JPS57161230A - Construction of retaining wall - Google Patents
Construction of retaining wallInfo
- Publication number
- JPS57161230A JPS57161230A JP4701081A JP4701081A JPS57161230A JP S57161230 A JPS57161230 A JP S57161230A JP 4701081 A JP4701081 A JP 4701081A JP 4701081 A JP4701081 A JP 4701081A JP S57161230 A JPS57161230 A JP S57161230A
- Authority
- JP
- Japan
- Prior art keywords
- bury
- panel
- retaining wall
- mountain
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Retaining Walls (AREA)
Abstract
PURPOSE:To eliminate the need to compensate for a difference between a design longitudinal section and actual longitudinal section by using an expensive cobble stone by a method in which bury panels are provided with a proper spacing in relation to a retaining wall, and the areas between the retaining wall, the bury panel, and sloped ground are embedded with mountain soil. CONSTITUTION:A bury panel 5 with a water drain hole 6 is provided with a proper spacing from a retaining wall constructed by stacking up interposing blocks 1, and a send mat to collect water coming into the mountain soil is bonded to the mountain side back of the panel 5. Then, the area between the sloped ground and the bury panel 5 is embedded with mountain soil 8, and also the space between the retaining wall and the bury panel 5 is filled with a cobble stones 4 and compacted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4701081A JPS57161230A (en) | 1981-03-28 | 1981-03-28 | Construction of retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4701081A JPS57161230A (en) | 1981-03-28 | 1981-03-28 | Construction of retaining wall |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS57161230A true JPS57161230A (en) | 1982-10-04 |
JPS614935B2 JPS614935B2 (en) | 1986-02-14 |
Family
ID=12763192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4701081A Granted JPS57161230A (en) | 1981-03-28 | 1981-03-28 | Construction of retaining wall |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS57161230A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5567089A (en) * | 1993-10-15 | 1996-10-22 | Akamine; Masumi | Block for contstructing retaining wall and constructed retaining wall structure |
-
1981
- 1981-03-28 JP JP4701081A patent/JPS57161230A/en active Granted
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5567089A (en) * | 1993-10-15 | 1996-10-22 | Akamine; Masumi | Block for contstructing retaining wall and constructed retaining wall structure |
Also Published As
Publication number | Publication date |
---|---|
JPS614935B2 (en) | 1986-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6443387A (en) | Waste treating facility and constructing method thereof | |
ES8505004A1 (en) | Retaining wall for earth and similar materials. | |
JPS57161230A (en) | Construction of retaining wall | |
ES8204499A1 (en) | Process for construction of an underground structure and the structure thus obtained | |
GB2070668B (en) | Auger drill for the manufacturing of concrete foundation piles | |
JPS5771923A (en) | Construction work of continuous underground wall | |
JPS57140425A (en) | Greens-planting work for water-impermeable slope | |
SE7901451L (en) | KIT AND DEVICE FOR BUILDING UNDER THE MARKET OF VERTICAL WALLS, WITH THE BEGINNING FROM AN UNDERGROUND AREA | |
JPS5677429A (en) | Basement | |
JPS5639239A (en) | Hollow concrete block for afforestation | |
JPS6483799A (en) | Method of constructing underground space | |
JPS57165513A (en) | Construction of waterway | |
JPS57146839A (en) | Construction of retaining wall | |
JPS6128624A (en) | Slope-stabilizing construction | |
JPS5568931A (en) | Construction of block piled retaining wall and block | |
PL333502A1 (en) | Method of driving a tunnel beneath an existing building structure | |
JPS57116835A (en) | Construction of structure with basement | |
JPS57130622A (en) | Construction of continuous underground wall | |
JPS5673726A (en) | Retaining wall work of precast decorated plate with parapet | |
SU1747608A2 (en) | Landslide protection structure | |
SU990953A1 (en) | Absorber of drying system | |
JPS57161231A (en) | Composite steel sheet pile culvert | |
MY100521A (en) | Method of building a cavity structure in an embankment. | |
JPS56119013A (en) | Hollow fill-type dam | |
SU1622487A1 (en) | Method of erecting earth structure |