PL112403B2 - Method of erecting retaining walls - Google Patents

Method of erecting retaining walls Download PDF

Info

Publication number
PL112403B2
PL112403B2 PL20735378A PL20735378A PL112403B2 PL 112403 B2 PL112403 B2 PL 112403B2 PL 20735378 A PL20735378 A PL 20735378A PL 20735378 A PL20735378 A PL 20735378A PL 112403 B2 PL112403 B2 PL 112403B2
Authority
PL
Poland
Prior art keywords
reinforcement
bars
protruding
prefabricated
elements
Prior art date
Application number
PL20735378A
Other languages
Polish (pl)
Other versions
PL207353A1 (en
Inventor
Franciszek Szatkowski
Wiktor Chowanski
Original Assignee
Wojewodzkie Przed Robot Drogow
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wojewodzkie Przed Robot Drogow filed Critical Wojewodzkie Przed Robot Drogow
Priority to PL20735378A priority Critical patent/PL112403B2/en
Publication of PL207353A1 publication Critical patent/PL207353A1/en
Publication of PL112403B2 publication Critical patent/PL112403B2/en

Links

Landscapes

  • Retaining Walls (AREA)

Description

Przedmiotem wynalazku jest sposób wykonywania muru oporowego, który moze byc stosowanyszczególnie w budownictwie drogowym.Znane sa mury oporowe wykonywane „na mokro44 jako konstrukcje zelbetowe. Sposoby wykonywania tych murów sa bardzo pracochlonne i kosztowne z uwagi na koniecznosc stosowania duzej ilosci deskowan i ruszto¬ wan, które z reguly nie moga byc ponownie wykorzy¬ stane. Znany jest takze sposób wykonywania muru oporowego polegajacy na wykonaniu muru czesciowo z prefabrykatów, a czesciowo na mokro.W tym przypadku sciane czolowa muru oporowego wykonuje sie z elementów prefabrykowanych, a pólke odciazajaca muru oporowego wykonuje sie metodawyle¬ wana wykorzystujac zbrojenie wystajace z elementów prefabrykowanych. Wada tych murów, szczególnie o wysokosciach 6 do 8 m, sa znaczne odksztalcenia od pionu pod dzialaniem parcia nasypu i obciazonego naziomu. Górna krawedz takiego muru moze sie wychy¬ lic od pionu: — o 35 mm przy wysokosci muru oporowego 6 m — o 57 mm przy wysokosci muru oporowego 7 m — o 87 mm przy wysokosci muru oporowego 8 m Opisane zjawisko jest niegrozne w skutkach i moze byc wyeliminowane bardzo latwo przez ustawienie elemen¬ tów prefabrykowanych z wstepnym wychyleniem w strone nasypu — o wielkosci koncowego wygiecia górnej krawedzi muru oporowego. Sprawa staje sie bardziej skomplikowana przy usytuowaniu muru oporowego w sasiedztwie sztywnych budowli np. przyczólków mostu lub wiaduktu.Celem wynalazku jest unikniecie tej wady i opracowa¬ nie sposobu wykonywania muru oporowego o duzej sztywnosci i malej materialochlonnosci.Sposób wykonywania muru oporowego wedlug wyna¬ lazku polega na ustawieniu zeber od strony nasypu na klockach montazowych i zazebieniu zbrojenia wystaja¬ cego z zeber ze zbrojeniem wystajacym z fundamentu oraz ze zbrojeniem wystajacym z elementów prefabryko¬ wanych czolowych. Nastepnie w zazebione zbrojenie wsuwa sie prety montazowe i zalewa betonem.Zaleta wynalazku jest mozliwosc uzyskania muru opo¬ rowego zebrowego z plaskich elementów zelbetowych.Mury te moga byc budowane nie tylko prostoliniowo lecz takze mozna zalamywac je w prostokatnych wycieciach elementów prefabrykowanych. Istnieje równiez mozli¬ wosc laczenia muru oporowego wykonanego innym systemem z murem oporowym wedlug wynalazku.Przedmiot wynalazku przedstawiony jest w przykla¬ dzie wykonania na rysunkach, na którychfig. 1 przedsta¬ wia mur oporowy w widoku z boku i ilustruje sposóbjego wykonania, a fig. 2 przedstawia przekrój poziomy przez mur oporowy oraz ilustruje sposób laczenia zebra z ele¬ mentem czolowym, fig. 3 przedstawia element czolowy w widoku z góry.Wykonanie muru oporowego wedlug wynalazku odbywa sie w nastepujacej kolejnosci: prefabrykowane elementy czolowe 2 ustawia sie w zaglebieniu wykons-3 112 403 4 truowanym w fundamencie 3. Element czolowy 2 opiera sie na calej swej szerokosci i wymaga jedynie montazo¬ wego podparcia bocznego dla zapewnienia jego piono¬ wego polozenia. Z elementem sasiednim ustawia sie na styk element czolowy 2. Zebra 1 ustawia sie prostopadle do elementów czolowych na pretach zbrojenia 5 wystaja¬ cych z cokolu fundamentu 3. Prety zbrojenia wystajace / zebra 1 od strony czolowej nalezy wsunac w prostokatne wyciecia 6 elementów czolowych 2. Dla wlasciwego wysokosciowego usytuowania zebra 1 ponad prety zbro¬ jenia 5 nalezy oprzec zebro 1 na klockach montazowych.Po wstawieniu w prostokatne wyciecia 6 pionowych pre¬ tów montazowych nalezy zabetonowac prostokatne wyciecia metoda zblizona do iniekcji. Polaczenie zebra 1 z fundamentem 3 odbywa sie przez zabetonowanie cokolu fundamentu 3, po uprzednim wstawieniu pozio¬ mych pretów montazowych, w przygotowanym desko¬ waniu z desek o rozstawie 50 cm, co pozwala wyeliminowac skutki niedokladnego usytuowania zaze¬ bionych pretów 5 w fundamencie 3.Mury oporowe wedlug wynalazku nalezy stosowac w zasadzie dla wysokosci muru wiekszej od 5 m.Zastrzezenie patentowe Sposób wykonywania muru oporowego polegajacy na tym, ze prefabrykowane elementy czolowe ustawia sie w bruzdzie fundamentu i po regulacji poziomej i pionowej zalewa sie bruzde betonem, a od strony nasypu ustawia sie w pewnych odstepach prefabrykowane zebra, zna¬ mienny tym, ze prety zbrojenia wystajace z zebra (1) od strony czolowej wsuwa sie w prostokatne wyciecia (6) elementów prefabrykowanych (2) zazebiajac je ze zbroje¬ niem wystajacym z elementów prefabrykowanych (2), natomiast prety zbrojenia (4) wystajace z podstawy zebra (l) zazebia sie z pretami zbrojenia (5) wystajacymi z cokolu fundamentu (3), przy czym zebro (1) opiera sie na klockach montazowych i po wstawieniu w prostokatne wyciecia (6) elementów prefarykowanych (2) zalewa sie prostokatne wyciecia elementów prefabrykowanych betonem metoda zblizona do iniekcji, a po wstawieniu w zazebione prety zbrojenia (4)-zebra (1) i w zazebione prety zbrojenia (5) fendamentu (3) poziomych pretów montazowych zabetonowuje sie cokól fundamentu (3) w odpowiednim deskowaniu.NE Fu. 2 Fia.3 Prac. Poligraf. UP i4l. Nakfad 120 fgz.Cena 45 zl PLThe subject of the invention is a method of making a retaining wall, which can be used especially in road construction. Retaining walls made "wet" are known44 as reinforced concrete structures. The methods of making these walls are very time-consuming and expensive due to the need to use a large number of formwork and scaffolding, which as a rule cannot be reused. A method of making a retaining wall is also known, which consists in making the wall partly from prefabricated elements, and partly wet. In this case, the front wall of the retaining wall is made of prefabricated elements, and the relieving shelf of the retaining wall is made with a metal profile using the reinforcement protruding from the prefabricated elements. The disadvantage of these walls, especially those with a height of 6 to 8 m, are significant deformations from the vertical under the influence of the embankment pressure and the loaded backfill. The upper edge of such a wall may deviate from the vertical: - by 35 mm for a retaining wall height of 6 m - by 57 mm for a retaining wall height of 7 m - by 87 mm for a retaining wall height of 8 m. The described phenomenon is harmless and may be eliminated very easily by arranging the prefabricated elements with a preliminary inclination towards the embankment - the size of the final bend of the upper edge of the retaining wall. The matter becomes more complicated when placing a retaining wall adjacent to rigid structures, e.g. abutments of a bridge or viaduct. The aim of the invention is to avoid this disadvantage and to develop a method of making a retaining wall with high stiffness and low material consumption. The method of making a retaining wall according to the invention is on the arrangement of the ribs on the embankment side on the mounting blocks and the interlocking of the reinforcement protruding from the ribs with the reinforcement protruding from the foundation and with the reinforcement protruding from the prefabricated end elements. Then, the mounting bars are inserted into the interlocking reinforcement and poured with concrete. The advantage of the invention is the possibility of obtaining a ribbed retaining wall made of flat reinforced concrete elements. These walls can be built not only in a straight line, but can also be crushed in rectangular cuts of prefabricated elements. It is also possible to join a retaining wall made of another system with a retaining wall according to the invention. 1 is a side view of the retaining wall and illustrates how it was made, and FIG. 2 shows a horizontal section through the retaining wall and illustrates how the zebra is joined to the end piece, FIG. 3 is a top view of the head piece. according to the invention, it takes place in the following sequence: the prefabricated frontal elements 2 are positioned in a recess designed in the foundation 3. The frontal element 2 rests on its entire width and only requires a lateral assembly support to ensure its vertical verticality. location. Front element 2 is placed in contact with the adjacent element. Zebra 1 is positioned perpendicular to the front elements on the reinforcement bars 5 protruding from the foundation plinth 3. The reinforcement bars / ribs 1 protruding from the front side should be inserted into the rectangular cuts of the 6 front elements 2. For the correct height positioning of the rib 1 above the reinforcement bars 5, support the rib 1 on the mounting blocks. After inserting the 6 vertical mounting rods into the rectangular cuts, concret the rectangular cuts using the method similar to the injection. The connection of the zebra 1 with the foundation 3 takes place by concreting the plinth of the foundation 3, after prior insertion of horizontal assembly rods, in the prepared formwork made of boards with a spacing of 50 cm, which allows to eliminate the effects of inaccurate location of interlocking rods 5 in the foundation 3. Retaining walls according to the invention should be used in principle for a wall height greater than 5 m. Patent claim A method of making a retaining wall, whereby prefabricated frontal elements are positioned in the foundation groove and, after horizontal and vertical adjustment, the groove is flooded with concrete, and from the embankment side the prefabricated ribbons are positioned at certain intervals, characterized by the fact that the reinforcement rods protruding from the zebra (1) from the front side are inserted into rectangular cuts (6) of the prefabricated elements (2), meshing them with the reinforcement protruding from the prefabricated elements (2) ), while the reinforcement bars (4) protruding from the base of the zebra (l) mesh with the reinforcement bars (5) protruding from what the foundation circle (3), with the rib (1) resting on the mounting blocks, and after inserting the prefabricated elements (2) into rectangular cuts (6), the rectangular cuts of the prefabricated elements are flooded with concrete, similar to the injection method, and after inserting into the interlocking bars of the reinforcement (4) - ribs (1) and the interlocking bars of the reinforcement (5) of the fendament (3) of the horizontal assembly bars are concreted in the foundation plinth (3) in the appropriate formwork. 2 Fia. 3 Work. Typographer. UP i4l. Nakfad 120 fgz. Price PLN 45 PL

Claims (3)

1. Zastrzezenie patentowe Sposób wykonywania muru oporowego polegajacy na tym, ze prefabrykowane elementy czolowe ustawia sie w bruzdzie fundamentu i po regulacji poziomej i pionowej zalewa sie bruzde betonem, a od strony nasypu ustawia sie w pewnych odstepach prefabrykowane zebra, zna¬ mienny tym, ze prety zbrojenia wystajace z zebra (1) od strony czolowej wsuwa sie w prostokatne wyciecia (6) elementów prefabrykowanych (2) zazebiajac je ze zbroje¬ niem wystajacym z elementów prefabrykowanych (2), natomiast prety zbrojenia (4) wystajace z podstawy zebra (l) zazebia sie z pretami zbrojenia (5) wystajacymi z cokolu fundamentu (3), przy czym zebro (1) opiera sie na klockach montazowych i po wstawieniu w prostokatne wyciecia (6) elementów prefarykowanych (2) zalewa sie prostokatne wyciecia elementów prefabrykowanych betonem metoda zblizona do iniekcji, a po wstawieniu w zazebione prety zbrojenia (4)-zebra (1) i w zazebione prety zbrojenia (5) fendamentu (3) poziomych pretów montazowych zabetonowuje sie cokól fundamentu (3) w odpowiednim deskowaniu. NE Fu.1. Patent claim A method of making a retaining wall where the prefabricated frontal elements are positioned in the foundation groove and, after horizontal and vertical adjustment, the groove is flooded with concrete, and on the embankment side, prefabricated ribs are set at certain intervals, characterized by the fact that the reinforcement bars protruding from the zebra (1) from the front side are inserted into the rectangular cuts (6) of the prefabricated elements (2) meshing them with the reinforcement protruding from the prefabricated elements (2), while the reinforcement bars (4) protruding from the base of the ribs (l ) it engages with the reinforcement rods (5) protruding from the foundation plinth (3), the rib (1) is supported on the mounting blocks and, after inserting into rectangular cuts (6) of prefabricated elements (2), the rectangular cuts of prefabricated elements are flooded with concrete method similar to the injection, and after inserting the ribs (4) into the interlocked bars of the reinforcement (4) and the interlocking bars (5) of the fendament (3) of the horizontal assembly bars the foundation plinth (3) is set in appropriate formwork. NE Fu. 2. Fia.2. Fia. 3. Prac. Poligraf. UP i4l. Nakfad 120 fgz. Cena 45 zl PL3. Work. Typographer. UP i4l. Nakfad 120 fgz. Price PLN 45 PL
PL20735378A 1978-06-02 1978-06-02 Method of erecting retaining walls PL112403B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL20735378A PL112403B2 (en) 1978-06-02 1978-06-02 Method of erecting retaining walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL20735378A PL112403B2 (en) 1978-06-02 1978-06-02 Method of erecting retaining walls

Publications (2)

Publication Number Publication Date
PL207353A1 PL207353A1 (en) 1979-02-12
PL112403B2 true PL112403B2 (en) 1980-10-31

Family

ID=19989700

Family Applications (1)

Application Number Title Priority Date Filing Date
PL20735378A PL112403B2 (en) 1978-06-02 1978-06-02 Method of erecting retaining walls

Country Status (1)

Country Link
PL (1) PL112403B2 (en)

Also Published As

Publication number Publication date
PL207353A1 (en) 1979-02-12

Similar Documents

Publication Publication Date Title
US8925282B2 (en) Foundation system for bridges and other structures
CN213741114U (en) Concatenation formula excavation supporting device
US20150322635A1 (en) Foundation system for bridges and other structures
CN113605443B (en) High-low span concrete bottom plate construction structure and method thereof
CN110029753A (en) A kind of crack resistence exempts from float strips board wall body and construction method
CN205046560U (en) Muscle formula bracket
CN215760439U (en) High-low span concrete bottom plate formwork structure
PL112403B2 (en) Method of erecting retaining walls
US20170247843A1 (en) Foundation system for bridges and other structures
CN111206602B (en) Partially collapsed high slope lattice beam formwork system and construction method
CN113846858A (en) Protection system for horizontal hole in building construction process and construction method
CN210482391U (en) Water stop steel plate supporting structure of foundation bottom plate post-cast strip
KR20130121271A (en) Assemblies for supporting earth anchor of soil retaining wall and soil retaining wall constructing method using the same
CN213897319U (en) Water supply pipe construction structure under high slope environment
CN105274997A (en) Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
CN114673528B (en) Tunnel top cavity supporting method
KR100720067B1 (en) Construction method of composite beam using arched plate
KR200370135Y1 (en) Forms for edge girder construction
CN113338486B (en) Assembled steel-concrete frame shear wall building system
JP5830068B2 (en) Slope reinforcement method
JP7482587B2 (en) Joint structure of precast concrete slab members and method for constructing concrete slab structure
JPS6054459B2 (en) Slope protection method
JP2775668B2 (en) Wide-area slope protection method
CN221941236U (en) Water conservancy bank protection cast in situ concrete structure
CN220815655U (en) Vertical end wall structure of tunnel portal