KR100616123B1 - Groundwater collection / drainage system of lower ground of underground structure and construction method - Google Patents

Groundwater collection / drainage system of lower ground of underground structure and construction method Download PDF

Info

Publication number
KR100616123B1
KR100616123B1 KR1020050054759A KR20050054759A KR100616123B1 KR 100616123 B1 KR100616123 B1 KR 100616123B1 KR 1020050054759 A KR1020050054759 A KR 1020050054759A KR 20050054759 A KR20050054759 A KR 20050054759A KR 100616123 B1 KR100616123 B1 KR 100616123B1
Authority
KR
South Korea
Prior art keywords
pdd
pipe
socket
tube
groundwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020050054759A
Other languages
Korean (ko)
Inventor
김형배
채수근
Original Assignee
드레인시스템개발 주식회사
지에스이앤씨(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 드레인시스템개발 주식회사, 지에스이앤씨(주) filed Critical 드레인시스템개발 주식회사
Priority to KR1020050054759A priority Critical patent/KR100616123B1/en
Application granted granted Critical
Publication of KR100616123B1 publication Critical patent/KR100616123B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0009PE
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0085Geotextiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 발명은 지하구조물 하부지반의 지하수 집배수 장치 및 그 시공 방법에 관한 것으로서, 더욱 상세하게는 기초 시공기준면을 재차 굴착하지 않고도 드레인보드 및 이중 배수관 형태의 PDD관을 이용하여 지하수를 영구적으로 집수 및 배수시킬 수 있도록 한 지하구조물 하부지반의 지하수 집배수 장치 및 그 시공 방법에 관한 것이다.The present invention relates to a groundwater collecting and draining device and a construction method of the lower ground of the underground structure, and more specifically, to collect the groundwater permanently by using a drain board and a PDD pipe in the form of a double drain pipe without digging again the basic construction reference surface. The present invention relates to a groundwater collection and drainage device of a substructure of an underground structure to be drained, and a construction method thereof.

이를 위해, 본 발명은 최종 굴착면에 소정의 배열로 깔리는 토목섬유와; 상기 토목섬유상에 소정의 배열로 배치되는 드레인보드와; 상기 토목섬유상에 소정의 배열로 배치되는 동시에 드레인보드와 연통 가능하게 연결되는 이중 배수관 형태의 PDD관과; 상기 드레인보드와 PDD관을 연통 가능하게 연결하는 제1소켓과; 상기 PDD관의 각 조인트 부분을 연결하는 제2소켓과; 상기 토목섬유 및 드레인보드, PDD관 등을 포함하는 전체 시공면에 걸쳐 덮는 다수겹의 폴리에틸렌 필름을 포함하여 구성된 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치 및 그 시공 방법을 제공한다.To this end, the present invention and geotextiles laid in a predetermined arrangement on the final drilling surface; A drain board disposed on the geotextile in a predetermined arrangement; A PDD pipe having a double drainage pipe arranged in a predetermined arrangement on the geotextile and communicatively connected to the drain board; A first socket connecting the drain board and the PDD tube to communicate with each other; A second socket connecting each joint part of the PDD pipe; It provides a groundwater drainage device and a construction method of the basement floor, characterized in that it comprises a plurality of layers of polyethylene film covering the entire construction surface including the geotextile and drain board, PDD pipe and the like.

지하구조물 집수 드레인 장치, 시공 방법, PDD관, 드레인보드, 토목섬유, 소켓, 폴리에틸렌 필름 Underground structure collection drainage device, construction method, PDD pipe, drain board, geotextile, socket, polyethylene film

Description

지하구조물 하부지반의 지하수 집배수 장치 및 그 시공 방법{Device for drain underground water and method for construction the same}Device for drain underground water and method for construction the same}

도 1은 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치에 사용되는 PDD관을 나타내는 사시도,1 is a perspective view showing a PDD pipe used in the groundwater collection and drainage device of the lower ground structure in accordance with the present invention;

도 2a는 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치에 사용되는 PDD관으로서, 원형 단면 형상을 나타내는 단면도,Figure 2a is a cross-sectional view showing a circular cross-sectional shape as a PDD pipe used in the groundwater collecting and drainage device of the ground substructure of the underground structure according to the present invention,

도 2b는 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치에 사용되는 PDD관으로서, 원형 단면 형상 외에 여러가지 형상으로 제작된 것을 나타내는 단면도,Figure 2b is a cross-sectional view showing that the PDD pipe used in the groundwater collecting and drainage device of the lower ground structure according to the present invention, in addition to the circular cross-sectional shape, made in various shapes,

도 3은 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치의 PDD관에 연결되는 드레인 보드용 제1소켓을 보여주는 사시도,3 is a perspective view showing a first socket for a drain board connected to the PDD pipe of the groundwater collecting and draining device of the lower ground structure according to the present invention;

도 4는 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치의 PDD관에 연결되는 여러 형태의 연결용 제2소켓을 보여주는 사시도,Figure 4 is a perspective view showing a second socket for connection of various types connected to the PDD pipe of the groundwater collection and drainage device of the ground structure lower ground according to the present invention,

도 5는 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치의 설치상태에 대한 일실시예를 보여주는 사시도,Figure 5 is a perspective view showing an embodiment of the installation state of the groundwater collection and drainage device of the lower ground structure in accordance with the present invention,

도 6은 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치의 설치상 태에 대한 다른 실시예를 보여주는 사시도,Figure 6 is a perspective view showing another embodiment of the installation state of the groundwater collection and drainage device of the lower ground structure according to the present invention,

도 7은 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치의 시공 방법을 설명하는 순서도,7 is a flow chart illustrating a construction method of a groundwater collection and drainage device of the lower ground structure in accordance with the present invention;

도 8은 도 5의 A-A 선을 취한 단면도,8 is a cross-sectional view taken along the line A-A of FIG.

도 9는 도 5의 B-B선을 취한 단면도,9 is a cross-sectional view taken along the line B-B of FIG.

도 10은 본 발명에 따른 지하구조물 하부지반의 지하수 집배수 장치의 드레인보드 및 제2토목섬유를 보여주는 단면도.10 is a cross-sectional view showing a drain board and a second geotextile of the groundwater collecting and draining device of the lower ground structure in accordance with the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : PDD관 12 : 내부관10: PDD tube 12: inner tube

14 : 외부관 16 : 연결판14: outer tube 16: connecting plate

18 : 배수구멍 20 : 집수로18: drainage hole 20: catchment

22 : 제1소켓 24 : 중공관22: first socket 24: hollow tube

26 : 중공판 28 : 드레인보드26: hollow plate 28: drain board

30 : 제2소켓 32 : 제1토목섬유30: second socket 32: first geotextile

34 : 돌기 36 : 폴리에틸렌 필름34: projection 36: polyethylene film

38 : 버림 콘크리트 40 : 제2토목섬유38: discarded concrete 40: the second geotextile

본 발명은 지하구조물(건축물) 하부지반의 지하수 집배수장치 및 그 시공 방법에 관한 것으로서, 더욱 상세하게는 기초 시공기준면을 재차 굴착하지 않고도 드레인보드 및 이중 배수관 형태의 PDD관을 이용하여 지하수를 영구적으로 집수 및 배수시킬 수 있도록 한 지하구조물(건축물) 하부지반의 지하수 집배수장치 및 그 시공 방법에 관한 것이다.The present invention relates to a groundwater drainage device and a construction method of the lower ground structure (architecture), more specifically, to ground water permanently using a drain board and a double drain pipe type PDD pipe without digging the foundation construction reference surface again. The present invention relates to a groundwater collecting and draining device of a substructure of an underground structure (architecture) which can be collected and drained.

일반적으로 토목 및 건축 지하 구조물의 시공을 위하여 소정의 깊이로 굴착 작업이 이루어지고, 그 굴착이 종료된 지면(바닥면)이 기초 시공기준면이 되며, 이 기초 시공기준면을 기준으로 토목 또는 건축 구조물을 시공하게 된다.In general, excavation work is carried out to a predetermined depth for the construction of civil and architectural underground structures, and the ground (floor surface) after the excavation is completed is the basic construction reference surface, and based on this basic construction reference surface, It will be constructed.

상기 기초 시공기준면에 지하수가 침투 유입 되는 경우, 지하수는 지하구조물(건축물)에 양압력으로 작용되며, 이 양압력은 지하구조물(건축물)의 바닥부와 그 주변 지하수위에 의한 수두차이에 의하여 발생되어 지하구조물(건축물)을 들어올리는 힘으로 작용하게 된다. 이러한 지하수에 의한 양압력은 지하구조물(건축물)에 다음과 같은 악영향을 미치게 된다.When the groundwater penetrates the foundation construction surface, the groundwater acts as a positive pressure on the underground structure (building), and this positive pressure is generated by the head difference due to the bottom part of the underground structure (building) and the surrounding groundwater level. It acts as a lifting force for underground structures (buildings). The positive pressure caused by the groundwater has the following adverse effects on the underground structure (building).

즉, 지하수에 의해 발생되는 양압력이 지하구조물의 정하중(사하중+활하중)보다 크면 지하구조물(건축물)은 부상(뜸) 또는 한쪽으로 기울어지거나, 양압력이 집중적으로 발생되는 메트(Mat)기초 또는 기초바닥슬래브 구역에 크랙(균열)이 발생되어, 결국 지하구조물(건축물)은 파괴된다.That is, if the positive pressure generated by the groundwater is greater than the static load (dead load + live load) of the underground structure, the underground structure (building) is inclined to one side or the other side, or the mat base where the positive pressure is concentrated or Cracks are generated in the foundation floor slab area, eventually destroying underground structures (buildings).

또한, 지하수에 의한 양압력이 지하구조물(건축물)의 정하중(사하중+활하중)보다 작더라도, 지하구조물(건축물)의 콘크리트 약화를 촉진하고, 시공접합부(조인트) 등을 통하여 지하수가 지하구조물(건축물) 내측으로 침투 유입되어 균열발생의 원인으로 작용할 수 있다.In addition, even if the positive pressure due to the groundwater is less than the static load (dead load + live load) of the underground structure (building), it promotes the weakening of the concrete of the underground structure (building), and the groundwater is connected to the underground structure (building) through construction joints (joints). ) It can penetrate into the inside and act as a cause of cracking.

따라서, 지하층이 있는 토목 및 건축구조물을 시공하는 현장에서 지하수에 의한 양압력에 대한 대책으로 지하구조물의 기초 두께를 증가시키거나, 락 앵커 등을 설치하여 양압력에 저항시키거나, 또는 기초 시공기준면에 배수관을 설치하여 지하수를 집구 및 배수시켜 양압력을 감소시키는 장치를 설치하고 있다.Therefore, as a countermeasure against the positive pressure caused by groundwater in the construction of civil engineering and building structures with underground floors, the foundation thickness of the underground structure may be increased, or a rock anchor or the like may be installed to resist the positive pressure, or the foundation construction reference surface. A drain pipe is installed in the house to install and drain the groundwater to reduce the positive pressure.

최근에는 기초 시공기준면에 배수관을 설치하여 지하수를 집수정으로 배수시키는 공법이 많이 사용되고 있는데, 그 중 하나의 공법은 대한민국 등록실용 제20-0336460호에 개시된 바와 같다.Recently, a method of draining groundwater to a sump is installed by installing a drain pipe on a basic construction reference plane, and one of the methods is disclosed in Korean Registered Application No. 20-0336460.

개시된 내용을 살펴보면, 지하층 지반을 굴착 완료후 기초 시공기준면(최종 굴착면)에 별도의 트렌치를 소정 깊이로 더 굴착한 다음, 이 트렌치 내에 집수정과 연결되는 다발관과 자갈(쇄석) 등을 채우는 방식을 채택하고 있다.In the disclosed contents, after excavation of the basement ground, additional trenches are excavated to a predetermined depth in the basic construction reference plane (final excavation surface), and the bundle pipes and gravel (crushed stone) connected to the sump well are filled in the trenches. The system is adopted.

따라서, 기초 시공기준면에 미리 배치된 토목섬유 및 드레인보드를 통하여 지하수의 집수가 이루어지는 동시에 상기 트렌치내의 다발관으로 지하수가 모여서 집수정으로 배수된 다음, 집수정에 집수된 지하수를 펌프로 강제 배수시키게 된다.Therefore, the groundwater is collected through the geotextiles and drainboards pre-arranged in the foundation construction plane, and the groundwater is collected into the bundle pipe in the trench and drained to the sump, and the groundwater collected in the sump is forcedly pumped. do.

그러나, 위와 같은 기존의 배수 시스템은 트렌치가 기초 시공기준면에 시공되고 또한 지하구조물과 간섭되므로, 기초지반의 허용지내력이 감소되어 설계접지압에 미달되는 문제점이 있고, 특히 추가적인 트렌치 굴착은 시공성과 안정성 및 경제성 등을 저하시키고 공기가 길어지는 문제점이 있다.However, in the existing drainage system as described above, since the trench is constructed on the foundation construction plane and also interferes with the underground structure, the allowable bearing capacity of the foundation ground is reduced, which causes the design ground pressure to be lowered. There is a problem that the economy is lowered and the air is long.

또한, 트렌치 과다 굴착에 따른 부분적으로 기초지반의 허용지내력이 크게 감소될 수 있고, 트렌치와 트렌치 사이에 드레인보드를 설치하지 않을 경우 부분적으로 양압력이 증가하는 문제점이 있다.In addition, the allowable bearing capacity of the foundation ground may be greatly reduced due to the over-excavation of the trench, and there is a problem in that the positive pressure is partially increased when the drain board is not installed between the trench and the trench.

또한, 드레인보드와 다발관의 연결상태가 불량하여 지하수를 원활하게 배수시키지 못하여 부분적으로 양압력이 발생되는 문제점이 있다.In addition, there is a problem in that positive pressure is partially generated because the connection between the drain board and the bundle pipe is poor and the groundwater cannot be drained smoothly.

본 발명은 상기와 같은 기존의 배수 구조 및 공법이 갖는 제반 문제점을 해결하기 위하여 개발된 것으로서, 기초 시공기준면(최종 굴착면)을 재차 굴착하지 않고도 표준화된 자재로 개발되어 조립과 설치가 간단한 드레인보드 및 이중 배수관 형태의 PDD관을 기초 시공기준면에 간편하게 시공함으로써, 굴착면 지반을 통해 침투 유입하는 지하수를 드레인보드를 통해 집수하는 동시에 집수 및 배수 역할을 하는 PDD관을 통해 집수정으로 신속하게 배수시킬 수 있기 때문에 시공성이 우수하고 공기를 단축시킬 수 있으며, 결국 지하수를 용이하게 영구적으로 집수 및 배수시켜 양압력이 작용되지 않도록 한 지하구조물(건축물) 하부지반의 지하수 집배수장치 및 그 시공 방법을 제공하는데 그 목적이 있다.The present invention was developed in order to solve all the problems of the existing drainage structure and method as described above, drain boards that are simple to assemble and install by developing a standardized material without digging the basic construction reference surface (final digging surface) again And by constructing the double-drain pipe type PDD pipe on the basic construction reference plane, the groundwater infiltrated through the excavation ground can be collected through the drain board, and it can be quickly drained to the water collecting well through the PDD pipe, which serves as a collection and drainage. It provides excellent workability and shortens the air, and eventually provides groundwater drainage system and construction method of the substructure of the underground structure (building) that prevents positive pressure from acting as the groundwater is easily and permanently collected and drained. Its purpose is to.

특히, 본 발명의 PDD관은 그 구성이 내부와 외부 즉, 물이 흐르는 공간이 2중으로 되어 있으며 각각은 배수구멍을 통해 서로 연결되어 지하수의 흐름이 원활해지고, 외부배수로의 내측면의 연장을 극대화시켜 최소한의 단면으로도 외부배수 로의 통수능력이 최대가 될 수 있으며, 또한 외부하중에 가장 유리하게 저항할 수 있도록 원형의 기하학적인 형상으로 제작됨과 함께 내부와 외부 배수로를 연결판으로 강하게 직접 연결해줌으로써, PDD관의 굴곡강도와 충격강도를 극대화시켜 PDD관의 변형으로 인한 기초체의 침하를 방지할 수 있도록 한 것이다.In particular, the PDD pipe of the present invention has a double structure inside and outside, that is, the space in which water flows, and each of them is connected to each other through a drain hole, so that the groundwater flows smoothly and maximizes the extension of the inner surface of the external drainage path. It is possible to maximize the water supply capacity of the external drainage channel with the minimum cross section, and it is manufactured in the shape of a circular geometric shape to resist the external load most advantageously, and by connecting the internal and external drainage channels directly with the connecting plate. In addition, the bending strength and impact strength of the PDD pipe are maximized to prevent the settlement of the foundation due to the deformation of the PDD pipe.

상기한 목적을 달성하기 위한 본 발명의 지하구조물 하부지반의 지하수 집배수 장치는:Groundwater collection and drainage device of the substructure of the underground structure of the present invention for achieving the above object:

최종 굴착면에 소정의 배열로 깔리는 제1토목섬유와; 상기 제1토목섬유상에 소정의 배열로 배치되는 드레인보드와; 상기 드레인보드를 감싸는 제2토목섬유와; 상기 제1토목섬유상에 소정의 배열로 배치되는 동시에 드레인보드와 연통 가능하게 연결되는 이중 배수관 형태의 PDD관과; 상기 드레인보드와 PDD관을 연통 가능하게 연결하는 제1소켓과; 상기 PDD관의 각 조인트 부분을 연결하는 제2소켓과; 상기 토목섬유 및 드레인보드, PDD관 등을 포함하는 전체 시공면상에 걸쳐 까는 2겹의 폴리에틸렌 필름을 포함하여 구성된다.First geotextiles laid in a predetermined arrangement on the final drilling surface; A drain board disposed on the first geotextile in a predetermined arrangement; A second geosynthetic fiber surrounding the drain board; A PDD tube having a double drainage pipe disposed on the first geotextile in a predetermined arrangement and connected to the drain board so as to communicate with the drain board; A first socket connecting the drain board and the PDD tube to communicate with each other; A second socket connecting each joint part of the PDD pipe; It comprises a two-layer polyethylene film covering the entire construction surface, including the geotextile and drain board, PDD pipe and the like.

바람직한 구현예로서, 상기 PDD관은 배수구멍이 형성된 내부관과, 집수로가 형성된 외부관과, 상기 내부관의 외경면과 외부관의 내경면을 일체로 연결하는 연결판으로 구성된 것을 특징으로 한다.In a preferred embodiment, the PDD pipe is characterized by consisting of an inner tube formed with a drainage hole, an outer tube formed with a water collecting passage, and a connecting plate integrally connecting the outer diameter surface of the inner tube and the inner diameter surface of the outer tube. .

더욱 바람직한 구현예로서, 상기 배수구멍은 내부관의 사방위치에 배치하되, 그 길이방향을 따라 등간격으로 배치시키고, 상기 집수로는 외부관의 사방위치에 형성하되, 그 길이방향을 따라 "ㅡ"자로 절개하여 형성한 것을 특징으로 한다.In a more preferred embodiment, the drainage holes are disposed at four sides of the inner tube, at equal intervals along the longitudinal direction thereof, and the collecting channel is formed at all four sides of the outer tube, along the longitudinal direction of the drain tube. "It is characterized by being formed by incision.

또한, 상기 PDD관은 원형, 타원형, 사각형, 마제형 등의 형상중 선택된 어느 하나의 형상으로 성형 제작되는 것을 특징으로 한다.In addition, the PDD tube is characterized in that the molded shape of any one selected from the shape of a circle, oval, square, horseshoe.

다른 바람직한 구현예로서, 상기 제1소켓은 드레인보드와 PDD관을 연결하는 소켓으로서, 상기 PDD관의 외부관의 외경에 제2소켓으로 직접 연결되는 "ㅡ"자형의 중공관과; 이 중공관의 일측면 또는 양측면에 연통 가능하게 일체로 성형되어 드레인보드의 선단부가 인입되는 중공판으로 구성된 것을 특징으로 한다.In another preferred embodiment, the first socket is a socket for connecting the drain board and the PDD pipe, the hollow tube having a '-' shape directly connected to the outer diameter of the outer pipe of the PDD pipe by a second socket; It is characterized in that the hollow tube is formed integrally with one side or both sides of the hollow tube so that the leading end of the drain board is introduced.

또한, 상기 제2소켓은 PDD관을 직접 연결하는 소켓으로서, "ㅡ"자형, "+"자형, "T"자형, "L"자형, "Y"자형으로 성형된 중공관중 선택된 어느 하나인 것을 특징으로 한다.In addition, the second socket is a socket for directly connecting the PDD pipe, which is selected from any one of the hollow tube formed of "-" shape, "+" shape, "T" shape, "L" shape, "Y" shape. It features.

또한, 상기 제2소켓은 기초시공면이 단차(높이)가 있는 경우에 상기 PDD관이 기초시공면에 원활하게 밀착 설치될 수 있도록 연성재료로 만들어진 것을 특징으로 한다.In addition, the second socket is characterized in that the PDD tube is made of a flexible material so that the PDD tube can be installed in close contact with the basic construction surface when the foundation construction surface has a step (height).

한편, 상기 제1소켓 및 제2소켓의 연결에 의하여 상기 PDD관의 가려진 부분을 제외하고 외부관의 노출된 부분을 제2토목섬유로 덮도록 형성하는 것을 특징으로 한다.On the other hand, by the connection of the first socket and the second socket is characterized in that it is formed so as to cover the exposed part of the outer tube with the second geotextile except for the shielded portion of the PDD tube.

상기한 목적을 달성하기 위한 본 발명의 지하구조물(건축물) 하부지반의 지하수 집수 및 배수장치의 시공방법은:Construction method of the groundwater collection and drainage of the underground structure (architecture) lower ground of the present invention for achieving the above object is:

굴착작업 및 기초 시공기준면의 정리 단계와; 상기 기초 시공기준면에 제1토목섬유를 깔아주는 단계와; 상기 제1토목섬유상에 제2토목섬유로 감싸여진 드레 인보드를 배치하는 단계와; 상기 제1토목섬유상에 PDD관을 배치하는 동시에 각 조인트 부위를 제2소켓으로 연통되게 연결하고, 상기 드레인보드와 PDD관을 제1소켓으로 서로 연통되게 연결하는 단계와; 상기 토목섬유, 드레인보드, PDD관 및 소켓들이 시공된 기초 시공기준면상에 걸쳐 폴리에틸렌 필름을 깔아주어 마감하는 단계와; 상기 폴리에틸렌 필름의 상면에 걸쳐 버림콘크리트를 타설하는 단계를 포함하여 이루어지는 것을 특징으로 한다.Arranging excavation work and foundation construction reference surface; Laying a first geotextile on the basic construction reference surface; Disposing a drainboard wrapped with a second geotextile on the first geotextile; Placing a PDD tube on the first geotextile and simultaneously connecting each joint portion to a second socket, and connecting the drainboard and the PDD tube to each other through a first socket; Laying and finishing a polyethylene film over the basic construction reference surface on which the geotextile, drain board, PDD pipe and sockets are constructed; And casting the discarded concrete over the upper surface of the polyethylene film.

바람직한 구현예로서, 상기 제1소켓 및 제2소켓의 연결에 의하여 상기 PDD관의 가려진 부분을 제외하고 상기 외부관의 노출된 부분을 제2토목섬유로 감싸는 단계를 포함하는 것을 특징으로 한다.In a preferred embodiment, it comprises the step of wrapping the exposed portion of the outer tube with a second geotextile except for the shielded portion of the PDD tube by the connection of the first socket and the second socket.

이하, 본 발명의 지하구조물 하부지반의 지하수 집배수 장치 및 그 시공방법의 바람직한 실시예를 첨부도면을 참조로 상세하게 설명하기로 한다.Hereinafter, a preferred embodiment of the groundwater collecting and draining device and the construction method of the lower ground structure of the present invention will be described in detail with reference to the accompanying drawings.

첨부한 도 1은 본 발명에 따른 지하구조물(건축물) 하부지반의 지하수 집배수장치에 사용되는 PDD관을 나타내는 사시도이고, 도 2a는 그 단면도로서, 원형단면 형상을 나타낸다.1 is a perspective view showing a PDD pipe used in the groundwater collecting and draining device of the underground structure (building) lower ground according to the present invention, Figure 2a is a cross-sectional view, showing a circular cross-sectional shape.

또한, 도 2b에서 보는 바와 같이 상기 PDD관(10)은 원형 단면 뿐만아니라 타원형, 사각형, 마제형 등 다양한 단면구조로 제작될 수 있다.In addition, as shown in FIG. 2B, the PDD tube 10 may be manufactured in various cross-sectional structures such as an oval, a square, a horseshoe, as well as a circular cross section.

본 발명의 주된 구성인 상기 PDD(Permanent Double Drain)관(10)은 이중 배수관 형태의 관으로서, 내부관(12)과 외부관(14), 그리고 내부관(12)과 외부관(14)을 일체로 연결하는 연결판(16)으로 구성되며, 원형, 타원형, 사각형, 마제형 등의 형상으로 선택 제작될 수 있다.The PDD (Permanent Double Drain) tube 10, which is a main configuration of the present invention, is a double-drain tube type tube, which includes an inner tube 12 and an outer tube 14, and an inner tube 12 and an outer tube 14. Consists of a connecting plate 16 to be integrally connected, it can be produced in a selection of circular, oval, square, horseshoe shape and the like.

보다 상세하게는, 상기 PDD관(10)의 내부관(12)은 중공관으로서, 그 사방위치에 배수구멍(18)이 관통 형성되고, 이 배수구멍(18)은 내부관(12)의 길이방향을 따라 등간격으로 계속 형성된다.More specifically, the inner tube 12 of the PDD tube 10 is a hollow tube, the drain hole 18 is formed through the four sides, the drain hole 18 is the length of the inner tube 12 It continues to form at equal intervals along the direction.

또한, 상기 PDD관(10)의 외부관(14)은 상기 내부관(12)의 외경면에 이격되어 배열되는 중공관으로서, 그 사방위치에 배수구멍(18)보다 큰 폭의 집수로(20)가 형성되고, 이 집수로(20)는 외부관(14)의 길이방향을 따라 "ㅡ"자로 절개 형성된다.In addition, the outer tube 14 of the PDD tube 10 is a hollow tube arranged to be spaced apart from the outer diameter surface of the inner tube 12, the water collecting passage 20 having a width larger than the drain hole 18 in all four positions thereof. ) Is formed, and this water collecting passage 20 is formed by cutting the "-" character along the longitudinal direction of the outer tube 14.

이때, 상기 내부관(12)의 외경면과 외부관(14)의 내경면 간에 4개의 연결판(16)이 일체로 성형됨으로써, 상기 내부관(12)과 외부관(14)이 서로 일체로 형성되는 것이다. In this case, the four connecting plates 16 are integrally formed between the outer diameter surface of the inner tube 12 and the inner diameter surface of the outer tube 14 so that the inner tube 12 and the outer tube 14 are integrally formed with each other. It is formed.

특히, 상기 PDD관(10)의 외부관(14) 표면은 제2토목섬유(40)로 모두 감싸서 집수로(20)를 통해 토립자가 유입되는 것을 막고 오직 지하수만 유입되도록 한다.In particular, the surface of the outer tube 14 of the PDD tube 10 is all wrapped with the second geosynthetic fiber 40 to prevent the inlet is introduced through the water collecting passage 20 so that only groundwater is introduced.

첨부한 도 3은 본 발명에 따른 지하구조물(건축물) 하부지반의 지하수 집배수장치의 PDD관에 연결되는 드레인 보드용 제1소켓을 보여주는 사시도이다.3 is a perspective view showing a first socket for a drain board connected to the PDD pipe of the groundwater collecting and draining device of the underground structure (building) lower ground according to the present invention.

도 3에서 보는 바와 같이, 상기 제1소켓(22)은 후술하는 드레인보드(28)와 PDD관(10)을 연결해주는 소켓으로서, 상기 PDD관(10)의 외부관 외경에 직접 연결되는 중공관(24)과, 이 중공관(24)의 일측면(도 3의 (a)참조) 또는 양측면(도 3의 (b) 참조)에 연통 가능하게 일체로 성형되어 드레인보드(28)의 선단부가 인입되는 중공판(26)으로 구성된다.As shown in FIG. 3, the first socket 22 is a socket connecting the drain board 28 and the PDD pipe 10 to be described later, and the hollow pipe directly connected to the outer diameter of the outer pipe of the PDD pipe 10. (24) and one side of the hollow tube 24 (see Fig. 3A) or both sides (see Fig. 3B) are integrally formed so as to communicate with each other so that the tip of the drain board 28 is formed. It consists of a hollow plate 26 to be drawn in.

첨부한 도 4는 본 발명에 따른 지하수 집배수장치인 PDD관에 연결되는 여러 형태의 연결용 제2소켓을 보여주는 사시도이다.4 is a perspective view showing a second socket for connection of various types connected to a PDD pipe which is a groundwater collecting and draining device according to the present invention.

도 4에서 보는 바와 같이, 상기 제2소켓(30)은 PDD관(10)을 직접 연결해주는 소켓으로서, "ㅡ"자형, "+"자형, "T"자형, "L"자형, "Y"자형 그리고 설계 조건 및 시공부지면의 상황에 따라 다양한 형태로 구성할 수 있다.As shown in Figure 4, the second socket 30 is a socket for directly connecting the PDD pipe 10, "-" shaped, "+" shaped, "T" shaped, "L" shaped, "Y" It can be configured in various forms according to the shape and design conditions and the situation of the construction site.

첨부한 도 5는 본 발명에 따른 지하구조물(건축물) 하부지반의 지하수 집배수 장치의 설치상태에 대한 일실시예를 보여주는 사시도이고, 도 8은 도 5의 A-A 선을 취한 단면도이며, 도 9는 도 5의 B-B선을 취한 단면도이다.5 is a perspective view showing an embodiment of the installation state of the groundwater collecting and drainage device of the underground structure (architecture) lower ground according to the present invention, Figure 8 is a cross-sectional view taken a line AA of Figure 5, Figure 9 It is sectional drawing which took the BB line of FIG.

이하, 상기와 같이 구성된 PDD관(10), 제1소켓(22) 및 제2소켓(30)을 이용하여 시공되는 지하구조물(건축물) 하부지반의 지하수 집배수 장치를 도 7을 참조하여 그 시공 방법과 함께 설명하기로 한다.Hereinafter, the groundwater drainage device of the underground structure (building) lower ground constructed using the PDD pipe 10, the first socket 22, and the second socket 30 configured as described above will be described with reference to FIG. 7. The method will be described together.

먼저, 토목 또는 건축구조물의 지하 부분을 시공하기 위하여 굴착작업을 시행하는 바, 굴착작업이 종료된 지표면 즉, 기초 시공기준면을 고르게 정리하는 단계가 선행된다.First, an excavation work is carried out to construct an underground part of a civil engineering or building structure, and the step of evenly arranging the ground surface in which the excavation work is completed, that is, the basic construction reference plane, is preceded.

다음으로, 상기 기초 시공기준면의 설계 배치 기준에 따라 제1토목섬유(32)를 소정의 배열로 깔아주는 단계가 진행된다.Next, the step of laying the first geosynthetic fiber 32 in a predetermined arrangement according to the design arrangement criteria of the basic construction reference surface is in progress.

상기 제1토목섬유(32)는 기초 시공기준면으로 침투 유입되는 지하수를 실질적으로 흡수하여 초기집수의 역할을 수행한다.The first geosynthetic fiber 32 substantially absorbs groundwater penetrating into the basic construction reference plane to serve as initial collection.

이어서, 상기 제1토목섬유(32)상에 지하수 침투해석을 시행하여 소정의 설계 배치 기준대로 드레인보드(28)를 배치하는 단계가 진행되는 바, 상기 드레인보드(28)는 첨부한 도 10에서 보는 바와 같이 제2토목섬유(40)로 감싸여져 시공되며 제2토목섬유(40)로 흡수된 지하수를 집수하기 위한 중간 경로 역할을 하는 구성이다.Subsequently, a step of arranging the drain board 28 according to a predetermined design layout standard by performing groundwater penetration analysis on the first geotextile 32 is performed. As shown, the construction is wrapped with the second civil fiber 40 and serves as an intermediate path for collecting ground water absorbed by the second civil fiber 40.

상기 드레인보드(28)의 상부는 평평한 판체로 되어 있고, 이 판체의 저면에 볼록한 다수의 돌기(34)가 등간격으로 형성된 구조로써, 돌기(34)는 상부하중을 굴착면 바닥에 전달시키고, 또한 돌기(34) 사이로 지하수의 흐름이 유도된다. The upper portion of the drain board 28 is a flat plate, the convex protrusions 34 are formed at equal intervals on the bottom surface of the plate body, the protrusions 34 transfer the upper load to the bottom of the excavation surface, In addition, the flow of groundwater is induced between the projections 34.

그리고, 드레인보드(28)의 표면은 모두 제2토목섬유(40)로 감싸여져 이물질이 걸러지면서 지하수만 침투되도록 한다.And, the surface of the drain board 28 is all wrapped with the second geosynthetic fiber 40 so that only the groundwater penetrates while the foreign matter is filtered.

다음으로, 상기 제1토목섬유(32)상에 지하수 침투해석을 시행하여 소정의 설계 배치 기준대로 PDD관(10)을 배치하는 동시에 각 조인트 부위를 제2소켓(30)으로 연통되게 연결한다.Next, the groundwater penetration analysis is performed on the first geotextile 32 to arrange the PDD pipe 10 according to a predetermined design layout standard, and at the same time, connect each joint portion to the second socket 30.

즉, 지하수의 집수정까지 PDD관(10)을 연결함에 있어서, 직선 배열, 교차 배열, 또는 직각 배열, 또는 다양한 각도의 곡선 배열을 통하여 연결하게 되는데, 각 PDD관(10)의 조인트 부위를 상기 제2소켓(30)으로 연결하게 된다.That is, in connecting the PDD pipe 10 to the catchment of the groundwater, it is connected through a straight arrangement, cross arrangement, or right angle arrangement, or a variety of angled curve arrangement, the joint portion of each PDD pipe 10 It is connected to the second socket (30).

보다 상세하게는, 상기 제2소켓(30)은 전술한 바와 같이 "ㅡ"자형, "+"자형, "T"자형, "L"자형, "Y"자형 등으로 제작된 것으로서, 상기 PDD관(10)의 각 조인트 부위에 적절한 것을 선택하여 연결하면 된다.In more detail, the second socket 30 is manufactured in the "-" shape, the "+" shape, the "T" shape, the "L" shape, the "Y" shape, etc. as described above. What is necessary is just to connect and connect a suitable thing to each joint part of (10).

특히, 상기 제2소켓(30)은 강성재료를 사용하여 성형 제작되기도 하지만, 기초시공면의 단차 발생 구간에 PDD관(10)의 밀착 설치가 원활하게 되도록 연성재료를 사용하여 성형 제작될 수 있다.In particular, although the second socket 30 may be manufactured by using a rigid material, the second socket 30 may be manufactured by using a flexible material so that the PDD pipe 10 may be closely installed in a step generation section of the foundation construction surface. .

이와 동시에, 상기 드레인보드(28)와 PDD관(10)을 제1소켓(22)으로 서로 연통되게 연결하는 단계도 진행된다.At the same time, the step of connecting the drain board 28 and the PDD pipe 10 in communication with each other by the first socket 22 is also in progress.

즉, 상기 PDD관(10)은 제2소켓(30)을 통해 중공관과 연결하는 동시에 이 중 공관(24)의 일면 또는 양면에 일체로 형성된 중공판(26)에 드레인보드(28)의 선단부를 삽입시키면 된다.That is, the PDD tube 10 is connected to the hollow tube through the second socket 30, and at the same time, the front end portion of the drain board 28 on the hollow plate 26 formed integrally on one or both sides of the hollow tube 24. Just insert

이어서, 상기와 같이 토목섬유(32,40), 드레인보드(28), PDD관(10) 및 소켓(22,30)들이 시공된 기초 시공기준면상에 전체적으로 2겹의 폴리에틸렌 필름(36)을 깔아주어 지하수가 기초 내측으로 유입되지 않도록 한다.Subsequently, two layers of polyethylene films 36 are laid on the foundation construction reference plane on which the geotextiles 32 and 40, the drain board 28, the PDD pipe 10, and the sockets 22 and 30 are constructed. This prevents groundwater from entering the base.

마지막으로, 상기 폴리에틸렌 필름(36)의 상면에 걸쳐 버림콘크리트(38)를 타설하는 등의 후속공정을 진행한다.Finally, a subsequent process such as casting the discarded concrete 38 over the upper surface of the polyethylene film 36 is performed.

이상과 같이 시공된 본 발명의 지하구조물(건축물) 하부지반의 지하수의 집수 및 배수 경로를 설명하면 다음과 같다.Referring to the collection and drainage path of the groundwater of the underground structure (building) lower ground of the present invention constructed as described above are as follows.

해당 기초 시공기준면을 통해 유입되는 지하수는 상기 제1토목섬유(32)에서 흡수되어, 드레인보드(28)를 통해 제1소켓(22)의 중공판(26)을 지나 상기 PDD관(10)의 외부관(14)쪽으로 흐르게 된다.Groundwater flowing through the foundation construction reference surface is absorbed by the first geosynthetic fiber 32 and passes through the hollow plate 26 of the first socket 22 through the drain board 28 of the PDD pipe 10. Flow toward the outer tube (14).

또한, 상기 PDD관(10)의 외부관(14)의 집수로(20)을 통하여 지하수가 유입되는 동시에 배수되며, 상기 드레인보드(28)를 통해 집수된 물이 합쳐지면서 많아지면 상기 PDD관(10) 내부관(12)의 배수구멍(18)을 통해 내부관(12)의 내부 및 또 다른 외부관으로 유입되어 배수된다.In addition, the groundwater is introduced and drained through the water collecting passage 20 of the outer pipe 14 of the PDD pipe 10, and the water collected through the drain board 28 increases as the water is collected and the PDD pipe ( 10) flows into and out of the inner tube 12 and another outer tube through the drainage hole 18 of the inner tube 12.

즉, 상기 PDD관(10)의 외부관(14)과 집수로(20)와 드레인 보드(28)을 통해 집수된 지하수는 소정의 간격으로 배열된 PDD관(10)의 내부관(12)과 외부관(14) 내부를 따라 최종적으로 집수정으로 배수된다.That is, the groundwater collected through the outer tube 14, the water collecting passage 20, and the drain board 28 of the PDD tube 10 may have an inner tube 12 of the PDD tube 10 arranged at predetermined intervals. The drain pipe is finally drained along the inside of the outer tube 14.

이와 같이, 지하 건축 및 토목 구조물의 기초 지반으로 침투 유입되는 지하 수가 드레인 보드(28) 및 PDD관(10)을 통하여 용이하게 집수되어 집수정으로 배수된다.In this way, the underground water infiltrated into the foundation ground of the underground construction and civil engineering structure is easily collected through the drain board 28 and the PDD pipe 10 and drained to the sump.

한편, 첨부한 도 5 및 도 6에 도시한 바와 같이, 상기 제1소켓(22) 및 제2소켓(30)에 의하여 상기 PDD관(10)의 가려진 부분을 제외한 외부관(14)의 노출부분을 제2토목섬유(40)로 직접 덮어줌으로써, 제2토목섬유(40)를 통해 집수로로 유입된 지하수가 곧바로 상기 PDD관(10)의 외부관(14)의 집수로(20) 뿐만아니라 내부관(12)의 배수구멍(18)을 통하여 신속하게 집수 및 배수되어, 지하수의 집수 및 배수성능을 더 향상시킬 수 있다.Meanwhile, as shown in FIGS. 5 and 6, the exposed portion of the outer tube 14 except for the portion of the PDD tube 10 covered by the first and second sockets 22 and 30. By covering directly with the second geosynthetic fiber 40, the groundwater flowing into the water collecting channel through the second geosynthetic fiber 40 immediately as well as the water collecting passage 20 of the outer tube 14 of the PDD pipe 10 The water is quickly collected and drained through the drainage holes 18 of the inner tube 12, so that the groundwater catchment and drainage performance can be further improved.

본 발명의 지하구조물 하부지반의 지하수 집배수 장치 및 그 시공 방법에 대한 기술사상을 예시도면에 의거하여 설명했지만, 이는 본 발명의 가장 양호한 실시예를 예시적으로 설명한 것이지 본 발명의 특허청구범위를 한정하는 것은 아니다.Although the technical idea of the groundwater collecting and draining device and the construction method of the ground underground structure of the present invention has been described based on the exemplary drawings, this is illustrative of the best embodiment of the present invention and the claims of the present invention. It is not limited.

본 발명은 이 기술 분야의 통상의 지식을 가진 자라면 누구나 본 발명의 기술사상의 범주를 이탈하지 않는 범위 내에서 다양한 변형 및 모방이 가능함은 명백한 사실이다.It is apparent that the present invention can be variously modified and imitated by those skilled in the art without departing from the scope of the technical idea of the present invention.

이상에서 본 바와 같이, 본 발명에 따른 지하구조물(건축물) 하부지반에 침투 유입하는 지하수의 집배수 장치 및 그 시공 방법에 의하면, 표준화된 자재인 드레인보드와 이중 배수관 형태의 PDD관을 기초 시공기준면에 간편하게 시공함으로써, 굴착면 지반을 통해 침투하는 지하수를 드레인보드를 통해 집수하는 동시에 집 수 및 배수 역할을 하는 PDD관을 통해 집수정까지 신속하게 배수시킬 수 있다.As described above, according to the present invention, the groundwater drainage device and the construction method of the groundwater infiltrate into the lower ground (architecture) according to the present invention, based on the standard construction material drain board and double-drain pipe-type PDD pipe base construction reference plane By simply installing in the groundwater, the groundwater penetrating through the excavation ground can be collected through the drain board, and at the same time, it can be quickly drained to the sump through the PDD pipe, which serves as a collection and drainage.

특히, 집수 및 배수장치의 규격이 작기 때문에 버림콘크리트 내에 모두 설치가 가능하므로 기초 시공기준면(최종 굴착면)을 재차 굴착하여 트렌치를 형성하지 않아도 되므로, 시공성이 매우 우수하고 공기를 크게 단축시킬 수 있다.In particular, since the size of the catchment and drainage device is small, it can be installed in the discarded concrete, so the foundation construction reference surface (final excavation surface) does not need to be excavated again to form a trench, so the workability is excellent and the air can be greatly shortened. .

또한, PDD관은 그 구성이 내부와 외부 즉, 물이 흐르는 공간이 2중으로 되어 있으며 각각은 배수구멍을 통해 서로 연결되어 지하수의 흐름이 원활해지고, 외부배수로의 내측면의 연장을 극대화시켜 최소한의 단면으로도 외부배수로의 통수능력이 최대가 될 수 있는 장점이 있다.In addition, the structure of the PDD pipe is double inside and outside, that is, the space in which water flows, and each of them is connected to each other through the drainage hole to facilitate the flow of groundwater, and to maximize the extension of the inner side of the external drainage path to minimize The cross section also has the advantage that the water supply capacity to the external drainage can be maximized.

또한, PDD관은 외부하중에 가장 유리하게 저항할 수 있도록 원형의 기하학적인 형상으로 제작되어, 내부와 외부 배수관를 연결판으로 강하게 직접 연결해줌으로써, PDD관의 굴곡강도와 충격강도를 극대화시켜 PDD관의 변형으로 인한 기초체의 침하를 방지할 수 있다.In addition, the PDD pipe is manufactured in a circular geometric shape to most advantageously resist external loads, and strongly connects the internal and external drain pipes to the connecting plate, thereby maximizing the bending strength and impact strength of the PDD pipe. It is possible to prevent settlement of the base body due to deformation.

결국, 본 발명의 지하구조물(건축물) 하부지반으로 침투 유입하는 지하수의 집배수 장치와 그 시공 방법은 기초지반의 허용지내력의 감소 없이 지하수를 영구적으로 용이하게 집수 및 배수시켜 양압력을 배제함으로써, 토목 및 건축의 지하구조물 뿐만아니라 구조물 전체의 안정성을 확보할 수 있다.As a result, the groundwater collecting and draining device and construction method of the groundwater infiltrating into the underground structure (architecture) lower ground of the present invention by easily collecting and draining the groundwater permanently without reducing the allowable bearing capacity of the foundation ground, thereby excluding positive pressure, It is possible to secure the stability of the entire structure as well as underground structures of civil engineering and construction.

Claims (10)

지하구조물 하부지반의 지하수 집배수 장치에 있어서,In the groundwater collection and drainage device of the substructure of the underground structure, 최종 굴착면에 소정의 배열로 깔리는 제1토목섬유와; First geotextiles laid in a predetermined arrangement on the final drilling surface; 상기 제1토목섬유상에 소정의 배열로 배치되는 드레인보드와; A drain board disposed on the first geotextile in a predetermined arrangement; 상기 드레인보드를 감싸는 제2토목섬유와; A second geosynthetic fiber surrounding the drain board; 상기 제1토목섬유상에 소정의 배열로 배치되는 동시에 드레인보드와 연통 가능하게 연결되는 이중 배수관 형태의 PDD관과; A PDD pipe having a double drainage pipe disposed on the first geotextile in a predetermined arrangement and connected to the drainboard so as to be in communication with the drainboard; 상기 드레인보드와 PDD관을 연통 가능하게 연결하는 제1소켓과; A first socket connecting the drain board and the PDD tube to communicate with each other; 상기 PDD관의 각 조인트 부분을 연결하는 제2소켓과; A second socket connecting each joint part of the PDD pipe; 상기 토목섬유 및 드레인보드, PDD관 등을 포함하는 전체 시공면상에 걸쳐 까는 2겹의 폴리에틸렌 필름을 포함하여 구성된 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.An underground water collecting and draining device of the substructure of the underground structure, characterized in that it comprises a two-layered polyethylene film covering the entire construction surface including the geotextile, drain board, PDD pipe and the like. 청구항 1에 있어서, The method according to claim 1, 상기 PDD관은 배수구멍이 형성된 내부관과;The PDD tube may include an inner tube having a drainage hole; 집수로가 형성된 외부관과;An outer tube in which a water collecting passage is formed; 상기 내부관의 외경면과 외부관의 내경면을 일체로 연결하는 연결판으로 구성된 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.An underground water collection and drainage device of the lower ground structure of the underground structure, characterized in that consisting of a connecting plate for integrally connecting the outer diameter surface of the inner tube and the inner diameter surface of the outer tube. 청구항 1 또는 청구항 2에 있어서, The method according to claim 1 or 2, 상기 PDD관의 내부관의 배수구멍은 내부관의 사방위치에 배치하되, 그 길이방향을 따라 등간격으로 배치시키고, 상기 외부관의 집수로는 외부관의 사방위치에 형성하되, 그 길이방향을 따라 "ㅡ"자로 절개하여 형성한 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.The drainage hole of the inner tube of the PDD tube is disposed at four sides of the inner tube, and is disposed at equal intervals along the longitudinal direction, and the collecting channel of the outer tube is formed at all four positions of the outer tube, Underground water collection and drainage device of the lower ground structure, characterized in that formed by cutting along the "-". 청구항 1 또는 청구항 2에 있어서, 상기 PDD관은 원형, 타원형, 사각형, 마제형 등의 형상중 선택된 어느 하나의 형상으로 성형 제작되는 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.According to claim 1 or claim 2, The PDD pipe is groundwater drainage device of the basement ground structure, characterized in that the molded in any one shape selected from the shape of a circle, oval, square, horseshoe. 청구항 1에 있어서, The method according to claim 1, 상기 제1소켓은 드레인보드와 PDD관을 연결하는 소켓으로서, 상기 PDD관의 외부관의 외경에 제2소켓으로 직접 연결되는 "ㅡ"자형의 중공관과; 이 중공관의 일측면 또는 양측면에 연통 가능하게 일체로 성형되어 드레인보드의 선단부가 인입되는 중공판으로 구성된 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.The first socket is a socket for connecting the drain board and the PDD pipe, the "-" shaped hollow pipe directly connected to the outer diameter of the outer pipe of the PDD pipe to the second socket; An underground water collecting and draining device of the lower ground of the underground structure, characterized in that the hollow tube formed integrally formed in communication with one side or both sides of the hollow tube to the leading end of the drain board. 청구항 1에 있어서, 상기 제2소켓은 PDD관을 직접 연결하는 소켓으로서, "ㅡ"자형, "+"자형, "T"자형, "L"자형, "Y"자형으로 성형된 중공관중 선택된 어느 하나인 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.The method according to claim 1, wherein the second socket is a socket for directly connecting the PDD pipe, any of the hollow tube formed of "-" shaped, "+" shaped, "T" shaped, "L" shaped, "Y" shaped Groundwater drainage device of the substructure of the underground structure, characterized in that one. 청구항 1 또는 청구항 6에 있어서, 상기 제2소켓은 기초시공면이 단차(높이)가 있는 경우에 상기 PDD관이 기초시공면에 원활하게 밀착 설치될 수 있도록 연성재료로 만들어진 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.The basement structure according to claim 1 or 6, wherein the second socket is made of a flexible material so that the PDD pipe can be installed in close contact with the foundation construction surface when the foundation construction surface has a step (height). Groundwater collection and drainage system in the lower ground. 청구항 1에 있어서, 상기 제1소켓 및 제2소켓의 연결에 의하여 상기 PDD관의 가려진 부분을 제외하고 외부관의 노출된 부분을 제2토목섬유로 덮도록 형성하는 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수 장치.According to claim 1, Underground structure, characterized in that formed by the connection of the first socket and the second socket to cover the exposed part of the outer tube with a second geosynthetic fiber except for the shielded portion of the PDD pipe Groundwater drainage device. 지하구조물(건축물) 하부지반의 지하수 집배수장치 시공방법에 있어서,In the groundwater drainage system construction method of the underground structure (architecture) lower ground, 굴착작업 및 기초 시공기준면의 정리 단계와; Arranging excavation work and foundation construction reference surface; 상기 기초 시공기준면에 제1토목섬유를 깔아주는 단계와; Laying a first geotextile on the basic construction reference surface; 상기 제1토목섬유상에 제2토목섬유로 감싸여진 드레인보드를 배치하는 단계 와; Disposing a drain board wrapped with a second geotextile on the first geotextile; 상기 제1토목섬유상에 PDD관을 배치하는 동시에 각 조인트 부위를 제2소켓으로 연통되게 연결하고, 상기 드레인보드와 PDD관을 제1소켓으로 서로 연통되게 연결하는 단계와; Placing a PDD tube on the first geotextile and simultaneously connecting each joint portion to a second socket, and connecting the drainboard and the PDD tube to each other through a first socket; 상기 토목섬유, 드레인보드, PDD관 및 소켓들이 시공된 기초 시공기준면상에 걸쳐 폴리에틸렌 필름을 깔아주어 마감하는 단계와; Laying and finishing a polyethylene film over the basic construction reference surface on which the geotextile, drain board, PDD pipe and sockets are constructed; 상기 폴리에틸렌 필름의 상면에 걸쳐 버림콘크리트를 타설하는 단계를 포함하여 이루어지는 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수장치 시공방법.A method of constructing a groundwater drainage device for an underground structure, characterized in that it comprises the step of pouring discarded concrete over the upper surface of the polyethylene film. 청구항 9에 있어서, 상기 제1소켓 및 제2소켓의 연결에 의하여 상기 PDD관의 가려진 부분을 제외하고 상기 외부관의 노출된 부분을 제2토목섬유로 감싸는 단계를 포함하는 것을 특징으로 하는 지하구조물 하부지반의 지하수 집배수장치 시공방법.10. The underground structure according to claim 9, comprising the step of wrapping the exposed part of the outer tube with the second geotextile except for the shielded part of the PDD tube by the connection of the first socket and the second socket. Construction method of groundwater drainage system of lower ground.
KR1020050054759A 2005-06-24 2005-06-24 Groundwater collection / drainage system of lower ground of underground structure and construction method Expired - Fee Related KR100616123B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050054759A KR100616123B1 (en) 2005-06-24 2005-06-24 Groundwater collection / drainage system of lower ground of underground structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050054759A KR100616123B1 (en) 2005-06-24 2005-06-24 Groundwater collection / drainage system of lower ground of underground structure and construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0018247U Division KR200396485Y1 (en) 2005-06-24 2005-06-24 Device for drain underground water for construction the same

Publications (1)

Publication Number Publication Date
KR100616123B1 true KR100616123B1 (en) 2006-08-28

Family

ID=37601184

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050054759A Expired - Fee Related KR100616123B1 (en) 2005-06-24 2005-06-24 Groundwater collection / drainage system of lower ground of underground structure and construction method

Country Status (1)

Country Link
KR (1) KR100616123B1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446612Y1 (en) 2008-01-22 2009-11-12 다해산업(주) Drain Board for Foundation Floor Drainage
KR100969552B1 (en) * 2010-02-26 2010-07-12 정의숙 System for drain regulation underground water
KR101061186B1 (en) * 2010-11-15 2011-08-31 박수림 Positive pressure attenuation treatment device for underground structures and construction method
KR101133563B1 (en) * 2011-11-11 2012-04-04 지에스이앤씨(주) Device for drain underground water
KR101434914B1 (en) * 2012-05-15 2014-11-03 송현기 Permanent drain system and construction method thereof
KR101961284B1 (en) * 2018-09-19 2019-03-22 지에스이앤씨(주) System for flow-back underground water occurred by the De-Watering
CN109944231A (en) * 2019-04-30 2019-06-28 交通运输部天津水运工程科学研究所 A kind of vacuum preloading drainpipe
KR102094157B1 (en) * 2019-10-02 2020-03-27 지에스이앤씨(주) Rodding eye system cleaning by high pressure permanent drainage materials for building
CN111455974A (en) * 2020-03-04 2020-07-28 温州大学 Vacuum preloading flocculation drainage method for transverse drainage plate combined geotextile
KR102693177B1 (en) 2023-06-15 2024-08-08 준이엔씨(주) Permanent drainage system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200446612Y1 (en) 2008-01-22 2009-11-12 다해산업(주) Drain Board for Foundation Floor Drainage
KR100969552B1 (en) * 2010-02-26 2010-07-12 정의숙 System for drain regulation underground water
KR101061186B1 (en) * 2010-11-15 2011-08-31 박수림 Positive pressure attenuation treatment device for underground structures and construction method
KR101133563B1 (en) * 2011-11-11 2012-04-04 지에스이앤씨(주) Device for drain underground water
KR101434914B1 (en) * 2012-05-15 2014-11-03 송현기 Permanent drain system and construction method thereof
KR101961284B1 (en) * 2018-09-19 2019-03-22 지에스이앤씨(주) System for flow-back underground water occurred by the De-Watering
CN109944231A (en) * 2019-04-30 2019-06-28 交通运输部天津水运工程科学研究所 A kind of vacuum preloading drainpipe
KR102094157B1 (en) * 2019-10-02 2020-03-27 지에스이앤씨(주) Rodding eye system cleaning by high pressure permanent drainage materials for building
CN111455974A (en) * 2020-03-04 2020-07-28 温州大学 Vacuum preloading flocculation drainage method for transverse drainage plate combined geotextile
KR102693177B1 (en) 2023-06-15 2024-08-08 준이엔씨(주) Permanent drainage system

Similar Documents

Publication Publication Date Title
US4185429A (en) Apparatus for waterproofing a basement or similar structure
US8186127B1 (en) Basement water drainage method for use with a foundation having no footing
US8590213B2 (en) Apparatus and method for waterproofing a basement
KR100616123B1 (en) Groundwater collection / drainage system of lower ground of underground structure and construction method
JP2923498B1 (en) Drainage method and earth retaining support used for it
KR100926694B1 (en) Groundwater collection and drainage system of the substructure under the underground structure
KR200396485Y1 (en) Device for drain underground water for construction the same
KR20090028964A (en) Retaining wall structure with drainage system and construction method
JP2001220763A (en) Underground wall wastewater treatment method and underground wall constructed by this method
JP4862706B2 (en) Method for constructing well in underground wall structure and method for using well constructed by this method
KR100655383B1 (en) Basement floor drainage method
KR100456610B1 (en) Structure method for drainageway of weak stratum and the conduct pipe thereof
JP2004278287A (en) Permeable steel pipe mountain retaining type retaining wall structure
JP4590196B2 (en) Rainwater storage tank and construction method thereof
KR100748607B1 (en) Groundwater Drainage Construction Method and System for Reducing Upstream Pressure of Building
KR20090029530A (en) Drain pipe for groundwater collection and drainage device in the lower ground of the underground structure
KR100524136B1 (en) Basic bottom permanent drainage structure using trench and drainage member and it&#39;s construction method
KR200314875Y1 (en) Connector for apparatus draining
CN207933833U (en) A road anti-seepage structure
CN222296300U (en) A tunnel drainage system
JP7471183B2 (en) Water collection structure and construction method of water collection structure
KR101282340B1 (en) Drain board of water flow layer one body type and, method for permanent drain used of that
JPS6215343Y2 (en)
KR102600671B1 (en) Draining Plate Assembly
KR200431569Y1 (en) Plate drain

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

A302 Request for accelerated examination
PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

FPAY Annual fee payment

Payment date: 20130528

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

FPAY Annual fee payment

Payment date: 20140528

Year of fee payment: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

FPAY Annual fee payment

Payment date: 20151019

Year of fee payment: 10

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

FPAY Annual fee payment

Payment date: 20161118

Year of fee payment: 11

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 11

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

FPAY Annual fee payment

Payment date: 20180219

Year of fee payment: 12

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 12

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20180820

Year of fee payment: 13

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20190819

Year of fee payment: 14

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 14

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 15

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 16

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 17

PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20230819

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20230819