PL9331B1 - Construction method4 of the dam, used "" in silting workings. - Google Patents

Construction method4 of the dam, used "" in silting workings. Download PDF

Info

Publication number
PL9331B1
PL9331B1 PL9331A PL933127A PL9331B1 PL 9331 B1 PL9331 B1 PL 9331B1 PL 9331 A PL9331 A PL 9331A PL 933127 A PL933127 A PL 933127A PL 9331 B1 PL9331 B1 PL 9331B1
Authority
PL
Poland
Prior art keywords
dam
silting
construction
method4
workings
Prior art date
Application number
PL9331A
Other languages
Polish (pl)
Filing date
Publication date
Application filed filed Critical
Publication of PL9331B1 publication Critical patent/PL9331B1/en

Links

Description

W celu zmniejszenia kosztów roboci¬ zny, materjalu i ulatwienia rozbierania tam z&mulkowych buduje sie je w sposób na¬ stepujacy.Stemple 1, 1\ szkieletu tamy rozsta¬ wia sie szeroko (przynajmniej o dwa me¬ try jeden od drugiego). Stemple moga byc drewniane, albo zelazne rurowe skladane.Szkielet tamy przytrzymywany jest przez sciagacze 3, 4, 5 ze starych linek zelaz¬ nych. Sciagacze opasuja slupy szkieletu poprzedniej tamy 2, albo stemple zwykle¬ go budynku, sa jednak nie krótsze, niz wy¬ sokosc przestrzeni otamowanej. Sciagacze mozna wykonac z kawalków linki zwiaza¬ nej na wezel i skreconej 4, albo z takiej samej linki zaopatrzonej w sciagacze gwintowane 3, 5, zawieszone w ten siposób, zeby gwinty sciagajace znalazly sie blisko stempli tamy 1, V tak, aby latwo mozna bylo je rozkrecic i wyciagnac z piasku.Sciagacze zwylkle mozna pozastawiac w piasku. O ile slupy szkieletu sa dobrze o- sadzone w gniazdku, wykopanem w kamie¬ niu spodkowym, to wystarczy w zupelno¬ sci tylko jeden sciagacz pod stropem 5.Przy nizszych tamach mozna sie obejsc bez sciagaczy zupelnie.Szkielet tamy od góry do dolu pokry¬ wa sie tarczami z desek albo z cienkiej bla^ chy 1 mm grubosci, których dlugosc rów¬ na sie rozstawieniu slupów szkieletu, t. j. okolo 2 m, i szerokosc okolo 1 m lub wie¬ cej, stosownie do wysokosci pokladu zamu¬ lanego. Tarcze blaszane obramowane sa naokolo plaskiem zelazem, obramowanie wzmacnia L ulaitwia laczenie tarcz. Alby u- latwic zlaczenie blach, plaskie zelazo ob-ramowania posiada wmitowane palce ze¬ lazne 6, 7, zaopatrzone w prostokatne o- twory, w które przetyka sie kliny (klfriy w celu ochrony od zgubienia .przytwierdza sie na lancuszkach do tarcz). Tarcze drew¬ niane mozna laczyc w styk podwójnemi zatyczkami4damrami Szerokosc rozsta¬ wienia palców zlaczonych zalezy od wiel¬ kosci tarcz, srednio co pól metra. Gdyby pomiedzy tarczami pokazaly sie szczeliny, to zatyka sie je paskami plótna, albo li¬ stewkami drewnianemi. Tarcze zlaczane pomiedzy soba przytwierdzone sa do slu¬ pów szkieletu zapomoca palaków 8 z gru¬ bego okraglego zelaza, obejmujacych slu¬ py, konce palaków przepuszcza sie przez otwór w rogu tarczy; tarcze, nadziane na¬ roznikiem na koniec palaka, zamocowane sa zatyczka w ksztalcie klina, przepu¬ szczona przez koniec palajka zaopatrzone¬ go w odpowiedni otwór albo tez przysru¬ bowane nakretka. Przy tarczach zawiesza¬ nych w styk koniec palaka przepuszcza sie przez róg jednej tylko tarczy, a inne sa przytwierdzone do niej nakladka z bla¬ chy i klamrami z zatyczkami w ksztalcie klina. Pierwsze palajki od dolu mozna u- sunac i zastapic je deska 9 okolo 50 mirt gruba, przybita do slupów. Obramowanie tarcz mozna uproscic i dac z dwóch tylko stron tam, gdzie sa wnitowane palce zla- czowe. Laczyc tez tarcze miedzy soba moz¬ na zwyklemi srubkami. Tarcze przytwier¬ dzone sa ze strony zewnetrznej tamy w ten sposób, ze po zamuleniu danej prze¬ strzeni tarcze nadzwyczaj latwo zdejmu¬ je sie ze szkieletu najpierw dolne, a potem wyzsze, Po zamuleniu mozna równiez u- sunac slupy szkieletu po uprzedniem zdje¬ ciu sciagaczy. PLIn order to reduce the labor and material costs and to facilitate the dismantling of the dams, they are constructed in a stepwise manner. The stamps 1, 1 of the dam skeleton are widely spaced (at least two meters from each other). The stamps can be wooden or iron tubular folded. The dam skeleton is held by cords 3, 4, 5 from old iron lines. The braces encircle the posts of the frame of the previous dam 2, or the stamps of an ordinary building, are however not shorter than the height of the dammed space. The pullers can be made of pieces of a line tied onto a knot and twisted 4, or of the same line provided with threaded pullers 3, 5, suspended in this way so that the tightening threads are close to the stamps of the dam 1, V so that it is easy to Unscrew them and take them out of the sand. The pullers can usually be left in the sand. As long as the posts of the skeleton are well placed in the socket, dug in the saucer stone, only one cuff under the ceiling is enough. 5. At lower dams, you can do without baffles completely. The skeleton of the dam is covered from top to bottom. is cut with boards made of boards or a thin sheet of 1 mm thick, the length of which is equal to the spacing of the frame posts, ie about 2 m, and a width of about 1 m or more, according to the height of the muddy deck. The metal discs are framed around with a flat iron, the rim is reinforced with L facilitates the connection of the discs. In order to facilitate the joining of the sheets, the flat iron framing has embedded lock fingers 6, 7, provided with rectangular holes into which wedges are inserted (to protect against loss, the wedges are attached to shield chains). Wooden discs can be joined with double plugs and dams. The width of the fingers between the joined fingers depends on the size of the discs, on average every half a meter. If there are gaps between the shields, they are blocked with linen strips or wooden slats. The shields joined between each other are attached to the skeleton posts by means of stakes 8 of thick round iron covering the stakes, the ends of the stakes are passed through a hole in the corner of the plate; the discs, stuffed with a spigot on the end of the post, are fitted with a wedge-shaped plug, passed through the end of the stick provided with an appropriate hole or screwed with a nut. In the case of shields suspended in contact, the end of the pole is passed through the corner of one shield only, and the other shields are attached to it with sheet metal plates and clamps with wedge-shaped plugs. The first stakes from the bottom can be removed and replaced with a board 9 about 50 myrtle thick, nailed to the poles. The shield border can be simplified and given on only two sides where the contact fingers are riveted in. You can also connect the shields between each other with ordinary screws. The shields are fixed on the outside of the dam in such a way that after silting a given space, the shields are extremely easy to remove from the skeleton, first the lower ones, and then the higher ones. After silting, you can also remove the skeleton poles after removing them. cuffs. PL

Claims (1)

1. Zastrzezenie patentowe. Sposób budowy tamy stosowanej przy zamulaniu wyrobisk, znamienny tern, ze do rozstawionych szeroko stempli, zlaczonych sciagaczami (3, 5) ze stemplami (2), po- zostajacemi wewnatrz wyrobiska zamula¬ nego, przymocowuje sie na zewnetrznej stronie poszycie tamy, skladajace sie z oddzielnych tarcz, utrzymywanych zapo- nuoca palaków z zatyczkami. Wladyslaw Jankowski.Do opisu patentowego Nr I 1 I fil K 1 ^ 1 1 I ^ I ¦ii ^» •i-v **¦ -P--1— fi -%CT£- ti-M T°+ ^ dofN. 4ofN- bo^tK ftfr ras r 1 I Druk l. Boguslawskiego, Warszaw*. PL1. Patent claim. The method of construction of a dam used for silting of excavations, characterized by the fact that the stamps widely spaced, connected by braces (3, 5) with stamps (2), remaining inside the silted excavation, are fixed on the outside of the dam sheathing, consisting of separate shields, held to protect sticks with plugs. Wladyslaw Jankowski. To the patent description No. I 1 I fil K 1 ^ 1 1 I ^ I ¦ii ^ »• i-v ** ¦ -P - 1— fi -% CT £ - ti-M T ° + ^ dofN. 4ofN- bo ^ tK ftfr ras r 1 I Printed by l. Boguslawski, Warsaw *. PL
PL9331A 1927-11-12 Construction method4 of the dam, used "" in silting workings. PL9331B1 (en)

Publications (1)

Publication Number Publication Date
PL9331B1 true PL9331B1 (en) 1928-10-31

Family

ID=

Similar Documents

Publication Publication Date Title
KR101210665B1 (en) A fordable temporary bridge for saving life and rescue in middel and small size river
CN106948349A (en) Quick block up fabricated construction system, erecting device and method
CN207406004U (en) A kind of steel form locks leg structure
CN204000932U (en) Lower channel in safety in a kind of deep foundation pit construction operation
PL9331B1 (en) Construction method4 of the dam, used "" in silting workings.
DE2655677C3 (en) Kit for a transportable prefabricated house, especially a residential house
US2134624A (en) Snow slide preventer
CN206784389U (en) Quick block up fabricated construction system and erecting device
CN109356104A (en) Temporary traffic corridor structure and its construction method in the whole period
US1880838A (en) Sand trap for protection of shores, beaches, etc.
CN105971266B (en) Self-anchored adjustable pedal for erecting high-altitude catwalk
CN203795883U (en) Safety protecting device with reserved holes
JP6322839B2 (en) Tsunami evacuation facility
CN220394680U (en) Sand shovel is packed in sand bag special for flood prevention
US1552300A (en) Weatherproof pole or post
WO2003062564A1 (en) Multi-use walls comprising tongue-and-groove tiles and a metal structure which is intended for, for example, floors, walls fences and steps
CN206616517U (en) A kind of vegetation ecological concrete protective slope structure
CH378519A (en) Tent hall construction
RU2626627C1 (en) Prefabricated protective and regulatory structure
CN214089702U (en) Flood control dike protection structure for water conservancy
GB366629A (en) Improvements in or relating to portable sheds
CN209075893U (en) Movable plank house escape device
AU2006100594A4 (en) System for protecting structures in high winds
DE578392C (en) Trestle for emergency closures
DE453074C (en) Device for the protection of rooms against flooding