RU2002135737A - METHOD FOR OPEN DEVELOPMENT OF SHORT-DEPTH DEPOSITS WITH INTERNAL DUMP FORMATION - Google Patents

METHOD FOR OPEN DEVELOPMENT OF SHORT-DEPTH DEPOSITS WITH INTERNAL DUMP FORMATION

Info

Publication number
RU2002135737A
RU2002135737A RU2002135737/03A RU2002135737A RU2002135737A RU 2002135737 A RU2002135737 A RU 2002135737A RU 2002135737/03 A RU2002135737/03 A RU 2002135737/03A RU 2002135737 A RU2002135737 A RU 2002135737A RU 2002135737 A RU2002135737 A RU 2002135737A
Authority
RU
Russia
Prior art keywords
excavation
tier
dumping
mining
dump
Prior art date
Application number
RU2002135737/03A
Other languages
Russian (ru)
Other versions
RU2246620C2 (en
Inventor
Георгий Григорьевич Саканцев
Original Assignee
Институт горного дела УрО РАН
Filing date
Publication date
Application filed by Институт горного дела УрО РАН filed Critical Институт горного дела УрО РАН
Priority to RU2002135737/03A priority Critical patent/RU2246620C2/en
Priority claimed from RU2002135737/03A external-priority patent/RU2246620C2/en
Publication of RU2002135737A publication Critical patent/RU2002135737A/en
Application granted granted Critical
Publication of RU2246620C2 publication Critical patent/RU2246620C2/en

Links

Claims (1)

Способ открытой разработки крутопадающих месторождений с внутренним отвалообразованием, при котором карьер по длине делят на очереди, из которых первую отрабатывают до проектной глубины с внешним отвалообразованием, а отработку последующих очередей ведут с применением внутреннего отвалообразования, размещая вскрышу в выработанное пространство смежной очереди с общим подвиганием отвального фронта по мере развития горных работ, отличающийся тем, что вторую и последующую очереди карьера делят по высоте на выемочные ярусы, отработку верхнего яруса ведут с размещением вскрыши в верхний отвальный ярус выработанного пространства смежной очереди, используя транспортные коммуникации поверхности, при отработке второго выемочного яруса отсыпку отвального яруса внутреннего отвала первоначально осуществляют формированием у продольного погашенного борта карьера пионерной насыпи, на верхней площадке которой размещают транспортные коммуникации и ведут с нее отсыпку отвального яруса, по мере понижения горных работ в рабочей зоне выемочного яруса изменяют профиль верхней площадки насыпи, обеспечивая необходимую грузотранспортную связь рабочих горизонтов выемочного яруса с отвальным ярусом, после отработки выемочного яруса оставшуюся часть пионерной насыпи срабатывают до верхней отметки следующего выемочного яруса, а отработку последующих выемочных ярусов осуществляют аналогичным образом, используя вновь образованную верхнюю площадку пионерной насыпи.A method for open-cast mining of steeply dipping deposits with internal dumping, in which the quarry is divided into lines by length, of which the first is mined to the design depth with external dumping, and the development of subsequent stages is carried out using internal dumping, placing overburden in the worked out space of the adjacent queue with the general moving of the dump front with the development of mining, characterized in that the second and subsequent stages of the quarry are divided in height into excavation tiers, mining the upper tier is carried out with overburden placement in the upper dump stage of the worked-out space of the adjacent queue, using surface transportation communications, while working out the second excavation tier, dumping of the dump stage of the internal dump is initially carried out by forming a pioneer embankment at the longitudinal extruded side, on the upper platform of which transport communications are placed and lead dumping of the dumping tier from it, as the mining operations in the working area of the excavation tier decrease, the profile of the upper oschadki mound, providing the necessary connection gruzotransportnuyu working levels excavation tiers with tier dump after mining excavation tier remainder of pioneer mound triggered to mark the next upper tier excavation, excavation and subsequent testing of tiers is performed in a similar manner using the newly formed upper platform pioneer mound.
RU2002135737/03A 2002-12-30 2002-12-30 Method for open extraction of steep-falling deposits with internal dump-forming RU2246620C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2002135737/03A RU2246620C2 (en) 2002-12-30 2002-12-30 Method for open extraction of steep-falling deposits with internal dump-forming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2002135737/03A RU2246620C2 (en) 2002-12-30 2002-12-30 Method for open extraction of steep-falling deposits with internal dump-forming

Publications (2)

Publication Number Publication Date
RU2002135737A true RU2002135737A (en) 2004-06-27
RU2246620C2 RU2246620C2 (en) 2005-02-20

Family

ID=35218969

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2002135737/03A RU2246620C2 (en) 2002-12-30 2002-12-30 Method for open extraction of steep-falling deposits with internal dump-forming

Country Status (1)

Country Link
RU (1) RU2246620C2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2528731C1 (en) * 2013-03-25 2014-09-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open working out of steep deposits with internal spoil disposal
RU2528704C1 (en) * 2013-05-06 2014-09-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open working out of steep deposits of platform shape
RU2533996C1 (en) * 2013-06-26 2014-11-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of open development of steep deposits of area form

Similar Documents

Publication Publication Date Title
RU2533996C1 (en) Method of open development of steep deposits of area form
RU2490462C2 (en) Method of open mining of steep oblong deposits
RU2528704C1 (en) Method of open working out of steep deposits of platform shape
RU2652234C1 (en) Method of open development of inclined deposits with the use of spoil banks
RU2002135737A (en) METHOD FOR OPEN DEVELOPMENT OF SHORT-DEPTH DEPOSITS WITH INTERNAL DUMP FORMATION
RU2528731C1 (en) Method of open working out of steep deposits with internal spoil disposal
RU2348808C2 (en) Method of preparing bottom of block
RU2444625C1 (en) Development method of tube-like and thick ore bodies
RU2015130708A (en) METHOD FOR OPEN DEVELOPMENT OF STEELY FALLING DEPOSITS OF A ROUND SHAPE USING A QUEUE
RU2013136259A (en) METHOD FOR OPEN DEVELOPMENT OF LARGE-SCALE DEPOSITS OF LONG LENGTH WITH INTERNAL DUMPING
RU2425220C1 (en) Method for formation of steeply inclined transport access track
RU2632604C1 (en) Method for forming and depreserving steep temporary nonactive walls when developing deep laying deposits
RU2376471C1 (en) Method of steep trench performance
RU2685587C1 (en) Method for open development of steeply-dipping deposits with application of combined temporary non-working sides
RU2224107C1 (en) Process of opencast-underground mining of mineral resources
RU2360118C1 (en) Method of open development of bedded deposit of minerals
RU2246620C2 (en) Method for open extraction of steep-falling deposits with internal dump-forming
RU2642903C1 (en) Method for open-cut mining of mineral deposits
RU2534297C1 (en) Method of making steep trench
RU2002110187A (en) Method for open development of steeply falling elongated deposits
RU2231642C1 (en) Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness
RU2651833C1 (en) Method of open-underground development of coal bed, lying in the form of brachysyncline
RU99116204A (en) METHOD FOR OPEN DEVELOPMENT OF CLOSE FALLING EXTENDED DEPOSITS
RU2276268C2 (en) Method for opened development of superimposed mineral deposit beds
RU2303695C1 (en) Method for opened bedded deposit development