RU2091537C1 - Method of gully elimination - Google Patents

Method of gully elimination Download PDF

Info

Publication number
RU2091537C1
RU2091537C1 RU95116065A RU95116065A RU2091537C1 RU 2091537 C1 RU2091537 C1 RU 2091537C1 RU 95116065 A RU95116065 A RU 95116065A RU 95116065 A RU95116065 A RU 95116065A RU 2091537 C1 RU2091537 C1 RU 2091537C1
Authority
RU
Russia
Prior art keywords
dam
ravine
sediments
reservoir
erected
Prior art date
Application number
RU95116065A
Other languages
Russian (ru)
Other versions
RU95116065A (en
Inventor
В.П. Ягин
В.А. Кореньков
Н.Н. Нейланд
Original Assignee
Акционерное общество Красноярский проектно-изыскательский институт "Гидропроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество Красноярский проектно-изыскательский институт "Гидропроект" filed Critical Акционерное общество Красноярский проектно-изыскательский институт "Гидропроект"
Priority to RU95116065A priority Critical patent/RU2091537C1/en
Publication of RU95116065A publication Critical patent/RU95116065A/en
Application granted granted Critical
Publication of RU2091537C1 publication Critical patent/RU2091537C1/en

Links

Images

Abstract

FIELD: agriculture and forestry, particular, elimination of gullies, mainly, at banks of water basin with varying water level. SUBSTANCE: the offered method includes erection of dam to form pool-settler with sediments before dam. After accumulation of sediments, a dam is erected which is located partially on the crest of the previous dam, and partially, on sediments of previous dam to form before next a pool with sediments. After accumulation of sediments before the last small dam, next dam is erected using the same method. EFFECT: higher efficiency. 2 dwg

Description

Изобретение относится к сельскому и лесному хозяйству, а также к мелиорации, в частности к ликвидации оврагов преимущественно на берегу водоема с переменным уровнем воды. The invention relates to agriculture and forestry, as well as to land reclamation, in particular to the elimination of ravines mainly on the banks of a reservoir with a variable water level.

Известен способ ликвидации оврагов, заключающийся в засыпке оврагов балластным материалов (RU, патент N 2004091, кл. A 01 B 13/16, 1993). Недостатком способа являются высокие затраты, обусловленные большими объемами работ по засыпке глубоких и длинных оврагов. A known method of eliminating gullies, which consists in filling the gullies with ballast materials (RU, patent N 2004091, class A 01 B 13/16, 1993). The disadvantage of this method is the high cost due to the large amount of work on backfilling deep and long ravines.

Известен способ ликвидации оврагов, заключающийся с сочетании искусственных посадок деревянистых кустарников и естественного возобновления растительности (Солонко В. В. Овраги и борьба с ними, Иркутск, 1979, с. 25). Однако такой способ приводит к затуханию оврага только в случае, если зарегулирован весь его водосбор, а основной тальверг оврага имеет общий уклон не более 10-12o.There is a method of eliminating ravines, which consists of a combination of artificial plantings of woody shrubs and the natural renewal of vegetation (Solonko V.V. Ravines and the fight against them, Irkutsk, 1979, p. 25). However, this method leads to the attenuation of the ravine only if its entire catchment is regulated, and the main talverge of the ravine has a total slope of not more than 10-12 o .

Известен способ ликвидации оврагов, заключающийся в отделении стока от бортов оврага, уполаживании боковых склонов оврага с закреплением их посевами многолетних трав и кустарников и заключении ручья, протекающего по дну оврага, в неразмываемую одежду (Солонко В.В. Овраги и борьба с ними, Иркутск, 1979. с. 36). Однако реализация этого способа связана с высокими затратами. There is a method of eliminating ravines, which consists in separating runoff from the sides of the ravine, flattening the side slopes of the ravine with securing them with crops of perennial grasses and shrubs, and enclosing a stream flowing along the bottom of the ravine in indelible clothing (Solonko V.V. Ravines and the fight against them, Irkutsk , 1979.p. 36). However, the implementation of this method is associated with high costs.

Известен способ ликвидации оврагов, включающий возведение плотинок из камня поперек оврага с образованием перед каждой плотинкой прудка-отстойника, причем первую плотинку возводят в устье оврага, а последующие плотинки возводят каждый раз с удалением от устья оврага выше прудка-отстойника и после накопления отложений перед предыдущей плотинкой (Солонко В.В. "Овраги и борьба с ними" Иркутск, 1971, с.36). Однако при этом способе возможно превращение оврага только в балку, что не позволяет земельный участок полностью ввести в хозяйственный оборот, а в случае расположения оврага на берегу водоема с переменным уровнем воды в нем этот способ становится слабоэффективным из-за дальнейшего разрушения бортов оврага в его устьевой части в результате волнового и ледового воздействия при высоких уровнях воды в водоеме. There is a method of eliminating ravines, including the construction of dams of stone across the ravine with the formation of a settling pond in front of each dam, the first dam being erected at the mouth of the ravine, and subsequent dams being erected each time with removal from the mouth of the ravine above the settling pond and after accumulation of deposits before the previous dam (Solonko VV "Gullies and the fight against them" Irkutsk, 1971, p. 36). However, with this method, the ravine can only be converted into a beam, which does not allow the land to be fully put into economic circulation, and if the ravine is located on the shore of a reservoir with a variable water level in it, this method becomes ineffective due to further destruction of the sides of the ravine in its wellhead parts as a result of wave and ice exposure at high water levels in the reservoir.

технический результат от использования изобретения заключается в повышении эффективности известного способа за счет переформирования оврага в ложбину с уположенными естественным путем бортами и за счет полного восстановления поверхности берега водоема и придания ему неразмываемости. the technical result from the use of the invention is to increase the efficiency of the known method by transforming the ravine into a hollow with naturally laid sides and due to the complete restoration of the surface of the shore of the reservoir and making it indelible.

Этот технический результат достигается за счет того, что в способе ликвидации оврагов преимущественно на берегу водоема с переменным уровнем воды, включающий возведение плотинок из камня поперек оврага с образованием перед каждой плотинкой пруда-отстойника, причем первую плотинку возводят в устье оврага, а последующие плотинки возводят каждый раз после накопления отложений перед предыдущей плотинкой, согласно изобретению, каждую последующую плотинку возводят путем ее расположения частично на гребне предыдущей плотинки, а частично на отложениях, при этом поверхность откосов плотинок со стороны водоема совмещают с поверхностью берега водоема, а гребень последней плотинки располагают выше наката волны на берег водоема. Дополнительно гребень последней плотинки располагают на высоте, обеспечивающей формирование на месте оврага ложбины с устойчивым продольным уклоном. This technical result is achieved due to the fact that in the method of eliminating ravines mainly on the shore of a reservoir with a variable water level, including the construction of dams of stone across the ravine with the formation of a settling pond in front of each dam, the first dam being erected at the mouth of the ravine, and subsequent dams being erected each time after the accumulation of deposits in front of the previous dam, according to the invention, each subsequent dam is erected by its location partially on the crest of the previous dam, and partially on sediments, while the surface of the slopes of the dams from the side of the reservoir is combined with the surface of the shore of the reservoir, and the crest of the last dam is located above the wave run to the shore of the reservoir. Additionally, the crest of the last dam is located at a height that ensures the formation of a ravine in place of a ravine with a stable longitudinal slope.

Сущность технического решения заключается в том, что в результате постоянного нахождения в устье оврага прудка-отстойника, прекращается вынос из оврага в водоем твердого стока, образующегося в результате водной эрозии поверхности водосборной площадки, бортов и дна оврага, а также в результате обрушения бортов устьевого участка оврага при возведении на них льда и волны водоема с переменным уровнем воды, вследствие чего происходит быстрое заиление оврага с одновременным уполаживанием естественным путем его бортов, особенно на устьевом участке. Расположение же всех плотинок ярусами непосредственно в устье оврага и выполнение их из камня обеспечивает восстановление участка берега, нарушенного оврагом, придания этому участку берега неразмываемости и отвод воды из прудка-отстойника в водоем через проницаемые тела плотинок с переливом через гребни плотинок или без перелива, например, путем устройства водосбросного колодца, периодически наращиваемого по высоте. Плотинки, расположенные ярусами частично на отложениях, известны как дамбы обвалования золоотвалов. Однако они, будучи поставленные в заявленную совокупность признаков, обеспечивают получение указанного нового технического результата, причем в новой задаче, что и обеспечивает преимущества заявленного технического решения над известными. The essence of the technical solution lies in the fact that as a result of the constant presence of a settling pond at the mouth of the ravine, the solid runoff from the ravine to the reservoir stops, resulting from water erosion of the surface of the drainage area, the sides and bottom of the ravine, and also as a result of the collapse of the sides of the estuary the ravine when erecting ice and waves of a reservoir with a variable water level on them, as a result of which there is a rapid siltation of the ravine with a simultaneous smoothing of its sides in a natural way, especially on the estuary part time. The location of all dams with tiers directly at the mouth of the ravine and their execution from stone ensures the restoration of the coastal part disturbed by the ravine, imparting indelibility to this stretch of the coast, and the removal of water from the settling pond into the reservoir through permeable bodies of the dams with overflow through the crests of dams or without overflow, for example , by arranging a spillway well periodically incremented in height. Dams located in tiers partially on the sediments are known as dams of the ash dumps. However, they, being put in the claimed combination of features, provide the specified new technical result, and in a new task, which provides the advantages of the claimed technical solution over the known ones.

На фиг. 1 изображен овраг в процессе его ликвидации, план; на фиг. 2- сечение А-А по фиг. 1. In FIG. 1 depicts a ravine in the process of its elimination, plan; in FIG. 2- section AA in FIG. one.

Способ осуществляют следующим образом. The method is as follows.

В борту 1 оврага 2 на его устьевом участке 3 при низком уровне 4 воды в водоеме 5 формируют выположенный спуск 6. После чего непосредственно в устье оврага 2 и поперек его возводят первую (нижнюю) плотинку 7 с образованием перед нею прудка-отстойника с отложениями 8. После накопления отложений 8 возводят вторую (среднюю) плотинку 9, которую располагают частично на гребне плотинки 7, а частично на отложениях 8 с образованием перед плотинкой 9 прудка-отстойника с отложениями 10. после накопления отложений 10 возводят последнюю (верхнюю) плотинку 11, которую располагают частично на гребне плотинки 9, а частично на отложениях 10 с образованием перед плотинкой 11 прудка-отстойника с отложениями 12. On board 1 of the ravine 2, at its mouth portion 3, at a low level of 4 water in the pond 5, a laid down slope 6 is formed. After that, the first (lower) dam 7 is erected directly at the mouth of the ravine 2 and across it to form a settling pond in front of it with sediments 8 After the accumulation of deposits 8, a second (middle) dam 9 is built, which is partially located on the crest of the dam 7, and partially on deposits 8 with the formation of a settling pond with sediments in front of the dam 9. After the accumulation of deposits 10, the last (upper) dam 11 is erected, which they are located partly on the crest of dam 9, and partly on deposits 10 with the formation of a settling pond with sediments 12 in front of the dam 11.

Плотинка 7.9 и 11 возводят из камня и фильтровыми слоями 13 отделяют от отложений 4,10 и 12, от дна 14 и бортов 1 оврага 2. а поверхность откосов плотинок 7, 9 и 11 со стороны водоема 5 совмещают с поверхностью берега 15 водоема 5. Гребень верхней плотинки 11 располагают выше наката волны 16 на берег 15 при максимальном уровне 17 воды в водоеме 5, причем на высоте, обеспечивающей формирование на месте оврага ложбины с устойчивым продольным уклоном iо, величина которого зависит от свойство отложений и от характера закрепления ложбины (посев многолетних трав, кустарников и т.д.) и обычно iо≅0,18.Dam 7.9 and 11 are erected from stone and separated by filter layers 13 from sediments 4.10 and 12, from bottom 14 and sides 1 of ravine 2. And the surface of the slopes of the dams 7, 9 and 11 from the side of the reservoir 5 is combined with the surface of the shore 15 of the reservoir 5. The crest of the upper dam 11 is located above the run-up of wave 16 to shore 15 at a maximum level of 17 water in the reservoir 5, and at a height that ensures the formation of a ravine in place of a ravine with a stable longitudinal slope i о , the magnitude of which depends on the property of sediments and on the nature of fixing the hollow ( sowing perennial herbs, cous tarnikov, etc.) and usually i about ≅0.18.

Сброс осветленной воды из прудков-отстойника осуществляют в водоем 5 посредством водопроницаемых плотинок 7, 9 и 11 и переливом через их гребни, а в случае высоких расходов, которые могут возникнуть при большой водосборной площади, посредством водосбросного колодца 18, наращиваемого по высоте по мере накопления отложений 8, 10 и 12. The clarified water is discharged from the settling ponds into the reservoir 5 by means of permeable dams 7, 9 and 11 and overflow through their ridges, and in case of high costs that may occur with a large catchment area, by means of a spillway 18, which increases in height as it accumulates sediments 8, 10 and 12.

Уположение бортов 1 оврага 2 осуществляют естественным путем в процессе накопления отложений 8, 10 и 12, а при необходимости посредством землеройной техники. Одновременно плотинки 7, 9 и 11 защищают восстановленную часть берега 15 водоема 5 от размыва. The position of the sides 1 of the ravine 2 is carried out naturally in the process of accumulation of deposits 8, 10 and 12, and, if necessary, through excavation equipment. At the same time, dams 7, 9 and 11 protect the restored part of the shore 15 of the reservoir 5 from erosion.

Изобретение позволяет повысить эффективность известного способа ликвидации оврагов за счет переформирования оврага в ложбину с уположениями естественным путем бортами и за счет восстановления поверхности берега водоема и придания ему неразмываемости. The invention improves the efficiency of the known method of eliminating ravines by transforming the ravine into a hollow with natural sidewalls and by restoring the surface of the shore of the reservoir and making it indelible.

Claims (1)

Способ ликвидации оврага, образованного в берегу водоема с переменным уровнем воды, включающий возведение поперек оврага плотинок из камня с обратным фильтром на верховом откосе каждой плотинки и с образованием перед каждой плотинкой прудка-отстойника, причем примыкающую к основанию оврага плотинку возводят в его устье, а последующие по высоте оврага плотинки возводят каждый раз после накопления отложений перед предыдущей плотинкой, отличающийся тем, что каждую последующую по высоте оврага плотинку возводят путем ее расположения частично на гребне предыдущей плотинки, а частично на отложениях, при этом поверхность откосов плотинок со стороны водоема совмещают с поверхностью берега водоема, а гребень последней по высоте оврага плотинки располагают выше наката волны на берег водоема. A method of eliminating a ravine formed on the shore of a reservoir with a variable water level, including erecting dams of stone across the ravine with a reverse filter on the upper slope of each dam and forming a settling pond in front of each dam, and a dam adjacent to the base of the ravine is erected at its mouth, and subsequent dams along the height of the ravine are erected each time after accumulation of sediments in front of the previous dam, characterized in that each subsequent dams along the height of the ravine is erected by its location frequently typically on the crest of the previous dam, and partially on the sediments, while the surface of the slopes of the dams on the side of the reservoir is combined with the surface of the shore of the reservoir, and the crest of the last height of the dam ravine is located above the wave run to the shore of the reservoir.
RU95116065A 1995-09-13 1995-09-13 Method of gully elimination RU2091537C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU95116065A RU2091537C1 (en) 1995-09-13 1995-09-13 Method of gully elimination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU95116065A RU2091537C1 (en) 1995-09-13 1995-09-13 Method of gully elimination

Publications (2)

Publication Number Publication Date
RU95116065A RU95116065A (en) 1997-09-10
RU2091537C1 true RU2091537C1 (en) 1997-09-27

Family

ID=20172093

Family Applications (1)

Application Number Title Priority Date Filing Date
RU95116065A RU2091537C1 (en) 1995-09-13 1995-09-13 Method of gully elimination

Country Status (1)

Country Link
RU (1) RU2091537C1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Солонко В.В. Овраги и борьба с ними. - Иркутск, 1971, с. 36. *

Similar Documents

Publication Publication Date Title
CN100577918C (en) Watershed weir series treating soil erosion and constructing method thereof
CN102874972A (en) Pre-reservoir series system of purification for non-point source pollution in hilly and mountainous area agriculture
CN104773835B (en) A kind of Paddy Field in Irrigated Area surrounding water-discharging at fixed point wetland constructing system
CN101233842A (en) Method and facility for killing oncomelania
KR0147725B1 (en) Revetment method for making the sand bed of natural type watercourse
RU2091537C1 (en) Method of gully elimination
CN111893948A (en) Ecological wetland revetment structure based on river and lake terrain remodeling and construction method thereof
KR0147724B1 (en) Revetment method for making the curve point of natural type watercourse
Singh et al. Case history on malaria vector control through the application of environmental management in Malaysia
KR0147723B1 (en) A revetment method for making natural type watercourse
RU2011735C1 (en) Earth- filled dam with filtering spillway
Schultze et al. Emergency measures for streambank stabilization: an evaluation
RU2770692C1 (en) Method for preventing the inflow of surface water from the territory of areal and point sources of pollution
CN113045139B (en) Ecological restoration method for lugu lake big grass sea degraded wetland
SU821648A1 (en) Land reclamation system
RU2050436C1 (en) Meliorative system
SU1604172A1 (en) Device for protecting gullies against outwashing with surface flow
SU1047402A1 (en) Method of reclamation of erosive slopings
RU2261953C1 (en) Soil desalinization method
SU1446231A1 (en) System for drying bogland of terraces
RU2021648C1 (en) Slime filter
SU1664127A1 (en) Forest reclamation method of soil protection against erosion
RU2016163C1 (en) Method of underwater formation of silting structure layer
SU1667651A1 (en) Method of consolidating gullies with numerous branches
SU1454267A1 (en) Method of preparing the surface of spoil heaps for afforestation