KR100456610B1 - Structure method for drainageway of weak stratum and the conduct pipe thereof - Google Patents

Structure method for drainageway of weak stratum and the conduct pipe thereof Download PDF

Info

Publication number
KR100456610B1
KR100456610B1 KR10-2000-0065403A KR20000065403A KR100456610B1 KR 100456610 B1 KR100456610 B1 KR 100456610B1 KR 20000065403 A KR20000065403 A KR 20000065403A KR 100456610 B1 KR100456610 B1 KR 100456610B1
Authority
KR
South Korea
Prior art keywords
drainage
foundation
groundwater
trench
road
Prior art date
Application number
KR10-2000-0065403A
Other languages
Korean (ko)
Other versions
KR20020035216A (en
Inventor
최한순
Original Assignee
주식회사 경기기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 경기기술단 filed Critical 주식회사 경기기술단
Priority to KR10-2000-0065403A priority Critical patent/KR100456610B1/en
Publication of KR20020035216A publication Critical patent/KR20020035216A/en
Application granted granted Critical
Publication of KR100456610B1 publication Critical patent/KR100456610B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/08Restraining of underground water by employing open ditches arranged below the level of the water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

본 발명은 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공방법 및 그 구조에 관한 것으로서, 토목공사 및 하수도 공사에 필요한 배수로의 구조로 시멘트를 타설하지 않고 배수로를 형성하여 소용공사기간을 단축하고 골조비용을 최소화한 배수로 시공방법 및 배수관을 얻기 위한 것인 바,The present invention relates to the construction method and structure of the drainage of the soft ground with a lot of inflow of groundwater to the bottom of the road, to shorten the construction period by forming a drainage channel without placing cement in the structure of the drainage required for civil engineering and sewage construction It is to obtain a drainage construction method and drainage pipes to minimize the skeleton cost,

도로 작업시 지하수의 배수로 시공방법에 있어서, 일정깊이와 너비를 갖도록 기초 배수로를 굴토하여 ""형상의 기초기반을 형성하여 집수정을 형성하는 트렌치 단계와; 상기 집수정을 굴토하고 트렌치 내부에 다공이 형성된 상부와 하단이 밀폐된 유공관을 매설하는 단계와; 상기 유공관의 매설된 상부에 입자가 굵은 자갈층을 매설하는 기초저면에 포설하는 단계와; 상기 기초저면을 포설한 층의 상부면에 방수층을 형성하기 위해 폴리에틸렌 필름을 내설하는 단계와; 상기 방수층의 상부에 버림콘크리트와 단일배트 콘크리트로 적층하여 타설하는 단계로 이루어짐으로 써, 연약지반과 지하수의 유입이 많이 발생되는 도로에 사용되는 공법으로 도로의 전체보다는 부분적인 구간에 사용되는 효과가 있으며. 특히 기존의 콘크리트의 타설이 시공비가 고가이며 별도의 설비가 필요치 않아 공사비와 공사기간의 절약 및 단축효과를 얻을 수 있는 뛰어난 효과가 있다.In the groundwater drainage construction method of road work, excavate the foundation drainage to have a certain depth and width. "Trench step of forming a basal foundation by the shape of the base to form; and a step of burying the perforated hole and the air hole tube sealed in the upper and lower ends formed in the trench inside the trench; Particles in the buried upper portion of the hole Laying a thick gravel layer on the foundation bottom; and laying down a polyethylene film to form a waterproof layer on the upper surface of the foundation layer on which the foundation bottom is laid; As it is composed of the steps of lamination, it is used in roads where the inflow of soft ground and groundwater is high, and it is used in partial sections rather than the entire road, especially the existing concrete is expensive to construct. Excellent efficiency that can save construction cost and construction period and shorten the effect by not needing additional equipment A.

Description

도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공 공법 및 그 배수관 {Structure method for drainageway of weak stratum and the conduct pipe thereof}Construction method for drainage of weak ground with a lot of groundwater inflow on the base of the road and its drainage pipe {}

본 발명은 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공방법 및 그 구조에 관한 것으로서, 더욱 상세하게는 토목공사 및 하수도 공사에 필요한 배수로의 구조로 시멘트를 타설하지 않고 배수로를 형성하여 소용공사기간을 단축하고 골조비용을 최소화한 배수로 시공방법 및 그 배수관에 관한 것이다.The present invention relates to a construction method and structure of the drainage of the soft ground with a lot of groundwater inflow to the bottom of the road, more specifically, to form a drainage channel without laying cement in the structure of the drainage required for civil engineering and sewage construction The present invention relates to a drainage construction method and a drainage pipe having a shorter period of time and a minimized frame cost.

현재 토목건설은 도로를 개통하거나 터닦기 등을 하는 기초공사 작업 시에 이루어지는 배수로의 위치 설정이 매우 중요하다.At present, it is very important for the civil construction to set up the location of the drainage channel during the foundation work such as opening the road or sweeping the ground.

일반적인, 도로 개통공사나 택지 개발공사와 같은 토목공사에는 우천시 빗물배수 또는 일반배수를 위한 배수로가 형성되는데, 이는 콘크리트 몰탈로 된 것이 주종을 이루고 있다.In general, civil engineering works such as road opening construction and land development are formed drainage for rainwater drainage or general drainage, which is mainly made of concrete mortar.

이러한 종래의 배수로 시공방법을 기술하면, 먼저 전자인 콘크리트 몰탈로 형성되는 것은 배수로지를 선정하여 일정 깊이와 너비를 갖도록 상·하고 굴토하고, 그 양면에 일정 거리를 이격시켜 거푸집을 고정한 다음, 거푸집과 굴토된 공간부 사이에 콘크리트 몰탈을 투입, 건조시킨 후 고정된 거푸집을 철거하고, 그 내면에 미장과 같은 마감 작업을 행하는 것으로 그 작업을 완성시킨다.When describing such a conventional drainage construction method, first, the former is formed of concrete mortar, which is selected and drained and piled up to have a certain depth and width, and fixed the formwork by spaced apart a certain distance on both sides thereof. The work is completed by putting concrete mortar between the excavated spaces and drying them, then removing the fixed formwork and performing finishing work such as plastering on the inner surface.

이러한 것은, 굴토된 배수로에 다수개로 된 중량의 거푸집을 이동시켜 고정해야만 하고, 또한 완성되는 시점에 이를 철거한 후 마감 작업을 취해 주어야만 하기 때문에 그 작업이 매우 번거롭고 까다로우며, 작업시간이 지연되는 등의 제반문제와 함께 거푸집을 이동시켜야 함으로써, 작업자의 수고로움을 가중시키는 한편, 그로 인한 불필요한 인건비 지출을 유발시켜 작업에 소요되는 비용을 가중시키는 등의 문제가 있었다.This is very cumbersome and cumbersome because the heavy formwork must be moved and fixed in the pitted drainage, and it has to be removed and finished at the time of completion. By moving the formwork with various problems, such as to increase the labor of the worker, there is a problem such as causing unnecessary labor costs caused by the increase in the cost required for the work.

또한, 후자인 합성수지재로 된 배수로의 경우에는 전자에 비해 비교적 그 작업이 간단하고 용이한 반면, 우천시 배수로의하부, 즉 굴토된 기초 배수로 사이로 물이 스며들어가 결국 합성수지재 배수로판 하부로 배수되어 버리는 폐단과 동시에하부로 배수되면서 굴토부의 부분 침식 현상을 일으켜 상부의 합성수지재 배수로의 조립된 상태가 뒤틀리거나 엇갈림과 같은 배수로 파손현상이 자주 발생하여, 실용화에 따른 개선해야될 문제가 상존하고 있었다.In the latter case, the drainage channel made of the synthetic resin material is relatively simpler and easier than the former, while water penetrates into the lower part of the rainwater drainage, that is, the excavated base drainage, and eventually drains to the bottom of the synthetic resin drainage plate. At the same time as the end of drainage, the partial erosion of the pit was caused by the drainage, and the assembled state of the synthetic resin drainage channel of the upper part was often distorted or the drainage such as staggered, causing problems to be improved according to the practical use.

또한, 후자인 합성수지재로 된 배수로의 경우에는 전자에 비해 비교적 그 작업이 간단하고 용이한 반면, 우천시 배수로의 하부, 즉 굴토된 기초 배수로 사이로 물이 스며들어가 결국 합성수지재 배수로판 하부로 배수되어 버리는 폐단과 동시에 하부로 배수되면서 굴토부의 부분 침식 현상을 일으켜 상부의 합성수지재 배수로의 조립된 상태가 뒤틀리거나 엇갈림과 같은 배수로 파손현상이 자주 발생하는 개선해야될 문제가 상존하고 있었다.In the latter case, the drainage channel made of synthetic resin material is relatively simpler and easier than the former, while water penetrates into the lower part of the rainwater drainage, that is, the excavated base drainage, and eventually drains to the lower part of the synthetic resin drainage plate. At the same time as the end of drainage, the partial erosion of the pit was caused, and the assembled state of the synthetic resin drainage channel in the upper part of the drainage, such as distorted or staggered, there was a problem that needs to be improved.

따라서, 본 발명은 상기 종래의 문제점을 감안하여 안출한 것으로서, 본 발명의 목적은 토목공사 및 하수도 공사에 필요한 배수로의 구조로 시멘트를 타설하지 않고 배수로를 형성하여 소용공사기간을 단축하고 골조비용을 최소화한 배수로 시공방법 및 그 구조물을 제공하는 데 있다.Therefore, the present invention has been made in view of the above-mentioned conventional problems, the object of the present invention is to form a drainage channel without placing cement in the structure of the drainage required for civil engineering and sewerage construction to shorten the construction period and reduce the cost of the skeleton It is to provide a construction method and the structure of the minimized drainage.

본 발명의 다른 목적은 굴착깊이를 감소시켜 붕괴위험요소를 최소화한 배수로 시공방법 및 그 구조물을 제공하는 데 있다.It is another object of the present invention to provide a drainage construction method and structure thereof which minimize the risk of collapse by reducing the depth of excavation.

이와 같은 목적을 달성하기 위한 본 발명은일정깊이와 너비를 갖도록 기초 배수로를 굴토하여 ""형상의 기초기반을 형성하여 집수정을 형성하는 트렌치 단계(F1);상기 집수정을 굴토하고 트렌치 내부에 유공관을 매설시 기초면 보다 다수의 통공관이 형성된 유공관이 저면에 매설되어 유공관에 부력 발생을 억제하도록 다공이 형성된 상부와 하단이 밀폐된 유공관을 매설하는 단계(F2);상기 유공관의 매설된 상부에 입자가 굵은 자갈층을 매설하는 기초저면에 포설하는 단계(F3); 로 이루어지는 도로작업시 지하수의 배수로 시공방법에 있어서,상기 기초저면을 포설(F3)한 층의 상부면에 방수층을 형성하기 위해 폴리에틸렌 필름을 내설하는 단계(F4);상기 방수층의 상부에 버림콘크리트와 단일배트 콘크리트로 적층하여 타설하는 단계(F5)로 이루어진 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 공법을 제공하는데 있습니다.The present invention to achieve the above object is to excavate the foundation drainage to have a certain depth and width " "French step (F1) to form a foundation base to form a basin of the shape; when the burrowing the pit and buried a hole in the trench inside the hole has a plurality of through-holes formed on the bottom surface buried buoyancy to the hole A step of embedding the air hole tube closed the top and the bottom formed with pores to suppress the generation (F2); The step of laying on the bottom of the foundation for embedding a coarse gravel layer of particles in the buried upper portion of the hole (F3); Road work consisting of In the drainage construction method of the municipal groundwater, Step (F4) insulated polyethylene film to form a waterproof layer on the upper surface of the layer (F3) laid the base bottom (F4); It is to provide a method for drainage of soft ground with a lot of groundwater inflow on the bottom of the road consisting of the step of stacking and pouring (F5).

도 1은 본 발명의 바람직한 실시예의 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공 공법의 순서도,1 is a flow chart of the construction method of the drainage of the soft ground with a lot of groundwater inflow on the bottom of the road of a preferred embodiment of the present invention,

도 2는 본 발명의 바람직한 실시예의 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공 공법에 의한 구조를 도시한 부분 절취 사시도,Figure 2 is a partially cut perspective view showing the structure by the construction method of the drainage of the soft ground with a lot of groundwater inflow to the bottom of the road of a preferred embodiment of the present invention,

도 3은 본 발명의 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공 공법에 의한 구조를 도시한 단면도,Figure 3 is a cross-sectional view showing a structure by the construction method of the drainage of the soft ground with a lot of groundwater inflow to the bottom of the road of the present invention,

도 4는 본 발명의 유공관을 도시한 사시도,Figure 4 is a perspective view of the hole pipe of the present invention,

도 5는 본 발명의 유공관과 유공관을 연결하는 연결부재를 도시한 사시도이다.5 is a perspective view illustrating a connecting member connecting the hole and the hole of the present invention.

* 도면의 주요부분에 대한 부호의 설명** Explanation of symbols for the main parts of the drawings *

10 : 다공 20 : 좌측플랜지10: porous 20: left flange

30 : 우측플랜지 40 : 힌지30: right flange 40: hinge

50 : 걸림봉 60 : 결합홈50: locking rod 60: coupling groove

70 : 연결부재 80 : 조임너트70: connecting member 80: tightening nut

90 : 유공관90: merit pipe

이하, 첨부된 도면들을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 4에 도시한 본 발명의 배수로 시공 공법 및 그 구조는 도로작업시 지하수의 배수로 시공방법에 있어서, 일정깊이와 너비를 갖도록 기초 배수로를 굴토하여 ""형상의 기초기반을 형성하여 집수정을 형성하는 트렌치 단계(F1); 상기 집수정을 굴토하고 트렌치 내부에 유공관을 매설시 기초면 보다 다수의 통공관이 형성된 유공관이 저면에 매설되어 유공관에 부력 발생을 억제하도록 다공이 형성된 상부와 하단이 밀폐된 유공관을 매설하는 단계(F2); 상기 유공관의 매설된 상부에 입자가 굵은 자갈층을 매설하는 기초저면에 포설하는 단계(F3); 상기 기초저면을 포설한 층의 상부면에 방수층을 형성하기 위해 폴리에틸렌 필름을 내설하는 단계(F4); 상기 방수층의 상부에 버림콘크리트와 단일배트 콘크리트로 적층하여 타설하는 단계(F5)로 이루어진 특징이 있다.The drainage construction method and the structure of the present invention shown in Figures 1 to 4 in the drainage construction method of groundwater during the road work, by excavating the foundation drainage to have a certain depth and width " "French step (F1) to form a foundation base to form a collecting basin; when burying the pit and buried a hole in the inside of the trench, a hole formed in a plurality of through-holes than the base surface is buried buoyancy in the hole Embedding a porous tube having a closed top and bottom formed with pores to suppress the occurrence (F2); laying a foundation bottom with a thick gravel layer embedded in the buried upper portion of the porous tube (F3); Step of laying the polyethylene film to form a waterproof layer on the upper surface of the layer (F4), characterized in that consisting of the step (F5) of the laminated concrete and single-batch concrete on the top of the waterproof layer.

상기 집수정을 트렌치하는 단계(F4)는 일정깊이와 너비를 갖도록 기초 배수로를 굴토하여 ""형상의 기초기반을 형성하도록 굴착하여 다지는 단계로 그 형상는 "∪", "∨"형상 등으로 기초를 다지고 그 중앙에는 유공관이 시트를 형성하도록 하였다.Trenching the sump (F4) is to excavate the foundation drainage to have a certain depth and width " "The excavation and compacting step to form the base of the shape, the shape is laid in the" ∪ "," ∨ "shape, etc. and the hole in the center to form a sheet.

상기 다공이 형성된 상부와 하단이 밀폐된 유공관을 매설하는 단계(F2)는 집수정을 굴토하고 트렌치 내부에 유공관을 매설시 기초면 보다 저면에 설치하여 지하수가 다수의 통공으로 유입되도록 설치하여 유공관에 부력 발생을 억제하도록 다공이 형성된다.In the step (F2) of embedding the perforated tube with the top and bottom of the perforated hole formed therein, the bottom of the trench may be installed and the groundwater may be introduced into a plurality of through-holes by installing the perforated pipe in the trench. Pores are formed to suppress buoyancy.

상기 기초저면에 포설하는 단계(F3)는 유공관의 매설된 상부에 입자가 굵은자갈층을 매설하여 배수가 잘 이루어지도록 굵은 입자를 형성하였다.In the step (F3) of laying on the bottom of the foundation, the coarse gravel layer was embedded in the upper part of the perforated tube to form coarse particles so that drainage was well achieved.

상기 기초 저면을 포설한 층의 상부면에 방수층을 형성하기 위해 폴리에틸렌 필름을 내설하는 단계(F4)로 지면에서 부상하는 지하수가 상부로 분출 또는 배출되어 도로에 손상을 방지하도록 방수층을 형성하였다.In step (F4) of laying the polyethylene film in order to form a waterproof layer on the upper surface of the layer on which the foundation bottom is laid, a waterproof layer is formed to prevent damage to the road by spraying or discharging the groundwater floating on the ground to the top.

상기 방수층의 상부에 버림콘크리트와 단일배트 콘크리트로 적층하여 타설하는 단계(F5)로 연약지반을 견고하게 하도록 방수층의 상부에 2중의 시멘트를 타설하였다. 상기의 타설단계는 필요에 따라 아스팔트를 타설하여도 무방하다.The double cement was placed on top of the waterproof layer so as to solidify the soft ground by stacking with cast concrete and single batt concrete on top of the waterproof layer (F5). In the pouring step, asphalt may be poured as necessary.

본 발명의 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 시공 공법 에 의해 사용되는 배수관은 지하수의 물이 잘 스며들도록 다수의 통공(10)이 형성된 상면부와, 지하로 스며들지 않도록 폐쇄형으로 형성되어 일정한 장소로 이동하도록 하면부를 구성된 유공관(80)과, 상기 유공관을 연결하도록 일측에 힌지(40)를 형성하여 좌·우측 플랜지(20,30)를 형성하여 좌측플랜지(20)는 걸림봉(50)에 조임너트(80)로 구성하고, 다른 우측플랜지(30)는 결합홈(60)을 형성하여 유공관(90)과 유공관(90')을 연결하도록 구성된다.The drainage pipe used by the drainage construction method of the soft ground with a lot of inflow of groundwater to the bottom of the road of the present invention is a closed type so that a plurality of through-holes 10 are formed so that the water of the groundwater penetrates well, and does not penetrate into the basement. The left flange 20 is formed by forming the left and right flanges 20 and 30 by forming a hinge 40 on one side to connect the hole and the hole formed in the air hole tube 80 and the lower surface portion formed to move to a predetermined place. Consists of a tightening nut 80 in the 50, the other right flange 30 is formed to form a coupling groove 60 to connect the hole hole 90 and the hole hole 90 '.

상기 유공관(90)은 상부에 다수의 통공(10)이 형성된 구조로 지하수의 유입이 쉽도록 구성하였고, 하단부는 폐쇄형으로 지하로 수며 들지 못하도록 하여 집수장으로 배출하도록 형성하였다.The perforated pipe 90 has a structure in which a plurality of through-holes 10 are formed in the upper portion and is configured to facilitate the inflow of groundwater, and the lower portion is formed to be discharged to the water collection station by being closed to the ground.

상기 유공관(90)은 서로 연결이 편리하도록 연결부재를 장착하여 연결이 쉽도록 구성하였다.The perforated pipe 90 was configured to facilitate the connection by mounting the connection member to facilitate the connection to each other.

상기 연결부재는 좌측플랜지(20)와 우측플랜지(30)로 구성되고 일측은 힌지(40)로 연결되도록 구성하고 좌측플랜지(20)는 걸림봉(80)에 조임너트(80)로 형성하여 우측플랜지(30)의 결합홈(60)에 삽입되어 조임너트(80)를 조여서 유공관의 결합하도록 구성하였다.The connecting member is composed of the left flange 20 and the right flange 30, one side is configured to be connected by the hinge 40 and the left flange 20 is formed by the fastening nut 80 on the locking rod 80 to the right Inserted into the coupling groove 60 of the flange 30 was tightened to tighten the tightening nut 80 was configured to engage the perforated pipe.

상기와 같이 형성된 배수관은 상단부로 지하수의 유입이 쉽고, 하단부가 패쇄된 구조로 지하수 배수가 월등하고 배수관과 배수관의 연결이 힌지를 갖는 플랜지로 연결되어 조립이 쉽고 교환이 편리한 특징이 있다.The drain pipe formed as described above is easy to inflow of groundwater to the upper end, the structure of the lower end is closed is connected to the flange having a superior groundwater drainage and the connection of the drain pipe and the drain pipe is easy to assemble and easy exchange.

예컨대, 본 발명은 상술한 실시예에 한정되지 아니하며, 특허청구범위에서 청구한 본 고안의 요지를 벗어남이 없이 본 발명이 속하는 기술분야에 통상의 지식을 가진 자라면 다양한 변형 실시가 가능한 것임은 물론이고, 그와 같은 변경은 본 발명의 청구범위내에 있게 된다.For example, the present invention is not limited to the above-described embodiment, and various modifications can be made by those skilled in the art without departing from the gist of the present invention claimed in the claims. Such changes are intended to be within the scope of the present invention.

상기 실시예를 통하여 설명한 바와 같이, 본 발명은 연약지반과 지하수의 유입이 많이 발생되는 도로에 사용되는 공법으로 도로의 전체보다는 부분적인 구간에 사용되는 효과가 있다. 또한, 기존의 콘크리트의 타설이 시공비가 고가이며 별도의 설비가 필요치 않아 공사비와 공사기간의 절약 및 단축효과를 얻을 수 있는 효과가 있으므로 건설산업상 매우 유용한 발명인 것이다.As described through the above embodiments, the present invention has an effect of being used in a partial section rather than the entire road as a construction method used for roads where a lot of inflow of soft ground and groundwater occurs. In addition, since the construction cost of the existing concrete is expensive and there is no need for a separate facility, it is very useful invention for the construction industry because it has the effect of saving and shortening the construction cost and construction period.

Claims (3)

일정깊이와 너비를 갖도록 기초 배수로를 굴토하여 ""형상의 기초기반을 형성하여 집수정을 형성하는 트렌치 단계(F1);By digging the foundation drainage to have a certain depth and width, "Trench step (F1) to form the foundation base to form a collection well; 상기 집수정을 굴토하고 트렌치 내부에 유공관을 매설시 기초면 보다 다수의 통공관이 형성된 유공관이 저면에 매설되어 유공관에 부력 발생을 억제하도록 다공이 형성된 상부와 하단이 밀폐된 유공관을 매설하는 단계(F2);Burying the perforated tube in which the upper and lower ends of the perforated hole are formed so as to suppress the buoyancy in the perforated pipe by embedding the perforated pipe in the trench and burying the perforated pipe in the trench. F2); 상기 유공관의 매설된 상부에 입자가 굵은 자갈층을 매설하는 기초저면에 포설하는 단계(F3); 로 이루어지는 도로작업시 지하수의 배수로 시공방법에 있어서,Installing (F3) a foundation bottom on which a gravel layer having coarse particles is embedded in the buried upper portion of the hole; In the road construction consisting of drainage of groundwater during road work, 상기 기초저면을 포설(F3)한 층의 상부면에 방수층을 형성하기 위해 폴리에틸렌 필름을 내설하는 단계(F4);Internalizing the polyethylene film to form a waterproof layer on an upper surface of the layer on which the foundation bottom is laid (F3) (F4); 상기 방수층의 상부에 버림콘크리트와 단일배트 콘크리트로 적층하여 타설하는 단계(F5)로 이루어진 도로 저면에 지하수의 유입이 많은 연약지반의 배수로 공법.The method of drainage method of the soft ground with a lot of inflow of groundwater on the bottom of the road consisting of the step (F5) of the step of stacking the cast concrete and single-bat concrete on top of the waterproof layer. 삭제delete 삭제delete
KR10-2000-0065403A 2000-11-04 2000-11-04 Structure method for drainageway of weak stratum and the conduct pipe thereof KR100456610B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0065403A KR100456610B1 (en) 2000-11-04 2000-11-04 Structure method for drainageway of weak stratum and the conduct pipe thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0065403A KR100456610B1 (en) 2000-11-04 2000-11-04 Structure method for drainageway of weak stratum and the conduct pipe thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020000031009U Division KR200221898Y1 (en) 2000-11-06 2000-11-06 Conduct pipe of weak stratum

Publications (2)

Publication Number Publication Date
KR20020035216A KR20020035216A (en) 2002-05-11
KR100456610B1 true KR100456610B1 (en) 2004-11-09

Family

ID=19697276

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0065403A KR100456610B1 (en) 2000-11-04 2000-11-04 Structure method for drainageway of weak stratum and the conduct pipe thereof

Country Status (1)

Country Link
KR (1) KR100456610B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100739869B1 (en) * 2006-11-28 2007-07-16 (자)한진개발공사 Asphalt road structure

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182198B (en) * 2011-04-12 2012-07-04 中国十九冶集团有限公司 Drainage laying method of pulp pipeline in seasonal wetland swamp region
CN104652494B (en) * 2014-05-19 2018-05-25 邹新建 With the method for keel or stick installation plastic draining board
CN105089080B (en) * 2014-05-19 2018-06-29 邹新建 The hollow layer method of observable structural leakage is made in underground engineering wall surface bottom plate
CN104264716B (en) * 2014-09-05 2018-08-17 邹新建 A method of establishing the maintenance system of permanent ne-leakage in underground engineering
CN111323088A (en) * 2020-03-02 2020-06-23 武汉大学 Flow monitoring method for underground drainage concealed pipe
CN114351742B (en) * 2021-12-02 2023-12-08 内蒙古平庄煤业(集团)有限责任公司 Be used for perpendicular overlap joint of prevention of seepage membrane to lay film pressing ware

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5722545U (en) * 1980-07-08 1982-02-05
JPS58191810A (en) * 1982-04-30 1983-11-09 Tsuchiya Etsuzo Improvement work of soil quality

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5722545U (en) * 1980-07-08 1982-02-05
JPS58191810A (en) * 1982-04-30 1983-11-09 Tsuchiya Etsuzo Improvement work of soil quality

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100739869B1 (en) * 2006-11-28 2007-07-16 (자)한진개발공사 Asphalt road structure

Also Published As

Publication number Publication date
KR20020035216A (en) 2002-05-11

Similar Documents

Publication Publication Date Title
US5836115A (en) Foundation waterproofing and drainage system
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR100721225B1 (en) Drainage structure for soft ground treatment and dehydration method
KR100616123B1 (en) Device for drain underground water and method for construction the same
CN110468938A (en) A kind of municipal drain pipeline construction method
KR100456610B1 (en) Structure method for drainageway of weak stratum and the conduct pipe thereof
CN114875936A (en) Construction method for drainage and protection of high cut slope side ditch
KR101975297B1 (en) Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors, rivers, dams and concrete that can prevent the inflow of soil and water
CN214363925U (en) Cut water seepage ditch system
KR200221898Y1 (en) Conduct pipe of weak stratum
CN109779682B (en) Water-rich section highway tunnel escape canal structure system
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
JP2001220763A (en) Draining method for underground wall and underground wall constructed using it
KR20240022081A (en) Construction Method of Drainage Channel in Soft Ground of Road with High Inflow of Groundwater
CN110629763A (en) Drag pipe well chamber foundation pit supporting structure and construction method thereof
CN219909051U (en) Assembled gravity retaining wall structure
CN109763518A (en) A kind of construction method of basement post-pouring zone
CN109973147B (en) Construction method of highway tunnel drainage ditch
JPS6215343Y2 (en)
CN219952005U (en) Backfill district foundation ditch drainage device
CN211897676U (en) Assembled road side ditch
RU2760431C1 (en) Surface runoff inlet and method for its installation
CN212153647U (en) Drainage facility suitable for water source area protection district excavation highway section
CN219732055U (en) Foundation pit finished product drainage system
KR20050112893A (en) Method of drain construction for basement

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130701

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20140529

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20150715

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20160701

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20170628

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20180626

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20190626

Year of fee payment: 16