PL45246B1 - - Google Patents

Download PDF

Info

Publication number
PL45246B1
PL45246B1 PL45246A PL4524660A PL45246B1 PL 45246 B1 PL45246 B1 PL 45246B1 PL 45246 A PL45246 A PL 45246A PL 4524660 A PL4524660 A PL 4524660A PL 45246 B1 PL45246 B1 PL 45246B1
Authority
PL
Poland
Prior art keywords
walls
load
poles
ceilings
ark
Prior art date
Application number
PL45246A
Other languages
Polish (pl)
Filing date
Publication date
Application filed filed Critical
Publication of PL45246B1 publication Critical patent/PL45246B1/pl

Links

Description

Opublikowac dnia 3* Biwtóemik* 1&6*yj* ^*% ^\02j & ^SPlS *4 CMS MIENTOTY Nr45246 KI;. 3Z-4*r3/01 Adam Salamon ^ 1 /) 1(OZ Warszawa,Polska / ' Wlodzimierz Hladyniuk Warszawa, Polska Kazimierz Cieszynski Warszawa, Polska Sposób * wykonywania * szkleletowo^tarczowyck' budynków z elementów prefabrykowanych montowanych za pomoca sprezania Patent trwa od. dnia 10 czerwca 1960 r.Przedmiotem wynalazku jest sposób wyko- w aksonometrii w rzutach-pionowym* i pozio* nywania budynków z elementów prefabryko^ mymi zewnetrzna^ scrane- ekranowa z uwzg^W- wanych, za pomoca sprezania w trakcie mon- nieniem* jej sprezenia, figL3,— laczenie scian? tazu budynku. Uklad slupów sprezonych w kie- zewnetrznej.;?z wewnetrzna?na, slupie konitnik^ runku pianowym oraz stropów i scian sprezo- cyjnym, fig. 4< — w, rzucie; poziomym ultóeme nych w kierunku, poziomym, w dwóch prosto-^ stropu na scianach zewneteranej i wewnetrznej; padlych kierunkach, stwarza sztywny system fig: 5 — rozwiazanie kcalsirukcyjne na przestrzenny doskonale pracujacy na parcie i uklad; kabli: sprezaia^yctr w slupie naroznym) wiatru oraz odporny na nierówne osiadanie fig. 6 — w rzucie pionowym: sprezanie: slupów fundamentów, System ten. jest szczególnie ko- nosnych, fig. 7,8 — w rzucie^ poziomym i pie¬ rzystny w zastosowaniu* dla okregów pod- nowym sprezony slup s£orikawy oraz? uklad leglych. wstrzasom/ sejsmicznym oraz na szkody stropu: niesprezowefto.i wresacie fi&* &*<— t garniem Na rysunku fig. 1—2 przedstawiaja mat szkieletowowtarcofiwegci bttdyf&u* zkoscKnnych prefabrykatów. Sposób sprezania zewnetrznej sciany ekranowej* odbywa sie za pomoca kabla 9 «biegnacego wV zebrze sciany ekranowej 5, zmocowanej ze? sfupem 11 za pomoca sruby lub szczeki 10 kotwiacej kabel 9.Slup 11 w^sókii na jedna kondygnacje jest za¬ opatrzony w stalowe nakladki 8, po obu stro¬ nach jego przekroju poprzecznego, pracujace na sciskanie podczas sprezania kabli 9. Po sprezeniu elementów sciennych, zebra sciany ekranowej 5 pracuja na sciskanie, a przepona* sciany 1 pracuje jako tarcza usztywniajaca tym samym powstaly zespól konstrukcyjny.Wszystkie wystepujace obciazenia statyczne i dynamiczne ze strojtów sa przenoszone na tarcze scienne a z nich na slupy, które umozli¬ wiaja najbardziej ekonomiczne wykorzystanie konstrukcji. Po sprezeniu elementów zewnetrz- ftycTTsciany ze slupami U zaklada sie od stro¬ ny wewnetrznej izolacje termiczna i paroizola- cje 3 oraz plyty wewnetrzne gipsowe, których iebra ff powinny trafiac na zebra 5 przynaj¬ mniej w jednym kierunku, pionowym lub poziomym, umozliwiajac przez to skrecanie ich srubami 7.Polaczenie sciany zewnetrznej z wewnetrzna na slupie konstrukcyjnym odbywa sie za po¬ moca sprezenia kablem 9 zakotwionym na slupie sruba lub szczeka 10. Przepona sciany zewnetrznej 1 wspólpracuje ze slupem 11 jako tarcza. Izolacja termiczna 3 oraz pustki po¬ wietrzne 4 chronia wnetrze budynku przed temperatura zewnetrzna po zalozeniu wewnetrz¬ nej plyty gipsowej z przepona 2, Calosc jest dowolnie skrecona za pomoca srub 7. Sciana wewnetrzna moze byc wykonana w odmienny równiez sposób, przewidujac ulozenie suchego tynku 12 po obu stronach sciany (fig. 3).Sposób ulozenia stropu wolnqzawieszonego na scianach zewnetrznych i wewnetrznych w rzucie poziomym, bez koniecznosci jego spre¬ zenia, jest uwidoczniony na fig. 4.Rozwiazanie konstrukcyjne naroznika i uklad kabli sprezajacych 9 w slupie naroznym U oraz sposób zamocowania srub kotwiacych ka¬ bel 10 przedstawia fig: 5. Przepony scian zew¬ netrznych 1, izolacje termiczne 3, pustki po¬ wietrzne 4 oraz wewnetrzne plyty gipsowe 2 sa podobnie montowane za pomoca srub 7 jak w pozostalych elementach.Sposób wykonywania sprezania slupów nos¬ nych U, przebieg kabli 9 sprezaj4cyen sciany i strop w przypadku^ jego sprezania jest uwi¬ doczniony na fig. 6. Strop wówczas jest wy^ konany z dwóch elementów zelbetowych jak dla scian, z przepona 1, dwoma pustkami po¬ wietrznymi 4 oraz izolacje termiczna i akus¬ tyczna 3 polaczonych ze soba za pomoca srub 7. Element stropowy moze byc sprezony w dwóch kierunkach za pomoca kabli 9.Slup srodkowy 11 sprezony kablami 9 za¬ kotwiony za pomoca srub 10, wraz z czterema scianami wewnetrznymi oraz sposób niezalez¬ nego ulozenia stropu w rzucie poziomym, bez koriiecznosci jego sprezania, jest uwidoczniony na fig. 7.Rzut pionowyl z przebiegu kabli sprezajacych 9 w trzech osiach pod katem 90° do siebie oraz jeden %e 'sposobów rozwiazania polacze- v nia slupów 11 ze soba oraz ze scianami, rów¬ niez i strop skladajacy sie z elementów zel¬ betowych 1, izolacji 3 i dwóch pustek po¬ wietrznych 4, swobodnie iilozony na scianach i w razie potrzeby sprezony, zobrazowano na fig. 8.Schemat szkieletowo-tarczowy powstaly z cienkosciennych prefabrykatów za pomoca sprezenia trójosiowego przestrzennego w trak¬ cie montazu jest uwidoczniony na fig. 9.Rozwiazanie konstrukcyjne wedlug wynalaz¬ ku eechuje minimalne zuzycie materialów, jednakze wysokowartosciowych. Nalezy przy tym wyjasnic, ze koszt materialów wysokowar¬ tosciowych w przypadku betonu jest okolo 2-krotnie wiekszy od betonów zwyklych, stali czterokrotnie wiekszy od stali miekkiej, a wy¬ korzystane wlasnosci eksploatacyjne materia¬ lów Wzrastaja 3-krotnie w przypadku betonu, a w przypadku stali 10-krotnie. Minimalne zuzycie materialów jest spowodowane poza tym okolicznoscia, ze elementy nosne wedlug wynalazku pracuja na obciazenie bezposrednie tylko jednej kondygnacji. Obciazenie z calego budynku na fundament przenosza jedynie sa¬ me slupy. Montaz budynku odbywa sie kon¬ dygnacjami przez kolejne dostawianie poszcze¬ gólnych slupów i scian, kazdorazowo laczonych w 3-ech kierunkach za pomoca sprezenia. PLPublish on 3 * Biwtóemik * 1 & 6 * yj * ^ *% ^ \ 02j & ^ SPlS * 4 CMS MIENTOTY Nr 45246 KI ;. 3Z-4 * r3 / 01 Adam Salamon ^ 1 /) 1 (OZ Warsaw, Poland / 'Wlodzimierz Hladyniuk Warsaw, Poland Kazimierz Cieszynski Warsaw, Poland Manner of * making * glass-and-glass buildings made of prefabricated elements assembled by means of prestressing The patent is valid from on June 10, 1960 The subject of the invention is a method of performing axonometry in vertical projections and leveling buildings with prefabricated external scaffolding elements, with the use of prestressing during assembly * its springs, figL3, - joining the walls of the building's front, The arrangement of the prestressed columns in the outer;? with the inner, the foam terminal pole, and the ceilings and tension walls, fig. 4 <- in, plan; horizontal ultraviolet in the direction, horizontally, in two straight ceilings on the outer and inner walls; fallen directions, creates a rigid fig system: 5 - a structural solution for spatial, perfectly working on pressure and layout; cables: tension in the corner pole) wia tru and resistant to uneven subsidence fig. 6 - in the vertical projection: prestressing: foundation columns, Ten system. is particularly square, Figs. 7,8 - in plan view and preferred in use for the circles underneath the compressed post of the Orikawa, and layout of the leglych. earthquake / seismic and ceiling damage: non-stressed and wreckage fi & * & * <- t with a pot In Figs. 1–2 show the mat of skeletal fibreboards bttdyf & u * bility of prefabricated elements. The method of tensioning the outer screen wall * is by means of a cable 9 running in the V rib of the screen wall 5, fastened with a? The post 11 by means of a bolt or jaw 10 anchoring the cable 9. The pole 11 in the slope and for one tier is provided with steel covers 8, on both sides of its cross-section, working in compression during tensioning the cables 9. After tensioning the wall elements , the ribs of the screen wall 5 work in compression, and the diaphragm * of the wall 1 works as a stiffening shield, thus the resulting construction unit. All the static and dynamic loads occurring from the cloths are transferred to the wall shields and then to the poles, which allow the most economical use of the structure . After the external elements are compressed, the walls with U-pillars are installed on the internal side of thermal insulation and vapor insulation 3 and internal gypsum boards, the ribs ff of which should hit the ribs 5 in at least one direction, vertical or horizontal, thus enabling their bolts are twisted 7. The connection between the external and the internal wall on the construction pole is made by means of a cable 9 anchored on the pole with a screw or clamp 10. The diaphragm of the external wall 1 cooperates with the pole 11 as a shield. Thermal insulation 3 and air voids 4 protect the interior of the building from the external temperature after installing the internal gypsum board with a diaphragm 2, the whole is freely twisted using screws 7. The internal wall can also be made in a different way, providing for the arrangement of dry plaster 12 on both sides of the wall (Fig. 3). The method of laying a free suspended ceiling on external and internal walls in a horizontal projection, without the need for its prestressing, is shown in Fig. 4. The construction solution of the corner and the layout of the tensile cables 9 in the U and corner post the method of fastening the anchor bolts 10 is shown in FIG. 5: Diaphragms of the outer walls 1, thermal insulation 3, air voids 4 and internal plasterboards 2 are similarly mounted with screws 7 as in the other elements. bearing U, the routing of the cables 9 for the tensioning of the wall and the ceiling in the case of tensioning it is shown in Fig. 6. it is made of two reinforced concrete elements as for walls, with a diaphragm 1, two air voids 4 and thermal and acoustic insulation 3 connected with each other by means of screws 7. The ceiling element can be prestressed in two directions by cables 9 The middle pole 11, chained by cables 9, anchored with screws 10, together with four internal walls, and the method of independent arrangement of the floor in the horizontal projection, without the necessity to tension it, is shown in Fig. 7. The vertical plan of the tensile cables 9 in three axes at an angle of 90 ° to each other and one% e 'method of connecting the columns 11 with each other and with the walls, also the ceiling consisting of reinforced concrete elements 1, insulation 3 and two air voids 4, loosely laid on the walls and, if necessary, compressed, is shown in Fig. 8. The skeleton-and-plate diagram made of thin-walled prefabricated elements by means of three-axis three-dimensional prestressing during the assembly is shown The construction solution according to the invention is characterized by minimal consumption of materials, albeit of high quality. It should be explained that the cost of high-quality materials in the case of concrete is about 2 times higher than that of ordinary concrete, steel is four times higher than that of mild steel, and the exploitation properties of the materials are increased 3 times in the case of concrete, and in the case of steel 10 times. The minimal material consumption is also caused by the fact that the load-bearing elements according to the invention work with the direct load of only one storey. The load from the entire building to the foundation is transferred only by the poles alone. The building is erected on tiers by successive addition of individual columns and walls, each time connected in three directions by means of a spring. PL

Claims (5)

Zastrzezenia patentowe 1. Sposób wykonywania szkieletowo-tarczo- wych budynków z elementów prefabryko¬ wanych montowanych za pomoca sprezania, znamienny tym, ze' slupy nosne, lekkie sciany zewnetrzne i wewnetrzne oraz stro¬ py wiaze sie ze soba na sucho za pomoca kabli sprezajacych przebiegajacych trój- osiowo, tworzac sprezona siatke przestrzeni — 2 —na, z pojedynczych pretów, dajaca w efek¬ cie przestrzennie sprezona konstrukcje szkieletowo-tarczowa.Claims 1. A method of making skeleton and shield buildings from prefabricated elements assembled by means of tension, characterized by the fact that load-bearing poles, light external and internal walls and ceilings are dryly connected with each other by means of tension cables running three-axis, creating a compressed grid of spaces - 2 - on, from single rods, resulting in a spatially compressed skeleton-disc structure. 2. Sposób wedlug zastrz. 1, znamienny tym, ze montaz odbywa sie kondygnacjami, spre¬ zajac poszczególne plyty scienne kolejno ze soba oraz ze slupami, a nastepnie stropy po czym slupy laczy sie kolejno kondygna¬ cjami.2. The method according to claim The method of claim 1, characterized in that the assembly takes place in storeys, tensioning the individual wall panels with each other and with the poles, and then the ceilings, and then the poles are connected successively by storeys. 3. Sposób wedlug zastrz. 1, znamienny tym, ze elementy nosne scian pracuja bezpo¬ srednio tylko na obciazenie jednej kon¬ dygnacji jako tarcze, a obciazenie z calego budynku jest przenoszone na fundament za pomoca slupów.3. The method according to p. A method as claimed in claim 1, characterized in that the load-bearing walls of the walls act directly on the load of one level only as shields, and the load from the entire building is transferred to the foundation by means of columns. 4. Sposób wedlug zastrz. 1, znamienny tym, ze sciany wewnetrzne i zewnetrzne pracuja jako tarcze usztywniajace szkielet sprezony.4. The method according to p. The method of claim 1, characterized in that the inner and outer walls act as stiffening shields for the prestressed skeleton. 5. Sposób wedlug zastrz. 1, znamienny tym, ze w przypadku stosowania konstrukcji bez uzycia slupów,., sprezanie scian i stropów odbywa sie trójosiowo (przestrzennie). Adam Salamon Wlodzimierz Hladyniuk Kazimierz CieszynskiDo opisu patentowego nr 45246 Ark. 1Do opisu patentowego nr 45246 Ark. 2Do opisu patentowego nr 45246 Ark. 3 *&s ZG „Ruch" W-wa, zam. 1007-61 B5 —100 ega. PL5. The method according to p. The method of claim 1, characterized in that in the case of using the structure without the use of poles, the tensioning of walls and ceilings takes place triaxially (spatially). Adam Salamon Wlodzimierz Hladyniuk Kazimierz Cieszynski To the patent description No. 45246 Ark. 1 To Patent No. 45,246 Ark. 2 to Patent No. 45,246 Ark. 3 * & s ZG "Ruch" W-wa, order 1007-61 B5 —100 ega. PL
PL45246A 1960-06-10 PL45246B1 (en)

Publications (1)

Publication Number Publication Date
PL45246B1 true PL45246B1 (en) 1961-10-15

Family

ID=

Similar Documents

Publication Publication Date Title
PL179062B1 (en) Skyscraper PL PL PL PL PL PL
CN108166612A (en) A kind of multilayer light gauge cold-formed steel shape-concrete composite structure building construction system
AU2018102135A4 (en) Floor slab system
WO1991005928A1 (en) Suspended surfaces for the application of plasters
CN203821925U (en) Earthquake-proofing house of light steel structure
PL45246B1 (en)
RU2729543C1 (en) Enclosing module and installation thereof on ready frame of building
CN104047457A (en) Light steel structure anti-seismic house
CN103790424A (en) Light steel keel structure system of anti-seismic house
CN203821669U (en) Floor slab structure system with light steel keels, and floor slab
JP2022116734A (en) roof structure
CN203821926U (en) Light steel keel structure system of earthquake-proof house
RU195319U1 (en) MODULE CORNER ASSEMBLY ASSEMBLY
SU808614A1 (en) Multistorey building
RU2043465C1 (en) Sectional prestressed concrete skeleton of a building or construction
EA039137B1 (en) Method for construction of composite frames without collar beams for buildings with kinematic foundations
RU93033783A (en) METHOD OF BUILDING FRAME BUILDING
RU2135710C1 (en) Covering
RU2609035C2 (en) Carcass unit for modular construction of buildings and system of such blocks
WO2007122377A1 (en) A sun lounge building and a method of assembling a sun lounge building
RU2121553C1 (en) Structure of built-on part of updated panel building
RU2119029C1 (en) Method for construction of garret stories by three-dimensional modules
SU1726707A1 (en) Production building
SU451827A1 (en) The partition of the building and facilities
RU1499U1 (en) BALCONY