GB2479989A - Optimizing a borehole trajectory based on a stress model - Google Patents

Optimizing a borehole trajectory based on a stress model Download PDF

Info

Publication number
GB2479989A
GB2479989A GB1106835A GB201106835A GB2479989A GB 2479989 A GB2479989 A GB 2479989A GB 1106835 A GB1106835 A GB 1106835A GB 201106835 A GB201106835 A GB 201106835A GB 2479989 A GB2479989 A GB 2479989A
Authority
GB
United Kingdom
Prior art keywords
reservoir
model
unit
trajectory
wellbore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB1106835A
Other versions
GB201106835D0 (en
Inventor
Donald W Lee
John R Waggoner
Jorge Aurelio Pastor
Carmen Elena Alvarez
Jose Ignacio Adachi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gemalto Terminals Ltd
Schlumberger Holdings Ltd
Original Assignee
Gemalto Terminals Ltd
Schlumberger Holdings Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US12/885,925 external-priority patent/US8768671B2/en
Application filed by Gemalto Terminals Ltd, Schlumberger Holdings Ltd filed Critical Gemalto Terminals Ltd
Publication of GB201106835D0 publication Critical patent/GB201106835D0/en
Publication of GB2479989A publication Critical patent/GB2479989A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • E21B47/0224Determining slope or direction of the borehole, e.g. using geomagnetism using seismic or acoustic means

Abstract

A system and method for optimizing a drilling operation. The drilling operation optimization comprises constructing a base model of the reservoir 504, a three dimensional stress model of the reservoir 506. The drilling operation optimization involves determining at least one property for at least one wellbore trajectory based on the base model and the three dimensional stress model, wherein each of the wellbore trajectories is selectable by an operator. The system has an operator station for inputting data into the drilling operation optimization unit at the wellsite and a drilling tool for forming a wellbore along at least one of the at least one selected wellbore trajectories.

Description

SYSTEM FOR OPTIMIZING A DRILLING OPERATION AND METHOD FOR
USING SAME
BACKGROUND
[0001] The invention relates to techniques for perforrriing oilfield operations relating to subtenanean foimations having reservoirs therein. More particularly, the invention relates to techniques for optimizing a wellbore based on a reservoir stress model, for example, determining a welibore design parameter for a wellbore trajectory from the reservoir stress model.
[0002] Oilfield operations are typically performed to locate and gather valuable downhole fluids from a reservoir. Typical oilfield operations may involve, for example, surveying, seismic testing, drilling, wireline testing, completions, production, planning, and oilfield analysis. Drilling operations may involve drilling a welibore, pumping a mud into the welibore, and the like. Developing a strategy for well (or wellbore) placement, may involve an examination of the safe mud weight window for drilling the well. The safe mud weight window may be a weight of drilling mud used during drilling operation. The safe mud weight window may vary for each trajectory and may be determined for each specific well trajectory by first doing a detailed analysis of an existing drilled wellbore. From the existing wellbore, a geomechanics expert may analyze and calculate the welibore stability for the planned wellbore. From the weilbore stability of the existing welibore, the geomechanics expert may determine a safe mud weight window. The calculations typically used to determine the wellbore stability may be complex and may require an expert to work weeks or months processing the information for each of the formed wellbores.
[0003] Base models of reservoirs have been formed to determine risks and properties of the reservoir, such as drilling hazards, and potential hydrocarbons. Examples of base models and methods of forming base models are described in US Patent Nos. 5,982,707, 6,014,343, and 6,138,076 the entire contents of which are herein incorporated by reference.
[0004] Despite the existence of techniques for forming base models and determining a safe mud weight window for an existing wellbore, there remains a need to optimize a drilling operation quickly by determining properties for a potential trajectory. It is desirable that such techniques take into consideration the reservoir stress properties prior to completing the welibore. It is further desirable that such techniques determine wellbore properties for one or more potential trajectories and compare the properties to optimize the wellbore(s) to be formed along the trajectories. Such techniques are preferably capable of one or more of the following, among others: reducing formation damage, minimizing sand optimizing production, reducing costs, reducing risks, reducing uncertainties, collecting data in real time, analyzing data in real time, updating operations in real time, adjusting operations in real time, providing a reliable analysis, and providing efficient data acquisition.
SUMMARY
[0005] The invention relates to a drilling operation optimization unit for determining at least one property of at least one weilbore trajectory in a reservoir at a welisite. The drilling operation optimization unit has a base model unit for producing a base model of the reservoir, a reservoir stress unit for producing a three dimensional stress model of the reservoir. The drilling operation optimization unit has a trajectory unit for determining at least one property for at least one wellbore trajectory based on the base model and the three dimensional stress model, wherein each of the wellbore trajectories is selectable by an operator.
[0006] The invention relates to a system for optimizing a drilling operation for a reservoir at a wellsite. The system has a drilling operation optimization unit. The drilling operation optimization unit has a base model unit for producing a base model of the reservoir and a reservoir stress unit for producing a three dimensional stress model of the reservoir. The drilling operation optimization unit has a trajectory unit for determining at least one property for at least one wellbore trajectory based on the base model and the three dimensional stress model. Each of the wellbore trajectories is selectable by an operator. The system has an operator station for inputting data into the drilling operation optimization unit at the welisite.
The system has a drilling tool for forming a wellbore along at least one of the at least one selected wellbore trajectories.
[0007] The invention relates to a method for optimizing a drilling operation in a reservoir at a wellsite. The method comprises providing a drilling operation optimization unit. The drilling operation optimization unit has a base model unit for producing a base model of the
I
reservoir and a reservoir stress unit for producing a three dimensional stress model of the reservoir. The drilling operation optimization unit has a trajectory unit for determining at least one property for at least one wellbore trajectory based on the base model and the three dimensional stress model, wherein each of the wellbore trajectories is selectable by an operator. The method comprises constructing a consolidated model of the reservoir, the consolidated model having a reservoir stress model and selecting the at least one wellbore trajectory. The method comprises determining at least one property of the welibore trajectory using the consolidated model and determining at least one design parameter for a wellbore to be formed along at least one of the at least one wellbore trajectories.
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] The embodiments may be better understood, and numerous objects, features, and advantages made apparent to those skilled in the art by referencing the accompanying drawings. These drawings are used to illustrate only typical embodiments of this invention, and are not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments. The figures are not necessarily to scale and certain features and certain views of the figures may be shown exaggerated in scale or in schematic in the interest of clarity and conciseness.
[0009] Figure 1 is a schematic diagram depicting a wellsite having a system for optimizing a drilling operation during an information gathering phase.
[0010] Figure 2 is a schematic diagram depicting the wellsite having the system for optimizing the drilling operation during a model generation phase.
[0011] Figure 3 is a schematic diagram depicting the wellsite having the system for optimizing the drilling operation during a pre-production phase.
[0012] Figure 4 depicts a block diagram illustrating a drilling operation optimization unit of the system of Figure 1.
[0013] Figure 5 is a flowchart depicting a method for optimizing the drilling operation.
[0014] Figure 6 depicts a schematic diagram of a computer system having the drilling operation optimization unit of Figure 4.
DESCRIPTION OF EMBODIMENT(S)
[0015] The description that follows comprises exemplary apparatus, methods, techniques, and instruction sequences that embody techniques of the inventive subject matter. However, it is understood that the described embodiments may be practiced without these specific details.
[0016] Figure 1 shows a schematic diagram depicting a wellsite 100 having a drilling operation optimization system 102 during an information gathering stage, or data audit. As shown, the welisite 100 is a land based wellsite 100, but could also be water based. The wellsite 100 may have a reservoir 104, which may contain valuable fluids (such as hydrocarbons) to be produced. The wellsite 100 may be in the information gathering phase prior to the production of the reservoir 104. The wellsite 100 may have wellsite equipment for gathering information about the wellsite 100 and/or the reservoir 104 such as a rig 106, a logging tool 108, a seismic wave inducing tool 110, one or more receivers 112, a conveyance 114, and a controller 116. The controller 116 may have a drilling operation optimization unit 118. The drilling operation optimization unit 118 may optimize one or more production wellbores 120, or wellbores, as will be described in more detail below.
[0017] The wellsite 100 may be surveyed, tested, and/or analyzed to determine information regarding the reservoir 104 during the information gathering stage. For example, the seismic wave inducing tool 110 may survey the reservoir 104, using seismic waves 122 that may be detected by the receivers 112. One or more test wellbores 124, or existing offset wells, may be drilled into and/or through the reservoir 104 to allow the logging tool 108 to test, survey, sample, and/or analyze the reservoir 104. Further, any method for gathering information regarding the reservoir 104 may be used, such as using operator knowledge of the area, information from other wellsites (not shown) in the region, logging while drilling tools, and the like. The information gathered may be sent to the controller 116 and/or the drilling operation optimization unit 118 in order to optimize the one or more production wellbores 120, or wells, to be completed in the reservoir 104.
[0018] The controller 116 may send and receive data to and/or from any of the tools, devices and/or systems associated with the wellsite 100, such as the seismic wave inducing tool 110, the logging tool 108, the one or more receivers 112, a network 126, one or more offsite communication devices 128, a wellsite communication device 130 and/or any suitable equipment located about the wellsite 100. The drilling operation optimization system 102 may comprise the network 126 for communicating between the weilsite 100 components, systems, devices, and/or tools. Further, the network 126 may communicate with the one or more offsite communication devices 128 and the wellsite communication device 130, such as computers, personal digital assistants, and the like. The network 126 and/or the controller 116 may communicate with any of the tools, devices and systems, using any combination of communication devices or methods such as, wired, telemetry, wireless, fiber optics, acoustic, infrared, a local area network (LAN), a personal area network (PAN), and/or a wide area network (WAN), and the like. The connection may be made via the network 126 to an external computer (for example, through the Internet using an Internet Service Provider), and the like. The drilling operation optimization unit 118 may be partially and/or wholly located at the controller 116, the network 126, the offsite communication devices 128, and/or the wellsite communication device 130.
[0019] Figure 2 shows a schematic diagram depicting the wellsite 100 having the drilling operation optimization system 102 of Figure 1 during a model generation phase. From the information gathered, a consolidated model 200 may be generated for the reservoir 104. The consolidated model 200 may be constructed from a base model and a reservoir stress model for the reservoir 104, as will be described in more detail below. The consolidated model 200 may be constructed by the drilling operation optimization unit 118 and/or model personnel 202. The model personnel 202 may be one or more people with expertise in analyzing the information gathered regarding the reservoir 104 such as, a geologist, a geomechanics expert, a geophysicist, a reservoir engineer, a production specialist, and the like. The consolidated model 200 may be constructed for the reservoir 104, multiple reservoirs (not shown), and/or
the entire field accessible from the wellsite 100.
[0020] Figure 3 shows a schematic diagram depicting the wellsite 100 having the drilling operation optimization system 102 of Figure 2 during a preproduction phase. The consolidated model 200 may have been constructed for the entire reservoir 104. The consolidated model 200 may be stored on the drilling operation optimization unit 118 for use by one or more operators 300. The operator 300 may be any personnel associated with the planning, drilling, completions, and/or production of the reservoir 104 at the wellsite 100.
The operator 300 may be located proximate the rig 106 for example: on a rig floor, or an operator station 311, or at any other suitable location for the planning, drilling, completing, and/or production of the reservoir 104.
[0021] The operator 300 may evaluate one or more trajectories 302 prior to drilling the trajectories 302, using the drilling operation optimization unit 118. For example, the operator 300 may input several potential trajectories, or the trajectories 302, into the drilling operation optimization unit 300. The drilling operation optimization unit 118 may then determine one or more properties, such as wellbore stability, for each of the trajectories 302 based on the consolidated model 200, as will be described in more detail below. The drilling operation optimization unit 118 may determine for example, an optimal trajectory 304 by comparing each of the potential trajectories 302. The operator 300 may then drill the one or more production welibores 120 based on the optimal trajectory 304.
[0022] The production wellbore(s) 120 may be formed using a drilling tool 306. The drilling tool 306 may have any number of instruments (not shown) for gathering data regarding the production wellbore during drilling. Further, any number of sensors, testers, and/or tools, such as the logging tool 108 (as shown in Figure 1), may be deployed into the production welibore 120 during drilling, completions, and/or production to gather information regarding the production wellbore 120. The information may be sent to the controller 116 and/or the drilling operation optimization unit 118.
[0023] The wellsite 100 may have a pumping system 308A and/or 308B, and/or cementing tool, for pumping a mud 309, and/or cement, into the production wellbore 120.
The wellsite 100 may further have a hoisting system 310 for delivering the conveyance and/or a tubular string 312 into the production wellbore 120. The tubular string 312 may be a casing string, a drill string, a production tubing and the like. The drilling operation optimization unit 118, as will be described in more detail below, may select design parameters for the mud, the cement, the tubular string and the like.
[0024] Figure 4 depicts a block diagram illustrating the drilling operation optimization unit 118 usable with the drilling operation optimization system 102 of Figure 1. The drilling operation optimization unit 118 may be incorporated into or about the welisite 100 (on or off site) for operation with the controller 116. The drilling operation optimization unit 118 may model various parameters of the drilling operation optimization system 102 in order to optimize the production welibores 120 formed in the reservoir 104. The drilling operation optimization unit 118 may form the consolidated model 200, determine properties of the trajectories 302 provided by the operator 300, and/or select the optimal trajectory 304 for the wellsite 100.
[0025] The drilling operation optimization unit 118 may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, micro-code, etc.), or an embodiment combining software and hardware aspects.
Embodiments may take the form of a computer program embodied in any medium having a computer usable program code embodied in the medium. The embodiments may be provided as a computer program product, or software, that may comprise a machine-readable medium having stored thereon instructions, which may be used to program a computer system (or other electronic device(s)) to perform a process. A machine readable medium comprises any mechanism for storing or transmitting information in a form (such as, software, processing application) readable by a machine (such as a computer). The machine-readable medium may comprise, but is not limited to, magnetic storage medium (e.g., floppy diskette); optical storage medium (e.g., CD-ROM); magneto-optical storage medium; read only memory (ROM); random access memory (RAM); erasable programmable memory (e.g., EPROM and EEPROM); flash memory; or other types of medium suitable for storing electronic instructions. Embodiments may further be embodied in an electrical, optical, acoustical or other form of propagated signal (e.g., carrier waves, infrared signals, digital signals, etc.), or wireline, wireless, or other communications medium. Further, it should be appreciated that the embodiments may take the form of hand calculations, and/or operator comparisons. To this end, the operator and/or engineer(s) may receive, manipulate, catalog and store the data from the drilling operation optimization system 102 in order to perform tasks depicted in the drilling operation optimization unit 118.
[0026] The drilling operation optimization unit 118 may have a storage device 400, a reservoir unit 402, a base model unit 404, a reservoir stress unit 406, a model consolidation unit 408, a trajectory unit 410, a well plan unit 412, an analyzer unit 414 and a transceiver unit 416. The storage device 400 may be any conventional database or other storage device capable of storing data associated with the drilling operation optimization system 102 shown in Figure 1. Such data may comprise, for example, historical data, information gathered, one or more base models, one or more reservoir stress models, information regarding the trajectories, and the like. The analyzer unit 414 may be any conventional device, or system, for performing calculations, derivations, predictions, analysis, and interpolation, such as those described herein. The transceiver unit 416 may be any conventional communication device capable of passing signals (e.g., power, communication) to and from drilling operation optimization unit 118. The reservoir unit 402, the base model unit 404, the reservoir stress unit 406, the model consolidation unit 408, the trajectory unit 410, the well plan unit 412, may be used to receive, collect and catalog data, and/or to generate outputs, as will be described further below.
[0027] The reservoir unit 402 may obtain, manipulate, catalog, classify and quantify data about the reservoir 104 (as shown in Figures 1-3). The reservoir data may be obtained prior to drilling, during drilling, after drilling, during completions operations, and/or during the production life of the reservoir 104 and/or the production welibore 120. The reservoir data may be sent to the drilling operation optimization unit 118 from multiple sources, such as from surveying equipment, well logging, well testing, production history of neighboring wells, operator knowledge of the area, seismic data, pressure data, temperature data, flow data, geomechanical expert data, and the like. The reservoir data may be obtained from any suitable device, tool, or personnel, about the welisite 100, such as the logging tool 108, the seismic wave inducing tool 110, the one or more receivers 112, the one or more offsite communication devices 128 (as shown in Figure 1), the model personnel 202 (as shown in Figure 2), the operator 300, and the like. The reservoir data collected may be any number of reservoir 104 parameters, such as vertical stress (the weight of the overburden), pore pressure (pressure of fluids in rock pores), horizontal stresses, reservoir porosity, permeability, vertical permeability, lateral permeability, mechanical properties (Poisson's Ratio, Young's Modulus, etc.), and the like. Once the reservoir data has been cataloged and/or parameterized by the reservoir unit 402, a base model, and a reservoir stress model may be created.
[0028] The base model unit 404 may use the data collected by the reservoir unit 402 and/or model personnel 202 input, to build the base model of the reservoir 104. The base model may be a semi-analytic simulator that models the three dimensional (3D) properties of the reservoir based on the reservoir data. For example, the base model may be a geo-mechanical and material property model of the subsurface of the welisite 100 and/or the reservoir 104 (as shown in Figures 1-3). The model may integrate the work of several of the model personnel 202. The base model may be any suitable reservoir model, such as the PETREL® software offered by the assignee of the present application, SCHLUMBERGER TECHNOLOGY CORPORATIONTM of Sugar Land, Texas. The base model may identify any number of features of the reservoir 104, such as the framework of the reservoir, the drilling hazards, and the like.
[0029] The reservoir stress unit 406 may use the use data collected by the reservoir unit 402 and/or model personnel 202 input to build the reservoir stress model. The reservoir stress model may be formed by building a one dimensional (ID) Mechanical Earth Model (MEM) for the field, or reservoir 104 (as shown in Figures 1-3). The 1D MEM may evaluate the rock mechanical properties and stress properties at the test wellbore 124. The 1D MEM may evaluate Earth stresses (Pp, Sh, Sv, SH), the directions and magnitudes of the stresses, the rock mechanics properties (E, v, UCS, friction angle, and the like). Pp may represent the pore pressure, or pressure of fluids in the rock pores in the reservoir 104. Sh and SH may represent the horizontal stresses in the reservoir 104, for example, SH may represent the maximum horizontal effective stresses, while Sh may represent the minimal horizontal effective stresses. Sv may represent the magnitude of vertical stress, or the weight of the overburden, in the reservoir 104. The mechanical material properties may be the rock tensile strength, the rock compressive strength, Poisson's ratio, and/or Young's modulus (the static elastic properties). The model personnel 202 (as shown in Figure 2) and/or the reservoir stress unit 406 may use any suitable techniques for identifying the natural fracture of the reservoir using, for example, seismic attributes, such as Amplitude Versus Angle and Azimuth (AZAZ) analysis.
[0030] The reservoir stress unit 406 and/or the model personnel 202 (as shown in Figure 2) may propagate the properties from the 1D MEM to a 3D model using suitable statistical methods, for example, Kriging, Sequential Gaussian Simulation, thorough inversion of seismic properties and the like. The propagated 3D model may provide an estimate of the reservoir properties in the reservoir 104 for the area similar to the base model.
[0031] The reservoir stress unit 406 and/or the model personnel 202 may construct a finite element model to determine the 3D stress field for the reservoir 104 (as shown in Figures 1-3). The finite element model may account for the rock properties that may vary with location in the reservoir 104, such as the stresses, the pressures and the like. The finite element model may yield a 3D stress field of the reservoir 104 for the area similar to the base model. The finite element model may be perfoimed using any suitable method, for example, a finite element calculator. The reservoir stress unit 406 may combine the 3D stress field (or the finite element model) with the 3D model. The combined model containing the 3D stress field and the 3D model may depict the properties of the reservoir 104, such as mechanical stratigraphy, overburden stress, pore pressure, rock strength, stress direction, minimum stress, maximum stress, and the like.
[0032] The model consolidation unit 408 may combine portions or all of the base model, the 1D MEM, 3D model and the 3D stress field to form a consolidated model of the reservoir 104 (as shown in Figures 1-3). The consolidated model may represent the properties of the reservoir 104 from all of the models. The consolidated model may predict and/or reflect the effect of drilling events on the reservoir properties, for example, wellbore stability.
Constructing the base model, the 1D MEM, the 3D model, the 3D stress field may require the model personnel 202 (as shown in Figure 2), for example a geomechanics expert, and/or the drilling operation optimization unit 118. These models may take several months to develop the equations, algorithms, and correlations between reservoir properties in order to allow the models to reflect the reservoir properties and responses to reservoir events, such as drilling events, completion events, production events, and the like. The expertise produced in these models may be combined in the consolidated model.
[0033] Once the consolidated model is formed and/or calibrated, the workflow may be reduced using the consolidated model. For example, the calibration equations, parameters, and the like may repeatedly determine properties of the potential trajectories 302 and/or the production wellbore 120 (as shown in Figure 3). The properties may be any suitable wellbore property such as wellbore stability, porosity, stress, and the like. From the wellbore properties along the potential trajectories 302, the drilling operation optimization unit 118 may determine one or more wellbore design parameters, such as the safe mud weight, as will be discussed in more detail below. The consolidated model may have all the expertise of the model personnel 202 (as shown in Figure 2) built into the consolidated model, thereby requiring minimal knowledge, or expertise from the operator 300.
[0034] The trajectory unit 410 may be used by the operator 300 (as shown in Figure 3), or other wellbore personnel and/or designers to optimize the production wellbore 120 to be formed. The operator 300 may input the one or more potential trajectories 302 into the drilling operation optimization unit 118. The prior construction of the consolidated model incorporates the equations, parameters, and calibrations from the base model, the 1D MEM, the 3D model, and/or the 3D stress field for the entire reservoir 104; therefore, the operator 300 may only need to input the potential trajectories 302. The potential trajectories 302 may be inputted, based on the operator's 300 knowledge, the information gathered, geological target, and/or a combination thereof.
[0035] The trajectory unit 410 may determine the welibore properties for each of the potential trajectories 302 using the consolidated model. Therefore, the operator 300 may instantaneously obtain weilbore properties for any potential trajectory 302 in the reservoir 104. The trajectory unit 410 may further compare the wellbore properties of each of the potential trajectories 302. The compared trajectories may be used to determine an optimal trajectory 304. The optimal trajectory 304 may be a trajectory based on any, or a combination of, goal(s) for the production of the reservoir 104. For example, the optimal trajectory 304 may be based on maximum production, minimal cost, effective reservoir drainage, avoidance of hazards, type of downhole equipment used, and the like.
[0036] The well plan unit 412 may determine a well plan for any of the trajectories 302 and/or the optimal trajectories 304 in the reservoir 104. The well plan unit 412 may determine wellbore design parameters to be used during the construction of the production wellbore 120. The wellbore design parameters, or drilling parameters, may be determined from the wellbore properties along the trajectories 302, and/or the optimal trajectory 304, as determined by the trajectory unit 410. The design parameters may be, for example, the safe mud weight determined from the wellbore stability, the safe mud weight window, cement weight, cement type, casing type, production tubing type, perforation method, casing point locations, the cost of the materials to be used, and the like. The safe mud weight may reduce wellbore instability and/or reduce mud loss due to rock failure. The well plan unit 412 may thus give the operator a well plan that provides the materials, equipment, and/or methods to be used during the drilling, the completion, and/or the production of the production wellbore 120. The mud weight is the weight of the drilling mud used during drilling. Determining the safe mud weight window may reduce welibore instability and/or mud loss due to rock failures. Rock failures occuning around the wellbore may be dependent upon a number of factors, such as the rock strength, the pore pressure, the stresses in the rock, the wellbore deviation, the wellbore azimuth and the like. The safe mud weight window may typically be determined by analyzing an offset well to calibrate a model. The equations from the calibrated model may be transferred to a planned well trajectory. This process is repeated as each new trajectory is examined.
[0037] During the drilling, completions and/or the production of the production wellbore 120, additional data may be collected and sent to the drilling operation optimization unit 118.
The drilling operation optimization unit 118 may update the consolidated model based on the additional data. The trajectory unit 410 and/or the well plan unit 412 may then update the well plan and/or the optimal trajectory based on the additional data obtained.
[0038] Figure 5 is a flowchart 500 depicting a method for optimizing a welibore in a reservoir 104 (as shown in Figures 1-3). The method starts by gathering 502 information about the reservoir 104 and/or the field at the wellsite 100. The information gathering stage may be performed using suitable methods, such as those described herein. A data audit 503 may be performed on the information gathered from the wellsite. The method continues by constructing 504 a base model. The base model may be used to determine any number of reservoir and/or welisite parameters, for example, the base model may determine 505 a framework model, drilling hazards, and/or the like. The method continues by constructing 506 a reservoir stress model. The reservoir stress model may be used to determine 507 any number of reservoir and/or wellbore parameters, for example, the mechanical stratigraphy, the overburden stress, the pore pressure, the rock strength, the stress direction, the minimum stress Sh, the maximum stress SH, and the like.
[0039] The method continues by consolidating 508 the base model and the reservoir stress model into a consolidated model and selecting 510 at least one wellbore trajectory. The method continues by determining 512 at least one property of the wellbore trajectory using the consolidated model. The determining 512 of the at least one property may apply 513 failure analysis to the wellbore trajectory. The method continues by selecting 514 an optimal trajectory and determining 516 at least one design parameter along the optimal trajectory. The method may continue by forming 518 the production weilbore using the design parameter along the optimal trajectory. The steps may be performed in other orders and/or repeated as desired.
[0040] Figure 6 depicts a schematic diagram of a computer system 600 having the drilling operation optimization unit 118. The drilling operation optimization unit 118 may be implemented on any type of computer system. The computer system 600 may have a processor 602, an associated memory 604, a storage device 606, and numerous other elements and functionalities. The computer system 600 may also have one or more input devices, such as a keyboard 608 and/or a mouse 610, and an output device, such as a monitor 612. The computer system may be connected to the network 126 (as shown in Figures 1-3).
[0041] While the embodiments are described with reference to various implementations and exploitations, it will be understood that these embodiments are illustrative and that the scope of the inventive subject matter is not limited to them. Many variations, modifications, additions, and improvements are possible. For example, the techniques used herein may be applied across one or more wellsites in one or more fields with one or more reservoirs.
[0042] Plural instances may be provided for components, operations or structures described herein as a single instance. In general, structures and functionality presented as separate components in the exemplary configurations may be implemented as a combined structure or component. Similarly, structures and functionality presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements may fall within the scope of the inventive subject matter.

Claims (24)

  1. WHAT IS CLAIMED IS: 1. A drilling operation optimization unit for determining at least one property of at least one wellbore trajectory in a reservoir at a wellsite, comprising: a base model unit for producing a base model of the reservoir; a reservoir stress unit for producing a three dimensional stress model of the reservoir; and a trajectory unit for determining at least one property for at least one wellbore trajectory based on the base model and the three dimensional stress model, wherein each of the wellbore trajectories is selectable by an operator.
  2. 2. The drilling operation optimization unit of claim 1, wherein the trajectory unit may determine the at least one property for two or more wellbore trajectories.
  3. 3. The drilling operation optimization unit of claim 2, wherein the trajectory unit may compare the two or more welibore trajectories to determine an optimal trajectory.
  4. 4. The drilling operation optimization unit of claim 3, further comprising a well plan unit for determining at least one drilling parameter to be used during the forming of a production wellbore along the optimal trajectory.
  5. 5. The drilling operation optimization unit of claim 4, wherein the at least one design parameter is a safe mud weight along the wellbore trajectory.
  6. 6. The drilling operation optimization unit of claim 1, further comprising a model consolidation unit for merging the base model and the three dimensional stress model into a consolidated model of the reservoir.
  7. 7. The drilling operation optimization unit of claim 1, wherein the at least one property is a wellbore stability.
  8. 8. A system for optimizing a drilling operation for a reservoir at a wellsite, the system comprising: a drilling operation optimization unit comprising: a base model unit for producing a base model of the reservoir; a reservoir stress unit for producing a three dimensional stress model of the reservoir; a trajectory unit for determining at least one property for at least one welibore trajectory based on the base model and the three dimensional stress model, wherein each of the welibore trajectories is selectable by an operator; and an operator station for inputting data into the drilling operation optimization unit at the wellsite; a drilling tool for forming a welibore along at least one of the at least one selected wellbore trajectories.
  9. 9. The system of claim 8, further comprising a pumping system for pumping a mud into the wellbore.
  10. 10. The system of claim 9, wherein the at least one property is a wellbore stability and the drilling operation optimization unit selects a safe mud weight to be pumped into the wellbore.
  11. 11. The system of claim 8, further comprising a hoisting system for running a casing string into the wellbore.
  12. 12. The system of claim 11, wherein the drilling operation optimization unit determines at least one casing point for the wellbore.
  13. 13. The system of claim 8, further comprising a controller for controlling the drilling tool.
  14. 14. A method for optimizing a drilling operation in a reservoir at a wellsite, the method comprising: providing a drilling operation optimization unit, the drilling operation optimization unit comprising: a base model unit for producing a base model of the reservoir; a reservoir stress unit for producing a three dimensional stress model of the reservoir; a trajectory unit for determining at least one property for at least one wellbore trajectory based on the base model and the three dimensional stress model, wherein each of the welibore trajectories is selectable by an operator; constructing a consolidated model of the reservoir, the consolidated model having a reservoir stress model; selecting the at least one welibore trajectory; determining at least one property of the welibore trajectory using the consolidated model; and determining at least one design parameter for a welibore to be formed along at least one of the at least one weilbore trajectories.
  15. 15. The method of claim 14, further comprising forming the weilbore along the at least one trajectory and wherein the at least one property is a weilbore stability.
  16. 16. The method of claim 15, wherein the design parameter is a safe mud weight window and further comprising selecting a safe mud weight.
  17. 17. The method of claim 15, further comprising selecting a cement weight.
  18. 18. The method of claim 14, wherein the at least one welibore trajectory is two or more welibore trajectories and further comprising comparing the two or more trajectories to determine an optimal trajectory.
  19. 19. The method of claim 14, further comprising constructing the base model of the reservoir and combining the base model with the reservoir stress model thereby forming the consolidated model.
  20. 20. The method of claim 14, wherein selecting the at least one weilbore trajectory further comprises the operator proximate the weilbore selecting the at least one trajectories prior to drilling.
  21. 21. The method of claim 14, further comprising logging a test welibore in the reservoir to build a one dimensional stress model for the reservoir.
  22. 22. The method of claim 21, further comprising propagating the one dimensional stress model throughout the reservoir to construct the three dimensional stress model.
  23. 23. The method of claim 22, further comprising constructing a finite element model for the reservoir and combining the finite element model and the three dimensional stress model thereby constructing the reservoir stress model.
  24. 24. The method of claim 14, further comprising inputting the at least one welibore trajectory at an operator station.
GB1106835A 2010-04-26 2011-04-26 Optimizing a borehole trajectory based on a stress model Withdrawn GB2479989A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US32792610P 2010-04-26 2010-04-26
US12/885,925 US8768671B2 (en) 2010-04-26 2010-09-20 System for optimizing a drilling operation and method for using same

Publications (2)

Publication Number Publication Date
GB201106835D0 GB201106835D0 (en) 2011-06-01
GB2479989A true GB2479989A (en) 2011-11-02

Family

ID=44147415

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1106835A Withdrawn GB2479989A (en) 2010-04-26 2011-04-26 Optimizing a borehole trajectory based on a stress model

Country Status (1)

Country Link
GB (1) GB2479989A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8768671B2 (en) 2010-04-26 2014-07-01 Schlumberger Technology Corporation System for optimizing a drilling operation and method for using same

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040122640A1 (en) * 2002-12-20 2004-06-24 Dusterhoft Ronald G. System and process for optimal selection of hydrocarbon well completion type and design
WO2008022124A2 (en) * 2006-08-15 2008-02-21 Landmark Graphics Corporation Method and system of planning hydrocarbon extraction from a hydrocarbon formation
US20080201079A1 (en) * 2007-02-21 2008-08-21 Castillo David A Method and apparatus for remote characterization of faults in the vicinity of boreholes
WO2009021010A2 (en) * 2007-08-06 2009-02-12 Geomechanics International, Inc. System and method for stress field based wellbore steering
US20090065252A1 (en) * 2006-09-28 2009-03-12 Baker Hughes Incorporated System and Method for Stress Field Based Wellbore Steering
US20090157319A1 (en) * 2007-12-17 2009-06-18 Landmark Graphics Corporation, A Halliburton Company Systems and Methods for Modeling Wellbore Trajectories
WO2010053618A1 (en) * 2008-11-06 2010-05-14 Exxonmobil Upstream Research Company System and method for planning a drilling operation
WO2010080270A1 (en) * 2009-01-09 2010-07-15 Landmark Graphics Corporation Systems and methods for planning well locations with dynamic production criteria

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040122640A1 (en) * 2002-12-20 2004-06-24 Dusterhoft Ronald G. System and process for optimal selection of hydrocarbon well completion type and design
WO2008022124A2 (en) * 2006-08-15 2008-02-21 Landmark Graphics Corporation Method and system of planning hydrocarbon extraction from a hydrocarbon formation
US20090065252A1 (en) * 2006-09-28 2009-03-12 Baker Hughes Incorporated System and Method for Stress Field Based Wellbore Steering
US20080201079A1 (en) * 2007-02-21 2008-08-21 Castillo David A Method and apparatus for remote characterization of faults in the vicinity of boreholes
WO2009021010A2 (en) * 2007-08-06 2009-02-12 Geomechanics International, Inc. System and method for stress field based wellbore steering
US20090157319A1 (en) * 2007-12-17 2009-06-18 Landmark Graphics Corporation, A Halliburton Company Systems and Methods for Modeling Wellbore Trajectories
WO2010053618A1 (en) * 2008-11-06 2010-05-14 Exxonmobil Upstream Research Company System and method for planning a drilling operation
WO2010080270A1 (en) * 2009-01-09 2010-07-15 Landmark Graphics Corporation Systems and methods for planning well locations with dynamic production criteria

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8768671B2 (en) 2010-04-26 2014-07-01 Schlumberger Technology Corporation System for optimizing a drilling operation and method for using same

Also Published As

Publication number Publication date
GB201106835D0 (en) 2011-06-01

Similar Documents

Publication Publication Date Title
US8768671B2 (en) System for optimizing a drilling operation and method for using same
US10920538B2 (en) Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
US10920552B2 (en) Method of integrating fracture, production, and reservoir operations into geomechanical operations of a wellsite
RU2569116C2 (en) System and method of well production intensification
US10605060B2 (en) System and method for performing stimulation operations
US10787887B2 (en) Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
US8527248B2 (en) System and method for performing an adaptive drilling operation
CA2826854C (en) Three-dimensional modeling of parameters for oilfield drilling
RU2461707C2 (en) Simulation of bottom-hole assembly/drilling string transient mode during drilling
US7953587B2 (en) Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US20140151035A1 (en) System and method for performing wellbore fracture operations
CA3100391C (en) Well operations involving synthetic fracture injection test
US10527749B2 (en) Methods and approaches for geomechanical stratigraphic systems
GB2479989A (en) Optimizing a borehole trajectory based on a stress model
WO2023245051A1 (en) Hydraulic fracturing system

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)