RU2011111282A - Способ и устройство для регулирования паротурбинной электростанции - Google Patents
Способ и устройство для регулирования паротурбинной электростанции Download PDFInfo
- Publication number
- RU2011111282A RU2011111282A RU2011111282/06A RU2011111282A RU2011111282A RU 2011111282 A RU2011111282 A RU 2011111282A RU 2011111282/06 A RU2011111282/06 A RU 2011111282/06A RU 2011111282 A RU2011111282 A RU 2011111282A RU 2011111282 A RU2011111282 A RU 2011111282A
- Authority
- RU
- Russia
- Prior art keywords
- signal
- generator
- predetermined
- depending
- time interval
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D15/00—Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
- F01D15/10—Adaptations for driving, or combinations with, electric generators
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Control Of Eletrric Generators (AREA)
- Control Of Turbines (AREA)
Abstract
1. Способ регулирования паротурбинной электростанции с генератором (12) и турбиной (14), содержащий этапы: ! - предоставление (34) первого сигнала (31), которой указывает уменьшение фактической мощности (PEL) генератора (12), ! - формирование (36) второго сигнала (KU), который указывает прерывание короткого замыкания, в зависимости от первого сигнала (S1), ! - сброс (38) второго сигнала (KU) спустя предопределенный первый временной интервал (TKU) и блокирование (38) второго сигнала на предопределенный второй временной интервал (TSPKU), ! - остановку и последующий запуск (40) турбины (14) в зависимости от второго сигнала (KU), ! - формирование (42) третьего сигнала (LAW), который показывает сброс нагрузки в зависимости от первого сигнала (S1), а также ! - продолжительную остановку (44) турбины (14) в зависимости от третьего сигнала (LAW). ! 2. Способ по п.1, ! при котором первый сигнал предоставляется, если фактическая мощность (PEL) генератора (12) скачкообразно уменьшается на предопределенное значение (GPLSP), или ! фактическая мощность (PEL) генератора (12) понизилась на предопределенное отрицательное значение (GPNEG), а также фактическая мощность (PEL) генератора (12) стала меньше, чем двукратное собственное потребление (GP2EB), а также разность между заданной мощностью (PSW) и фактической мощностью (PEL) генератора (12) стала больше, чем двукратное собственное потребление (GP2EB). ! 3. Способ по п.1 или 2, ! в котором предопределенный первый временной интервал (TKU) составляет от 100 мс до 200 мс, в частности, 150 мс. ! 4. Способ по п.1 или 2, ! в котором предопределенный второй временной интервал (TSPKU) составляет от 4 с до 10 с, в частности, 7 с. ! 5. Способ по п.3, ! в котором предопределенный второй временной �
Claims (16)
1. Способ регулирования паротурбинной электростанции с генератором (12) и турбиной (14), содержащий этапы:
- предоставление (34) первого сигнала (31), которой указывает уменьшение фактической мощности (PEL) генератора (12),
- формирование (36) второго сигнала (KU), который указывает прерывание короткого замыкания, в зависимости от первого сигнала (S1),
- сброс (38) второго сигнала (KU) спустя предопределенный первый временной интервал (TKU) и блокирование (38) второго сигнала на предопределенный второй временной интервал (TSPKU),
- остановку и последующий запуск (40) турбины (14) в зависимости от второго сигнала (KU),
- формирование (42) третьего сигнала (LAW), который показывает сброс нагрузки в зависимости от первого сигнала (S1), а также
- продолжительную остановку (44) турбины (14) в зависимости от третьего сигнала (LAW).
2. Способ по п.1,
при котором первый сигнал предоставляется, если фактическая мощность (PEL) генератора (12) скачкообразно уменьшается на предопределенное значение (GPLSP), или
фактическая мощность (PEL) генератора (12) понизилась на предопределенное отрицательное значение (GPNEG), а также фактическая мощность (PEL) генератора (12) стала меньше, чем двукратное собственное потребление (GP2EB), а также разность между заданной мощностью (PSW) и фактической мощностью (PEL) генератора (12) стала больше, чем двукратное собственное потребление (GP2EB).
3. Способ по п.1 или 2,
в котором предопределенный первый временной интервал (TKU) составляет от 100 мс до 200 мс, в частности, 150 мс.
4. Способ по п.1 или 2,
в котором предопределенный второй временной интервал (TSPKU) составляет от 4 с до 10 с, в частности, 7 с.
5. Способ по п.3,
в котором предопределенный второй временной интервал (TSPKU) составляет от 4 с до 10 с, в частности, 7 с.
6. Способ по любому из пп.1-2, 5,
в котором осуществляется формирование третьего сигнала (LAW), который указывает сброс нагрузки, в зависимости от первого сигнала и предопределенного третьего временного интервала (TLAW).
7. Способ по п.3,
в котором осуществляется формирование третьего сигнала (LAW), который указывает сброс нагрузки, в зависимости от первого сигнала и предопределенного третьего временного интервала (TLAW).
8. Способ по п.4
в котором осуществляется формирование третьего сигнала (LAW), который указывает сброс нагрузки, в зависимости от первого сигнала и предопределенного третьего временного интервала (TLAW).
9. Способ по п.6,
в котором предопределенный третий временной интервал (TLAW) составляет от 1,5 с до 2,5 с, в частности, 2 с.
10. Способ по п.7 или 8,
в котором предопределенный третий временной интервал (TLAW) составляет от 1,5 с до 2,5 с, в частности, 2 с.
11. Способ по любому из пп.1, 2, 5, 7, 8, 9,
в котором формирование третьего сигнала (LAW), который показывает сброс нагрузки, осуществляется в зависимости от переключателя нагрузки для генератора (GLSE).
12. Способ по п.3,
в котором формирование третьего сигнала (LAW), который показывает сброс нагрузки, осуществляется в зависимости от переключателя нагрузки для генератора (GLSE).
13. Способ по п.4,
в котором формирование третьего сигнала (LAW), который показывает сброс нагрузки, осуществляется в зависимости от переключателя нагрузки для генератора (GLSE).
14. Способ по п.6,
в котором формирование третьего сигнала (LAW), который показывает сброс нагрузки, осуществляется в зависимости от переключателя нагрузки для генератора (GLSE).
15. Способ по п.10,
в котором формирование третьего сигнала (LAW), который показывает сброс нагрузки, осуществляется в зависимости от переключателя нагрузки для генератора (GLSE).
16. Устройство для регулирования паротурбинной электростанции с генератором и турбиной, содержащее:
- средство (20) для предоставления (34) первого сигнала (S1), который указывает уменьшение фактической мощности (PEL) генератора (12),
- средство (22) для формирования (36) второго сигнала (KU), который указывает прерывание короткого замыкания, в зависимости от первого сигнала (S1),
- средство (24) для сброса (38) второго сигнала (KU) спустя предопределенный первый временной интервал (TKU) и блокирования (38) второго сигнала на предопределенный второй временной интервал (TSPKU),
- средство для остановки (40) и последующего запуска (40) турбины (14) в зависимости от второго сигнала (KU),
- средство (28) для формирования (42) третьего сигнала (LAW), который показывает сброс нагрузки в зависимости от первого сигнала (S1), а также
- средство для продолжительной остановки (44) турбины (14) в зависимости от третьего сигнала (LAW).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08015000.6 | 2008-08-25 | ||
EP08015000A EP2208867A1 (de) | 2008-08-25 | 2008-08-25 | Verfahren und Vorrichtung zum Regeln eines Dampfkraftwerks |
PCT/EP2009/060593 WO2010026035A2 (de) | 2008-08-25 | 2009-08-17 | Verfahren und vorrichtung zum regeln eines dampfkraftwerks |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2011111282A true RU2011111282A (ru) | 2012-09-27 |
RU2472006C2 RU2472006C2 (ru) | 2013-01-10 |
Family
ID=41797580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2011111282/06A RU2472006C2 (ru) | 2008-08-25 | 2009-08-17 | Способ и устройство для регулирования паротурбинной электростанции |
Country Status (7)
Country | Link |
---|---|
US (1) | US8624414B2 (ru) |
EP (2) | EP2208867A1 (ru) |
JP (1) | JP5194175B2 (ru) |
KR (1) | KR101282056B1 (ru) |
CN (1) | CN102137987B (ru) |
RU (1) | RU2472006C2 (ru) |
WO (1) | WO2010026035A2 (ru) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2423464A1 (de) * | 2010-08-27 | 2012-02-29 | Siemens Aktiengesellschaft | Verfahren zum Regeln eines Turbosatzes |
DE102012204218A1 (de) * | 2012-03-16 | 2013-09-19 | Siemens Aktiengesellschaft | Leistungsregelung und/oder Frequenzregelung bei einem solarthermischen Dampfkraftwerk |
EP2720338B1 (en) * | 2012-10-10 | 2021-06-09 | FIMER S.p.A. | Method and arrangement for detecting an islanding operation of a distributed power generator |
GB2509103B (en) | 2012-12-20 | 2020-05-06 | Bowman Power Group Ltd | Method and apparatus for controlling a turbogenerator system |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5584806A (en) * | 1978-12-20 | 1980-06-26 | Hitachi Ltd | System for operating thermoelectric power plant when its power supply system is disconnected |
JPS6123365A (ja) | 1984-07-11 | 1986-01-31 | Sharp Corp | 定電圧ダイオ−ドの形成方法 |
JPS6371503A (ja) * | 1986-09-12 | 1988-03-31 | Fuji Electric Co Ltd | タ−ビン過速防止装置 |
JP2540202B2 (ja) * | 1989-03-01 | 1996-10-02 | 富士電機株式会社 | 発電機の多変数制御システムにおける補正制御方式 |
US5042246A (en) * | 1989-11-06 | 1991-08-27 | General Electric Company | Control system for single shaft combined cycle gas and steam turbine unit |
US5301499A (en) * | 1990-06-28 | 1994-04-12 | General Electric Company | Overspeed anticipation and control system for single shaft combined cycle gas and steam turbine unit |
JP2626316B2 (ja) | 1991-06-26 | 1997-07-02 | 住友金属工業株式会社 | 焼結鉱製造方法 |
DE4411327C1 (de) * | 1994-03-25 | 1995-03-30 | Ver Energiewerke Ag | Verfahren und Schaltungsanordnung zur Erzeugung eines Signals zur Steuerung der Inselbetriebsfahrweise eines in einem Verbundnetz angeordneten Kraftwerksblockes |
FR2727809A1 (fr) * | 1994-12-06 | 1996-06-07 | Electricite De France | Dispositif de regulation de vitesse pour groupe turbo-alternateur |
IN190406B (ru) * | 1995-11-14 | 2003-07-26 | Siemens Ag | |
RU2169272C2 (ru) * | 1996-03-07 | 2001-06-20 | Сименс Акциенгезелльшафт | Способ и устройство для быстрого регулирования мощности энергетической установки |
US5949146A (en) * | 1997-07-02 | 1999-09-07 | Cummins Engine Company, Inc. | Control technique for a lean burning engine system |
JPH1181915A (ja) * | 1997-09-01 | 1999-03-26 | Mitsubishi Electric Corp | 発電所における負荷選択遮断/投入装置 |
DE59709511D1 (de) * | 1997-10-06 | 2003-04-17 | Alstom Switzerland Ltd | Verfahren zum Betrieb einer Kombianlage |
US6164057A (en) * | 1999-03-16 | 2000-12-26 | General Electric Co. | Gas turbine generator having reserve capacity controller |
DE10056231B4 (de) * | 2000-11-13 | 2012-02-23 | Alstom Technology Ltd. | Verfahren zum Betrieb eines Kombikraftwerks |
AUPR418901A0 (en) * | 2001-04-04 | 2001-05-03 | Applidyne Pty Ltd | Control system for cogeneration unit |
JP3702267B2 (ja) * | 2002-11-13 | 2005-10-05 | 三菱重工業株式会社 | 一軸形コンバインドサイクルプラント |
EP1592870B1 (de) * | 2003-02-11 | 2015-06-24 | Alstom Technology Ltd | Verfahren zum betrieb einer gasturbogruppe |
US7188475B2 (en) * | 2003-12-18 | 2007-03-13 | Honeywell International, Inc. | Starting and controlling speed of a two spool gas turbine engine |
KR101130430B1 (ko) * | 2007-02-16 | 2012-03-27 | 대구텍 유한회사 | 양면 사용 가능한 절삭 인서트 및 이를 장착한 밀링 커터 |
JP4616847B2 (ja) * | 2007-02-16 | 2011-01-19 | 三菱重工業株式会社 | 蒸気システムとその制御システム及び制御方法 |
JP5144169B2 (ja) * | 2007-08-17 | 2013-02-13 | 本田技研工業株式会社 | コージェネレーション装置 |
-
2008
- 2008-08-25 EP EP08015000A patent/EP2208867A1/de not_active Withdrawn
-
2009
- 2009-08-17 WO PCT/EP2009/060593 patent/WO2010026035A2/de active Application Filing
- 2009-08-17 CN CN200980133303.8A patent/CN102137987B/zh not_active Expired - Fee Related
- 2009-08-17 JP JP2011524320A patent/JP5194175B2/ja not_active Expired - Fee Related
- 2009-08-17 KR KR1020117006906A patent/KR101282056B1/ko not_active IP Right Cessation
- 2009-08-17 US US13/060,308 patent/US8624414B2/en not_active Expired - Fee Related
- 2009-08-17 RU RU2011111282/06A patent/RU2472006C2/ru not_active IP Right Cessation
- 2009-08-17 EP EP09781887A patent/EP2318667A2/de not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
US8624414B2 (en) | 2014-01-07 |
EP2208867A1 (de) | 2010-07-21 |
WO2010026035A3 (de) | 2010-08-05 |
JP2012500931A (ja) | 2012-01-12 |
JP5194175B2 (ja) | 2013-05-08 |
EP2318667A2 (de) | 2011-05-11 |
US20110156408A1 (en) | 2011-06-30 |
KR101282056B1 (ko) | 2013-07-05 |
KR20110047257A (ko) | 2011-05-06 |
CN102137987B (zh) | 2014-01-08 |
CN102137987A (zh) | 2011-07-27 |
RU2472006C2 (ru) | 2013-01-10 |
WO2010026035A2 (de) | 2010-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2647012T3 (es) | Generador para turbina eólica con un controlador de anticorte de baja tensión y procedimiento para controlar los componentes de turbina eólica | |
ES2519165T3 (es) | Método y sistema de control para controlar la conversión de potencia en un convertidor de potencia | |
TW200615955A (en) | Internal voltage generators for semiconductor memory devices | |
EA201992848A1 (ru) | Блок питания для аэрозольного ингалятора, а также способ управления и программа управления данным блоком питания | |
ES2617450T3 (es) | Parque eólico y procedimiento para el accionamiento de un parque eólico | |
WO2012019785A3 (en) | Arrangement for generating a control signal for controlling a power output of a power generation system | |
TW200616317A (en) | Method and apparatus for intelligently setting dead time | |
HK1124670A1 (en) | Single stage inverter device, and related controlling method, for converters of power from energy sources, in particular photovoltaic sources | |
EA201792352A2 (ru) | Система управления выходной мощностью фотоэлектрического элемента (варианты) | |
RU2011111282A (ru) | Способ и устройство для регулирования паротурбинной электростанции | |
EP2624429A3 (en) | Method of forming a switched mode power supply controller device with an off mode and structure therefor | |
AR089187A1 (es) | Un metodo para elaborar un componente de lignina, un componente de lignina y su uso y un producto | |
NZ741164A (en) | Battery with a voltage regulation device | |
PH12016000282A1 (en) | Steam temperature control using dynamic matrix control | |
RU2016140573A (ru) | Зарядное устройство для различных источников электроэнергии | |
EA201992088A1 (ru) | Генерирующее вдыхаемый компонент устройство, схема управления, а также способ управления и программа управления генерирующим вдыхаемый компонент устройством | |
ATE544003T1 (de) | Wasserkraftwerk | |
MX364503B (es) | Metodo y dispositivo para hacer recordatorios en un estado de apagado. | |
EP4242452A3 (en) | Controlling wind turbine noise | |
TWI264732B (en) | Input/output circuit | |
KR101027698B1 (ko) | 반도체 장치 및 그 제어 방법 | |
KR102049713B1 (ko) | 충방전 제어 회로를 갖는 전자 기기 | |
EP2254214A3 (en) | Circuit breaker and method of controlling its operation | |
JP2015039148A5 (ru) | ||
WO2016050689A3 (de) | Getakteter elektronischer energiewandler mit einstellbarer lückenzeit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20170818 |