NO20091092L - Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon - Google Patents
Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjonInfo
- Publication number
- NO20091092L NO20091092L NO20091092A NO20091092A NO20091092L NO 20091092 L NO20091092 L NO 20091092L NO 20091092 A NO20091092 A NO 20091092A NO 20091092 A NO20091092 A NO 20091092A NO 20091092 L NO20091092 L NO 20091092L
- Authority
- NO
- Norway
- Prior art keywords
- hydrocarbon
- formation
- planning
- completion
- recovery
- Prior art date
Links
- 239000004215 Carbon black (E152) Substances 0.000 title abstract 4
- 229930195733 hydrocarbon Natural products 0.000 title abstract 4
- 150000002430 hydrocarbons Chemical class 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 title abstract 3
- 238000000034 method Methods 0.000 title abstract 3
- 238000011084 recovery Methods 0.000 title abstract 2
- 238000004519 manufacturing process Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
Landscapes
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Earth Drilling (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
En fremgangsmåte og system for å planlegge hydrokarbonutvinning fra en hydrokarbonformasjon. De forskjellige fremgangsmåter og systemene har en holistisk fremgangsmåte for produksjonsbrønnplassering og ferdigstillelse, injektorbrønnplassering og ferdigstillelse og borehullbaner for å nå de forskjellige produksjonsbrønner og injektorbrønner, plasseringen og ferdigstillelsesvalgene er basert på parametere slik som initielt og forventet tidsvarierende stress i formasjonen, stress i overdekningsformasjonen og nærhet til forkastninger.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/464,551 US7657407B2 (en) | 2006-08-15 | 2006-08-15 | Method and system of planning hydrocarbon extraction from a hydrocarbon formation |
PCT/US2007/075897 WO2008022124A2 (en) | 2006-08-15 | 2007-08-14 | Method and system of planning hydrocarbon extraction from a hydrocarbon formation |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20091092L true NO20091092L (no) | 2009-05-11 |
NO340593B1 NO340593B1 (no) | 2017-05-15 |
Family
ID=39083057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20091092A NO340593B1 (no) | 2006-08-15 | 2009-03-12 | Fremgangsmåte og system for å planlegge hydrokarbonutvinning fra en hydrokarbonformasjon |
Country Status (10)
Country | Link |
---|---|
US (1) | US7657407B2 (no) |
EP (1) | EP2052346B1 (no) |
CN (1) | CN101512544B (no) |
AR (1) | AR062450A1 (no) |
AU (1) | AU2007285948B2 (no) |
BR (1) | BRPI0715907A2 (no) |
CA (1) | CA2659372C (no) |
MX (1) | MX2009001425A (no) |
NO (1) | NO340593B1 (no) |
WO (1) | WO2008022124A2 (no) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7529624B2 (en) * | 2007-02-21 | 2009-05-05 | Geomechanics International, Inc. | Method and apparatus for remote characterization of faults in the vicinity of boreholes |
CA2703072C (en) | 2007-12-13 | 2016-01-26 | Exxonmobil Upstream Research Company | Iterative reservoir surveillance |
US8884964B2 (en) | 2008-04-22 | 2014-11-11 | Exxonmobil Upstream Research Company | Functional-based knowledge analysis in a 2D and 3D visual environment |
US8892407B2 (en) * | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
US10060245B2 (en) * | 2009-01-09 | 2018-08-28 | Halliburton Energy Services, Inc. | Systems and methods for planning well locations with dynamic production criteria |
NO2497043T3 (no) * | 2009-11-02 | 2018-03-10 | ||
CA2781868C (en) | 2010-02-03 | 2016-02-09 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
GB2479989A (en) * | 2010-04-26 | 2011-11-02 | Schlumberger Holdings | Optimizing a borehole trajectory based on a stress model |
US8768671B2 (en) | 2010-04-26 | 2014-07-01 | Schlumberger Technology Corporation | System for optimizing a drilling operation and method for using same |
US9593558B2 (en) | 2010-08-24 | 2017-03-14 | Exxonmobil Upstream Research Company | System and method for planning a well path |
CA2823017A1 (en) | 2011-01-26 | 2012-08-02 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3d earth model |
EP2678802A4 (en) | 2011-02-21 | 2017-12-13 | Exxonmobil Upstream Research Company | Reservoir connectivity analysis in a 3d earth model |
MX340587B (es) | 2011-03-08 | 2016-07-15 | Landmark Graphics Corp | Metodo y sistema para perforar ramales en yacimientos de esquisto. |
WO2013006226A1 (en) | 2011-07-01 | 2013-01-10 | Exxonmobil Upstream Research Company | Plug-in installer framework |
WO2013169429A1 (en) | 2012-05-08 | 2013-11-14 | Exxonmobile Upstream Research Company | Canvas control for 3d data volume processing |
EP3008281A2 (en) | 2013-06-10 | 2016-04-20 | Exxonmobil Upstream Research Company | Interactively planning a well site |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
CN109268005A (zh) * | 2018-10-30 | 2019-01-25 | 中国石油大学(华东) | 一种基于储层时变性的剩余油预测方法及工业化流程 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2354852B (en) * | 1999-10-01 | 2001-11-28 | Schlumberger Holdings | Method for updating an earth model using measurements gathered during borehole construction |
WO2002003262A2 (en) * | 2000-06-29 | 2002-01-10 | Object Reservoir, Inc. | System and method for defining and displaying a reservoir model |
WO2003036034A1 (en) * | 2001-10-24 | 2003-05-01 | Shell Internationale Research Maatschappij B.V. | Coductor-in-conduit heat sources with an electrically conductive material in the overburden |
US7181380B2 (en) | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
US7042802B2 (en) * | 2003-09-18 | 2006-05-09 | Schlumberger Technology Corporation | Determination of stress characteristics of earth formations |
US7630914B2 (en) * | 2004-03-17 | 2009-12-08 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties |
CN1594829A (zh) * | 2004-06-18 | 2005-03-16 | 大庆油田有限责任公司 | 预防油田套管损坏的方法 |
US7228908B2 (en) * | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
-
2006
- 2006-08-15 US US11/464,551 patent/US7657407B2/en active Active
-
2007
- 2007-08-14 WO PCT/US2007/075897 patent/WO2008022124A2/en active Application Filing
- 2007-08-14 MX MX2009001425A patent/MX2009001425A/es active IP Right Grant
- 2007-08-14 BR BRPI0715907-2A patent/BRPI0715907A2/pt not_active IP Right Cessation
- 2007-08-14 AU AU2007285948A patent/AU2007285948B2/en not_active Ceased
- 2007-08-14 CA CA2659372A patent/CA2659372C/en active Active
- 2007-08-14 EP EP07814079.5A patent/EP2052346B1/en active Active
- 2007-08-14 CN CN200780030493.1A patent/CN101512544B/zh not_active Expired - Fee Related
- 2007-08-15 AR ARP070103618A patent/AR062450A1/es not_active Application Discontinuation
-
2009
- 2009-03-12 NO NO20091092A patent/NO340593B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
CA2659372A1 (en) | 2008-02-21 |
AU2007285948B2 (en) | 2011-01-20 |
EP2052346B1 (en) | 2017-01-11 |
EP2052346A2 (en) | 2009-04-29 |
AR062450A1 (es) | 2008-11-12 |
WO2008022124A2 (en) | 2008-02-21 |
MX2009001425A (es) | 2009-03-13 |
EP2052346A4 (en) | 2014-10-15 |
CN101512544A (zh) | 2009-08-19 |
NO340593B1 (no) | 2017-05-15 |
WO2008022124A3 (en) | 2008-11-13 |
US7657407B2 (en) | 2010-02-02 |
AU2007285948A1 (en) | 2008-02-21 |
BRPI0715907A2 (pt) | 2013-09-03 |
CN101512544B (zh) | 2015-11-25 |
US20080126050A1 (en) | 2008-05-29 |
CA2659372C (en) | 2011-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20091092L (no) | Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon | |
NO20091079L (no) | System og fremgangsmate for a utfore simuleringer for drift av oljefelt | |
GB2460189A (en) | System and method for performing oilfield drilling operations using visualization techniques | |
WO2011008544A3 (en) | Wellbore laser operations | |
NO20080922L (no) | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner | |
EA200870537A1 (ru) | Способы извлечения углеводородов с использованием горизонтальных скважин | |
WO2007092596A3 (en) | Methods and apparatus for predicting the hydrocarbon production of a well location | |
NO20085231L (no) | Systemer og fremgangsmater for fremstilling av olje og/eller gass | |
NO20084076L (no) | Bronnplanleggingssystem og -fremgangsmate | |
GB2464003B (en) | System and method for performing oilfield simulation operations | |
ATE529608T1 (de) | System und verfahren zum modellieren von bohrlochverläufen | |
MX2008016220A (es) | Planificación y operación de pozos en yacimiento petrolífero. | |
NO20092491L (no) | Bayesisk produksjonsanalyseteknikk for oppsprukne bronner med flere trinn | |
NO20084606L (no) | Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner | |
NO20080923L (no) | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner | |
GB2462227A (en) | System and method for performing a drilling operation in an oilfield | |
NO20084486L (no) | Vanninjeksjonssystemer og -metoder | |
MX2009013365A (es) | Metodo para recuperar petroleo crudo de una formacion subterranea. | |
MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
GB2462974A (en) | Valuing future information under uncertainty | |
WO2010083166A3 (en) | In-situ stress measurements in hydrocarbon bearing shales | |
NO20062913L (no) | Apparat og system for bronnplassering og reservoarkarakteristikk | |
MY167133A (en) | Well completion | |
NO20064742L (no) | Strekk-lofteramme anvendt som en jekkeramme | |
GB2506793A (en) | System and method for performing wellbore fracture operations |