RU2087618C1 - Micropile and device for its prestressing - Google Patents

Micropile and device for its prestressing Download PDF

Info

Publication number
RU2087618C1
RU2087618C1 RU9494028643A RU94028643A RU2087618C1 RU 2087618 C1 RU2087618 C1 RU 2087618C1 RU 9494028643 A RU9494028643 A RU 9494028643A RU 94028643 A RU94028643 A RU 94028643A RU 2087618 C1 RU2087618 C1 RU 2087618C1
Authority
RU
Russia
Prior art keywords
pipe
reinforcement
foundation
well
mortar
Prior art date
Application number
RU9494028643A
Other languages
Russian (ru)
Other versions
RU94028643A (en
Inventor
Стен Ролан
Original Assignee
Буйг
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Буйг filed Critical Буйг
Publication of RU94028643A publication Critical patent/RU94028643A/en
Application granted granted Critical
Publication of RU2087618C1 publication Critical patent/RU2087618C1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Micro-Organisms Or Cultivation Processes Thereof (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

FIELD: construction engineering. SUBSTANCE: device has pipe which is located in foundation around upper part of reinforcement and is cemented with foundation, means for bringing compressing force upon reinforcement during certain period of time, and means for introducing liquid construction mortar into pipe around compressed reinforcement to fill space between micropile and pipe. This procedure is used for making micropiles in restoration and repair of foundations of existing buildings and structures. EFFECT: high efficiency. 6 cl, 1 dwg

Description

Настоящее изобретение относится к микросваям и устройству их предварительного напряжения, используемым в качестве элементов для восстановления и ремонта фундаментов эксплуатируемых зданий и сооружений. The present invention relates to micro piles and their prestressing device, used as elements for the restoration and repair of the foundations of operating buildings and structures.

Микросвая свая небольшого диаметра, обычно для скважин диаметром самое большее равным 250 мм, снабженная арматурой и системой нагнетания в грунт. Она включает нижнюю часть, залитую в грунте, и верхнюю часть, жестко соединенную с фундаментом здания, которое нужно поддержать. Сжимающее усилие, соответствующее нагрузке для восстановления, передается от фундамента на грунт через микросваи, которая вследствие законов теории упругости, укорачивается. Когда микросвая полностью выполнит свою роль фундамента, она, следовательно, уже осядет на величину, которая может сказаться несравнимой с осадкой фундамента. A micro pile of small diameter, usually for wells with a diameter of at most 250 mm, equipped with reinforcement and an injection system into the ground. It includes the lower part, flooded in the ground, and the upper part, rigidly connected to the foundation of the building, which needs to be supported. The compressive force corresponding to the load for restoration is transmitted from the foundation to the ground through micro piles, which, due to the laws of the theory of elasticity, are shortened. When the micropile fully fulfills its foundation role, it, therefore, will already settle to a value that can affect incomparable settlement of the foundation.

Наиболее близким к изобретению по своей сущности и достигаемому результату является устройство для предварительного напряжения микросваи, предназначенной для поддержания фундамента, которое включает в себя скважину в фундаменте, трубу, предназначенную для введения в эту скважину, затвердеваемый раствор для введения между трубой и стенкой скважины, чтобы скрепить трубу с фундаментом, арматуру, имеющую нижнюю часть, которую вводят в нижележащий грунт в фундаменте, и верхнюю часть, которую вводят в трубу, затвердеваемое вещество для нагнетания вокруг нижней части арматуры, чтобы закрепить эту нижнюю часть в грунте, средства, чтобы мгновенно оказывать давление на арматуру, затвердеваемое вещество и средство для введения этого вещества в пространство, расположенное между верхней частью арматуры и трубой; а также микросвая, предварительно напряженная, для поддерживания фундамента, включающая в себя трубу, размещаемую в скважине, выполненной в фундаменте и скрепляемую со стенкой скважины с помощью затвердевшего строительного раствора, арматуру, имеющую нижнюю часть, скрепляемую в нижележащем грунте с фундаментом, и верхнюю часть, которая проходит в трубу и сжата, и затвердеваемое вещество в пространстве между этой верхней частью и трубой [1]
Целью изобретения является существенное уменьшение этого недостатка, с помощью приложения к микросвае усилия предварительного напряжения, которое позволит сделать ее активной посредством незначительных движений. Кроме того, изобретение позволяет определить величину усилия предварительного напряжения, вызывающего нарушение сплошности поддерживаемой структуры.
Closest to the invention in its essence and the achieved result is a device for prestressing a micropile designed to support the foundation, which includes a well in the foundation, a pipe intended for introduction into this well, a hardened solution for injection between the pipe and the wall of the well, fasten the pipe to the foundation, reinforcement having a lower part that is introduced into the underlying soil in the foundation, and the upper part that is introduced into the pipe, a hardened substance for pumping Thaniah around the bottom of the fitting to lock the lower part in the ground, means to instantly apply pressure to the valve, the substance solidifies, and means for introducing the substance into the space located between the upper reinforcement and the tube; as well as a micropile pre-stressed to support the foundation, including a pipe placed in the well, made in the foundation and fastened to the wall of the well with the hardened mortar, reinforcement having a lower part, fastened in the underlying soil with the foundation, and the upper part which passes into the pipe and is compressed, and the solidified substance in the space between this upper part and the pipe [1]
The aim of the invention is to significantly reduce this disadvantage, by applying a pre-stress force to the micro pile, which will make it active through minor movements. In addition, the invention allows to determine the magnitude of the prestressing force, causing a disruption in the continuity of the supported structure.

Согласно изобретению для создания предварительного напряжения микросвая, предназначенной для поддержания фундамента, и имеющей арматуру, нижняя часть которой должна быть залита в грунте, лежащем ниже фундамента, а верхняя часть должна быть жестко соединена с фундаментом, используют устройство, включающее трубу, которую можно размещать вокруг указанной верхней части арматуры микросваи и заливать, заделывать в фундамент, средства для оказания на короткое время давления, сжатия на указанную арматуру микросваи и средства, чтобы ввести в трубу вокруг спрессованной, сжатой арматуры жидкий строительный раствор для заливки арматуры трубы. According to the invention, to create a prestress micro-pile designed to support the foundation, and having reinforcement, the lower part of which must be filled in the soil lying below the foundation, and the upper part must be rigidly connected to the foundation, use a device that includes a pipe that can be placed around the specified upper part of the reinforcement of the micropiles and pour, close up into the foundation, means for applying pressure for a short time, compressing the specified reinforcement of the micropiles and means to introduce Uba around compacted, compressed reinforcement liquid mortar to fill the pipe fittings.

В предпочтительных способах реализации:
средства для оказания давления на арматуру микросваи включают уплотнение, расположенное вокруг арматуры микросваи в трубе, средства для создания в трубе герметичной камеры над этим уплотнением и этой арматурой и средства для введения жидкости под давлением в эту камеру;
средства для создания указанной камеры включают колпачок, навинченный на верхний конец трубы и снабженный патрубком для связи с центральным постом гидравлической системы;
средства для введения жидкого строительного раствора для заливки в зону, располагаемую между трубой и арматурой, имеют трубопровод, соединенный с источником жидкого строительного раствора, который заканчивается в трубе под указанным уплотнением.
In preferred methods of implementation:
means for applying pressure to the micro-pile reinforcement include a seal located around the micro-pile reinforcement in the pipe, means for creating a sealed chamber in the pipe above this seal and this reinforcement, and means for introducing pressure fluid into this chamber;
means for creating the specified chamber include a cap screwed on to the upper end of the pipe and provided with a pipe for communication with the Central post of the hydraulic system;
Means for introducing a liquid mortar for pouring into the zone located between the pipe and the fittings have a pipeline connected to the source of the liquid mortar, which ends in the pipe under the specified seal.

Предварительно напряженная микросвая согласно изобретению жестко соединена с фундаментом с помощью трубы, размещенной вокруг арматуры микросваи, причем указанная труба проходит в скважину, жестко соединенную с фундаментом и залитую с этой скважиной затвердевающим материалом для заливки, а указанная арматура микросваи имеет нижнюю часть, заделанную в грунт, лежащий ниже фундамента и верхнюю часть, сжатую и залитую в трубе с помощью твердеющего жидкого строительного раствора. The prestressed micropile according to the invention is rigidly connected to the foundation by means of a pipe placed around the reinforcement of the micropile, said pipe passing into a well rigidly connected to the foundation and filled with this well with hardening material for pouring, and said micropile reinforcement has a lower part embedded in the ground lying below the foundation and the upper part, compressed and poured into the pipe using a hardening mortar.

Ниже будет описан пример применения устройства согласно изобретению со ссылкой на чертеж, который представляет собой вертикальный разрез микросваи, снабженной устройством. An example of the application of the device according to the invention will be described below with reference to the drawing, which is a vertical section of a micropile provided with the device.

Микросвая в основном состоит из трубчатой арматуры 1, которая погружена в скважину 6, выполненную в фундаменте Г и в нижележащем грунте Т. The micropile mainly consists of tubular reinforcement 1, which is immersed in a well 6, made in the foundation G and in the underlying soil T.

Нижняя часть 1а этой трубы расположена в грунте Т, а жидкий строительный раствор для заливки 2 нагнетается вокруг трубы, чтобы заделать эту нижнюю часть в грунте. Нагнетание производится известными средствами, например, путем нагнетания раствора через внутренность трубы. The lower part 1a of this pipe is located in the soil T, and the mortar for pouring 2 is pumped around the pipe to seal this lower part in the soil. The injection is carried out by known means, for example, by injection of the solution through the inside of the pipe.

В представленном примере жидкий строительный раствор нагнетался в трубу, которая закрыта на своем нижнем конце и имеет манжету 3, которая позволяет заливаемому раствору проходить из внутренности трубы до окружающего грунта, где жидкий строительный раствор образует капсулу заливки 4. In the presented example, the mortar was injected into the pipe, which is closed at its lower end and has a cuff 3, which allows the grout to pass from the inside of the pipe to the surrounding soil, where the grout forms a fill capsule 4.

В соответствии с изобретением труба 5, называемая реакционной трубой, помещена в скважине 6 фундамента вокруг верхней части 1с трубчатой арматуры 1 микросваи 1. Эта реакционная труба 5 жестко соединяется с фундаментом с помощью заливаемого раствора 7, введенного между реакционной трубой и стенкой скважины 6. In accordance with the invention, a pipe 5, called a reaction pipe, is placed in the foundation well 6 around the top 1c of the tubular reinforcement 1 of the micropile 1. This reaction tube 5 is rigidly connected to the foundation using a grout 7 introduced between the reaction tube and the wall of the well 6.

Обод 8, снабженный герметическим соединением 9, размещен вокруг арматуры 1 в реакционной трубе 5, и колпачок 10 навинчен на верхний конец реакционной трубы, чтобы образовать в реакционной трубе над ободом 8 и верхним концом 1д арматурной трубы герметичную камеру 11, в которую может быть введена рабочая жидкость через трубопровод 12, соединенный с центральным постом гидравлической системы, схематически показанной на чертеже позицией 13, и заканчивающийся патрубком 14 колпачка 10. The rim 8, provided with a hermetic connection 9, is placed around the valve 1 in the reaction tube 5, and the cap 10 is screwed onto the upper end of the reaction tube to form an airtight chamber 11 into the reaction tube above the rim 8 and the upper end 1 d of the reinforcing tube, into which it can be inserted the working fluid through the pipe 12 connected to the Central post of the hydraulic system, schematically shown in the drawing at 13, and ending with the nozzle 14 of the cap 10.

Реакционная труба 5 снабжена под ободом 8 трубопроводом 15, который обеспечивает ввод заливаемого раствора в пространство 16, находящееся между арматурной трубой микросваи и реакционной трубой, и она снабжена вторым трубопроводом 17 для удаления воздуха из второго пространства по мере поступления раствора в пространство. The reaction tube 5 is provided under the rim 8 with a conduit 15, which allows the solution to be poured into the space 16 located between the micro-pile reinforcing tube and the reaction tube, and it is provided with a second conduit 17 to remove air from the second space as the solution enters the space.

Чтобы создать предварительное напряжение внутренней трубы, составляющей арматуру микросваи, последовательно осуществляют следующие операции:
нагнетание жидкого строительного раствора для заливки в арматурную трубу, чтобы образовать капсулу в грунте вокруг этой трубы и чтобы заполнить часть трубы, которая окружена фундаментом;
затвердение этого раствора;
нагнетание раствора для заливки вокруг реакционной трубы 5 в фундамент;
затвердение этого раствора;
создание и поддержание рабочего давления в камере П; измерение этого давления, позволяющее определить давление предварительного напряжения арматуры;
нагнетание раствора для заливки вокруг арматурной трубы в реакционную трубу 5;
затвердевание раствора;
удаление жидкости из камеры, демонтаж колпачка и выравнивание труб.
To create a preliminary voltage of the inner pipe that makes up the micro-pile reinforcement, the following operations are performed sequentially:
injection of mortar for pouring into the reinforcing pipe to form a capsule in the soil around this pipe and to fill the part of the pipe that is surrounded by the foundation;
hardening of this solution;
injection of a solution for pouring around the reaction tube 5 into the foundation;
hardening of this solution;
creation and maintenance of working pressure in the chamber P; measuring this pressure to determine the prestressing pressure of the valve;
injection of a solution for pouring around the reinforcing pipe into the reaction pipe 5;
solution solidification;
removing liquid from the chamber, removing the cap and aligning the pipes.

Арматура 1 действует как плунжерный поршень домкрата, который будет состоять из реакционной трубы 5 и колпачка 10. Воздействие давления жидкости в камере 11 вызывает сжимание, компрессию трубы 1 через движение книзу, следовательно, упругому укорачиванию этой трубы в той части, которая расположена между капсулой заливки 2 и направляющим ободом, он же уплотняющий обод 8. Реакция на эту компрессию оказывается на кладку фундамента посредством трубы 5, которую именно по этой причине называют реакционной трубой. Реакция микросваи может быть точно отрегулирована через давление в камере П, по желанию; вплоть до приподымания фундамента, если сила предварительного напряжения выше порога отрыва (отслаивания). The valve 1 acts as a plunger piston of the jack, which will consist of a reaction tube 5 and a cap 10. The influence of the fluid pressure in the chamber 11 causes compression, compression of the pipe 1 through a downward movement, therefore, the elastic shortening of this pipe in the part located between the filling capsule 2 and a guide rim, it is also a sealing rim 8. The reaction to this compression is on the laying of the foundation by means of a pipe 5, which for this reason is called a reaction pipe. The reaction of the micropiles can be precisely adjusted through the pressure in the chamber P, if desired; up to raising the foundation, if the prestressing force is higher than the separation threshold (peeling).

Раствор для нагнетания обычно является цементным раствором, содержащим в случае необходимости обычные добавки. Изобретение не ограничивается одним особым раствором. The injection solution is usually a cement mortar containing, if necessary, conventional additives. The invention is not limited to one particular solution.

Изобретение особенно применимо для восстановления и ремонта фундаментов эксплуатируемых зданий. The invention is particularly applicable for the restoration and repair of the foundations of operating buildings.

Claims (6)

1. Устройство для предварительного напряжения микросваи, предназначенной для поддержания фундамента, которое включает в себя скважину в фундаменте, трубу, предназначенную для введения в эту скважину, затвердеваемый раствор для введения между трубой и стенкой скважины, чтобы скрепить трубу с фундаментом, арматуру, имеющую нижнюю часть, которую вводят в нижележащий грунт в фундаменте, и верхнюю часть, которую вводят в трубу, затвердеваемое вещество для нагнетания вокруг нижней части арматуры, чтобы закрепить эту нижнюю часть в грунте, средства, чтобы мгновенно оказать давление на арматуру, затвердеваемое вещество и средства для введения этого вещества в пространство, расположенное между верхней частью арматуры и трубой, отличающееся тем, что затвердеваемое вещество для введения в названное пространство строительный раствор, предназначенный для герметичного скрепления трубы с арматурой для того, чтобы реакция на компрессию арматуры оказывала действие на фундамент через трубу. 1. Device for prestressing a micropile designed to support the foundation, which includes a well in the foundation, a pipe intended for introduction into this well, a hardened solution for injection between the pipe and the wall of the well to fasten the pipe to the foundation, reinforcement having a bottom the part that is introduced into the underlying soil in the foundation, and the upper part that is introduced into the pipe, a hardened substance for injection around the lower part of the reinforcement, to fix this lower part in the soil, media tva, in order to instantly apply pressure to the reinforcement, the hardened substance and means for introducing this substance into the space located between the upper part of the reinforcement and the pipe, characterized in that the hardened substance for introducing into the named space a mortar designed to seal the pipe with the reinforcement so that the reaction to the compression of the reinforcement has an effect on the foundation through the pipe. 2. Устройство по п.1, отличающееся тем, что средства для оказания давления на арматуру микросваи в трубе включают соединение, размещенное вокруг арматуры в трубе, средства для создания в трубе герметичной камеры над этим соединением и арматурой и средства для введения жидкости под давлением в эту камеру. 2. The device according to claim 1, characterized in that the means for exerting pressure on the micro-pile reinforcement in the pipe include a connection placed around the reinforcement in the pipe, means for creating a sealed chamber in the pipe above this connection and the reinforcement, and means for introducing liquid under pressure into this camera. 3. Устройство по п.2, отличающееся тем, что средства для создания указанной герметичной камеры включают колпачок, навинченный на верхний конец трубы и снабженный патрубком для соединения с центральным постом гидросистемы. 3. The device according to claim 2, characterized in that the means for creating the specified pressurized chamber include a cap screwed on to the upper end of the pipe and provided with a pipe for connection to the central station of the hydraulic system. 4. Устройство по п.1 или 3, отличающееся тем, что средства для введения жидкого строительного раствора для заливки в пространство, находящееся между трубой и арматурой, имеют трубопровод, соединенный с источником раствора, который заканчивается в трубе под указанным соединением, и трубопровод для удаления воздуха указанного пространства под указанным соединением. 4. The device according to claim 1 or 3, characterized in that the means for introducing a liquid mortar for pouring into the space between the pipe and the fittings have a pipe connected to a source of mortar, which ends in a pipe under the specified connection, and a pipe for air removal of the specified space under the specified connection. 5. Предварительно напряженная микросвая для поддерживания фундамента, включающая в себя трубу, размещаемую в скважине, выполненной в фундаменте, и скрепляемую со стенкой скважины с помощью затвердевающего строительного раствора, арматуру, имеющую нижнюю часть, скрепляемую в нижележащем грунте с фундаментом, и верхнюю часть, которая проходит в трубу и сжата, и затвердеваемое вещество в пространстве между этой верхней частью и трубой, отличающаяся тем, что затвердеваемое вещество обеспечивает скрепление трубы с арматурой таким образом, чтобы реакция на компрессию арматуры оказывала действие на фундамент через трубу. 5. Pre-stressed micropile for supporting the foundation, including a pipe placed in the well, made in the foundation, and fastened to the wall of the well using a hardening mortar, reinforcement having a lower part, fastened in the underlying soil with the foundation, and the upper part, which passes into the pipe and is compressed, and the hardened substance in the space between this upper part and the pipe, characterized in that the hardened substance ensures the fastening of the pipe with the fittings so that In general, the reaction to the compression of the reinforcement had an effect on the foundation through the pipe. 6. Микросвая по п.5, отличающаяся тем, что указанная арматура микросваи является трубчатой. 6. The micro pile according to claim 5, characterized in that said micro-pile reinforcement is tubular.
RU9494028643A 1993-08-09 1994-08-08 Micropile and device for its prestressing RU2087618C1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9309781 1993-08-09
FR9309781A FR2708947B1 (en) 1993-08-09 1993-08-09 Device for prestressing a micropile intended to support a foundation and micropile thus prestressed.

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
RU9309781 Addition

Publications (2)

Publication Number Publication Date
RU94028643A RU94028643A (en) 1996-08-20
RU2087618C1 true RU2087618C1 (en) 1997-08-20

Family

ID=9450061

Family Applications (1)

Application Number Title Priority Date Filing Date
RU9494028643A RU2087618C1 (en) 1993-08-09 1994-08-08 Micropile and device for its prestressing

Country Status (7)

Country Link
EP (1) EP0638688B1 (en)
AT (1) ATE161600T1 (en)
DE (1) DE69407509T2 (en)
FR (1) FR2708947B1 (en)
HK (1) HK1005915A1 (en)
RU (1) RU2087618C1 (en)
ZA (1) ZA945926B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113969576A (en) * 2021-10-21 2022-01-25 中建三局集团有限公司 Novel unbonded post-tensioning prestressed uplift pile structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1117505B (en) * 1952-12-17 1961-11-16 Frederico Spies Dipl Ing Method and device for the production of reinforced in-situ concrete foundation piles
JPS5824026A (en) * 1981-08-05 1983-02-12 Hirose Kozai Sangyo Kk Construction of each pile for netted pile structure
WO1990011412A1 (en) * 1989-03-22 1990-10-04 Iniectojet S.P.A. A procedure for the forming of consolidation and foundation piles with embedded reinforcements
DE4005032C2 (en) * 1990-02-19 1994-06-09 Bauer Spezialtiefbau Device for applying a force between a base plate and a foundation element

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Заявка ФРГ N 4005032, кл. E 02 D 27/48, 1991. *

Also Published As

Publication number Publication date
ZA945926B (en) 1995-04-12
ATE161600T1 (en) 1998-01-15
DE69407509T2 (en) 1998-05-28
EP0638688B1 (en) 1997-12-29
HK1005915A1 (en) 1999-01-29
FR2708947A1 (en) 1995-02-17
EP0638688A1 (en) 1995-02-15
FR2708947B1 (en) 1995-11-03
RU94028643A (en) 1996-08-20
DE69407509D1 (en) 1998-02-05

Similar Documents

Publication Publication Date Title
CN104878835B (en) Strip footing increases basement structure behind house
CN101122131A (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
JPS587022A (en) Stake constructing method and apparatus
KR102050988B1 (en) Construction method of vertical shaft using the slipform
US3385070A (en) Shell-less cast-in-place concrete pile
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
US6663321B1 (en) Process and device for producing a pile in the earth
RU2087618C1 (en) Micropile and device for its prestressing
CN101289857A (en) Sublevel grouting process for prestressed anchor rod and grouting device thereof
CN211285576U (en) Manual hole digging pile structure
RU2231596C2 (en) Method of pile forming in preliminary formed well
CN210977512U (en) Tunnel secondary lining anticreep is empty vertically to move back tubular area mould slip casting rotary device
CN114922172A (en) Anchor rod pile device capable of eliminating negative frictional resistance of collapsible loess and construction method
CN204112325U (en) A kind of for anchor jacked pile pile pressing device
CN114592517A (en) Pile body dead weight hammering construction process with enlarged pile shoe
CN110318419B (en) Construction method of one-lining door opening support of underpass type pipe gallery
SU1052625A1 (en) Method of constructing a cast-in-place injector pile
CN112647497A (en) In-hole prestressed supporting member, prestressed anchor rod and construction method
CN108018859B (en) Emergency treatment method and structure for sudden surge of foundation pit
CN110578326A (en) manual hole digging pile structure and construction method thereof
SU1622527A1 (en) Method of erecting pile
KR101559268B1 (en) Prestressed steel pile for uplift of the sunk structures
RU2244783C1 (en) Method for connection of eccentrically loaded column with stepped foundation
RU2148124C1 (en) Method for construction of drilling-injection piles

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20040809