JPS5824026A - Construction of each pile for netted pile structure - Google Patents

Construction of each pile for netted pile structure

Info

Publication number
JPS5824026A
JPS5824026A JP56123357A JP12335781A JPS5824026A JP S5824026 A JPS5824026 A JP S5824026A JP 56123357 A JP56123357 A JP 56123357A JP 12335781 A JP12335781 A JP 12335781A JP S5824026 A JPS5824026 A JP S5824026A
Authority
JP
Japan
Prior art keywords
pile
pipe
mortar
cement mortar
pile structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP56123357A
Other languages
Japanese (ja)
Inventor
Hidefumi Kodama
児玉 秀文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIROSE KOZAI SANGYO KK
Original Assignee
HIROSE KOZAI SANGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIROSE KOZAI SANGYO KK filed Critical HIROSE KOZAI SANGYO KK
Priority to JP56123357A priority Critical patent/JPS5824026A/en
Priority to KR1019810003823A priority patent/KR830007973A/en
Publication of JPS5824026A publication Critical patent/JPS5824026A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To prevent the occurrence of landslide by forming a netted pile structure by a method in which a pipe whose lower end is opened is inserted into an excavated pit, iron bars are sent, and then cement mortar is poured, the pipe is drawn out, and then the supply of high-pressure air and cement mortar is repeatedly made. CONSTITUTION:A pipe 10 whose lower end is opened is inserted into an excavated pit, iron bars 15 are set, and then cement mortar 14 is poured into the pit. Then, the pipe 10 is pulled out by a given length and high-pressure air 20 is supplied from the hole 12 of a head 11 to form an expanded portion 18. When the level of the cement mortar 14 placed is lowered, the mortar is further supplied from the hole 12 of the head 11. Furthermore, the pipe 10 is drawn out by a given length and said processes are repeated to form a pile 3.

Description

【発明の詳細な説明】 本発明は地盤中に形成された複数のパイルと、これらを
一端において接合する接合体とからなる網状パイル構造
体についての各パイルの施工方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing each pile of a net-like pile structure consisting of a plurality of piles formed in the ground and a joined body joining the piles at one end.

網状パイル構造体は例えば第1図に示す様に斜面の地滑
り防止のために、地盤Gの滑り面Sを貫通して複数のパ
イルf31 +3)・・・を地盤G中に形成したもので
ある。
For example, as shown in Fig. 1, the net-like pile structure is a structure in which a plurality of piles f31 + 3) are formed in the ground G by penetrating the sliding surface S of the ground G in order to prevent landslides on slopes. .

網状パイル構造体+1+のパイル(3) (3)・・は
3次元又+42次元構造体を形成し、例えば第2図に示
す様に外方に広がり一方に傾斜するパイル+3+ +3
+・・・列を複数性する。
Net-like pile structure +1+ pile (3) (3)... forms a three-dimensional or +42-dimensional structure, for example, as shown in Fig. 2, the pile +3+ +3 spreads outward and slopes to one side.
+...Make the column plural.

網状パイル構造体f1)の各パイル(3)は一般の現場
施工バイルに比較して直径が細いだめ地盤との結合の白
玉について十分な配慮をしなければならない。
Each pile (3) of the net-like pile structure f1) has a smaller diameter than a general on-site construction pile, and sufficient consideration must be given to the connection with the soil.

本発明は網状パイル構造体についてこの問題を解決する
各パイルの施工方法の提供を目的とする。
The object of the present invention is to provide a construction method for each pile that solves this problem for a net-like pile structure.

本発明の網状パイル構造体の各パイルの施工方法を図面
に示す実施例に従い、以下説明する。
A construction method for each pile of the net-like pile structure of the present invention will be described below according to an embodiment shown in the drawings.

第3図は掘削工程後に接合体(2)を貫通して地盤Gに
設けられた穴に下端が開口されたパイプ(lO)を挿入
し、鉄筋(I5)を入れモルタル(14)を注入した状
態を示す。
Figure 3 shows that after the excavation process, a pipe (lO) with an open bottom end is inserted into a hole made in the ground G through the joint (2), reinforcing bars (I5) are inserted, and mortar (14) is injected. Indicates the condition.

穴は接合体(2)に対して一般に傾斜しているが簡単の
ため図示の穴は垂直にしている。
The holes are generally inclined with respect to the joint (2), but for simplicity the holes are shown vertically.

このパイプ(10)は掘削用のゲージングと併用しても
よい。
This pipe (10) may be used in conjunction with gauging for excavation.

パイプ(10)の北端には穴(12)を有するヘッド(
I I)が装着される。
The north end of the pipe (10) has a head (12) with a hole (12).
II) is installed.

次に第4図に示すようにパイプ(10)を所定の長さだ
け引抜く。
Next, as shown in FIG. 4, the pipe (10) is pulled out by a predetermined length.

次に第5図に示すようにヘッド(11)の穴(12)か
ら高圧の空気(20)をパイプ(10)内に供給する。
Next, as shown in FIG. 5, high pressure air (20) is supplied into the pipe (10) from the hole (12) of the head (11).

これによりモルタル(14)はパイプ(10)を引抜い
たことにより露出しだ穴の壁面及び穴の底面から地盤G
中に浸透し膨張部(18)を形成する。
As a result, the mortar (14) is exposed by pulling out the pipe (10), and the ground G is exposed from the wall and bottom of the hole.
It penetrates inside and forms an expanded portion (18).

これによりモルタル()4)のレベルが低下するだめ第
6図に示す様にヘッド(11)の穴(12)からモルタ
ル(14)1を補充する。
As a result, the level of the mortar (4) decreases, so mortar (14) 1 is replenished from the hole (12) of the head (11) as shown in FIG.

次に第7図に示す様にパイプ(10)を更に所定の長さ
だけ引抜き、第4図乃至第6図に示した工程を繰返す。
Next, as shown in FIG. 7, the pipe (10) is further pulled out by a predetermined length, and the steps shown in FIGS. 4 to 6 are repeated.

これによりモルタル(14)は露出した穴の壁面に次々
浸透して、最終的には第8図に示す様に地盤Gに食込ん
だ膨張部(18)を有するパイル(3)が形成され本発
明の能の網状パイル構造体の各パイルの施工方法を次に
示す。
As a result, the mortar (14) penetrates into the exposed wall of the hole one after another, and finally, as shown in Figure 8, a pile (3) having an expanded part (18) that digs into the ground G is formed. The construction method for each pile of the Noh net-like pile structure of the invention is shown below.

すなわち第9図に示す様に最初にパイプ(10)を引抜
いた際に特に高圧の空気(20)をパイプ(10)内に
供給する。
That is, as shown in FIG. 9, particularly high pressure air (20) is supplied into the pipe (10) when the pipe (10) is first pulled out.

これにより大きな膨張部(19)か形成されるが、これ
以降の引抜き工程後に供給される空気圧は最初の圧力よ
り低くする。
This forms a large expansion part (19), but the air pressure supplied after the subsequent drawing process is lower than the initial pressure.

すなわち第10図例示す様に最初の膨張部(19)より
小さな膨張部(18)が形成される。
That is, as shown in FIG. 10, an expanded portion (18) smaller than the first expanded portion (19) is formed.

この方法により最終的に1−1:第11図に示す様な下
方が大きい階段状の膨張部(+s) (19)を有する
パイル(3)が形成される。
By this method, finally 1-1: a pile (3) having a step-like expansion part (+s) (19) with a large lower part as shown in FIG. 11 is formed.

次に、最初に引抜く一定距離について特に空気圧を高く
し、これ以降の空気圧を低くした場合には第12図に示
す様な階段状の膨張部(18) (lqfを有するパイ
ル(3)を形成することも可能である。
Next, if the air pressure is particularly high for the first certain distance of pulling out, and then the air pressure is lowered thereafter, a step-like expansion part (18) (pile (3) having lqf as shown in Fig. 12) is created. It is also possible to form

更に本発明の他の施工方法として、捷ず第13図に示す
様にモルタル(14)を半分程度注入して空気圧をかけ
て膨張部(18)を形成し硬化させた後、残りのモルタ
ル(14)を注入しより高い空気圧をかけた場合には第
14図に示す様な階段状の膨張部++s)(+1を有す
るパイル(3)を形成することも可能である。
Furthermore, as another construction method of the present invention, as shown in FIG. 13, about half of the mortar (14) is injected and air pressure is applied to form and harden the expanded part (18), and then the remaining mortar ( 14) is injected and a higher air pressure is applied, it is also possible to form a pile (3) having a step-like expansion part ++s)(+1 as shown in FIG. 14).

本発明の網状パイル構造体の各パイルの施工方法は以上
の構成において次の効果を有する。
The construction method for each pile of the net-like pile structure of the present invention has the following effects in the above configuration.

(1)本発明の網状パイル構造体の各パイルの施工方法
は掘削工程後に下端が開口されたパイプ(lO)を挿入
し鉄筋(15)を入れモルタル(14)を注入する工程
と、該工程の後にパイプ(lO)の引抜き、高圧空気(
20)の供給、モルタル(14)の補充を繰返しモルタ
ル(14)を地盤Gに浸透させる工程とから構成され、
特にモルタル(14)が高圧空気(20)により地盤G
に浸透するため地盤Gに食込んだ膨張部(18) (1
1(+9) (+1を有するパイル(3)が形成され、
その結果直径の細い網状パイル構造体のパイル(3)に
おいて十分地盤Gと結合し地滑り等を有効に防止出来る
(1) The method for constructing each pile of the reticulated pile structure of the present invention includes the steps of inserting a pipe (lO) with an open bottom end after the excavation step, inserting reinforcing bars (15), and injecting mortar (14); After removing the pipe (lO), high pressure air (
20) and replenishment of mortar (14) are repeated to infiltrate the mortar (14) into the ground G,
In particular, the mortar (14) is ground G due to high pressure air (20).
(18) (1)
1(+9) (a pile (3) with +1 is formed,
As a result, the pile (3) of the net-like pile structure with a small diameter is sufficiently connected to the ground G, and landslides can be effectively prevented.

(2)本発明の網状パイル構造体の各パイルの施工方法
は同上の構成であり、供給する空気圧を変化させた場合
には階段状の膨張部(18) (1m(+9) (ag
を有するパイル(3)が形成され、その結果引張力及び
圧縮力を有効に支持可能なパイル(3) +31・・・
を有する網状パイル構造体の提供が可能となる。
(2) The construction method for each pile of the reticulated pile structure of the present invention has the same configuration as above, and when the supplied air pressure is changed, the step-like expansion part (18) (1 m (+9) (ag
As a result, a pile (3) is formed which can effectively support tensile force and compressive force +31...
It becomes possible to provide a net-like pile structure having the following properties.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は網状パイル構造体の一例を示す概念図第2図は
同上斜視図 第3図乃至第8図は本発明の施工方法の説明図第9図乃
至第11図は本発明の他の施工方法の説明図 第12図は本発明の他の施工方法により形成されたパイ
ルの断面正面図 第13図及び第14図は本発明の他の施工方法の説明図 1:網状パイル構造    2:接合体3:パイル  
     IO=パイプ11:ヘッド       1
2:穴 14:モルタル      15:鉄筋18.18’ 
、 19 、19’ :膨張部 20:空気G:地盤 
        S:滑り面出願人  廣瀬鋼材産業株
式会社 第12図 第(3図 ■
FIG. 1 is a conceptual diagram showing an example of a net-like pile structure. FIG. 2 is a perspective view of the same as above. FIGS. 3 to 8 are explanatory diagrams of the construction method of the present invention. An explanatory diagram of the construction method. FIG. 12 is a cross-sectional front view of a pile formed by another construction method of the present invention. FIGS. 13 and 14 are explanatory diagrams of another construction method of the present invention. 1: Reticular pile structure 2: Joined body 3: pile
IO = pipe 11: head 1
2: Hole 14: Mortar 15: Rebar 18.18'
, 19, 19': Expansion section 20: Air G: Ground
S: Sliding surface Applicant: Hirose Kozai Sangyo Co., Ltd. Figure 12 (Figure 3■

Claims (1)

【特許請求の範囲】 1、 掘削工程後に下端が開口されたパイプ(10)を
挿入し鉄筋(15)を入れモルタル(14)を注入する
工程と、該工程の後にパイプ(10)の引抜き、高圧空
気(20)の供給、モルタル(14)の補充を繰返しモ
ルタル(14)を地盤Gに浸透させる工程とからなる網
状パイル構造体の各パイルの施工方法 2、供給する空気圧を変化させた特許請求の範囲第1項
記載の網状パイル構造体の各パイルの施工方法
[Claims] 1. After the excavation step, a step of inserting a pipe (10) whose lower end is open, inserting reinforcing bars (15) and injecting mortar (14), and after this step, pulling out the pipe (10); Construction method 2 for each pile of a net-like pile structure consisting of the steps of repeatedly supplying high-pressure air (20) and replenishing mortar (14) to infiltrate the mortar (14) into the ground G, a patent that changes the supplied air pressure A method for constructing each pile of the reticulated pile structure according to claim 1.
JP56123357A 1981-08-05 1981-08-05 Construction of each pile for netted pile structure Pending JPS5824026A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP56123357A JPS5824026A (en) 1981-08-05 1981-08-05 Construction of each pile for netted pile structure
KR1019810003823A KR830007973A (en) 1981-08-05 1981-10-10 Construction method of each pile of network pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56123357A JPS5824026A (en) 1981-08-05 1981-08-05 Construction of each pile for netted pile structure

Publications (1)

Publication Number Publication Date
JPS5824026A true JPS5824026A (en) 1983-02-12

Family

ID=14858572

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56123357A Pending JPS5824026A (en) 1981-08-05 1981-08-05 Construction of each pile for netted pile structure

Country Status (2)

Country Link
JP (1) JPS5824026A (en)
KR (1) KR830007973A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0638688A1 (en) * 1993-08-09 1995-02-15 Bouygues Apparatus for prestressing a micro-pile destined to support a foundation and micro-pile thus prestressed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0638688A1 (en) * 1993-08-09 1995-02-15 Bouygues Apparatus for prestressing a micro-pile destined to support a foundation and micro-pile thus prestressed
FR2708947A1 (en) * 1993-08-09 1995-02-17 Intrafor Device for prestressing a micropile intended to support a foundation and micropile thus prestressed.

Also Published As

Publication number Publication date
KR830007973A (en) 1983-11-09

Similar Documents

Publication Publication Date Title
KR100557010B1 (en) Earth anchor including a duplex grouting pipe and the earth anchor construction method using the same
JPS5824026A (en) Construction of each pile for netted pile structure
JP3081905B2 (en) Cast-in-place concrete pile and its construction method
JP2790038B2 (en) Reinforcement method of existing pile foundation building
JP3213240B2 (en) Support pile reinforcement structure of existing structure and its reinforcement method
JPH1136296A (en) Pc hollow pile and construction method for underground structure
JP3586839B2 (en) In-situ formed concrete pile and its forming method
JP2766159B2 (en) Excavator and underground diaphragm wall method
JPH07279172A (en) Method for setting tie rod anchor in deep layer ground
KR970011805B1 (en) Construction method of pc pile
JPS61134425A (en) Method of forming foundation pile
KR200325653Y1 (en) Earth anchor including a duplex grouting pipe
JPH0468407B2 (en)
JPH10131176A (en) Reinforcing method of existing pile by force-fit of outer winding steel pipe
JPS6161000A (en) Building of garage
JP3146375B2 (en) Existing structure retention method
JPH0213611A (en) Construction method of continuous underground wall
JPH0266220A (en) Prevention method of damage at cross-section in concrete part of cast-in-place pile
JPS59145822A (en) Construction work of underground continuous wall
JPH05311645A (en) Construction method for cast-in-place concrete pile
JP2022188997A (en) Method for connecting stay pile and tendon
JPS621048B2 (en)
JPS5869924A (en) Construction of sheathing wall having upper part consisting of underground continuous wall and lower part of pillar-row pile
JPH04174134A (en) Method of swell preventive construction of earth anchor
JPS61204417A (en) Method of forming pile increased in support force at pile tip by bagform substance