RU2001114942A - Method and machine for tamping rail ties - Google Patents

Method and machine for tamping rail ties

Info

Publication number
RU2001114942A
RU2001114942A RU2001114942/28A RU2001114942A RU2001114942A RU 2001114942 A RU2001114942 A RU 2001114942A RU 2001114942/28 A RU2001114942/28 A RU 2001114942/28A RU 2001114942 A RU2001114942 A RU 2001114942A RU 2001114942 A RU2001114942 A RU 2001114942A
Authority
RU
Russia
Prior art keywords
machine
track
frame
rail
tamping
Prior art date
Application number
RU2001114942/28A
Other languages
Russian (ru)
Other versions
RU2225908C2 (en
Inventor
Йозеф Тойрер
Герберт Вёргёттер
Original Assignee
Франц Плассер Банбаумашинен-Индустригезельшафт М.Б.Х.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AT0043100U external-priority patent/AT3876U3/en
Application filed by Франц Плассер Банбаумашинен-Индустригезельшафт М.Б.Х. filed Critical Франц Плассер Банбаумашинен-Индустригезельшафт М.Б.Х.
Publication of RU2001114942A publication Critical patent/RU2001114942A/en
Application granted granted Critical
Publication of RU2225908C2 publication Critical patent/RU2225908C2/en

Links

Claims (4)

1. Способ подбивки шпал рельсового пути, причем рельсовый путь (2), который нужно приподнять и подбить, ограничен двумя ходовыми механизмами (4) с образованием участка подъема пути (19), отличающийся тем, что в первой рабочей поездке для подъема пути и внесения щебня под путь (2) участок подъема пути (19) удлиняют в продольном направлении пути, в следующей рабочей поездке для формирования окончательного заданного положения и подбивки шпал пути (2) участок подъема пути (19) укорачивают.1. A method of knocking down rail track sleepers, the rail track (2) that needs to be raised and knocked out is limited by two running gears (4) to form a track lift section (19), characterized in that in the first working trip for lifting the track and making crushed stone under the track (2), the section of the track (19) is lengthened in the longitudinal direction of the track; in the next working trip, to shorten the track sleepers (2), the section of the track (19) is shortened. 2. Способ по п.1, отличающийся тем, что изменение длины участка подъема пути (19) происходит благодаря приподниманию или опусканию дополнительной рамы (5), соединенной с подбивочным агрегатом (8), путеподъемным и рихтовочным агрегатом (9) и ходовым механизмом (4), относительно рамы (3) машины (1).2. The method according to claim 1, characterized in that the change in the length of the path lifting section (19) occurs due to raising or lowering the additional frame (5) connected to the tamping unit (8), overhead and leveling unit (9) and the running gear ( 4), relative to the frame (3) of the machine (1). 3. Машина для подбивки шпал рельсового пути (2), имеющая собственную раму (3), опирающуюся на концах на ходовые механизмы (4) и передвигающуюся по рельсовому пути (2), дополнительную раму (5), расположенную между ходовыми механизмами (4) и соединенную на одном конце с помощью шарнира (7) с рамой машины (3), с возможностью перемещения в продольном направлении машины и имеющую на противоположном конце ходовой механизм (4) для опирания на рельсовый путь (2), отличающаяся тем, что в области ходового механизма 4, связанного с дополнительной рамой (5), дополнительная рама (5) связана через привод (20) с направляющими роликами (21), которые расположены на раме машины (3) с возможностью перемещения в продольном направлении машины.3. A machine for tamping railroad ties (2), having its own frame (3), resting on the ends of the running gears (4) and moving along the rail (2), an additional frame (5) located between the running gears (4) and connected at one end by a hinge (7) to the frame of the machine (3), with the possibility of moving in the longitudinal direction of the machine and having a running gear (4) at the opposite end for supporting against the rail track (2), characterized in that in the region running gear 4 associated with the additional frame (5), supplement te a frame (5) is connected via a drive (20) with guide rollers (21) which are arranged on the machine frame (3) movably in the longitudinal direction of the machine. 4. Машина для подбивки шпал рельсового пути (2), имеющая собственную раму (3), опирающуюся на концах на ходовые механизмы (4) и передвигающуюся по рельсовому пути (2), подбивочный агрегат (8), находящийся между ходовыми механизмами (4), и путеподъемный и рихтовочный агрегат (9), отличающаяся тем, что один ходовой механизм (4) выполнен с возможностью перемещения в продольном направлении машины относительно рамы машины (3).4. A machine for tamping rail ties (2), having its own frame (3), resting on the ends of the running gears (4) and moving along the rail (2), a tamping unit (8) located between the running gears (4) and hoisting and leveling unit (9), characterized in that one running gear (4) is arranged to move in the longitudinal direction of the machine relative to the frame of the machine (3).
RU2001114942/11A 2000-06-09 2001-06-05 Method of tie tamping and tie tamping outfit RU2225908C2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT0043100U AT3876U3 (en) 2000-06-09 2000-06-09 METHOD AND MACHINE FOR FILLING A TRACK
ATGM431/2000 2000-06-09

Publications (2)

Publication Number Publication Date
RU2001114942A true RU2001114942A (en) 2003-06-10
RU2225908C2 RU2225908C2 (en) 2004-03-20

Family

ID=3490414

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001114942/11A RU2225908C2 (en) 2000-06-09 2001-06-05 Method of tie tamping and tie tamping outfit

Country Status (12)

Country Link
US (1) US6481358B2 (en)
EP (1) EP1162309B1 (en)
JP (1) JP4824203B2 (en)
CN (1) CN1205390C (en)
AT (2) AT3876U3 (en)
CA (1) CA2350166C (en)
DE (1) DE50105805D1 (en)
DK (1) DK1162309T3 (en)
ES (1) ES2240391T3 (en)
PL (1) PL208240B1 (en)
RU (1) RU2225908C2 (en)
UA (1) UA72899C2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT4463U3 (en) * 2001-04-26 2002-03-25 Plasser Bahnbaumasch Franz CLEANING MACHINE FOR CLEANING THE GRAVEL BED OF A TRACK
AT413554B (en) * 2003-10-31 2006-03-15 Plasser Bahnbaumasch Franz STOP MACHINE FOR SUPPORTING A TRAIL
AT500949B8 (en) * 2004-10-01 2007-02-15 Plasser Bahnbaumasch Franz MACHINE FOR IMPLEMENTING A RAILWAY CORRECTION
RU2480552C1 (en) * 2011-11-16 2013-04-27 Николай Михайлович Балезин Method for continuous railway track sleeper tamping and machine for its realisation
CN107544309B (en) * 2017-09-28 2020-07-07 中国神华能源股份有限公司 Control circuit, method and device for tamping vehicle, storage medium and processor
KR102197762B1 (en) * 2018-02-12 2021-01-04 류수경 A Special train for replacing gravel ballast to concrete ballast
FR3108342B1 (en) * 2020-03-20 2022-03-25 Matisa Materiel Ind Sa WORKS rail MACHINE comprising a machine frame and a work shuttle, and associated WORKS rail convoy
AT525273B1 (en) 2021-08-04 2023-02-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Process and machine for processing a track
CN114987228A (en) * 2022-08-08 2022-09-02 中国铁建高新装备股份有限公司 Hybrid power transmission method and system and railway vehicle

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT379176B (en) * 1981-12-22 1985-11-25 Plasser Bahnbaumasch Franz DRIVABLE PLANT AND METHOD FOR CONTINUOUSLY PROGRESSIVE RENOVATION OF THE RAILWAYS
AT382658B (en) * 1983-12-16 1987-03-25 Plasser Bahnbaumasch Franz CONTINUOUSLY MOVABLE TRACKING MACHINE
AT376258B (en) * 1982-09-09 1984-10-25 Plasser Bahnbaumasch Franz MOBILE TRACK LEVELING AND LEVELING MACHINE
AT380279B (en) * 1983-08-19 1986-05-12 Plasser Bahnbaumasch Franz CONTINUOUSLY (NON-STOP) TRAVELABLE TRACK LEVELING AND LEVELING MACHINE
AT379835B (en) * 1983-08-19 1986-03-10 Plasser Bahnbaumasch Franz CONTINUOUSLY (NON STOP) TRAVELABLE TRACK-LEVELING AND LEVELING MACHINE
FR2559174B1 (en) * 1984-02-06 1986-10-24 Framafer CONTINUOUSLY FORWARDED RAILWAY WORK MACHINE
FR2562107B1 (en) * 1984-03-30 1986-11-14 Framafer CONTINUOUSLY FORWARDED MACHINE FOR WORKING ON RAILWAYS
AT383838B (en) 1984-06-01 1987-08-25 Plasser Bahnbaumasch Franz CONTINUOUSLY TRAVELABLE TRACK LEVELING AND LEVELING MACHINE
AT389336B (en) 1986-02-12 1989-11-27 Plasser Bahnbaumasch Franz TRACKING MACHINE WITH LIFTING, STOPPING AND, IF NECESSARY, DIRECTIONAL UNIT
EP0239711B1 (en) * 1986-04-02 1989-05-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Mobile plant cleaning the ballast of a track with means to distribute said ballast
AT387999B (en) * 1987-05-27 1989-04-10 Plasser Bahnbaumasch Franz TRACK BOTTLE BED CLEANING MACHINE WITH ENDLESS CONVEYOR OR ROOM CHAIN
DE3866876D1 (en) * 1988-07-26 1992-01-23 Plasser Bahnbaumasch Franz CONTINUOUSLY (NON STOP) TRAVELABLE TRACK, LEVELING AND LEVELING MACHINE.
ES2035647T3 (en) * 1989-05-18 1993-04-16 Franz Plasser Bahnbaumaschinen- Industriegesellschaft M.B.H. MOBILE ROAD BATTERING MACHINE CONTINUOUSLY WITH PLOW DISPOSITION.
AT398097B (en) * 1991-11-13 1994-09-26 Plasser Bahnbaumasch Franz SYSTEM FOR PRODUCING A PLANUM PROTECTIVE LAYER
RU2086723C1 (en) * 1993-06-16 1997-08-10 Франц Плассер Банбаумашинен-Индустригезельшафт Мбх Method of and device for reconditioning of railway track ballast layer
ES2143746T3 (en) * 1995-03-07 2000-05-16 Plasser Bahnbaumasch Franz BATCHING MACHINE, MACHINERY CONFIGURATION AND PROCEDURE FOR BOTTOM BATTING OF A TRACK.
DK0952254T3 (en) * 1998-03-27 2004-03-15 Plasser Bahnbaumasch Franz Method for track position correction

Similar Documents

Publication Publication Date Title
RU2013483C1 (en) Sleeper tamping and nipping machine
JP3658432B2 (en) Compaction unit for track compaction machine that compacts the underside of two sleepers adjacent to each other
RU2001114942A (en) Method and machine for tamping rail ties
CA1230267A (en) Ballast tamping machine
RU2062858C1 (en) Track-packing machine for switches and railroad crossings
CA2352939A1 (en) A machine for renewing a track
RU2225908C2 (en) Method of tie tamping and tie tamping outfit
CZ278179B6 (en) Track packing machine being provided with packing units adjustable in the track transversal direction
RU2241088C1 (en) Tie tamper with own frame and auxiliaries frame
RU2195523C1 (en) Tamping machine
CA2212837A1 (en) A track maintenance machine for excavating ballast bed material of a track
DE3866872D1 (en) MACHINE FOR SIDE-SHIFTING A TRACK LISTED BY RAILS AND CROSS-SLEEPERS.
CA1046850A (en) Track ballast tamping unit
CA1109734A (en) Track tamper
RU2158796C2 (en) Tie-tamping outfit
CN204658650U (en) Turn over formula cellular concrete cutting off machine
RU2228981C2 (en) Ballast bed treatment machine
CA2267846A1 (en) A machine having a sleeper crib excavator
US4606273A (en) Railway carriage with set-off apparatus
CN104842441A (en) Floor overturning cutter of aerated concrete
CN108221513A (en) A kind of railroad turnout steel rail construction Transport Machinery
CA2399596A1 (en) A machine for treating a track
ITTO960041A1 (en) SELF-PROPELLED MACHINE FOR THE STABILIZATION, BY HAMMERING AND COMPACTION, OF TRACKS LAYED ON THE MASSAGE.
RU2261301C1 (en) Tamping and leveling machine
CA1045899A (en) Track surfacing