AR062450A1 - Metodo y sistema de planificacion para la extraccion de hidrocarburo de una formacion de hidrocarburo - Google Patents
Metodo y sistema de planificacion para la extraccion de hidrocarburo de una formacion de hidrocarburoInfo
- Publication number
- AR062450A1 AR062450A1 ARP070103618A ARP070103618A AR062450A1 AR 062450 A1 AR062450 A1 AR 062450A1 AR P070103618 A ARP070103618 A AR P070103618A AR P070103618 A ARP070103618 A AR P070103618A AR 062450 A1 AR062450 A1 AR 062450A1
- Authority
- AR
- Argentina
- Prior art keywords
- hydrocarbon
- formation
- installation
- termination
- planning system
- Prior art date
Links
- 239000004215 Carbon black (E152) Substances 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 title abstract 4
- 229930195733 hydrocarbon Natural products 0.000 title abstract 4
- 150000002430 hydrocarbons Chemical class 0.000 title abstract 4
- 238000000034 method Methods 0.000 title abstract 3
- 238000000605 extraction Methods 0.000 title abstract 2
- 238000005755 formation reaction Methods 0.000 abstract 3
- 238000009434 installation Methods 0.000 abstract 3
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
Landscapes
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Earth Drilling (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Método y sistema de planificacion de extraccion de hidrocarburo de una formacion de hidrocarburos. Los direfentes métodos y sistemas adoptan un enfoque holístico para efectuar la instalacion y la terminacion del pozo, la instalacion y la terminacion del inyector, y las trayectorias de hoyos para lograr los diferentes pozos de produccion y pozos de inyeccion, las selecciones de instalacion y terminacion basadas en parámetros tales como tension en tiempo variable inicial y estimada en la formacion, tension en formaciones suprayacentes y proximidad a fallas.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/464,551 US7657407B2 (en) | 2006-08-15 | 2006-08-15 | Method and system of planning hydrocarbon extraction from a hydrocarbon formation |
Publications (1)
Publication Number | Publication Date |
---|---|
AR062450A1 true AR062450A1 (es) | 2008-11-12 |
Family
ID=39083057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP070103618A AR062450A1 (es) | 2006-08-15 | 2007-08-15 | Metodo y sistema de planificacion para la extraccion de hidrocarburo de una formacion de hidrocarburo |
Country Status (10)
Country | Link |
---|---|
US (1) | US7657407B2 (es) |
EP (1) | EP2052346B1 (es) |
CN (1) | CN101512544B (es) |
AR (1) | AR062450A1 (es) |
AU (1) | AU2007285948B2 (es) |
BR (1) | BRPI0715907A2 (es) |
CA (1) | CA2659372C (es) |
MX (1) | MX2009001425A (es) |
NO (1) | NO340593B1 (es) |
WO (1) | WO2008022124A2 (es) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7529624B2 (en) * | 2007-02-21 | 2009-05-05 | Geomechanics International, Inc. | Method and apparatus for remote characterization of faults in the vicinity of boreholes |
EP2223157A4 (en) | 2007-12-13 | 2016-12-07 | Exxonmobil Upstream Res Co | ITERATIVE TANK SURVEILLANCE |
WO2009131762A2 (en) | 2008-04-22 | 2009-10-29 | Exxonmobil Upstream Research Company | Functional-based knowledge analysis in a 2d and 3d visual environment |
US8892407B2 (en) * | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
US10060245B2 (en) * | 2009-01-09 | 2018-08-28 | Halliburton Energy Services, Inc. | Systems and methods for planning well locations with dynamic production criteria |
CN102597808B (zh) * | 2009-11-02 | 2016-08-03 | 界标制图有限公司 | 采用倾斜的横向各向同性的3d逆向时间偏移的地震成像系统与方法 |
CA2781868C (en) | 2010-02-03 | 2016-02-09 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
GB2479989A (en) * | 2010-04-26 | 2011-11-02 | Schlumberger Holdings | Optimizing a borehole trajectory based on a stress model |
US8768671B2 (en) | 2010-04-26 | 2014-07-01 | Schlumberger Technology Corporation | System for optimizing a drilling operation and method for using same |
WO2012027020A1 (en) | 2010-08-24 | 2012-03-01 | Exxonmobil Upstream Research Company | System and method for planning a well path |
WO2012102784A1 (en) | 2011-01-26 | 2012-08-02 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3d earth model |
US9874648B2 (en) | 2011-02-21 | 2018-01-23 | Exxonmobil Upstream Research Company | Reservoir connectivity analysis in a 3D earth model |
CN103492659B (zh) | 2011-03-08 | 2016-04-13 | 兰德马克绘图国际公司 | 在页岩地层中钻设侧井的方法和系统 |
WO2013006226A1 (en) | 2011-07-01 | 2013-01-10 | Exxonmobil Upstream Research Company | Plug-in installer framework |
WO2013169429A1 (en) | 2012-05-08 | 2013-11-14 | Exxonmobile Upstream Research Company | Canvas control for 3d data volume processing |
EP3008281A2 (en) | 2013-06-10 | 2016-04-20 | Exxonmobil Upstream Research Company | Interactively planning a well site |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
CN109268005A (zh) * | 2018-10-30 | 2019-01-25 | 中国石油大学(华东) | 一种基于储层时变性的剩余油预测方法及工业化流程 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2354852B (en) * | 1999-10-01 | 2001-11-28 | Schlumberger Holdings | Method for updating an earth model using measurements gathered during borehole construction |
US20020067373A1 (en) * | 2000-06-29 | 2002-06-06 | Eric Roe | System and method for defining and displaying a reservoir model |
NZ532092A (en) * | 2001-10-24 | 2006-09-29 | Shell Int Research | In situ thermal processing of a hydrocarbon containing formation via backproducing through a heater well |
US7181380B2 (en) | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
US7042802B2 (en) * | 2003-09-18 | 2006-05-09 | Schlumberger Technology Corporation | Determination of stress characteristics of earth formations |
US7630914B2 (en) * | 2004-03-17 | 2009-12-08 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties |
CN1594829A (zh) * | 2004-06-18 | 2005-03-16 | 大庆油田有限责任公司 | 预防油田套管损坏的方法 |
US7228908B2 (en) * | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
-
2006
- 2006-08-15 US US11/464,551 patent/US7657407B2/en active Active
-
2007
- 2007-08-14 MX MX2009001425A patent/MX2009001425A/es active IP Right Grant
- 2007-08-14 CN CN200780030493.1A patent/CN101512544B/zh not_active Expired - Fee Related
- 2007-08-14 CA CA2659372A patent/CA2659372C/en active Active
- 2007-08-14 EP EP07814079.5A patent/EP2052346B1/en active Active
- 2007-08-14 WO PCT/US2007/075897 patent/WO2008022124A2/en active Application Filing
- 2007-08-14 BR BRPI0715907-2A patent/BRPI0715907A2/pt not_active IP Right Cessation
- 2007-08-14 AU AU2007285948A patent/AU2007285948B2/en not_active Ceased
- 2007-08-15 AR ARP070103618A patent/AR062450A1/es not_active Application Discontinuation
-
2009
- 2009-03-12 NO NO20091092A patent/NO340593B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
EP2052346B1 (en) | 2017-01-11 |
US7657407B2 (en) | 2010-02-02 |
EP2052346A2 (en) | 2009-04-29 |
BRPI0715907A2 (pt) | 2013-09-03 |
US20080126050A1 (en) | 2008-05-29 |
NO20091092L (no) | 2009-05-11 |
WO2008022124A3 (en) | 2008-11-13 |
CN101512544A (zh) | 2009-08-19 |
AU2007285948A1 (en) | 2008-02-21 |
MX2009001425A (es) | 2009-03-13 |
NO340593B1 (no) | 2017-05-15 |
WO2008022124A2 (en) | 2008-02-21 |
CA2659372A1 (en) | 2008-02-21 |
CN101512544B (zh) | 2015-11-25 |
AU2007285948B2 (en) | 2011-01-20 |
CA2659372C (en) | 2011-11-22 |
EP2052346A4 (en) | 2014-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR062450A1 (es) | Metodo y sistema de planificacion para la extraccion de hidrocarburo de una formacion de hidrocarburo | |
MX2019013507A (es) | Pozo de inyeccion y metodos de produccion, aparatos y sistemas. | |
EA200870228A1 (ru) | Способ и устройство ствола скважины для заканчивания, добычи и нагнетания | |
WO2010151574A3 (en) | Water injection systems and methods | |
MX354032B (es) | Aparato y métodos para recuperación de hidrocarburos. | |
WO2012058027A3 (en) | Method and system for fracturing a formation | |
GB2522145A (en) | Improved hydraulic fracturing process for deviated wellbores | |
WO2014147226A3 (en) | Increasing hydrocarbon recovery from reservoirs | |
EA201290226A1 (ru) | Системы и способы создания кольцевой пробки в подземной скважине | |
GB2499172B (en) | A method for combined cleaning and plugging in a well. | |
MY167151A (en) | Water injection systems and methods | |
WO2012162308A3 (en) | Select-fire stackable gun system | |
WO2011013056A8 (en) | Methods and apparatus for multilateral multistage stimulation of a well | |
WO2012054139A3 (en) | Methods for establishing a subsurface fracture network | |
WO2007112254A3 (en) | Water injection systems and methods | |
WO2013025420A3 (en) | Hydrocarbon recovery employing an injection well and a production well having multiple tubing strings with active feedback control | |
CL2012002346A1 (es) | Metodo de pretratamiento de suelo adyacente a una estructura, comprende: el posicionado de un aparato de inyeccion sobre un primer sitio de inyeccion adyacente a una estructura, operar el aparato inyectando una pluralidad de corrientes discretas, de pesticida a alta presion debajo del suelo tanto en forma vertical como en forma no vertical. | |
RU2012127785A (ru) | Способ гидроразрыва пласта с селективной закачкой потока | |
WO2015119634A3 (en) | Simultaneous injection and production well system | |
GB2526010A (en) | A method of pressure testing a plugged well | |
GB2538685A (en) | Wellbore fluid discrimination using impedance spectra characteristics | |
WO2015054267A3 (en) | Systems and methods for enhancing steam distribution and production in sagd operations | |
WO2013006660A3 (en) | Method for hydrocarbon recovery using sagd and infill wells with rf heating | |
CA2703319A1 (en) | Operating wells in groups in solvent-dominated recovery processes | |
EA201290230A1 (ru) | Системы и способы создания кольцевой пробки в подземной скважине |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant, registration | ||
FD | Application declared void or lapsed, e.g., due to non-payment of fee |