NO341648B1 - Endelig volummetode for koblet påkjenning/fluidstrømning i en reservoarsimulator - Google Patents

Endelig volummetode for koblet påkjenning/fluidstrømning i en reservoarsimulator

Info

Publication number
NO341648B1
NO341648B1 NO20073486A NO20073486A NO341648B1 NO 341648 B1 NO341648 B1 NO 341648B1 NO 20073486 A NO20073486 A NO 20073486A NO 20073486 A NO20073486 A NO 20073486A NO 341648 B1 NO341648 B1 NO 341648B1
Authority
NO
Norway
Prior art keywords
cell
fluid flow
reservoir
final volume
volume method
Prior art date
Application number
NO20073486A
Other languages
English (en)
Other versions
NO20073486L (no
Inventor
Gareth Shaw
Original Assignee
Schlumberger Holdings
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Holdings filed Critical Schlumberger Holdings
Publication of NO20073486L publication Critical patent/NO20073486L/no
Publication of NO341648B1 publication Critical patent/NO341648B1/no

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/006Measuring wall stresses in the borehole
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/30Analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Acoustics & Sound (AREA)
  • Geophysics (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Complex Calculations (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

Det er beskrevet en fremgangsmåte ved beregning av mekanisk spenning tilpasset for modellering av et sett spenninger og forskyvninger i et reservoar, idet fremgangsmåten omfatter at (a) det bygges en reservoarmodell over et område av interesse ved å danne et gitter av området av interesse, idet gitteret består av en eller flere celler og har knutepunkter, idet hver celle har et cellesenter, (b) ukjente bergforskyvninger interpoleres i området av interesse fra cellesentre til gitterknutepunkter, (c) det integreres over hver celle for å danne et distinkt system av ligninger og (d) det distinkte system av ligninger brukes for å modellere spenningene og forskyvningene i reservoaret.
NO20073486A 2004-12-14 2007-07-05 Endelig volummetode for koblet påkjenning/fluidstrømning i en reservoarsimulator NO341648B1 (no)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US63586604P 2004-12-14 2004-12-14
US11/295,329 US7707018B2 (en) 2004-12-14 2005-12-05 Finite volume method system and program storage device for linear elasticity involving coupled stress and flow in a reservoir simulator
PCT/IB2005/004108 WO2006064379A2 (en) 2004-12-14 2005-12-14 Finite volume method for coupled stress/fluid flow in a reservoir simulator

Publications (2)

Publication Number Publication Date
NO20073486L NO20073486L (no) 2007-09-14
NO341648B1 true NO341648B1 (no) 2017-12-18

Family

ID=36585159

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20073486A NO341648B1 (no) 2004-12-14 2007-07-05 Endelig volummetode for koblet påkjenning/fluidstrømning i en reservoarsimulator

Country Status (7)

Country Link
US (1) US7707018B2 (no)
EP (1) EP1825411B1 (no)
CN (1) CN101278292B (no)
CA (1) CA2596535C (no)
EA (1) EA010968B1 (no)
NO (1) NO341648B1 (no)
WO (1) WO2006064379A2 (no)

Families Citing this family (64)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080087420A1 (en) * 2006-10-13 2008-04-17 Kaminsky Robert D Optimized well spacing for in situ shale oil development
US8145463B2 (en) * 2005-09-15 2012-03-27 Schlumberger Technology Corporation Gas reservoir evaluation and assessment tool method and apparatus and program storage device
FR2894672B1 (fr) * 2005-12-12 2008-01-18 Inst Francais Du Petrole Methode de determination des capacites de stockage de gaz acides d'un milieu geologique a l'aide d'un modele de transport reactif multiphasique
EP2057577A4 (en) * 2006-08-14 2009-07-22 Exxonmobil Upstream Res Co ENHANCED MULTIPORT FLOW APPROXIMATION
US20080065362A1 (en) * 2006-09-08 2008-03-13 Lee Jim H Well completion modeling and management of well completion
US7574339B2 (en) * 2006-09-19 2009-08-11 The Protomold Company Automated generation of lean models for injection molding simulation
WO2008036153A2 (en) 2006-09-20 2008-03-27 Exxonmobil Upstream Research Company Fluid injection management method for hydrocarbon recovery
US7877246B2 (en) * 2006-09-22 2011-01-25 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
WO2008048455A2 (en) * 2006-10-13 2008-04-24 Exxonmobil Upstream Research Company Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
US7895241B2 (en) * 2006-10-16 2011-02-22 Schlumberger Technology Corp. Method and apparatus for oilfield data repository
CA2665116C (en) * 2006-10-30 2011-07-19 Schlumberger Canada Limited System and method for performing oilfield simulation operations
US20080319726A1 (en) 2007-06-19 2008-12-25 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US8775141B2 (en) * 2007-07-02 2014-07-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US8244509B2 (en) * 2007-08-01 2012-08-14 Schlumberger Technology Corporation Method for managing production from a hydrocarbon producing reservoir in real-time
US7900700B2 (en) * 2007-08-02 2011-03-08 Schlumberger Technology Corporation Method and system for cleat characterization in coal bed methane wells for completion optimization
US8548782B2 (en) * 2007-08-24 2013-10-01 Exxonmobil Upstream Research Company Method for modeling deformation in subsurface strata
US8768672B2 (en) * 2007-08-24 2014-07-01 ExxonMobil. Upstream Research Company Method for predicting time-lapse seismic timeshifts by computer simulation
WO2009029135A1 (en) * 2007-08-24 2009-03-05 Exxonmobil Upstream Research Company Method for predicting well reliability by computer simulation
US9070172B2 (en) * 2007-08-27 2015-06-30 Schlumberger Technology Corporation Method and system for data context service
US8156131B2 (en) * 2007-08-27 2012-04-10 Schlumberger Technology Corporation Quality measure for a data context service
GB0723224D0 (en) * 2007-11-27 2008-01-09 Fujitsu Ltd A multi-level gris embedding process with uniform and non-uniform grid refinement for multigurid-fdtd electromagnetic solver
US8099267B2 (en) * 2008-01-11 2012-01-17 Schlumberger Technology Corporation Input deck migrator for simulators
US9074454B2 (en) 2008-01-15 2015-07-07 Schlumberger Technology Corporation Dynamic reservoir engineering
WO2009099753A1 (en) * 2008-02-05 2009-08-13 Schlumberger Canada Limited Integrating field data
US8238675B2 (en) * 2008-03-24 2012-08-07 Microsoft Corporation Spectral information recovery for compressed image restoration with nonlinear partial differential equation regularization
US8190414B2 (en) * 2008-03-26 2012-05-29 Exxonmobil Upstream Research Company Modeling of hydrocarbon reservoirs containing subsurface features
WO2009120409A1 (en) * 2008-03-28 2009-10-01 Exxonmobil Upstream Research Company Computing a consistent velocity vector field from a set of fluxes
CA2724002C (en) * 2008-05-16 2016-11-01 Chevron U.S.A. Inc. Multi-scale method for multi-phase flow in porous media
US8499829B2 (en) * 2008-08-22 2013-08-06 Schlumberger Technology Corporation Oilfield application framework
US8255195B2 (en) * 2008-09-18 2012-08-28 Geoscape Analytics, Inc N-phasic element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation
US10590762B2 (en) 2008-09-18 2020-03-17 Geoscale, Inc. N-phasic finite element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation of the calculated reservoir response
US8280709B2 (en) * 2008-10-03 2012-10-02 Schlumberger Technology Corporation Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
US9228415B2 (en) * 2008-10-06 2016-01-05 Schlumberger Technology Corporation Multidimensional data repository for modeling oilfield operations
US8374836B2 (en) * 2008-11-12 2013-02-12 Geoscape Analytics, Inc. Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments
GB0900687D0 (en) * 2009-01-16 2009-02-25 Rock Deformation Res Ltd Fault analysis system
US8275589B2 (en) * 2009-02-25 2012-09-25 Schlumberger Technology Corporation Modeling a reservoir using a compartment model and a geomechanical model
EP2261459A1 (en) * 2009-06-03 2010-12-15 BP Exploration Operating Company Limited Method and system for configuring crude oil displacement system
US8494827B2 (en) * 2009-09-25 2013-07-23 Exxonmobil Upstream Research Company Method of predicting natural fractures and damage in a subsurface region
RU2563862C2 (ru) * 2010-10-06 2015-09-20 Лоджинд Б.В. Атрибут напряжения в горных породах
US20120136636A1 (en) * 2010-11-26 2012-05-31 Adrian Kleine Finite element adjustment for basin faults
EP2649551A4 (en) * 2010-12-08 2017-12-06 Exxonmobil Upstream Research Company Constructing geologic models from geologic concepts
MX2013006752A (es) * 2010-12-16 2013-12-06 Landmark Graphics Corp Metodo y sistema para graficar informacion correlacionada.
US8965745B2 (en) * 2011-04-14 2015-02-24 Schlumberger Technology Corporation Grid from depositional space
WO2013162849A1 (en) * 2012-04-24 2013-10-31 Conocophillips Company An efficient data mapping technique for simulation coupling using least squares finite element method
CN105408942A (zh) * 2013-08-16 2016-03-16 界标制图有限公司 确定并显示储层的储量估计
CN103605160A (zh) * 2013-12-09 2014-02-26 中国科学院武汉岩土力学研究所 深埋隧道开挖过程微震事件空间分形维数计算方法
CN104076392B (zh) * 2014-05-28 2015-04-22 中国矿业大学(北京) 基于网格搜索和牛顿迭代的微震震源定位联合反演方法
CN104143027B (zh) * 2014-08-01 2017-03-29 北京理工大学 一种基于sph算法的流体热运动仿真系统
US10443358B2 (en) 2014-08-22 2019-10-15 Schlumberger Technology Corporation Oilfield-wide production optimization
US9951601B2 (en) 2014-08-22 2018-04-24 Schlumberger Technology Corporation Distributed real-time processing for gas lift optimization
ES2640378T3 (es) * 2014-11-17 2017-11-02 Repsol, S.A. Método para gestionar la producción de un yacimiento petroquímico y producto de programa para el mismo
US10445446B2 (en) 2014-11-19 2019-10-15 Halliburton Energy Services, Inc. Discretization scheme for simulating proppant transport in dynamic fracture networks
CA2963485C (en) * 2014-11-19 2017-12-05 Halliburton Energy Services, Inc. Formation fracture flow monitoring
US10082601B2 (en) 2014-12-04 2018-09-25 Chevron U.S.A. Inc. System and method for geomechanical and rock physics elastostatic modeling
US10190406B2 (en) * 2014-12-23 2019-01-29 Baker Hughes, A Ge Company, Llc Formation fracturing potential using surrounding pore pressures
WO2017044074A1 (en) * 2015-09-08 2017-03-16 Halliburton Energy Services, Inc. Domain-adaptive hydraulic fracture simulators and methods
CN106570284B (zh) * 2016-11-09 2019-11-08 西安交通大学 一种聚焦式太阳能热发电系统的多维分析方法
US10997271B2 (en) 2016-11-29 2021-05-04 Halliburton Energy Services, Inc. Variable elimination to improve solver efficiency
US20190155971A1 (en) * 2017-11-20 2019-05-23 Samsung Electronics Co., Ltd. Device dislocation stress simulation
US12117582B2 (en) 2019-10-01 2024-10-15 ExxonMobil Technology and Engineering Company Model for coupled porous flow and geomechanics for subsurface simulation
WO2021096983A1 (en) * 2019-11-11 2021-05-20 Saudi Arabian Oil Company Geomechanical modeling of stimulated rock volume stress conditions at multiple scales
US11525935B1 (en) 2021-08-31 2022-12-13 Saudi Arabian Oil Company Determining hydrogen sulfide (H2S) concentration and distribution in carbonate reservoirs using geomechanical properties
US11921250B2 (en) 2022-03-09 2024-03-05 Saudi Arabian Oil Company Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation
CN116245036A (zh) * 2022-11-30 2023-06-09 山东大学 工程岩体应力-渗流耦合的pd-fem-fvm高效模拟分析方法及系统

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4210964A (en) * 1978-01-17 1980-07-01 Shell Oil Company Dynamic visual display of reservoir simulator results
US6106561A (en) * 1997-06-23 2000-08-22 Schlumberger Technology Corporation Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator
GB2336008B (en) * 1998-04-03 2000-11-08 Schlumberger Holdings Simulation system including a simulator and a case manager adapted for organizing data files
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
GB0017227D0 (en) * 2000-07-14 2000-08-30 Schlumberger Ind Ltd Fully coupled geomechanics in a commerical reservoir simulator
US7177764B2 (en) * 2000-07-14 2007-02-13 Schlumberger Technology Corp. Simulation method and apparatus for determining subsidence in a reservoir

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Liu, Q .et al. Coupled Stress and Fluid Flow Using Finite Element Method in a Commercial Reservoir Simulator, SPE 88616. , Dated: 01.01.0001 *

Also Published As

Publication number Publication date
CN101278292B (zh) 2010-11-17
CA2596535C (en) 2014-03-25
WO2006064379A3 (en) 2006-09-21
CN101278292A (zh) 2008-10-01
WO2006064379A2 (en) 2006-06-22
EP1825411B1 (en) 2018-09-19
EP1825411A2 (en) 2007-08-29
EA010968B1 (ru) 2008-12-30
CA2596535A1 (en) 2006-06-22
US20060129366A1 (en) 2006-06-15
EA200701279A1 (ru) 2008-02-28
NO20073486L (no) 2007-09-14
US7707018B2 (en) 2010-04-27

Similar Documents

Publication Publication Date Title
NO341648B1 (no) Endelig volummetode for koblet påkjenning/fluidstrømning i en reservoarsimulator
NO20062497L (no) Fremgangsmate for oppskalering av absolutte permeabiliteter for a konstruere en flytsimulasjonsmodell
CN110472276B (zh) 一种裂缝型油气储层加密井改造优化方法
NO20100029L (no) Fremgangsmate, program og datasystem for a harmonisere modelldata for hydrokarbonreservoarer
WO2007140264A3 (en) Method for modeling a reservoir using a 3d wettability map generated from a wettability logging tool
MX2009009733A (es) Generacion automatica de instrucciones de edificacion para modelos de elementos de edificacion.
GB2455237A (en) System and method for performing oilfield simulation operations
CN111104766B (zh) 基于离散裂缝模型的油水两相非达西渗流数值模拟方法
WO2008054610A3 (en) Modeling and management of reservoir systems with material balance groups
NO20073485L (no) Fremgangsmate, system og programlagringsutstyr for optimalisering av verdi-innstillinger i instrumenterte bronner ved hjelp av adjungert gradient-teknikk og reservoarsimulering
NO20110593A1 (no) Flerfasestromning i en bronnboring og tilknyttet hydraulisk oppsprekking
EA016505B1 (ru) Устройство для моделирования пласта-коллектора тяжелой нефти
CA2665116A1 (en) System and method for performing oilfield simulation operations
EA201070207A1 (ru) Способ управления добычей из нефтегазоносного коллектора в режиме реального времени
NO20054217D0 (no) Fremgangsmate for a generere en reservoarmodell pa et fleksibelt gitter
CN109684685B (zh) 一种多分支井水合物降压开采条件下的产能及储层稳定性分析方法
CA2871407C (en) System and method for reservoir simulation using on-demand data
CN107832482B (zh) 致密储层多尺度裂缝网络建模及模拟方法
Gülen et al. Production scenarios for the Haynesville Shale play
CN113919247A (zh) 一种复杂裂缝网络性油藏流动模拟方法
CN114722687B (zh) 基于三重介质模型的碳酸盐岩气藏大斜度井产量预测方法
CN110872942B (zh) 油藏注采耦合方式下不同作用力对采收率贡献的研究方法
Horvat Protocol and assessment tool for performance evaluation of light-frame building envelopes used in residential buildings.
CN116415317B (zh) 一种地下盐穴储氢库选址耦合数值模拟方法
Baraccani et al. The structural behaviour of the masonry vaults of the Cathedral of Modena