SU1203209A1 - Cellar of skeleton-supporting building - Google Patents
Cellar of skeleton-supporting building Download PDFInfo
- Publication number
- SU1203209A1 SU1203209A1 SU843764757A SU3764757A SU1203209A1 SU 1203209 A1 SU1203209 A1 SU 1203209A1 SU 843764757 A SU843764757 A SU 843764757A SU 3764757 A SU3764757 A SU 3764757A SU 1203209 A1 SU1203209 A1 SU 1203209A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- cellar
- waterproofing
- slab
- layer
- columns
- Prior art date
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
Изобретение относитс .к строительству , а именно к устройству подвалов каркасных зданий в услови х высокого уровн грунтовых вод.. The invention relates to the construction, in particular to the arrangement of basements of frame buildings under conditions of a high level of groundwater.
Цель изобретени - снижение материалоемкости и трудоемкости,, и повышеш1е долговечности конструкций плиты в грунтах с агрессивными грунтовыми водами.The purpose of the invention is to reduce the material and labor intensity, and increase the durability of the slab structures in soils with aggressive groundwater.
На фиг. 1 показан подвал каркасн здани , поперечный разрез; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - узел J,на фиг. 1.FIG. 1 shows the basement of the building framework, a transverse section; in fig. 2 shows section A-A in FIG. one; in fig. 3 - node J, in FIG. one.
Подвал каркасного здани вклю- чает плиту 1, размещенную на подготовке 2 по слою 3 горизонтальной изол ции, опертые н а плиту I фундаменты (.не пока запы) с колоннами 4, перекрытие 5 и устройство 6 ;уг гашени гидростатического нано- ра груптов1)1к под.The basement of the frame building includes a slab 1, placed on preparation 2 on layer 3 of horizontal insulation, supported on slab I of the foundations (not yet zapy) with columns 4, ceiling 5 and device 6, extinguishing hydrostatic nano group 1) 1k under.
Устройство 6 дл гашени г1Гдро- статического напора грунтовых вод выполнено в виде грунтовых анкеров размещенных между фундаментами колонн 1 и прикрепленных к плите 1 ттосредством. сборных распределительных шайб 8, причем последние выполнены трапецеидальпого сечени с меньшим нижним основанием и покрыты слоем 9 гидроизол ции. The device 6 for extinguishing the groundwater pressure head 1 is made in the form of ground anchors placed between the foundations of the columns 1 and attached to the slab 1 by means. prefabricated distribution washers 8, the latter being made of trapezoidal section with a smaller lower base and covered with a waterproofing layer 9.
Дл повышени долговечности кон- струкц1Ш плиты в грунтах с агрессивными грунтовыми водами распределительные шайбы 8 могут быть выполнены из пoли iepбeтoнa и установлены . на горизонтальную гидроизол хдаю 3 по слою 10 мастики.In order to increase the durability of the structure of the slab in soils with aggressive groundwater, the distribution washers 8 can be made of i-concrete and installed. on horizontal waterproofing 3 across layer 10 mastic.
Подвал возвод т следующим образом .The basement is erected as follows.
В котловане выполн ют грунтовые анкеры 7, затем устраивают бетонну подготовку 2, гидроизол цию 3.из асфальто- или цементобетона. На несущих стержн х грунтовых анкеров 7In the excavation, ground anchors 7 are made, then concrete preparation 2 is installed, waterproofing 3. from asphalt or cement concrete. On bearing rods of ground anchors 7
5 0 50
5 о 5 o
5five
00
5five
закрепл ют при помощи твердеющего материала 11 распределительные- шайбы 8, устанавлива их на сплошную гадроилол цию 3 с помощью гидроизол ционной мастики. Этой же мастикой дополнительно гплотн ют стыки нижней поверхности щайб 8 с гидроизол цией 3. После устройства защитного покрыти слоев 3 и 9 гидроизол ции производ т армирование и бетонирование плиты 1 , в которой .ос- юил ют стаканы, выпуски арматуры или другие элементы дл креплени колонн 4 подвала.The distribution washers 8 are fastened with the help of hardening material 11; they are installed on solid hydroylation 3 with the help of waterproofing mastic. The same mastic additionally assembles the joints of the bottom surface of the washers 8 with waterproofing 3. After the protective coating of the waterproofing layers 3 and 9, reinforcement and concreting of the plate 1 are made, in which glasses, reinforcement fittings or other elements are fastened columns 4 basement.
Конструкци подвала каркасного здапи работае т следующим образом.The construction of the basement frame frame is as follows.
Усили от перекрыти 5 передаютс колоннами 4 на плиту 1. Гидростатическое давление, .действующее на плиту I снизу, воспринимаетс грунтовыми анкерами 7. Усили от анкеров 7 передаютс к плите 1 посредством распределительных шайб 8, конструкци которых обеспечивает передачу усилий от анкеров 7 к смежным участкам Л1ЛИТЫ 1 и обеспечивает сплошность гидроизол ции 3 и У в. местах крепле и анкеров 7 к плите 1 . Передача УСИ.ЛИЙ от гидростатического давлепи на плиту 1 осуществл етс за счет взаимодействи консо.пьпых выступов 12 и 13 по периметру шайб 8 и плиты 1. Изгибающие моменты в участках плиты 1 между анкерами 7 уменьшаютс за счет опн- рани колонн А в пролетах между анкерами 7.The forces from the overlap 5 are transferred by the columns 4 to the plate 1. The hydrostatic pressure acting on the plate I from the bottom is perceived by the ground anchors 7. The forces from the anchors 7 are transmitted to the plate 1 by means of distribution washers 8, the design of which ensures the transmission of forces from the anchors 7 to adjacent areas L1LITES 1 and ensures the integrity of the waterproofing of 3 and V c. the ground points and anchors 7 to the plate 1. The transfer of the UCI.LIH from the hydrostatic pressure to the plate 1 is carried out by the interaction of the consoles of the projections 12 and 13 around the perimeter of the washers 8 and the plate 1. The bending moments in the areas of the plate 1 between the anchors 7 are reduced due to the installation of columns A in the spans between anchors 7.
Подвал может быть возведен в любых грунтах, но дл каждого типа грунта он будет отличатьс конструкцией грунтовых анкеров 7. Например,The basement can be erected in any soils, but for each type of soil it will differ in the design of the soil anchors 7. For example,
дп м псих грунтов (песок, суглинок ) возможно применение винтовых анкеров, дл скальных грунтов - буровых анкеров со стержн ми, замо- 1но;шченными в скважинах.A screw ground anchor (sand, loam) is possible to use screw anchors, for rocky soils - drilling anchors with rods, permanently; drilled in wells.
/1-/1 / 1- / 1
l.l.
fa a Ifa a I
ИAND
ЯI
риг. 2rig. 2
11eleven
ww
6.76.7
/S/ S
Редактор Н.ТупицаEditor N. Tupitsa
Составитель Г.ИвановйCompiled by G.Ivanovy
Техред О.Неце Корректор М.ДемчнкTehred O.Niese Proofreader M.Demlnk
Заказ 8395/36 Тираж 695ПодписноеOrder 8395/36 Circulation 695 Subscription
ВНИИПИ Государственного комитета СССР 113035, Москва, Ж-Э5, Раушска наб., д.4/5VNIIPI USSR State Committee 113035, Moscow, F-E5, 4/5 Raushsk nab.
Филиал ППП Патент, г.Ужгород, ул.Проектна , 4Branch PPP Patent, Uzhgorod, Proektna St., 4
Фиг,3FIG 3
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843764757A SU1203209A1 (en) | 1984-07-13 | 1984-07-13 | Cellar of skeleton-supporting building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843764757A SU1203209A1 (en) | 1984-07-13 | 1984-07-13 | Cellar of skeleton-supporting building |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1203209A1 true SU1203209A1 (en) | 1986-01-07 |
Family
ID=21128289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843764757A SU1203209A1 (en) | 1984-07-13 | 1984-07-13 | Cellar of skeleton-supporting building |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1203209A1 (en) |
-
1984
- 1984-07-13 SU SU843764757A patent/SU1203209A1/en active
Non-Patent Citations (1)
Title |
---|
Купцов И.П и др. Проектирование и строительство тепловых электростанций.- Строительна часть. М.: Энерги , 1972, с. 56,57, р.4-., * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110512647B (en) | Partial assembly type subway station structure design and construction method | |
CN105951880A (en) | Assembled underground structure of precast concrete planks and construction method thereof | |
US20050155297A1 (en) | Massive construction system using rock masonry | |
Varghese | Building construction | |
US4570409A (en) | Foundation system for modular and mobile housing | |
CA2119817A1 (en) | Cement-Containing Construction Ropes and Applications Therefor | |
SU1203209A1 (en) | Cellar of skeleton-supporting building | |
Kavitha et al. | An overview of water proofing system in concrete structures | |
CN115262588B (en) | Assembled self-adaptive slope surface protection structure and construction method thereof | |
CN209412856U (en) | A kind of assembled integral basement structure meeting stability against floating requirement | |
Evans | APPLICATIONS OF PRESTRESSED CONCRETE TO WATER SUPPLY AND DRAINAGE. | |
Leonhardt | The committee to save the tower of Pisa: a personal report | |
Witzany et al. | The analysis of non‐stress effects on historical stone bridge structures (monitoring, theoretical analysis, maintenance) | |
Baker et al. | Tall buildings and their foundations: three examples | |
Van Gemert et al. | Structural consolidation and strengthening of masonry: historical overview and evolution | |
RU2024697C1 (en) | Building | |
Hooda et al. | Modern Trends in Construction | |
RU2094568C1 (en) | Modular foundation | |
BAIRWA | CANDIDATE'S DECLARATION | |
Gunjan | Seismic Rehabilitation and Retrofitting | |
Crocker et al. | Earthen architecture and seismic codes: lessons from the field | |
Moreland et al. | Earth-covered buildings: technical notes | |
Clark | IMIX EXZ Wall WP Residential Basement Waterproofing | |
KOLBAY | WATER CONSCIOUS CONSTRUCTION STRATEGIES IN OTTOMAN ARCHITECTURE | |
Van Gemert et al. | Evolution of structural consolidation and strengthening of masonry in Belgium: historical overview and case studies |