PL333502A1 - Method of driving a tunnel beneath an existing building structure - Google Patents
Method of driving a tunnel beneath an existing building structureInfo
- Publication number
- PL333502A1 PL333502A1 PL98333502A PL33350298A PL333502A1 PL 333502 A1 PL333502 A1 PL 333502A1 PL 98333502 A PL98333502 A PL 98333502A PL 33350298 A PL33350298 A PL 33350298A PL 333502 A1 PL333502 A1 PL 333502A1
- Authority
- PL
- Poland
- Prior art keywords
- tunnel
- earth
- construction
- ground
- beneath
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000010276 construction Methods 0.000 abstract 6
- 230000006641 stabilisation Effects 0.000 abstract 3
- 238000011105 stabilization Methods 0.000 abstract 3
- 230000003014 reinforcing effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Disclosed is a method for building a tunnel (5) under an existing construction, wherein the tunnel (5) is pressed through the ground beneath an existing construction and the ground in the area of the cutting construction (9) on the advancement side of the tunnel (5) is removed parallel to direction in which the tunnel (5) advances. The existing construction is secured against earth movements during advancement of the tunnel (5) by building stabilization plates (10). In order to minimize friction between the tunnel (5) and the earth in place and to stabilize the earth beneath the existing construction, the stabilization plates (10) are embedded in the ground in an open type construction and connected to each other before the tunnel (5) is pressed through. The stabilization plates (10) are also fitted with reinforcing beams (11) on the earth side.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19718221 | 1997-04-30 | ||
PCT/DE1998/001171 WO1998049425A1 (en) | 1997-04-30 | 1998-04-28 | Method for building a tunnel under an existing construction |
Publications (1)
Publication Number | Publication Date |
---|---|
PL333502A1 true PL333502A1 (en) | 1999-12-20 |
Family
ID=7828190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PL98333502A PL333502A1 (en) | 1997-04-30 | 1998-04-28 | Method of driving a tunnel beneath an existing building structure |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP0979346B1 (en) |
AT (1) | ATE200137T1 (en) |
DE (2) | DE19725089A1 (en) |
PL (1) | PL333502A1 (en) |
WO (1) | WO1998049425A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2370621B1 (en) * | 2010-05-19 | 2012-10-26 | Obras Y Proyectos, Ecología Y Medio Ambiente, S.L. (Opema) | TUNNEL PUSHED BY SUCCESSIVE SECTIONS. |
ES2393760B1 (en) * | 2010-12-16 | 2013-11-04 | Obras Y Proyectos, Ecología Y Medio Ambiente, S.L. (Opema) | TUNNEL PUSHED BY SUCCESSIVE SECTIONS. |
CN102619523B (en) * | 2012-03-20 | 2014-01-01 | 中铁六局集团有限公司 | Unequal-height tank whole jacking construction method |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1463632A (en) * | 1975-01-10 | 1977-02-02 | Genton J C | Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby |
DE2802751A1 (en) * | 1978-01-23 | 1979-07-26 | Friedrich Bong | Tunnel driving unit for use under road or railway - has forward blades to make support carrier upper chords pass below slide carrier lower chord |
DE2918425C2 (en) * | 1979-05-08 | 1982-08-12 | Bilfinger + Berger Bauaktiengesellschaft, 6800 Mannheim | Method for height-compensating support of a track safety device while a structure is being pushed in under tracks and a device for carrying out the method |
GB2185277B (en) * | 1985-12-04 | 1988-10-19 | Abraham Neviazsky | Improvements in and relating to inserting tubular members into the ground |
DE3603236A1 (en) * | 1986-02-03 | 1987-08-06 | Panhofer Johannes | Method and apparatus for underpassing existing traffic routes, in particular railway lines |
DE3725710A1 (en) * | 1987-05-19 | 1988-12-01 | Kunz Alfred & Co | Structure-forming method under existing one - involves welding additional panels to sheet steel overhead strip as work progresses |
DE3733246A1 (en) * | 1987-10-01 | 1989-04-13 | Kunz Alfred & Co | METHOD FOR PRODUCING A TUNNEL WITH LOW COVERAGE UNDER RAILWAY SYSTEMS OR THE LIKE |
DE3803120A1 (en) * | 1988-02-03 | 1989-08-17 | Bilfinger Berger Bau | Method and apparatus for tunnelling under traffic routes, in particular track systems, according to the jacking method |
DE3817004A1 (en) * | 1988-05-19 | 1989-11-30 | Dyckerhoff & Widmann Ag | Device for use in the jacking of a construction body through an earth dam or the like |
-
1997
- 1997-06-13 DE DE19725089A patent/DE19725089A1/en not_active Ceased
-
1998
- 1998-04-28 AT AT98932015T patent/ATE200137T1/en active
- 1998-04-28 PL PL98333502A patent/PL333502A1/en unknown
- 1998-04-28 EP EP98932015A patent/EP0979346B1/en not_active Expired - Lifetime
- 1998-04-28 DE DE59800577T patent/DE59800577D1/en not_active Expired - Lifetime
- 1998-04-28 WO PCT/DE1998/001171 patent/WO1998049425A1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
ATE200137T1 (en) | 2001-04-15 |
EP0979346A1 (en) | 2000-02-16 |
DE59800577D1 (en) | 2001-05-03 |
EP0979346B1 (en) | 2001-03-28 |
WO1998049425A1 (en) | 1998-11-05 |
DE19725089A1 (en) | 1998-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SI0775781T1 (en) | Waterproofing system for hydraulic structures with rigid sheets in synthetic material | |
AU4200189A (en) | Self-propelled machine for the concreting of ditches | |
EP0316448A4 (en) | Control unit for underground excavators. | |
PL333502A1 (en) | Method of driving a tunnel beneath an existing building structure | |
AU9357998A (en) | Arched support structure | |
IT8321320A0 (en) | PROCEDURE AND EQUIPMENT FOR INSTALLING REINFORCEMENT BOLTS DURING ROCK STRENGTHENING OPERATIONS USING BOLTS. | |
GB2163201B (en) | A process for providing foundations and/or reinforcing the ground by laying compensating foundations | |
AU3828989A (en) | An arrangement for operating hydraulic actuating means in a rock drilling boom and the like boom construction | |
FR2695183B1 (en) | PILOT VALVE, IN PARTICULAR FOR USE IN A HYDRAULIC MINING SYSTEM. | |
GB2199105B (en) | Yieldable anchor plate system for rock bolts | |
AU5017785A (en) | A device for fracturing stone, rock, concrete and the like | |
ES2012629A6 (en) | Improvements to Patent No. 8900407 for "System for constructing underground passageways which are transverse to communication paths above | |
SU1145088A1 (en) | Underwater canal for laying pipelines | |
ES8701290A1 (en) | Roller cutter loader for mine | |
JPS57161230A (en) | Construction of retaining wall | |
AU640193B2 (en) | Improved process for stabilising rock and/or filling hollows, e.g. in tunnel building and mining | |
ES275022U (en) | Anchor for a track system sleeper embedded in ballast | |
MITARASHI et al. | THREE DIMENSIONAL EFFECTS TO SURROUNDING GROUNDS OF LARGE SECTION TUNNEL BY ADOPTING PILOT TUNNELING | |
JPS57123326A (en) | Reaction receiver for pile-driving platform | |
EP0346941A3 (en) | Method for producing construction elements in the soil, such as piles, anchors or the like, and apparatus for applying this method | |
JPS57209395A (en) | Steel sheet pile for excavating tunnel, cutting nose thereof can be detached | |
Nishitake | Study on Acting Forces to the Disk Cutters During Excavation by Using TBM-Interaction Forces Between Rock and Disk Cutters | |
KOJIMA | SOFT ROCK-FUNDAMENTALS AND EXAMPLES FOR INVESTIGATION, DESIGN AND CONSTRUCTION WORKS | |
AU6916298A (en) | Device for stabilising an unstable shoulder in railway and road construction ndmethod for producing the same | |
Stone | Recovery of Moisture/Solute Profiles in Reclaimed Coal-Mine Spoil, Northwest New Mexico |