NO20091092L - Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon - Google Patents

Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon

Info

Publication number
NO20091092L
NO20091092L NO20091092A NO20091092A NO20091092L NO 20091092 L NO20091092 L NO 20091092L NO 20091092 A NO20091092 A NO 20091092A NO 20091092 A NO20091092 A NO 20091092A NO 20091092 L NO20091092 L NO 20091092L
Authority
NO
Norway
Prior art keywords
hydrocarbon
formation
planning
completion
recovery
Prior art date
Application number
NO20091092A
Other languages
English (en)
Other versions
NO340593B1 (no
Inventor
Richard B Logan
Original Assignee
Landmark Graphics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landmark Graphics Corp filed Critical Landmark Graphics Corp
Publication of NO20091092L publication Critical patent/NO20091092L/no
Publication of NO340593B1 publication Critical patent/NO340593B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism

Landscapes

  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Earth Drilling (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

En fremgangsmåte og system for å planlegge hydrokarbonutvinning fra en hydrokarbonformasjon. De forskjellige fremgangsmåter og systemene har en holistisk fremgangsmåte for produksjonsbrønnplassering og ferdigstillelse, injektorbrønnplassering og ferdigstillelse og borehullbaner for å nå de forskjellige produksjonsbrønner og injektorbrønner, plasseringen og ferdigstillelsesvalgene er basert på parametere slik som initielt og forventet tidsvarierende stress i formasjonen, stress i overdekningsformasjonen og nærhet til forkastninger.
NO20091092A 2006-08-15 2009-03-12 Fremgangsmåte og system for å planlegge hydrokarbonutvinning fra en hydrokarbonformasjon NO340593B1 (no)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/464,551 US7657407B2 (en) 2006-08-15 2006-08-15 Method and system of planning hydrocarbon extraction from a hydrocarbon formation
PCT/US2007/075897 WO2008022124A2 (en) 2006-08-15 2007-08-14 Method and system of planning hydrocarbon extraction from a hydrocarbon formation

Publications (2)

Publication Number Publication Date
NO20091092L true NO20091092L (no) 2009-05-11
NO340593B1 NO340593B1 (no) 2017-05-15

Family

ID=39083057

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20091092A NO340593B1 (no) 2006-08-15 2009-03-12 Fremgangsmåte og system for å planlegge hydrokarbonutvinning fra en hydrokarbonformasjon

Country Status (10)

Country Link
US (1) US7657407B2 (no)
EP (1) EP2052346B1 (no)
CN (1) CN101512544B (no)
AR (1) AR062450A1 (no)
AU (1) AU2007285948B2 (no)
BR (1) BRPI0715907A2 (no)
CA (1) CA2659372C (no)
MX (1) MX2009001425A (no)
NO (1) NO340593B1 (no)
WO (1) WO2008022124A2 (no)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7529624B2 (en) * 2007-02-21 2009-05-05 Geomechanics International, Inc. Method and apparatus for remote characterization of faults in the vicinity of boreholes
CA2703072C (en) 2007-12-13 2016-01-26 Exxonmobil Upstream Research Company Iterative reservoir surveillance
US8884964B2 (en) 2008-04-22 2014-11-11 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2D and 3D visual environment
US8892407B2 (en) * 2008-10-01 2014-11-18 Exxonmobil Upstream Research Company Robust well trajectory planning
US10060245B2 (en) * 2009-01-09 2018-08-28 Halliburton Energy Services, Inc. Systems and methods for planning well locations with dynamic production criteria
NO2497043T3 (no) * 2009-11-02 2018-03-10
CA2781868C (en) 2010-02-03 2016-02-09 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
GB2479989A (en) * 2010-04-26 2011-11-02 Schlumberger Holdings Optimizing a borehole trajectory based on a stress model
US8768671B2 (en) 2010-04-26 2014-07-01 Schlumberger Technology Corporation System for optimizing a drilling operation and method for using same
US9593558B2 (en) 2010-08-24 2017-03-14 Exxonmobil Upstream Research Company System and method for planning a well path
CA2823017A1 (en) 2011-01-26 2012-08-02 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3d earth model
EP2678802A4 (en) 2011-02-21 2017-12-13 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3d earth model
MX340587B (es) 2011-03-08 2016-07-15 Landmark Graphics Corp Metodo y sistema para perforar ramales en yacimientos de esquisto.
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
WO2013169429A1 (en) 2012-05-08 2013-11-14 Exxonmobile Upstream Research Company Canvas control for 3d data volume processing
EP3008281A2 (en) 2013-06-10 2016-04-20 Exxonmobil Upstream Research Company Interactively planning a well site
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
CN109268005A (zh) * 2018-10-30 2019-01-25 中国石油大学(华东) 一种基于储层时变性的剩余油预测方法及工业化流程

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2354852B (en) * 1999-10-01 2001-11-28 Schlumberger Holdings Method for updating an earth model using measurements gathered during borehole construction
WO2002003262A2 (en) * 2000-06-29 2002-01-10 Object Reservoir, Inc. System and method for defining and displaying a reservoir model
WO2003036034A1 (en) * 2001-10-24 2003-05-01 Shell Internationale Research Maatschappij B.V. Coductor-in-conduit heat sources with an electrically conductive material in the overburden
US7181380B2 (en) 2002-12-20 2007-02-20 Geomechanics International, Inc. System and process for optimal selection of hydrocarbon well completion type and design
US7042802B2 (en) * 2003-09-18 2006-05-09 Schlumberger Technology Corporation Determination of stress characteristics of earth formations
US7630914B2 (en) * 2004-03-17 2009-12-08 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
CN1594829A (zh) * 2004-06-18 2005-03-16 大庆油田有限责任公司 预防油田套管损坏的方法
US7228908B2 (en) * 2004-12-02 2007-06-12 Halliburton Energy Services, Inc. Hydrocarbon sweep into horizontal transverse fractured wells

Also Published As

Publication number Publication date
CA2659372A1 (en) 2008-02-21
AU2007285948B2 (en) 2011-01-20
EP2052346B1 (en) 2017-01-11
EP2052346A2 (en) 2009-04-29
AR062450A1 (es) 2008-11-12
WO2008022124A2 (en) 2008-02-21
MX2009001425A (es) 2009-03-13
EP2052346A4 (en) 2014-10-15
CN101512544A (zh) 2009-08-19
NO340593B1 (no) 2017-05-15
WO2008022124A3 (en) 2008-11-13
US7657407B2 (en) 2010-02-02
AU2007285948A1 (en) 2008-02-21
BRPI0715907A2 (pt) 2013-09-03
CN101512544B (zh) 2015-11-25
US20080126050A1 (en) 2008-05-29
CA2659372C (en) 2011-11-22

Similar Documents

Publication Publication Date Title
NO20091092L (no) Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon
NO20091079L (no) System og fremgangsmate for a utfore simuleringer for drift av oljefelt
GB2460189A (en) System and method for performing oilfield drilling operations using visualization techniques
WO2011008544A3 (en) Wellbore laser operations
NO20080922L (no) Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner
EA200870537A1 (ru) Способы извлечения углеводородов с использованием горизонтальных скважин
WO2007092596A3 (en) Methods and apparatus for predicting the hydrocarbon production of a well location
NO20085231L (no) Systemer og fremgangsmater for fremstilling av olje og/eller gass
NO20084076L (no) Bronnplanleggingssystem og -fremgangsmate
GB2464003B (en) System and method for performing oilfield simulation operations
ATE529608T1 (de) System und verfahren zum modellieren von bohrlochverläufen
MX2008016220A (es) Planificación y operación de pozos en yacimiento petrolífero.
NO20092491L (no) Bayesisk produksjonsanalyseteknikk for oppsprukne bronner med flere trinn
NO20084606L (no) Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner
NO20080923L (no) Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner
GB2462227A (en) System and method for performing a drilling operation in an oilfield
NO20084486L (no) Vanninjeksjonssystemer og -metoder
MX2009013365A (es) Metodo para recuperar petroleo crudo de una formacion subterranea.
MX346613B (es) Metodo y sistema para producción de presión de poro.
GB2462974A (en) Valuing future information under uncertainty
WO2010083166A3 (en) In-situ stress measurements in hydrocarbon bearing shales
NO20062913L (no) Apparat og system for bronnplassering og reservoarkarakteristikk
MY167133A (en) Well completion
NO20064742L (no) Strekk-lofteramme anvendt som en jekkeramme
GB2506793A (en) System and method for performing wellbore fracture operations