal seam and forming method thereof | |
RU2235205C2 (en) | Method for opencast mining blanket deposits | |
RU1806267C (en) | Process of combined development of deposit | |
UA32583U (en) | Method for development of steep shallow ore deposits in contour zone of pits | |
SU732531A1 (en) | Method for open mining of mineral deposits | |
RU2215148C2 (en) | Method of opencast mining of permafrost placer deposits with internal dump formation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20020418 |