RU2002110187A - Method for open development of steeply falling elongated deposits - Google Patents

Method for open development of steeply falling elongated deposits

Info

Publication number
RU2002110187A
RU2002110187A RU2002110187/03A RU2002110187A RU2002110187A RU 2002110187 A RU2002110187 A RU 2002110187A RU 2002110187/03 A RU2002110187/03 A RU 2002110187/03A RU 2002110187 A RU2002110187 A RU 2002110187A RU 2002110187 A RU2002110187 A RU 2002110187A
Authority
RU
Russia
Prior art keywords
quarry
mining
pillar
horizon
overburden
Prior art date
Application number
RU2002110187/03A
Other languages
Russian (ru)
Other versions
RU2224109C2 (en
Inventor
Михаил Владимирович Курленя
Михаил Лазаревич Медведев
Original Assignee
Институт химии и химической технологии СО РАН
Filing date
Publication date
Application filed by Институт химии и химической технологии СО РАН filed Critical Институт химии и химической технологии СО РАН
Priority to RU2002110187/03A priority Critical patent/RU2224109C2/en
Priority claimed from RU2002110187/03A external-priority patent/RU2224109C2/en
Publication of RU2002110187A publication Critical patent/RU2002110187A/en
Application granted granted Critical
Publication of RU2224109C2 publication Critical patent/RU2224109C2/en

Links

Claims (1)

Способ открытой разработки крутопадающих вытянутых месторождений, включающий отработку карьерного поля этапами, подготовку горной массы к экскавации буровзрывным способом, транспортирование породы и полезного ископаемого автосамосвалами, размещение вскрышных пород во внешнем и внутреннем отвалах, отличающийся тем, что по завершении горных работ в пределах предпоследнего этапа, на горизонте, совпадающем со ступенью граничного контура карьера и контура горных работ предпоследнего этапа отработки карьерного поля, от верхней бровки постановки уступа в предельное положение, выделяют целик, ориентированный вкрест простирания карьерного поля, соединяющий противоположные борта карьера, с шириной верхнего основания, равной ширине площадки примыкания съезда к горизонту, разделяющий карьер на часть для размещения внутреннего отвала и часть основного извлечения вскрышных пород и полезного ископаемого, от контуров верхнего основания целика, в противоположных направлениях, по простиранию карьерного поля проводят вскрывающие и подготовительные выработки на горизонт, смежный с горизонтом верхнего основания целика, в части карьера для размещения отвала отрабатывают законтурные запасы полезного ископаемого на глубину, позволяющую по простиранию, сопряженно борту размещения стационарной трассы, без изменения направления трассы устроить съезд максимальной длины, и после их отработки, от целика отсыпают съезд из вскрышных пород в направлении, противоположном направлению развития горных работ в части карьерного поля основного извлечения вскрышных пород и полезного ископаемого, соприкасающийся боковой поверхностью с откосом погашенного уступа борта, противоположного борту размещения съезда на целике, отрабатывают полезное ископаемое, находящееся в целике под съездом, после чего приступают к размещению породы в подготовленном пространстве карьера.A method for open-cast mining of steeply dipping elongated deposits, including mining a quarry field in stages, preparing the rock mass for excavation using a blasting method, transporting rock and minerals with dump trucks, placing overburden rocks in the external and internal dumps, characterized in that upon completion of mining operations within the penultimate stage, on the horizon coinciding with the step of the boundary contour of the quarry and the contour of mining of the penultimate stage of mining the quarry field, from the upper edge along setting the ledge to the limit position, distinguish the pillar, oriented across the strike of the quarry field, connecting the opposite sides of the quarry, with a width of the upper base equal to the width of the junction of the ramp adjoining the horizon, dividing the quarry into a part for accommodating the internal dump and part of the main extraction of overburden and mineral , from the contours of the upper base of the pillar, in opposite directions, along the strike of the quarry field, opening and preparatory workings are carried out to the horizon adjacent With the horizon at the upper base of the pillar, in the part of the quarry, the mine reserves are mined to a depth that allows you to extend a maximum length along the strike, conjugate to the fixed route board, without changing the direction of the route, and after working off, exit from the pillar overburden in the direction opposite to the direction of development of mining in the part of the quarry field of the main extraction of overburden and mineral, adjoining lateral rhnostyu with slope extinguished ledge opposite side board placement Congress on whole fulfill minerals, located entirely below in Congress, then proceed to placement in a prepared quarry rock space.
RU2002110187/03A 2002-04-17 2002-04-17 Process of opencast mining of steeply deeping stretched-out mineral deposits RU2224109C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2002110187/03A RU2224109C2 (en) 2002-04-17 2002-04-17 Process of opencast mining of steeply deeping stretched-out mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2002110187/03A RU2224109C2 (en) 2002-04-17 2002-04-17 Process of opencast mining of steeply deeping stretched-out mineral deposits

Publications (2)

Publication Number Publication Date
RU2002110187A true RU2002110187A (en) 2003-10-27
RU2224109C2 RU2224109C2 (en) 2004-02-20

Family

ID=32172583

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2002110187/03A RU2224109C2 (en) 2002-04-17 2002-04-17 Process of opencast mining of steeply deeping stretched-out mineral deposits

Country Status (1)

Country Link
RU (1) RU2224109C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2499139C1 (en) * 2012-05-23 2013-11-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method of open operation of elongated deposits of steeply pitching seams

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2490462C2 (en) * 2011-11-09 2013-08-20 Федеральное Государственное Бюджетное Учреждение Науки Институт Химии И Химической Технологии Сибирского Отделения Российской Академии Наук (Иххт Со Ран) Method of open mining of steep oblong deposits
RU2553672C2 (en) * 2013-08-01 2015-06-20 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method of opened development of long steep dipping fields with internal dumping

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2499139C1 (en) * 2012-05-23 2013-11-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method of open operation of elongated deposits of steeply pitching seams

Similar Documents

Publication Publication Date Title
RU2612178C2 (en) Method of open mining of steep dipping field having round form using temporary nonworking sidewalls
RU2533996C1 (en) Method of open development of steep deposits of area form
RU2652234C1 (en) Method of open development of inclined deposits with the use of spoil banks
RU2002110187A (en) Method for open development of steeply falling elongated deposits
RU2524716C1 (en) Strip mining of minerals including working of ore bodies in contact between ore and capping in sub-benches
RU2444625C1 (en) Development method of tube-like and thick ore bodies
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2224107C1 (en) Process of opencast-underground mining of mineral resources
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
RU2002135737A (en) METHOD FOR OPEN DEVELOPMENT OF SHORT-DEPTH DEPOSITS WITH INTERNAL DUMP FORMATION
RU99116204A (en) METHOD FOR OPEN DEVELOPMENT OF CLOSE FALLING EXTENDED DEPOSITS
UA32583U (en) Method for development of steep shallow ore deposits in contour zone of pits
RU2760270C1 (en) Method for developing a large flat-lying seam with the release of coal under the cover
RU2534297C1 (en) Method of making steep trench
RU2278261C1 (en) Method of combined open-cut and underground steeply pitching deposit development
RU2187644C2 (en) Method of mining of flat coal seam
SU1461930A1 (en) Method of combined mining of mineral deposits
RU2124128C1 (en) Method for opencast development of deposits
RU2290510C1 (en) Open underground method for extracting formations of mineral resources
RU2685583C1 (en) Method for open development of steep deposits with application of multistage temporarily non-working sides
RU2231642C1 (en) Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness
SU1444521A1 (en) Method of combined mining of steep ore bodies
SU1453024A1 (en) Method of supporting a mine working
SU1476135A1 (en) Method of open-cast mining of ore deposits