PL79594B2 - - Google Patents

Download PDF

Info

Publication number
PL79594B2
PL79594B2 PL15926572A PL15926572A PL79594B2 PL 79594 B2 PL79594 B2 PL 79594B2 PL 15926572 A PL15926572 A PL 15926572A PL 15926572 A PL15926572 A PL 15926572A PL 79594 B2 PL79594 B2 PL 79594B2
Authority
PL
Poland
Prior art keywords
shaft
deck
exploitation
around
pillars
Prior art date
Application number
PL15926572A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15926572A priority Critical patent/PL79594B2/pl
Publication of PL79594B2 publication Critical patent/PL79594B2/pl

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 30.09.1973 Opis patentowy opublikowano: 08.09.1975 79594 KI. 5b, 41/00 MKP E21c 41/00 Twórcywynalazku: Miroslaw Chudek, Tadeusz Kochmanski, Jan Zych Uprawniony z patentu tymczasowego: Politechnika Slaska im. W. Pstrowskiego, Gliwice (Polska) Sposób eksploatacji zlóz pokladowych w filarach ochronnych dla szybów Przedmiotem wynalazku jest sposób eksploatacji zlóz pokladowych przy zastosowaniu scisle okreslonego ksztaltu frontu odbudowy, majacy zastosowanie przy podziemnej eksploatacji mineralów uzytecznych, glównie wegla, zalegajacych jako poklady w filarach ochronnych dla szybów.Eksploatacje filaru ochronnego dla szybu, ze wzgledu na ochrone szybu, prowadzi sie w sposób planowy, aby wywolac mozliwie male deformacje szybu, przy równoczesnym zastosowaniu róznorodnych zabezpieczen tak obudowy szybu jak i zbrojenia oraz urzadzen szybu.Znany jest sposób eksploatacji filarów ochronnych dla szybów dwoma frontami prowadzonymi od srodka szybu do granic jego filaru. Sposób ten powoduje przede wszystkim powstawanie w szybie wzmozonych odksztalcen rozciagajacych, które sa przyczyna powstawania w obudowie szybowej szczelin poziomych pekania i zrywania przewodów, rurociagów oraz prowadników szybowych. Powstawanie szczelin w górotworze jest szczególnie niebezpieczne gdy górotwór jest zawodniony, gdyz przez te szczeliny moze sie dostac do szybu woda lub kurzawka. Prócz tego przy tym sposobie wystepuja wzmozone odksztalcenia poziome sciskajace, które sa z kolei przyczyna krzywienia i lamania dzwigarów szybowych oraz deformacji tarczy szybowej.Innym znanym sposobem jest eksploatacja jednoskrzydlowa z „kostka szybowa". Przy tym sposobie eksploatacje rozpoczyna sie zasadniczym frontem od granicy filaru. Z chwila gdy wplywy eksploatacji zasadniczej zaczynaja docierac do szybu rozpoczyna sie eksploatacje „kostki szybowej" to jest czesci pokladu zalegajacego bezposrednio wokól szybu. Sposób ten zmniejsza w znacznym stopniu odksztalcenia pionowe w szybie, jednak mimo to, w momencie odpowiadajacym zetknieciu sie frontu zasadniczego z „kostka szybowa", nastepuje wzrost pionowych odksztalcen rozciagajacych w dolnej czesci rury szybowej.Znany jest równiez sposób eksploatacji z tzw. „przeciwkostka". Sposób ten stanowi pewna odmiane sposobu eksploatacji z „kostka szybowa" i polega na pozostawieniu przy zblizaniu sie frontu zasadniczego da kostki pasa calizny weglowej wokól kostki czyli tzw. „przeciwkostki". Po oddaleniu sie frontu zasadniczego na odpowiednia odleglosc od szybu pas calizny ma byc likwidowany. Likwidacja tego pasa budzi watpliwosci natury technicznej ze wzgledu na tapania, pozary itp.2 79594 Znane sposoby eksploatacji filarów szybowych nie moga byc w kazdych warunkach zastosowane, a zwlasz¬ cza w trudnych warunkach geologiczno-górniczych, gdyz wówczas deformacje spowodowane eksploatacja filaru szybowego bylyby wieksze od dopuszczalnych dla danego szybu.Celem wynalazku jest umozliwienie eskploatacji filarów ochronnych dla szybów w trudniejszych warunkach geologiczno-górniczych, z ograniczeniem do minimum mozliwosci powstania w obudowie szybowej szczelin, pekniec, zgniatania obudowy i dzwigarów, wychylenia, skrzywienia szybu itp. Celem wynalazku jest równiez zwiekszenie bezpieczenstwa eksploatacji filarów szybowych przez zmniejszenie deformacji rury szybowej.Zadaniem wynalazku jest opracowanie takiego sposobu eksploatacji filarów ochronnych dla szybów, który powodowalby mniejsze deformacje rury szybowej niz dotychczasowe sposoby, a przede wszystkim mniejsze pionowe odksztalcenia szybu.Cel ten zostal osiagniety przez wyeksploatowanie wokól kostki szybowej, wybieranej jak dotychczas z podsadzka hydrauliczna, pasa pokladu o szerokosci d obliczanej w zaleznosci od glebokosci eksploatacji i szczelnym podsadzeniu tego pasa materialem podsadzkowym o wymaganych parametrach wytrzymalosciowych oraz wlasnosciach plastycznych. W omawianym pasie wokól kostki szybowej moze byc równiez zastosowany system obudowy kasztowej. Zasadniczy front eksploatacyjny z podsadzka hydrauliczna prowadzony jest od granic filaru ochronnego w kierunku szybu i po minieciu „kostki szybowej" posuwa sie dalej do przeciwleglego kranca filaru. Front zasadniczy moze przesuwac sie w filarze szybu w inny znany sposób. Przez wybranie i szczelne podsadzenie pasa pokladu wokól kostki szybowej uzyskuje sie ograniczenie szybkosci osiadania stropu w bezposrednim sasiedztwie szybu, zwlaszcza w momencie przechodzenia frontu zasadniczego przez szyb, a tym samym uzyskuje sie znaczne zmniejszenie pionowych odksztalcen rozciagajacych majacych zasadnicze znaczenie dla szybu.Sposób eksploatacji wedlug wynalazku moze byc stosowany przy wszystkich systemach eksploatacji.W praktyce sposób ten wymaga tylko dobrania wlasciwego materialu podsadzkowego i szczelnego podsadzenia pasa wokól kostki szybowej. Deformacje jakie wystapia, przy sposobie eksploatacji zalezec beda od dobrania szerokosci pasa, materialu do podsadzenia i samego podsadzenia pasa. Sposób eksploatacji wedlug wynalazku umozliwia eksploatacje w filarach ochronnych dla szybów tam, gdzie przy dotychczasowych sposobach byla ona ograniczona lub nawet niedopuszczalna np.: przy obudowie betonowej szybu.Sposób wykonania wynalazku przedstawiono tytulem przykladu na rysunku, przedstawiajacym schematycznie uklad frontów. Eksploatacje w filarze chroniacym okreslony obiekt S, rozpoczynamy zasadniczym frontem prostoliniowym polozenie 1., który przesuwa sie w kierunku szybu. Z chwila gdy front zasadniczy znajduje sie w odpowiedniej odleglosci od szybu i zajmie polozenie 2, eskploatujemy kostke szybowa, a po wyeksploatowaniu kostki eksploatujemy pas dookola kostki i podsadzamy go szczelnie materialem podsadzkowym. W miedzyczasie zasadniczy front przesuwa sie dalej zajmujac kolejno polozenia 3, 4 7 az do wyeksploatowania calego filaru. PL PLPriority: Application announced: September 30, 1973 Patent description was published: September 8, 1975 79594 KI. 5b, 41/00 MKP E21c 41/00 Inventors: Miroslaw Chudek, Tadeusz Kochmanski, Jan Zych Authorized by a temporary patent: Politechnika Slaska im. W. Pstrowskiego, Gliwice (Poland) Method of exploitation of seam deposits in protective pillars for shafts The subject of the invention is a method of exploitation of seam deposits using a strictly defined shape of the reconstruction front, applicable for underground exploitation of useful minerals, mainly coal, deposited as seams in protective pillars for Due to the protection of the shaft, the exploitation of the shaft protection pillar is carried out in a planned manner in order to cause the lowest possible deformation of the shaft, with the simultaneous application of various protections, such as the shaft casing, reinforcement and shaft equipment. The method of using the shaft protection pillars is known. two fronts running from the center of the shaft to the boundaries of its pillar. This method primarily causes the formation of increased tensile deformations in the shaft, which are the cause of the formation of horizontal cracks in the shaft casing and the breaking of cables, pipelines and shaft guides. The formation of fissures in the rock mass is particularly dangerous when the rock mass is flooded, because through these fissures water or dust can enter the shaft. Besides this method, there are increased horizontal compressive deformations, which in turn are the cause of curvature and breaking of the shaft girders and deformation of the shaft shield. Another known method is the single-leaf operation with "shaft block". In this method, the operation begins with the main front from the pillar boundary. As soon as the impacts of the main exploitation begin to reach the shaft, the exploitation of the "shaft block", that is the part of the deck lying directly around the shaft, begins. This method significantly reduces vertical deformations in the shaft, but nevertheless, at the moment corresponding to the contact of the main front with the "shaft block", there is an increase in vertical stretching deformations in the lower part of the shaft pipe. The so-called "counter-block" operation is also known. . This method is a variation of the "shaft block" method of operation and consists in leaving, while approaching the main front, to the cube of the carbon belt around the ankle, i.e. the so-called "counter-ankle". After the main front moves away from the shaft, the entire belt is to be liquidated. The elimination of this belt raises technical doubts due to taps, fires, etc. 2 79594 Known methods of exploitation of shaft pillars cannot be applied in all conditions, especially in difficult geological and mining conditions, because then the deformations caused by the exploitation of the shaft would be greater The purpose of the invention is to enable the operation of protective pillars for shafts in more difficult geological and mining conditions, minimizing the possibility of crevices, cracks, crushing of the casing and girders, shaft inclination, curvature, etc. Increasing the operational safety of shaft pillars by reducing shaft tube deformation. The task of the invention is to develop such a method of operation of the shaft protection pillars that would cause less shaft tube deformation than the existing methods, and above all, lower vertical deformation This goal was achieved by exploiting around the shaft block, selected as previously with hydraulic propping, a deck strip with a width d calculated depending on the depth of operation and tight backing of this belt with a backfilling material with the required strength parameters and plastic properties. In the strip in question around the shaft ankle, it is also possible to use a trim panel system. The main operational front with the hydraulic backfill is led from the boundaries of the protective pillar towards the shaft and, after passing the "shaft block", it continues to the opposite end of the pillar. The main front can move in the shaft pillar in a different known way. By selecting and tightly backfilling the deck belt around the shaft block, a reduction in the rate of ceiling subsidence in the immediate vicinity of the shaft is achieved, especially when the main front passes through the shaft, and thus a significant reduction in vertical stretching deformations, which are essential for the shaft, is achieved. The method of operation according to the invention can be used for all operating systems In practice, this method requires only the selection of the right backing material and tight support of the belt around the shaft block. According to the invention, it enables operation in protective pillars for shafts where it was limited or even unacceptable with the existing methods, e.g. with a concrete casing of the shaft. The method of implementation of the invention is shown by the title of an example in the drawing, which schematically shows the arrangement of the fronts. The mining operations in the pillar protecting a specific object S are started with the main rectilinear front, position 1, which moves towards the shaft. As soon as the main front is at the appropriate distance from the shaft and takes position 2, we operate the shaft block, and after the ankle has been exploited, we use the belt around the ankle and support it tightly with the filling material. In the meantime, the main front moves further taking positions 3, 4 and 7 until the entire pillar is used up. PL PL

Claims (2)

1. Zastrzezenia patentowe 1. Sposób eksploatacji zlóz pokladowych w filarach ochronnych dla szybów, znamienny tym, ze wokól szybu wybiera sie pas pokladu o szerokosci zaleznej od glebokosci zalegania pokladu i podsadza sie go szczelnie materialem podsadzkowym o wymaganych parametrach wytrzymalosciowych oraz wlasnosciach plastycznych.1. Patent claims 1. Method of exploitation of deck beds in protective pillars for shafts, characterized by the fact that a deck strip with a width depending on the depth of the deck is selected around the shaft and it is tightly supported with a filling material with the required strength parameters and plastic properties. 2. Sposób wedlug zastrz. 1, znamienny tym, ze w pasie wokól szybu stosuje sie system obudowy kasztowej. tksfAoatacf W2® A MKIMI J y\ Prac. Poligraf. UPPRL. zam. 2946/75 naklad 120+18 Cena 10zl PL PL2. The method according to claim The method of claim 1, characterized in that a chest-type lining system is used in the strip around the shaft. tksfAoatacf W2® A MKIMI J y \ Prac. Typographer. UPPRL. residing 2946/75 edition 120 + 18 Price 10 PLN PL PL
PL15926572A 1972-12-04 1972-12-04 PL79594B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15926572A PL79594B2 (en) 1972-12-04 1972-12-04

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15926572A PL79594B2 (en) 1972-12-04 1972-12-04

Publications (1)

Publication Number Publication Date
PL79594B2 true PL79594B2 (en) 1975-06-30

Family

ID=19960815

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15926572A PL79594B2 (en) 1972-12-04 1972-12-04

Country Status (1)

Country Link
PL (1) PL79594B2 (en)

Similar Documents

Publication Publication Date Title
RU2390633C1 (en) Procedure for development of steeply pitching beds of coal
Li et al. Trial of small gateroad pillar in top coal caving longwall mining of large mining height
PL185118B1 (en) Method of performining mining work in tectonically hazarded sedimentary deposits in particular of coal
CN107013215B (en) A kind of subregion domain construction filling mining is to reduce the method for safety pillar under wa ter bodies size
PL79594B2 (en)
Klishin et al. Directional hydraulic fracturing application for reduction of rock heaving intensity in the development opening under conditions of SM Kirov Mine
RU2391507C2 (en) Pilarless development method of coal beds
Ngah et al. Groundwater problems in Surface mining in the united kingdom
Luxner et al. Use of tunnel boring machines at Stillwater Mining's underground PGM mines.
RU2482442C1 (en) Method to charge weakly water-cut downholes
RU2854099C1 (en) Method for forming a dismantling chamber from a longwall face during the development of gently dipping coal seams
Bąk Factors determining the level of the planned concentration of coal production in polish mining
RU2827324C1 (en) Method of driving paired workings on thin flat coal beds with leaving rock in mine
RU2845483C1 (en) Method of preparation for safe mining operations on coal beds, potentially hazardous and hazardous by gas-dynamic phenomena and dynamic phenomena
SU1408069A1 (en) Method of mining twin longwalls by longwall set of equipment
RU2384705C1 (en) Development method of pillars under objects on surface for buried ore deposits
Giacomin et al. The most challenging underground project in southern Italy: Pavoncelli-bis water tunnel
RU2344292C1 (en) Method of development of thick flat-lying coal bed on clots of irregular shape
Młynarczyk et al. The evolution of mechanized excavating systems in LGOM mines conditions
SU1745935A1 (en) Method of protecting and supporting development drift on its pitching portion
RU2291301C2 (en) Level-wise method for preparing mine beds, thin and ones of average thickness, with extraction of faces in ascending or descending order
PL61978B1 (en)
PL213222B1 (en) Method for the underground exploitation of single bed deposits in protecting pillar of a pit shaft
Valentin et al. Investigation of reused preparatory workings deformations of as a result of cleaning operations
SU1452992A1 (en) Method of remining of mineral deposits