PL99600B1 - THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS - Google Patents

THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS Download PDF

Info

Publication number
PL99600B1
PL99600B1 PL18064475A PL18064475A PL99600B1 PL 99600 B1 PL99600 B1 PL 99600B1 PL 18064475 A PL18064475 A PL 18064475A PL 18064475 A PL18064475 A PL 18064475A PL 99600 B1 PL99600 B1 PL 99600B1
Authority
PL
Poland
Prior art keywords
working chamber
sewage
foundation
pipes
construction
Prior art date
Application number
PL18064475A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL18064475A priority Critical patent/PL99600B1/en
Publication of PL99600B1 publication Critical patent/PL99600B1/en

Links

Landscapes

  • Sewage (AREA)

Description

Przedmiotem wynalazku jest sposób wykonywa¬ nia komory roboczej studzienek kanalizacyjnych i element budowlany umozliwiajacy stosowanie te¬ go sposobu przy kanalizacji typowej oraz przy kanalizacji sanitarno-deszczowej, pietrowej (dwu¬ poziomowej) w robotach z zakresu inzynierii sa¬ nitarnej.Znane sposoby wykonywania komory roboczej studzienek kanalizacyjnych w obydwu typach ka¬ nalizacji polegaja na wykonywaniu fundamentu, na którym posadowiona zostaje komora robocza wykonana metoda murarska z cegiel kanalizacyj¬ nych, przy czym powierzchnia zewnetrzna sciany komory wymaga wykonania tynku, a powierzchnia wewnetrzna — spoinowania. Komory takie mozna wykonywac równiez metoda wylewania betonem na mokro przy uzyciu szalowania. Zarówno jedna jak i druga metoda wykonywania komór robo¬ czych jest pracochlonna i wymaga stosowania badz cegly kanalizacyjnej, badz materialów do sza¬ lowania, poza tym stosowanie tych metod powo¬ duje powstawanie niekorzystnych przerw techno¬ logicznych (twardnienie zaprawy lub betonu) i u- niemozliwia prowadzenie robót w okresie obnizo¬ nych temperatur.Sposób wykonywania komory roboczej studzie¬ nek kanalizacyjnych i element budowlany umozli¬ wiajacy stosowanie' sposobu wedlug wynalazku polega na tym, ze przy wykonywaniu kanalizacji typowej, rury kanalizacyjne zostaja ulozone w ciagu, równiez na fundamencie pod komora ro¬ bocza, natomiast komora ta w postaci elementu budowlanego, zostaje nalozona na te rury w miej¬ scu jej lokalizacji na przygotowanym fundamencie.W przypadku kanalizacji sanitarno-deszczowej, pietrowej (dwupoziomowej), dolne rury kanaliza¬ cji sanitarnej, ulozone w ciagu, równiez na fun¬ damencie pod komora robocza, zalewa sie beto¬ nem nad tym fundamentem do wysokosci podsta- Wy rury kanalizacji deszczowej (rury górnej) i na fundament o takiej konstrukcji naklada sie ele¬ ment budowlany stanowiacy komore robocza w taki sposób, aby dolne otwory tego elementu obej¬ mowaly rury kanalizacji deszczowej (rury górne).Element budowlany stanowiacy prefabrykowana komore robocza posiada postac kregu zelbetowego z wyprofilowanymi otworami w jego dolnej cze¬ sci, które umozliwiaja nakladanie tego elementu na ulozone rury, przy czym wyprofilowane otwory przelotowe posiadaja srednice odpowiadajace sred¬ nicy zewnetrznej rur kanalizacyjnych.Zastosowanie sposobu oraz elementu budowla¬ nego wedlug wynalazku umozliwia wyeliminowa¬ nie: praco i czasochlonnego murowania komór ro- boczyclr, niekorzystnych przerw technologicznych, uzaleznienia od temperatur zewnetrznych, stoso¬ wania cegly kanalizacyjnej badz materialu na oszalowania w przypadku wylewania takich ko¬ mór na mokro. Dzieki wynalazkowi wykonywanie komór roboczych wraz z nadbudowa kompletnych 99 6003 99 600 4 kominów wlazowych jest szybkie i mozliwe do re¬ alizacji na znacznych odcinkach sieci kanalizacyj¬ nych — jednoczesnie, bez koniecznosci koordyna¬ cji z robotami przy ukladaniu tej sieci.Sposób oraz element budowlany wedlug wyna¬ lazku uwidoczniony jest w przykladzie wykonania na rysunku, na którym fig. 1 przedstawia przekrój pionowy komory roboczej studzienki kanalizacyj¬ nej kanalizacji typowej, fig. 2 — przekrój piono¬ wy komory roboczej takiej studzienki kanalizacji sanitarno-deszczowej, pietrowej (dwupoziomowej) i fig. 3 — przekrój pionowy elementu budowlane¬ go. Na fundamencie 1 znajduje sie rura kanaliza¬ cyjna 2 i element budowlany 3 posadowiony na tym fundamencie 1, a jego otwory 4 obejmuja rure 2. Dla kanalizacji sanitarno-deszczowej, pie¬ trowej (dwupoziomowej) na fundamencie 1 znaj¬ duje sie rura kanalizacji sanitarnej 2 zabetonowa¬ na do wysokosci podstawy rury kanalizacji de¬ szczowej 5 i na takim fundamencie 6 nastawia sie element budowlany 3, a jego otwory 4 obejmuja rure 5. PLThe subject of the invention is a method of making a working chamber of sewage manholes and a construction element that allows the use of this method in a typical sewage system and in a multi-storey (two-level) sanitary and rainwater sewage system in works in the field of sanitary engineering. Sewer manholes in both types of sewerage consist in the construction of a foundation on which the working chamber is placed, made of sewer bricks, with the outer surface of the chamber wall requiring plaster, and the internal surface - grouting. Such chambers can also be made by wet concrete pouring using formwork. Both the first and the second method of constructing working chambers are labor-intensive and require the use of sewage bricks or formwork materials, besides, the use of these methods causes unfavorable technological breaks (hardening of mortar or concrete) and unevenness. it is impossible to carry out works in the period of low temperatures. The method of making the working chamber of the sewage chambers and the construction element enabling the application of the method according to the invention consists in the fact that when performing a typical sewage system, the sewage pipes are placed in sequence, also on the foundation under the working chamber, while this chamber in the form of a building element, is placed on these pipes in the place of its location on a prepared foundation. In the case of a multi-storey (two-level) sanitary and rainwater sewage system, the lower pipes of the sanitary sewage system are placed in line , also on the foundation under the working chamber, is poured with concrete above this foundation to a height These bases of rainwater pipes (upper pipes) and a foundation of such a structure are overlaid with a building element constituting the working chamber in such a way that the lower openings of this element include the rainwater pipes (upper pipes). the working chamber has the form of a reinforced concrete circle with profiled openings in its lower part, which enable the application of this element on the laid pipes, while the profiled through-holes have a diameter corresponding to the external diameter of sewage pipes. The use of the method and the construction element according to the invention allows elimination of: labor and time-consuming bricklaying of working chambers, unfavorable technological breaks, dependence on external temperatures, the use of sewage bricks or the formwork material in the case of pouring such chambers wet. Thanks to the invention, the construction of working chambers with the superstructure of complete 99,603 99,600 4 manhole chimneys is quick and possible to implement on large sections of sewage networks - at the same time, without the need to coordinate with the works during the laying of this network. according to the invention, it is shown in the example of the embodiment in the drawing, in which Fig. 1 shows a vertical section of the working chamber of a typical sewage system well, Fig. 2 - a vertical section of the working chamber of such a sanitary and rainwater sewage system, two-level sewerage chamber. and Fig. 3 is a vertical section of a building element. There is a sewage pipe 2 on the foundation 1 and a building element 3 placed on this foundation 1, and its openings 4 include a pipe 2. For a multi-storey (two-level) sanitary sewage system, on the foundation 1 there is a sanitary sewage pipe. 2 is concreted to the height of the base of the sewage system pipe 5, and on such a foundation 6 the building element 3 is set, and its openings 4 include the pipe 5.

Claims (3)

Zastrzezenia patentowe 1. Sposób wykonywania komory roboczej stu¬ dzienek kanalizacyjnych dla kanalizacji typowej, 15 20 25 [//////////// Z//////////////// znamienny tym, ze na rury kanalizacyjne (2) ulo¬ zone w ciagu, równiez na fundamencie (1) pod ko¬ more robocza, naklada sie element budowlany (3) stanowiacy te komore.Patent claims 1. Manner of making a working chamber of sewer manholes for a typical sewage system, 15 20 25 [//////////////// Characteristic in that the sewage pipes (2) are laid in sequence, also on the foundation (1) under the working chamber, the building element (3) is placed, constituting this chamber. 2. Sposób wykonywania komory roboczej stu¬ dzienek kanalizacyjnych dla kanalizacji sanitarno- -deszczowej, pietrowej (dwupoziomowej), znamien¬ ny tym, ze dolne rury kanalizacji sanitarnej (2), ulozone w ciagu, równiez na fundamencie (1) pod komora robocza, zalewa sie nad tym fundamentem (1) betonem do wysokosci podstawy rury kanaliza¬ cji deszczowej (górnej) (5) i na fundamencie (6) o takiej konstrukcji nastawia sie element budow¬ lany (3) stanowiacy komore robocza.2. The method of making a working chamber of sewage manholes for a multi-storey (two-level) sanitary-rain sewage system, characterized by the fact that the lower pipes of the sanitary sewage system (2) are placed in line, also on the foundation (1) under the working chamber, concrete is poured over this foundation (1) up to the height of the base of the rainwater drainage pipe (upper) (5), and the building element (3), which constitutes the working chamber, is set on the foundation (6) of such construction. 3. Element budowlany do wykonywania komory roboczej studzienek kanalizacyjnych dla kanali¬ zacji typowej znamienny tym, ze element budo¬ wlany (3) stanowi prefabrykowana komore robo¬ cza studzienki kanalizacyjnej w postaci kregu zel¬ betowego, posiadajacego w swojej dolnej czesci wyprofilowane otwory przelotowe (4) — o sredni¬ cach odpowiadajacych srednicy zewnetrznej rur kanalizacyjnych (2 lub 5) — umozliwiajace nakla¬ danie tego elementu (3) na ulozone rury. Y'/' Yy ' ¦ y / / i / ' /i ¦A Fia. 3 fi,. 2 WZGraf. Legn. 1188/Dm-80. 105+15 egz. Cena 45 zl PL3. A construction element for the construction of a working chamber of sewage manholes for a typical sewage system, characterized in that the construction element (3) is a prefabricated working chamber of a sewer manhole in the form of a gel-concrete circle, having in its lower part profiled through holes ( 4) - with diameters corresponding to the outer diameter of the sewage pipes (2 or 5) - enabling this element (3) to be applied to the pipes laid. Y '/' Yy '¦ y / / i /' / i ¦A Fia. 3 fi ,. 2 ZGRAPH. Legn. 1188 / Dm-80. 105 + 15 copies Price PLN 45 PL
PL18064475A 1975-05-21 1975-05-21 THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS PL99600B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL18064475A PL99600B1 (en) 1975-05-21 1975-05-21 THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL18064475A PL99600B1 (en) 1975-05-21 1975-05-21 THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS

Publications (1)

Publication Number Publication Date
PL99600B1 true PL99600B1 (en) 1978-07-31

Family

ID=19972223

Family Applications (1)

Application Number Title Priority Date Filing Date
PL18064475A PL99600B1 (en) 1975-05-21 1975-05-21 THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS

Country Status (1)

Country Link
PL (1) PL99600B1 (en)

Similar Documents

Publication Publication Date Title
CN106285032B (en) Basement renovation construction of buildings with raft foundations
JPS6016534B2 (en) Construction method for underground continuous wall connections
US5893254A (en) Brick wall on piers
RU10407U1 (en) BUILDING BLOCK
PL99600B1 (en) THE METHOD AND A CONSTRUCTION ELEMENT TO MAKE A WORKING CHAMBER OF SEWAGE CHAMBERS
JP2001220763A (en) Underground wall wastewater treatment method and underground wall constructed by this method
KR100456610B1 (en) Structure method for drainageway of weak stratum and the conduct pipe thereof
KR200229095Y1 (en) Drainage Plate for Basement Elution Treatment
KR100389535B1 (en) subway open cut structure water proofing method and panel thereby
CN217949155U (en) Basement post-cast strip structure
RU221195U1 (en) Glass-type precast reinforced concrete column sill
RU2780187C1 (en) Method for constructing a basement floor unit with a column over cold and ventilated undergrounds
CN212865948U (en) Construction foundation pit supporting structure
CA3101712C (en) System and method for excavating and constructing a shoring support wall and water management system
CN214363523U (en) Scenic spot foundation ditch bearing structure
CN208455644U (en) A prefabricated steel frame supporting honeycomb ground connection wall
AU677908B2 (en) Brick wall on piers
JPH0118710Y2 (en)
SU1203209A1 (en) Cellar of skeleton-supporting building
JPS63537A (en) Construction work of underground structure
SU958594A1 (en) Prefabricated-monolythic wall in soil
Templer Notes on the design of structures founded on heaving soil
KR200221898Y1 (en) Conduct pipe of weak stratum
JPH04203062A (en) Drainage device
KR970002573B1 (en) Water proof structure of underground construction structure