PL21995B1 - . 2 7 - 4 / -Zif Frame construction for multi-storey buildings. - Google Patents

. 2 7 - 4 / -Zif Frame construction for multi-storey buildings. Download PDF

Info

Publication number
PL21995B1
PL21995B1 PL21995A PL2199531A PL21995B1 PL 21995 B1 PL21995 B1 PL 21995B1 PL 21995 A PL21995 A PL 21995A PL 2199531 A PL2199531 A PL 2199531A PL 21995 B1 PL21995 B1 PL 21995B1
Authority
PL
Poland
Prior art keywords
winding
structure according
frame structure
ark
bars
Prior art date
Application number
PL21995A
Other languages
Polish (pl)
Filing date
Publication date
Application filed filed Critical
Publication of PL21995B1 publication Critical patent/PL21995B1/en

Links

Description

Wynalazek niniejszy dotyczy konstruk¬ cji szkieletowej do budowli wielopietro¬ wych, w której tylko slupy sa zelazobeto- nowe, natomiast wszystkie poziome dzwi¬ gary nosne sa wykonane jako konstrukcja wylacznie zelazna.Poziome dzwigary nosne sa polaczone z podluznem uzbrojeniem slupów badz bez¬ posrednio, badz tez spoczywaja na rozpo¬ rach ich podluznego uzbrojenia.Uzbrojenie slupów zelazobetonowych sklada sie ze sztywno ze soba polaczonych pretów podluznych. Uzbrojenie slupów jest wykonane z walcowanego zelaza i sta¬ nowi jednolity element budowlany.Slupy zelazobetonowe sa zaopatrzone w konstrukcji szkieletowej wedlug wyna¬ lazku w uzwojenia, polaczone najkorzyst¬ niej na jednym tylko koncu z pretami po- dluznemi i umieszczone na tych pretach przesuwnie i scisliwie, dzieki czemu dlu¬ gosc tego uzwojenia moze byc zmieniana.Na rysunku uwidoczniono kilka postaci wykonania przedmiotu wynalazku.Fig. 1 przedstawia schematycznie po¬ dluzny przekrój uzbrojenia dwóch usta¬ wionych na sobie slupów, przyczem uzwo¬ jenie slupa srodkowego jest zsuniete wgó- re, fig. 2 — widok perspektywiczny miejsca polaczenia dwóch slupów przed zestawie¬ niem ze soba poszczególnych czesci tych slupów, fig. 3 — takiz widok po zestawie¬ niu tych czesci, fig. 4 — przekrój podluzny innej postaci wykonania glowicy slupa w miejscu polaczenia dwóch slupów, fig. 5 — przekrój poprzeczny wzdluz linji B—B na fig. 4, fig. 6—9 przedstawiaja przekroje po¬ przeczne róznych konstrukcyj pomocni-czych, stosowanych przy betonowaniu slu¬ pów wedlug wynalazku, w szczególnosci betonowej okladziny szalujacej oraz kon¬ strukcji szalowania, fig. 10 — przekrój po¬ dluzny glowicy slupa w^ miejscu polacze¬ nia dwóch slupów, których prety podluz¬ nego uzbrojenia sa wykonane z katowni¬ ków, fig. 11 i 12 przedstawiaja widoki per¬ spektywiczne tej glowicy przed zestawie¬ niem poszczególnych czesci w jedna calosc oraz po niem, fig. 13 — przedstawia prze¬ krój podluzny, fig. 14 — przekrój po¬ przeczny, fig. 15 i 16 zas — widoki per¬ spektywiczne innej postaci wykonania glo¬ wicy slupa przed zestawieniem jej poszcze¬ gólnych czesci oraz po niem, fig. 17 — przedstawia perspektywiczny widok szkie¬ letu do budowli wielopietrowej, sluzacego jako podpora szkieletu uzbrojenia dzwiga¬ ra poziomego, fig. 18—20 przedstawiaja rózne rodzaje polaczenia poziomych dzwi¬ garów z podluznemi uzbrojeniami slupów, fig. 21—25 przedstawiaja rózne postacie wykonania rozpór wedlug wynalazku, slu¬ zacych do stykowego polaczenia pretów podluznych, a fig. 26 — przedstawia cze¬ sciowy widok konstrukcji szkieletowej we¬ dlug wynalazku.W konstrukcji szkieletowej do budowli wielopietrowych wedlug fig. 1—16 szkielet slupa sklada sie z pretów podluznych /, uzwojenia zewnetrznego 5, które oplata i usztywnia prety podluzne 1, oraz uzwoje¬ nia wewnetrznego 17, które rozpiera i utrwala polozenie pretów podluznych 1, przyczem sztywne prety podluzne 1, po¬ laczone ze soba i posiadajace dowolny przekrój poprzeczny, sa usztywnione zapo- moca uzwojenia 5, wykonanego z zelaza Walcowanego. To uzwojenie 5 posiada pro¬ mien wiekszy od promienia kola, jakie moz- naby opisac naokolo pretów podluznych 1, dzieki czemu moze byc ono z latwoscia nasuwane na te prety podluzne. Wskutek wydluzania sie uzwojenia 5 na dlugosci, odpowiadajacej jednemu pietru, promien tego uzwojenia zmniejsza sie, dzieki czemu przylega ono do podluznych pretów. W po¬ staciach wykonania slupa, przedstawionych na fig. 1 — 3 oraz fig. 10 — 12, zastosowa¬ ne sa jako rozpory prostki rurowe 17, do których przypawa sie prety podluzne /.Przyklad polaczenia szkieletów dwóch slupów, ustawionych na sobie, przedstawia fig- 2.Polaczenie jest utworzone z wewnetrz¬ nego lacznika 18 o ksztalcie rurowym.Szkielety obydwóch slupów sa nasadzo¬ ne na wewnetrzny lacznik 18. Uzwojenie wewnetrzne (rozpory 17) siega do konców obydwu slupów i jest nasuniete na we¬ wnetrzny lacznik 18. Uzwojenie zewnetrz¬ ne 5 nie siega konców slupów, lecz jest przerwane klamra 19. Lacznik 18 poszcze¬ gólnych szkieletów posiada ksztalt ruro¬ wy. Klamra rurowa 19 (fig. 2) jest zaopa¬ trzona w wystajace wsporniki 22, do któ¬ rych przymocowane sa podciagi 21 (fig, 2).Klamra 19 sluzy jako uzwojenie zewnetrz¬ ne miejsca polaczenia dwóch slupów, w którem uzwojenie zewnetrzne 5 jest prze¬ rwane, wskutek czego rdzen betonowy jest uzwojony takze i w tern miejscu, dzieki czemu zachowana zostaje ciaglosc uzwoje¬ nia slupów.Dzieki rurowemu ksztaltowi lacznika 18 i klamry 19 wewnetrzny przekrój poprzecz¬ ny obydwu szkieletów slupów jest wolny, przyczem osiaga sie jednoczesnie jednoli¬ te dzialanie nosne rdzenia betonowego slu¬ pów, stosowanych w konstrukcji wielopie¬ trowej. Rozpory moga byc w tym celu wy¬ konane tak, aby dwa slupy, ustawione je¬ den nad drugim mozna bylo wstawiac je¬ den w drugi.Podobna postac wykonania klamer 19 ze wspornikami 22 zawiera konstrukcja glowicy slupa wedlug fig, 4 i 5. W glowicy tej klamra jest zaopatrzona w nasadki 23, ulatwiajace przenoszenie obciazenia stropu na prety podluzne /. Do uzbrojenia po¬ dluznego 1, wzmocnionego w miejscach — 2 —styku katownikami 28 i plaskownikami 29, przytwierdzone sa podciagi 30 oraz lacz¬ niki 31, sluzace do laczenia podciagów (fig. 10—12).W glowicy slupa, przedstawionej na fig. 13 — 16f rozpory 32 sa wykonane z plaskowników. Podluzne prety 1 sa tutaj polaczone ze soba zapomoca lacznika 33, posiadajacego postac pudelka o prostokat¬ nym przekroju poprzecznym. Dolny koniec uzwojenia 5 górnej czesci slupa jest pola¬ czony z podciagami 36 zapomoca lacznika 34, natomiast do laczenia górnego konca uzwojenia dolnego slupa z podciagami 36 sluzy lacznik 35. Laczniki 37, sluzace do la¬ czenia podciagów tworza jednoczesnie srodkowa czesc klamry.Slupy betonowe konstrukcji szkieleto¬ wej wedlug wynalazku powinny wytrzymy¬ wac bardzo duze obciazenia, wobec czego konstrukcja slupów winna byc dostosowa¬ na do tych obciazen, mogacych wywolac odpryskiwanie i zniszczenie okladzinowego szalowania betonowego. Podczas dzialania obciazenia maksymalnego róznica miedzy naprezeniem betonu w uzwojonym rdzeniu i naprezeniem betonu w szalowaniu jest tak duza, ze w szalowaniu tworza sie rysy i powstaje niebezpieczenstwo odpryskiwa- nia betonu.Wytwarzanie szalowania uzwojonych slupów zelazobetonowych moze byc usku¬ teczniane w jednym zabiegu roboczym wraz z zabetonowywaniem konstrukcji szkieletowej. Szalowanie moze byc równiez umieszczane i pózniej. Wedlug fig. 7 i 8 srednica szalowania w swietle jest wieksza o grubosc szalowania od uzwojonego szkie¬ letu slupa. Grubosc okladziny jest ograni¬ czona jedynie policyjnemi przepisami o- gniowemi. Dla zabezpieczenia tego szalo¬ wania betonowego umieszczono w niem kratownice druciana 38 (fig. 7) lub tez dru¬ gie, nienosne uzwojenie 39 (fig. 8), wy¬ konane z cienkiego drutu lub podobnego materjalu. Zamiast tego uzwojenia mozna zastosowac takze znane szalowanie 7 z blachy, podziurkowanej na podobienstwo tarki. W tym przypadku rura blaszana 7 moze sluzyc równoczesnie jako szalowanie i po ukonczonem betonowaniu zostaje wy¬ prawiona z zewnatrz, czyli pozostaje w budowli (fig. 9).Jezeli wyrób szalowania i slupa ma byc uskuteczniany w dwóch oddzielnych zabie¬ gach roboczych, wówczas na nosnem uzwo¬ jeniu 5 szkieletu umocowuje sie bezpo¬ srednio szalowanie 42 wedlug fig. 6. W pierwszym zabiegu roboczym betonowany jest rdzen slupa, czyli czesc, znajdujaca sie wewnatrz uzwojenia 5, nastepnie szalowa¬ nie 42 zostaje usuniete, poczem w drugim zabiegu roboczym uskutecznia sie betono¬ wanie powloki przy zastosowaniu szalo¬ wania o wiekszej srednicy.Konstrukcja szkieletowa slupa wedlug fig. 17 sluzy jako podparcie zlobu 13 z bla¬ chy stalowej, sluzacego jako szalowanie belki zelazobetonowej z wkladkami uzbro- jeniowemi 8. Ten zlób szalujacy 13 pozo¬ staje w wykonczonej konstrukcji i dziala w niej jako uzbrojenie. Zlób 13 jest umie¬ szczony miedzy podluznemi pretami i w odleglosci, utrzymywanej zapomoca rozpór 32. Podluzne prety 1 w miejscu ich zetknie¬ cia sa polaczone ze soba zapomoca przypo- jonych katowników 53. Prostki rurowe 17 sluza jako rozpory pretów podluznych li sa równiez spojone z temi pretami. Prety podluzne / sa otoczone uzwojeniem 5, w miejscu zas swego polaczenia, dokonywa¬ nego na skrzyzowaniu tych pretów ze zlo¬ bem 13, prety te sa ponadto otoczone uzwo¬ jeniem 45. To uzwojenie 45 przebiega przez otwory, wykonane w zlobie 13.W postaci wykonania wynalazku wedlug fig. 18 — 20 zastosowano jako prety po¬ dluzne dwie belki o ksztalcie litery C, u- trzymywane w pozadanej od siebie odle¬ glosci zapomoca plaskowników 32 i blach lacznikowych 55. Dzwigar podciagowy 49 o przekroju dwuteowym spoczywa na roz- - 3 -porach 32. W tej postaci wykonania wyna¬ lazku zastosowano takze dodatkowe uzwo¬ jenie 45.Fig. 21 — 25 przedstawiaja rózne po¬ stacie wykonania polaczen podluznych pre¬ tów szkieletów slupów, ustawionych jeden nad drugim lub umieszczonych obok siebie, W konstrukcji, przedstawionej na fig. 21, polaczenie pretów podluznych 1, utwo¬ rzonych z katowników, jest uskutecznione zapomoca katowników 28, spojonych z pre¬ tami podluznemi 1. Prety i sa utrzymywa¬ ne w pozadanej od siebie odleglosci zapo¬ moca plaskowników 32 laczacych katow¬ niki 28. Taki element konstrukcyjny dzia¬ la zatem jako polaczenie rozporowe.Wedlug fig. 22 do wewnetrznej strony pretów podluznych 1, utworzonych z ka¬ towników, przypojone sa ceowniki 58.Ceowniki te przykrywaja z jednej strony miejsca polaczenia podluznych pretów, z drugiej zas strony utrzymuja ich w poza¬ danej od siebie odleglosci. Z pretami po¬ dluznemi 1 spojone sa takze katowniki roz¬ porowe 59, sluzace jednoczesnie jako pod¬ pory dzwigarów podciagowych.W postaci wykonania wynalazku wedlug fig. 23 podluzne prety 1 posiadaja prze¬ krój okragly. Jako laczniki tych pretów zastosowano katowniki 53, utrzymywane w odpowiedniej odleglosci zapomoca pla¬ skowników 32. Jezeli szkielet slupa zwe¬ za sie ku górze, to jest rzecza konieczna zwezenie to przeprowadzic w miejscach polaczenia poszczególnych czesci szkiele¬ tu. Wedlug wynalazku na wewnetrznej stronie katowników 53 (fig. 23), umieszczo¬ ne sa blachy 60, sluzace do zmiany odle¬ glosci miedzy podluznemi pretami 1, wsku¬ tek czego szkielet nastepnej wyzej lezacej czesci slupa posiada mniejsza srednice, niz szkielet pod nia lezacej czesci.W konstrukcji wedlug fig. 24 polacze¬ nie okraglych pretów podluznych 1 jest u- skutecznione zapomoca ceowników 58. Na ceownikach tych ulozone sa rozpory 59, sluzace jednoczesnie jako wsporniki dz*ri- garów podciagowych. Zwezenie slupa jest uzyskiwane dzieki zastosowaniu wyzej wspomnianych blach 60, spojonych z ceow- nikami 58.Podluzne prety 1 o okraglym przekro¬ ju w konstrukcji wedlug fig* 25 sa przy¬ twierdzone w miejscach ich polaczen do wycinków rurowych 61. W celu utrzymy¬ wania podluznych pretów 1 w pozadanej od siebie odleglosci w konstrukcji tej za¬ stosowano plaskowniki 62, spojone z wy¬ cinkami rurowemi 61.Fig. 26 przedstawia perspektywiczny widok czesciowy szkieletu zewnetrznej sciany wysokiego budynku. Szkielet kazde¬ go z poszczególnych slupów sklada sie z czterech ceowników 3. Ceowniki te sa u- trzymywane w pozadanej od siebie odle¬ glosci zapomoca rozpór 32 i sa otoczone prostokatnem uzwojeniem 4. Szkielety slupów, zastosowane we wnetrzu wyso¬ kiego budynku, posiadaja prety podluzne o przekroju okraglym oraz sa zaopatrzone w rurowate rozpory oraz w uzwojenia ko¬ lowe. PLThe present invention relates to a skeleton structure for multi-storey buildings, in which only the columns are of iron concrete and all horizontal girders are made of exclusively iron. The horizontal girders are connected to the longitudinal reinforcement of the columns or directly, or they rest on the spacing of their elongated armament. The armament of the iron-concrete poles consists of rigidly connected longitudinal bars. The reinforcement of the poles is made of rolled iron and constitutes a single building element. The steel-concrete poles are provided with a skeleton structure, according to the invention, with windings, preferably connected at one end only with the longitudinal rods and placed on these rods slidably and tightly. , so that the length of this winding can be varied. The drawing shows several embodiments of the subject of the invention. 1 shows schematically a longitudinal section of the reinforcement of two columns on one another, while the winding of the central column is pushed downwards, Fig. 2 - a perspective view of the connection point of two poles before putting together individual parts of these poles, Fig. 3 - also a view after putting these parts together, fig. 4 - longitudinal section of another embodiment of the head of a pillar at the junction of two poles, fig. 5 - a cross-section along the line B-B in fig. 4, fig. 6-9 show the cross sections of various auxiliary structures used in concreting columns according to the invention, in particular the concrete formwork lining and the formwork structure, Fig. 10 - longitudinal section of the column head at the junction of two poles, the bars of the longitudinal armament are made of torches, Figs. 11 and 12 show perspective views of this head before putting the individual parts together and after them, Fig. 13 - shows a longitudinal section, Fig. 14 - cross section, Figs. 15 and 16 - perspective views of another embodiment of the head of a pole before the collation of its individual parts and after it, Fig. 17 - a perspective view. view of the skeleton for a multi-storey building, serving as a support for the skeleton of a horizontal girder armament, Figs. 18-20 show various types of connections of horizontal members with longitudinal armaments of poles, Figs. 21-25 show various forms of execution of struts according to the invention, Fig. 26 shows a partial view of the skeleton structure according to the invention. In the skeleton structure for multi-story buildings, according to Figs. 1-16, the column skeleton consists of longitudinal rods /, external winding 5, which braids and stiffens the longitudinal bars 1, and the internal winding 17, which expands and fixes the position of the longitudinal bars 1, with rigid longitudinal bars 1, connected to each other and having any cross-section, they are stiffened by a winding 5 made of rolled iron. This winding 5 has a radius larger than the radius of a circle which can be described around the longitudinal bars 1, so that it can easily be slipped over the longitudinal bars. As a result of the length of the winding 5 corresponding to one floor, the radius of this winding is reduced, so that it adjoins the longitudinal bars. In the embodiment of the pole, shown in Figs. 1 - 3 and Figs. 10 - 12, tubular sections 17 are used as struts, to which the longitudinal bars are attached. The example of the connection of the skeletons of two poles placed on one another is shown Fig. 2. The connection is formed by a tubular inner connector 18. The skeletons of both poles are put on the inner connector 18. The inner winding (struts 17) extends to the ends of both poles and is slipped over the inner connector 18. The external winding 5 does not reach the ends of the poles, but the clamp 19 is broken. The connector 18 of the individual frames has a tubular shape. The tubular clamp 19 (Fig. 2) is provided with protruding brackets 22 to which the stringers 21 are attached (Fig. 2). The clamp 19 serves as an external winding for the connection of two poles, in which the outer winding 5 is broken, as a result of which the concrete core is also coiled in this place, thanks to which the continuity of the winding of the poles is maintained. Due to the tubular shape of the connector 18 and the clamp 19, the internal cross-section of both frames of the poles is free, while simultaneously achieving the same this is the bearing effect of the concrete core of columns used in multi-storey construction. For this purpose, the struts can be designed so that two poles, one above the other, can be inserted into the other. A similar embodiment of the staples 19 with supports 22 is provided in the construction of the head of the column according to Figs. the head of this head, the clamp is equipped with caps 23, which facilitate the transfer of the ceiling load onto the longitudinal bars /. To the longitudinal reinforcement 1, reinforced in the 2-point contact with angle bars 28 and flat bars 29, there are bracings 30 and couplings 31 for connecting the stringers (Figs. 10-12). In the head of the pole shown in Fig. 13 - 16f, struts 32 are made of flat bars. The elongated bars 1 are here connected by means of a connector 33 which is in the form of a box with a rectangular cross-section. The lower end of the winding 5 of the upper part of the pole is connected to the beams 36 by means of a connector 34, while the connector 35 is used to connect the upper end of the winding of the lower column to the beams 36. Connectors 37, used to connect the beams, form the middle part of the clamp. According to the invention, the frame structure should withstand very high loads, so that the structure of the columns should be adapted to these loads, which may cause chipping and destruction of the cladding concrete formwork. During the operation of the maximum load, the difference between the tension of the concrete in the wound core and the tension in the concrete in the formwork is so great that the formwork creates cracks and there is a risk of the concrete chipping. The production of formwork of iron-reinforced concrete columns can be reduced in one work step together. concreting the frame structure. Formwork can also be placed and after. According to Figs. 7 and 8, the light diameter of the formwork is greater than the thickness of the formwork than the wound column frame. The thickness of the cladding is only limited by law enforcement regulations. To protect this concrete formwork, wire lattices 38 (FIG. 7) or a second, unbearable winding 39 (FIG. 8), made of thin wire or the like, are provided in it. Instead of these windings, it is also possible to use the known sheet formwork 7, perforated like a grater. In this case, the sheet metal pipe 7 can simultaneously serve as formwork and, after concreting is completed, it is lifted from the outside, i.e. remains in the structure (Fig. 9). If the product of the formwork and the column is to be made in two separate work steps, then on with the frame winding 5, the formwork 42 is fixed directly according to Fig. 6. In the first work step, the core of the column is concreted, i.e. the part inside the winding 5, then the formwork 42 is removed, and then in the second work step it becomes effective. the concrete coating of the coating with a larger diameter planking. The column frame structure according to Fig. 17 serves as a support for the shell 13 made of steel sheet, which serves as the formwork of a reinforced concrete beam with reinforcement inserts 8. This formwork 13 pos. stands in a finished structure and acts as a weapon in it. The joint 13 is placed between the longitudinal rods and at a distance maintained by the struts 32. The elongated rods 1 are connected to each other by the attached angles 53 at the point of their contact. The tubular struts 17 serve as struts of the longitudinal rods and are also bonded to with these pretzels. The longitudinal rods are surrounded by a winding 5, at the point of their connection, made at the intersection of these rods with the groove 13, these rods are also surrounded by a winding 45. This winding 45 runs through holes made in the groove 13. According to Figs. 18-20, two C-shaped beams are used as longitudinal bars, held at the desired distance by means of flat bars 32 and connecting plates 55. The girder 49 with an I-section rests on a girder. - 3-pores 32. In this embodiment of the invention, an additional winding 45 is also used. 21-25 show different forms of connecting the longitudinal rods of the mullions arranged one above the other or placed next to each other. In the structure shown in Fig. 21, the connection of the longitudinal rods 1, made of angle bars, is achieved by means of angles 28, bonded to the longitudinal rods 1. The poles i are held at the desired distance from each other by the flat bars 32 joining the angles 28. Such a construction element thus functions as an expansion joint. According to Fig. 22 to the inside The longitudinal bars 1, formed of angles, are attached to channels 58. These bars cover on the one hand the connection points of the longitudinal bars, and on the other hand keep them at the desired distance from each other. The longitudinal bars 59 are also bonded to the long rods 1, which also serve as support for the girders. In the embodiment of the invention according to FIG. 23, the longitudinal rods 1 have a circular section. The fasteners of these rods are angle bars 53, held at a suitable distance by means of flaps 32. If the skeleton of a pole narrows upwards, it is necessary to taper it in places where the individual parts of the skeleton connect. According to the invention, on the inside of the angle bars 53 (Fig. 23), plates 60 are placed to change the distance between the longitudinal rods 1, as a result of which the skeleton of the next higher part of the column has a smaller diameter than the skeleton of the underlying link. In the construction according to Fig. 24, the connection of the round longitudinal bars 1 is improved by means of U-profiles 58. These U-bars are provided with struts 59, which simultaneously serve as supports for the pull-up rails. The taper of the pole is obtained by the use of the above-mentioned sheets 60 bonded to U-profiles 58. The longitudinal bars 1 with a circular cross-section in the structure according to Fig. 25 are attached at their connection points to the pipe sections 61. In order to maintain of elongated bars 1 at the desired distance from each other, this construction uses flat bars 62, bonded to the tubular sections 61. 26 shows a perspective partial view of the exterior wall of a tall building. The skeleton of each of the individual columns consists of four channels 3. These channels are held at the desired distance by means of struts 32 and are surrounded by a rectangular winding 4. Pole skeletons used in the interior of a tall building have bars longitudinal with a circular cross-section and provided with tubular struts and circular windings. PL

Claims (11)

Zastrzezenia patentowe. 1. Konstrukcja szkieletowa do budowli wielopietrowych, zawierajaca slupy zela- zobetonowe z uzwojeniem oraz poziome dzwigary nosne z ksztaltowników walco¬ wanych, znamienne tern, ze uzwojenie (5), polaczone najkorzystniej na jednym tylko koncu z podluznemi pretami (1), jest u- mieszczone na tych pretach przesuwnie i scisliwie.Patent claims. 1. A skeleton structure for multi-storey buildings, consisting of steel-reinforced concrete columns with a winding and horizontal girders made of rolled sections, characterized by the fact that the winding (5), preferably connected at one end only with longitudinal rods (1), is u- placed on these rods slidably and tightly. 2. Konstrukcja szkieletowa wedlug zastrz. 1, znamienna tern, ze uzwojenie (5) z walcowanego zelaza posiada taki pro¬ mien, iz w stanie rozpostartym przylega do podluznych pretów.2. Frame structure according to claims The method of claim 1, wherein the rolled iron winding (5) has a radius such that it rests against the elongated bars when stretched out. 3. Konstrukcja szkieletowa wedlug zastrz. 1, znamienna tern, ze jako rozpory do utrzymywania podluznych pretów (1) slupów zelazobetonowych w pozadanej od — 4 —siebie odleglosci zastosowane sa prostki ru¬ rowe (17), do których prety podluzne (1) sa przymocowane, np. przez spawanie, wskutek czego wewnetrzny przekrój slupa zelazobetonowego pozostaje wolny dla be¬ tonowania.3. Frame structure according to claims 1, characterized by the fact that as struts for holding the longitudinal bars (1) of the ferroconcrete columns at the desired distance, there are pipe straighteners (17) to which the longitudinal bars (1) are attached, e.g. by welding, whereby the internal cross section of the iron concrete column remains free for concreting. 4. Konstrukcja szkieletowa wedlug zastrz. 1 — 3f znamienna tern, ze przerwa w uzwojeniu w miejscach polaczenia szkie¬ letu miedzy dwoma pietrami jest otoczo¬ na uzwojeniem lacznikowem (45).4. Frame structure according to claims 1 - 3f, characterized by the fact that the break in the winding at the points of connection of the frame between the two floors is surrounded by the connecting winding (45). 5. Konstrukcja szkieletowa wedlug zastrz. 4, znamienna tern, ze uzwojenie lacznikowe (45) stanowia elementy, niosace obciazenie stropu.5. Frame structure according to claims 4. A method as claimed in claim 4, characterized in that the junction winding (45) is a load bearing element for the ceiling. 6. Konstrukcja szkieletowa wedlug zastrz. 1 — 3, znamienna tern, ze prostki rurowe (17) dwóch ustawionych jeden nad drugim szkieletów slupów zelazobetono- wych sa wstawione jedna w druga na ksztalt pudelka. 7. Konstrukcja szkieletowa wedlug zastrz. 1, znamienna tern, ze polaczenie poziomych dzwigarów zelaznych (21) ze szkieletem slupów zelazobetonowych sta¬ nowia rurowe laczniki (19), otaczajace po¬ dluzne prety slupów, przyczem do laczni¬ ków tych przymocowane sa srubami, nitami lub w inny sposób poziome dzwigary (21) zapomoca wsporników (22), wystajacych z prostki rurowej. 8. Konstrukcja szkieletowa wedlug zastrz. 1, znamienna tern, ze oprócz nosne¬ go uzwojenia (5) podluznych pretów (1) zawiera drugie nienosne uzwojenie (39), które jest umieszczone w okladzinie beto¬ nowej (40) i zapobiega powstawaniu pek¬ niec w tej okladzinie przy zastosowaniu dopuszczalnego obciazenia. 9. Konstrukcja szkieletowa wedlug zastrz. 8, znamienna tern, ze drugie uzwo¬ jenie (39) stanowi rura, wykonana z bla¬ chy, dziurkowanej na podobienstwo tarki, przyczem uzwojenie to sluzy jednoczesnie jako szalowanie i moze pozostac w slupie zelazobetonowym. 10. * Sposób wyrobu slupów zelazobe¬ tonowych w konstrukcji szkieletowej we¬ dlug zastrz. 1 wzglednie 1 — 9, znamien¬ ny tern, ze szalowanie (42), sluzace do be¬ tonowania slupów, osadza sie bezposred¬ nio na uzwojeniu nosnem (5) i usuwa po zwiazaniu sie betonu, poczem w dalszym zabiegu roboczym naklada sie zewnetrzne betonowe szalowanie okladzinowe (40). 11. Konstrukcja szkieletowa wedlug zastrz. 1, znamienna tern, ze jako laczniki podluznych pretów (1) zastosowane sa ka¬ towniki (53), które sa polaczone z pretami podluznemi przez spawanie i sa utrzymy¬ wane w pozadanej od siebie odleglosci za¬ pomoca plaskowników (32). 12. Konstrukcja szkieletowa wedlug zastrz. 1 wzglednie zastrz. 11, znamienna tern, ze miejsca polaczenia dwóch sasied¬ nich pretów podluznych (1) sa pokryte jedna scianka ceownika (58). 13. Konstrukcja szkieletowa wedlug zastrz. 1 wzglednie zastrz. 11 i 12, zna¬ mienna tem, ze jako laczniki pretów po¬ dluznych zastosowane sa wycinki rurowe (61). 14. Konstrukcja szkieletowa wedlug zastrz, 1 wzglednie zastrz. 11 i 12, zna¬ mienna tem, ze w celu zmiany odleglosci miedzy podluznemi pretami (1) w miej¬ scach ich polaczen zastosowane sa blachy (60), umieszczone miedzy lacznikami (28) wzglednie (58) i podluznemi pretami (1). 15. Konstrukcja szkieletowa wedlug zastrz. 1 wzglednie zastrz. 11 — 14, zna¬ mienna tem, ze plaskowniki (32) wzglednie katowniki (59), utrzymujace w pozadanej odleglosci miejsca polaczen pretów po¬ dluznych, sa uzyte jako wsporniki dzwi¬ garów podciagowych. 16. Konstrukcja szkieletowa wedlug zastrz. 1, znamienna tem, ze dzwigary pod- ciagowe (13, 49, 56) sa polaczone bezpo¬ srednio z pretami podluznemi (1). Bruno Bauer. Zastepca: M. Skrzypkowski, rzecznik patentowy.Do opisu patentowego Nr 21995. Ark. 1.Jtó- Do opisu patentowego Nr 21995. Ark. 2.Do opisu patentowego Nr 21995. Ark. 3- 7o».frDo opisu patentowego Nr 21995. Ark. 4. la.10.Do opisu patentowego Nr 21995, Ark. 5. 'igJ1_ ia.UDo opisu patentowego Nr 21995, Ark. 6, rJsJL 1q 1h 436Do opisu patentowego Nr 21995. Ark.6. Frame structure according to claims 1 - 3, characterized by the fact that the tubular straighteners (17) of the two frames of iron-concrete columns placed one above the other are inserted one into the other in the shape of a box. 7. Frame structure according to claims According to claim 1, characterized by the fact that the connection of the horizontal iron girders (21) with the frame of the ferroconcrete columns is constituted by tubular connectors (19), surrounding the long poles of the poles, and the horizontal girders are attached to these fasteners with screws, rivets or otherwise (21) by means of brackets (22) protruding from the tube straight. 8. Frame structure according to claims The material of claim 1, characterized by the fact that in addition to the bearing winding (5) of the longitudinal rods (1) it includes a second non-bearing winding (39) which is embedded in the concrete lining (40) and prevents the formation of cracks in the lining by using an acceptable load. 9. Frame structure according to claims 8, characterized by the fact that the second winding (39) is a tube made of sheet metal, perforated like a grater, while this winding simultaneously serves as shuttering and may remain in the ferroconcrete column. 10. * The method of manufacturing iron-concrete poles in a skeleton structure according to claim 1 or 1 or 9, the characteristic area is that the formwork (42), used for concreting the poles, is deposited directly on the supporting winding (5) and is removed after the concrete has set, and then, in a further working procedure, the external concrete cladding formwork (40). 11. Frame structure according to claims A method according to claim 1, characterized in that the elongated rods (1) used are angle bars (53) which are joined to the elongated rods by welding and held at a desired distance from each other by flat bars (32). 12. Frame structure according to claims 1 or claim 11, characterized by the fact that the points of connection of two adjacent longitudinal rods (1) are covered with one wall of the channel (58). 13. Frame structure according to claims 1 or claim 11 and 12, that is, tubular sections (61) are used as connectors of the long bars. Frame construction according to claim 1 or claim 1 11 and 12, that is, in order to change the distance between the longitudinal rods (1), in the places of their connections, plates (60) are used, placed between the connectors (28) or relatively (58) and the longitudinal rods (1). 15. Frame structure according to claims 1 or claim 11-14, with the exception that the flat bars (32) or the angles (59), keeping the connection points of the long rods at the desired distance, are used as supports for the girder girders. 16. Frame structure according to claims A method according to claim 1, characterized in that the girders (13, 49, 56) are connected directly to the longitudinal girders (1). Bruno Bauer. Deputy: M. Skrzypkowski, patent attorney. To the patent description No. 21995. Ark. 1.Jtó- To patent specification No. 21995. Ark. 2. To the patent description No. 21995. Ark. 3-7o ».fr To patent description No. 21995. Ark. 4. la 10. To the patent description No. 21995, Ark. 5. 'igJ1_ ia.UD to patent specification No. 21995, Ark. 6, rJsJL 1q 1h 436 To patent specification No. 21995. Ark. 7. J.9JL lct.16.Do opisu patentowego Nt 21995. Ark.7. J.9JL Ict.16. To Nt 21995 patent. Ark. 8. la. 17.Do opisu patentowego Nr 21995. Ark.8. la. 17. To patent specification No. 21995. Ark. 9. la.18 r=*-5lDo opisu patentowego Nr 21995. Ark.9. la.18 r = * - 5l to the patent description No. 21995. Ark. 10. tq.23. '\Qi2k.Do opisu patentowego Nr 21995. Ark.10.tq.23. '\ Qi2k. To patent description No. 21995. Ark. 11. Druk L. Boguslawskiego i Ski, Warszawa PL11. Print by L. Boguslawski and Ski, Warsaw PL
PL21995A 1931-04-16 . 2 7 - 4 / -Zif Frame construction for multi-storey buildings. PL21995B1 (en)

Publications (1)

Publication Number Publication Date
PL21995B1 true PL21995B1 (en) 1935-09-30

Family

ID=

Similar Documents

Publication Publication Date Title
US2284898A (en) Structural system
US1380324A (en) Concrete construction
US6061992A (en) Composite steel/concrete column
US3890750A (en) Construction system
CA2407359C (en) Open web dissymmetric beam construction
EP1007799B1 (en) Building panel for use in the construction of buildings
RS51618B (en) COMPOSITE SUPPORTING WALL PANELS AND FLOORS AND CONSTRUCTION OF SELF-SUPPORTED BUILDINGS OF A LARGE WIDTH
KR100698608B1 (en) Double prestressed roof-ceiling structure with grid-like flat bottom for large spans
US1618696A (en) Building method and product
RU2416007C2 (en) Stiffening structure for bearing ceiling slabs in buildings
CN104895231A (en) Assembled composite floor slab and manufacturing method thereof
Scalzi The staggered truss system-structural considerations
JP2980793B2 (en) Column / beam joining method
PL21995B1 (en) . 2 7 - 4 / -Zif Frame construction for multi-storey buildings.
DE2700022A1 (en) Large prefabricated wall element - has vertical concrete pillars extending through holes to link top and bottom concreted chords
US1975156A (en) Building
US3851024A (en) Reinforced concrete construction method
DE2546769A1 (en) Transportable ribbed concrete ceiling slab - with prefabricated reinforced component comprising lattice beams and fillers
US1948691A (en) Steel skeleton for reenforced concrete structures
EP1431469A2 (en) Method of forming a pillar and its junction with a girder, and pillar thus obtained
DE2542529A1 (en) Permanent formwork for reinforced concrete ceiling - is retained when concrete sets, and profiled for high load bearing capacity
JP3281972B2 (en) Reinforcing unit and method of constructing reinforced concrete building using the same
JP2817591B2 (en) Construction method of steel reinforced concrete building
US1099953A (en) Fireproof-building construction.
GB2056538A (en) Shuttering system