RU2012100461A - FLOW LINE FOR ALL-YEAR HAPPY LEACHING OF NOBLE METALS IN THE CRYOLITZONE - Google Patents

FLOW LINE FOR ALL-YEAR HAPPY LEACHING OF NOBLE METALS IN THE CRYOLITZONE Download PDF

Info

Publication number
RU2012100461A
RU2012100461A RU2012100461/03A RU2012100461A RU2012100461A RU 2012100461 A RU2012100461 A RU 2012100461A RU 2012100461/03 A RU2012100461/03 A RU 2012100461/03A RU 2012100461 A RU2012100461 A RU 2012100461A RU 2012100461 A RU2012100461 A RU 2012100461A
Authority
RU
Russia
Prior art keywords
additional
precious metals
capacity
specified
deposition
Prior art date
Application number
RU2012100461/03A
Other languages
Russian (ru)
Other versions
RU2493363C1 (en
Inventor
Виктор Николаевич Опарин
Александр Петрович Тапсиев
Артур Геннадьевич Секисов
Сергей Александрович Кондратьев
Владимир Александрович Усков
Юрий Васильевич Артеменко
Виктор Иванович Ростовцев
Виктор Петрович Мязин
Дмитрий Михайлович Шестернев
Юрий Николаевич Резник
Лидия Владимировна Шумилова
Елена Николаевна Шемякина
Алексей Евгеньевич Баянов
Original Assignee
Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН filed Critical Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН
Priority to RU2012100461/03A priority Critical patent/RU2493363C1/en
Publication of RU2012100461A publication Critical patent/RU2012100461A/en
Application granted granted Critical
Publication of RU2493363C1 publication Critical patent/RU2493363C1/en

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

1. Поточная линия для круглогодичного кучного выщелачивания благородных металлов в криолитозоне, включающая железобетонную кювету с бортом, отсыпанный на нее рудный штабель, установленную под ним систему дренажа, соединенную с комплексом устройств для работы в летний период, состоящим из последовательно соединенных самотечными трубопроводами буферной емкости и расположенных ниже границы сезонного промерзания-оттаивания грунтов устройства для осаждения благородных металлов, вспомогательного насоса, приемной емкости, которая сообщена с устройством для доукрепления раствора и основным насосом, соединенным напорным трубопроводом с системой орошения, заглубленной в приповерхностный слой рудного штабеля, а также комплекс устройств для работы в зимний период, состоящий из последовательно соединенных дополнительными самотечными трубопроводами и расположенных ниже границы сезонного промерзания-оттаивания грунтов дополнительной буферной емкости, указанного устройства для осаждения благородных металлов, дополнительной приемной емкости, которая сообщена с указанным устройством для доукрепления растворов и дополнительным насосом, соединенным дополнительным напорным трубопроводом через устройство для подогрева раствора с системой орошения, при этом указанное устройство для осаждения благородных металлов сообщено аварийными трубопроводами с аварийной емкостью, дополнительной буферной емкостью и дополнительной приемной емкостью, отличающаяся тем, что она снабжена теплоизолирующим экраном и теплоизолирующим кожухом, которыми система дренажа и указанное технологическое оборудование отделены о�1. A production line for year-round heap leaching of precious metals in the cryolithozone, including a reinforced concrete cuvette with a side, an ore stack dumped on it, a drainage system installed underneath it, connected to a set of devices for working in the summer period, consisting of series-connected gravity pipelines of a buffer tank and located below the boundary of seasonal freezing-thawing of soils of a device for the deposition of precious metals, an auxiliary pump, a receiving tank, which and with a device for further strengthening the solution and the main pump connected to the pressure pipe with an irrigation system buried in the surface layer of the ore stack, as well as a set of devices for working in the winter period, consisting of series-connected additional gravity pipelines and located below the boundary of seasonal freezing-thawing of soils additional buffer capacity, the specified device for the deposition of precious metals, additional receiving capacity, which is in communication with the specified a device for augmenting solutions and an additional pump connected by an additional pressure pipe through a device for heating the solution with an irrigation system, the specified device for the deposition of precious metals reported emergency pipelines with emergency capacity, additional buffer capacity and additional receiving capacity, characterized in that it is equipped a heat-insulating screen and a heat-insulating casing, with which the drainage system and the specified process equipment are separated about

Claims (2)

1. Поточная линия для круглогодичного кучного выщелачивания благородных металлов в криолитозоне, включающая железобетонную кювету с бортом, отсыпанный на нее рудный штабель, установленную под ним систему дренажа, соединенную с комплексом устройств для работы в летний период, состоящим из последовательно соединенных самотечными трубопроводами буферной емкости и расположенных ниже границы сезонного промерзания-оттаивания грунтов устройства для осаждения благородных металлов, вспомогательного насоса, приемной емкости, которая сообщена с устройством для доукрепления раствора и основным насосом, соединенным напорным трубопроводом с системой орошения, заглубленной в приповерхностный слой рудного штабеля, а также комплекс устройств для работы в зимний период, состоящий из последовательно соединенных дополнительными самотечными трубопроводами и расположенных ниже границы сезонного промерзания-оттаивания грунтов дополнительной буферной емкости, указанного устройства для осаждения благородных металлов, дополнительной приемной емкости, которая сообщена с указанным устройством для доукрепления растворов и дополнительным насосом, соединенным дополнительным напорным трубопроводом через устройство для подогрева раствора с системой орошения, при этом указанное устройство для осаждения благородных металлов сообщено аварийными трубопроводами с аварийной емкостью, дополнительной буферной емкостью и дополнительной приемной емкостью, отличающаяся тем, что она снабжена теплоизолирующим экраном и теплоизолирующим кожухом, которыми система дренажа и указанное технологическое оборудование отделены от многолетнемерзлых пород криолитозоны, причем устройство для подогрева раствора имеет замкнутую систему теплоснабжения, которой соединены последовательно водяная рубашка газификатора твердого топлива и водяной котел теплогенератора, причем газовые горелки последнего соединены газоходом с газификатором, при этом отводящий патрубок отработавшего газа теплогенератора соединен газопроводом через распределительную задвижку с системой орошения, имеющей газоотвод в теплоизолирующем покрытии системы орошения на ее дальнем конце.1. A production line for year-round heap leaching of precious metals in the cryolithozone, including a reinforced concrete cuvette with a side, an ore stack dumped on it, a drainage system installed underneath it, connected to a set of devices for working in the summer period, consisting of series-connected gravity pipelines of a buffer tank and located below the boundary of seasonal freezing-thawing of soils of a device for the deposition of precious metals, an auxiliary pump, a receiving tank, which and with a device for further strengthening the solution and the main pump connected to the pressure pipe with an irrigation system buried in the surface layer of the ore stack, as well as a set of devices for working in the winter period, consisting of series-connected additional gravity pipelines and located below the boundary of seasonal freezing-thawing of soils additional buffer capacity, the specified device for the deposition of precious metals, additional receiving capacity, which is in communication with the specified a device for augmenting solutions and an additional pump connected by an additional pressure pipe through a device for heating the solution with an irrigation system, the specified device for the deposition of precious metals reported emergency pipelines with emergency capacity, additional buffer capacity and additional receiving capacity, characterized in that it is equipped a heat-insulating screen and a heat-insulating casing, with which the drainage system and the specified process equipment are separated about permafrost of cryolithozone, and the device for heating the solution has a closed heat supply system, which is connected in series with a water jacket of a solidifier gasifier and a water boiler of a heat generator, the gas burners of the latter being connected by a gas duct to a gasifier, while the exhaust pipe of the heat generator is connected by a gas pipeline through a distribution valve to the system irrigation having a gas outlet in the insulating coating of the irrigation system at its far end. 2. Поточная линия по п.1, отличающаяся тем, что над теплоизолирующим кожухом имеется временное теплоизолирующее сооружение для защиты указанного технологического оборудования от воздействия низких температур и атмосферных осадков в зимнее время. 2. The production line according to claim 1, characterized in that there is a temporary heat-insulating structure above the insulating casing to protect the specified process equipment from the effects of low temperatures and precipitation in winter.
RU2012100461/03A 2012-01-10 2012-01-10 Flow line for year-round heap leaching of noble metals in cryolithic zone RU2493363C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012100461/03A RU2493363C1 (en) 2012-01-10 2012-01-10 Flow line for year-round heap leaching of noble metals in cryolithic zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012100461/03A RU2493363C1 (en) 2012-01-10 2012-01-10 Flow line for year-round heap leaching of noble metals in cryolithic zone

Publications (2)

Publication Number Publication Date
RU2012100461A true RU2012100461A (en) 2013-07-20
RU2493363C1 RU2493363C1 (en) 2013-09-20

Family

ID=48791494

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012100461/03A RU2493363C1 (en) 2012-01-10 2012-01-10 Flow line for year-round heap leaching of noble metals in cryolithic zone

Country Status (1)

Country Link
RU (1) RU2493363C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2728047C1 (en) * 2019-06-28 2020-07-28 Федеральное государственное бюджетное учреждение науки Федеральный исследовательский центр "Якутский научный центр Сибирского отделения Российской академии наук" Method of heap leaching of gold from poor ores in cryolite zone conditions

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU628737A1 (en) * 1976-07-14 1989-04-23 Предприятие П/Я М-5175 Method of leaching valuable components from ores
US4348056A (en) * 1981-01-12 1982-09-07 Kohorn H Von Method for above-ground leaching of metal bearing ores at below-freezing temperatures
RU2057920C1 (en) * 1993-07-15 1996-04-10 Валерий Валиевич Хабиров Process of accumulated leaching of metals at negative ambient temperatures
RU2183743C2 (en) * 2000-06-29 2002-06-20 Институт горного дела Севера СО РАН Method of heap leaching of metals under conditions
RU2249103C1 (en) * 2003-07-16 2005-03-27 Институт космофизических исследований и аэрономии Сибирского отделения РАН Method for group lixiviation of metals from frozen rocks
RU2298092C2 (en) * 2005-06-06 2007-04-27 Институт природных ресурсов, экологии и криологии Сибирского Отделения Российской Академии Наук (ИПРЭК СО РАН) Production line for year-round heap leaching of precious metals

Also Published As

Publication number Publication date
RU2493363C1 (en) 2013-09-20

Similar Documents

Publication Publication Date Title
CN104696175A (en) Low water head energy collecting device and method
CN104947780A (en) Inflow vertical shaft system connected into deep tunnel drainage system
CN105134545A (en) Water drawing device and water drawing method using water drawing device
CN105065908A (en) Sulfur-contained natural gas collection integrated device
RU2012100461A (en) FLOW LINE FOR ALL-YEAR HAPPY LEACHING OF NOBLE METALS IN THE CRYOLITZONE
CN104179523A (en) Tempering and explosion prevention device for gas stations
CN205332317U (en) Utilize energy -concerving and environment -protective heating system of millet electricity and secret cistern
CN203253214U (en) Aerodynamic sludge return device
CN211176809U (en) Garbage bin temperature lifting device for garbage power generation
CN204511793U (en) A kind of low water head energy collecting device
CN106351611A (en) Automatic environment-friendly combustion device for open flow of gas well
CN201756955U (en) Associated gas recovering and processing apparatus for low gas oil ratio oil platform
CN103894561B (en) continuous casting heat recovery system and method
KR101204043B1 (en) Indirect water intaking system of sump
CN204879446U (en) Contain sulphur natural gas gas collection integration device
CN105133698A (en) Energy gathering pumping device and pumping method thereof
CN204551511U (en) The exhaust of drainage of foundation pit pipeline is from pressurization system
CN204608949U (en) The prefabricated well head of sewer
CN205179957U (en) Water conservancy irrigation device
RU2686195C1 (en) Method and installation of fire water supply for arid regions
CN204227403U (en) A kind of boiler blowdown water comprehensive utilization device
CN201756545U (en) Methane recovery device
CN203525532U (en) Tar collecting system
CN101956421B (en) Fast diversion method of drain pipe in drainage construction
CN218816722U (en) Dry heat rock heat utilization system for cogeneration

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20150111